JPH09153090A5 - - Google Patents
Info
- Publication number
- JPH09153090A5 JPH09153090A5 JP7-312189A JP31218995A JPH09153090A5 JP H09153090 A5 JPH09153090 A5 JP H09153090A5 JP 31218995 A JP31218995 A JP 31218995A JP H09153090 A5 JPH09153090 A5 JP H09153090A5
- Authority
- JP
- Japan
- Prior art keywords
- production
- work
- request information
- order
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31218995A JPH09153090A (ja) | 1995-11-30 | 1995-11-30 | 加工工程生産計画立案方法及び装置 |
| US08/757,566 US5946663A (en) | 1995-11-30 | 1996-11-27 | Method of planning a production schedule and an apparatus for planning a production schedule |
| SG1996011456A SG77125A1 (en) | 1995-11-30 | 1996-11-28 | Method of planning a production schedule and an apparatus for planning a production schedule |
| MYPI96005003A MY114733A (en) | 1995-11-30 | 1996-11-29 | Method of planning a production schedule and an apparatus for planning a production schedule |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31218995A JPH09153090A (ja) | 1995-11-30 | 1995-11-30 | 加工工程生産計画立案方法及び装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09153090A JPH09153090A (ja) | 1997-06-10 |
| JPH09153090A5 true JPH09153090A5 (enExample) | 2002-07-19 |
Family
ID=18026296
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31218995A Pending JPH09153090A (ja) | 1995-11-30 | 1995-11-30 | 加工工程生産計画立案方法及び装置 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US5946663A (enExample) |
| JP (1) | JPH09153090A (enExample) |
| MY (1) | MY114733A (enExample) |
| SG (1) | SG77125A1 (enExample) |
Families Citing this family (45)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6477660B1 (en) * | 1998-03-03 | 2002-11-05 | Sap Aktiengesellschaft | Data model for supply chain planning |
| JP4502414B2 (ja) * | 1998-04-09 | 2010-07-14 | Okiセミコンダクタ株式会社 | 生産管理情報出力装置及び生産管理情報出力方法 |
| JP2000077289A (ja) * | 1998-08-27 | 2000-03-14 | Fujitsu Ltd | 製造予測管理システム |
| US6351734B1 (en) * | 1998-09-09 | 2002-02-26 | Unisys Corporation | System and method for resource allocation and planning |
| US6347256B1 (en) * | 1998-11-02 | 2002-02-12 | Printcafe System, Inc. | Manufacturing process modeling techniques |
| US6397118B1 (en) * | 1999-04-02 | 2002-05-28 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
| US6415195B1 (en) * | 1999-04-02 | 2002-07-02 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
| US6393332B1 (en) * | 1999-04-02 | 2002-05-21 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
| US6415194B1 (en) * | 1999-04-02 | 2002-07-02 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
| US6795711B1 (en) | 1999-10-07 | 2004-09-21 | Nokia Mobile Phones Ltd | Multimedia message content adaptation |
| JP3609315B2 (ja) * | 2000-02-28 | 2005-01-12 | 富士通株式会社 | プリント配線板の製造データ作成システム、及びプリント配線板の製造システム |
| US7546255B2 (en) * | 2000-03-31 | 2009-06-09 | International Business Machines Corporation | Inventory system |
| TW495819B (en) * | 2000-05-31 | 2002-07-21 | Toshiba Corp | Method and system for electronic commerce of semiconductor product, system and method of production, and design system, design method and manufacturing method of production equipment |
| US7996295B1 (en) | 2000-06-13 | 2011-08-09 | Dell Products L.P. | Data structure for use in an automated order entry system |
| US6871187B1 (en) | 2000-06-13 | 2005-03-22 | Dell Products L.P. | Translator for use in an automated order entry system |
| US20050283410A1 (en) * | 2000-06-13 | 2005-12-22 | Dell Products L.P. | Automated configuration catalog |
| US7346530B2 (en) * | 2001-01-31 | 2008-03-18 | Dell Products L.P. | Flexible ordering of inventory from material sources according to material requirements for manufacturing operations |
| US20020103725A1 (en) * | 2001-01-31 | 2002-08-01 | Martin Lisa S. | Inventory and order management tool |
| US7577577B2 (en) * | 2001-01-31 | 2009-08-18 | Dell Products L.P. | Pull to customer order demand fulfillment system and method |
| JP2002244711A (ja) * | 2001-02-13 | 2002-08-30 | Toshiba Corp | 受注組立生産システム、及び受注組立生産方法 |
| US20020165782A1 (en) * | 2001-02-16 | 2002-11-07 | Fischer Usa Inc. | Method, system and software for inventory management |
| US7379905B2 (en) | 2001-05-01 | 2008-05-27 | Dell Products L.P. | Automated data warehouse for demand fulfillment system |
| JP2003091309A (ja) * | 2001-07-11 | 2003-03-28 | Class Technology Co Ltd | 生産管理システムおよび生産管理方法 |
| JP2003157309A (ja) * | 2001-11-20 | 2003-05-30 | Mitsubishi Electric Corp | 配置人員計画装置および配置人員計画方法 |
| US20030139952A1 (en) * | 2002-01-24 | 2003-07-24 | Ford Global Technologies, Inc. | Complexity management and production optimization system |
| US20030154113A1 (en) * | 2002-02-14 | 2003-08-14 | Chien-Chih Chen | System and method for scheduling outsourced production |
| JP3982617B2 (ja) * | 2002-05-17 | 2007-09-26 | 日本アイ・ビー・エム株式会社 | 生産計画生成システム、生産計画生成方法、プログラム |
| US7007206B2 (en) * | 2002-05-28 | 2006-02-28 | Agilent Technologies, Inc. | Interactive circuit assembly test/inspection scheduling |
| US20030233264A1 (en) * | 2002-06-14 | 2003-12-18 | Jones Kevin Thomas | Manufacturing order scheduling and materials replenishment system |
| US20040117230A1 (en) * | 2002-12-16 | 2004-06-17 | Jones Kevin Thomas | Recalculating planned requests |
| KR100506926B1 (ko) * | 2003-07-16 | 2005-08-09 | 삼성전자주식회사 | 단일경로용 작업시스템 및 그 제어방법 |
| US7536321B2 (en) | 2004-01-30 | 2009-05-19 | Canon U.S.A., Inc. | Estimated time of arrival (ETA) systems and methods |
| KR20070103740A (ko) * | 2005-02-17 | 2007-10-24 | 마쯔시다덴기산교 가부시키가이샤 | 실장 조건 결정 방법, 실장 조건 결정 장치 및 실장기 |
| WO2006132282A1 (ja) * | 2005-06-10 | 2006-12-14 | Matsushita Electric Industrial Co., Ltd. | 生産管理方法、生産管理装置、部品実装機 |
| US20070208612A1 (en) * | 2006-03-01 | 2007-09-06 | Storm Paul V | Method and System for Detecting and Reporting Sales Trends |
| US20090037246A1 (en) * | 2007-07-31 | 2009-02-05 | Caterpillar Inc. | Resource allocation system and method |
| DE102007062986B4 (de) * | 2007-12-21 | 2013-12-24 | Abb Research Ltd. | Verfahren und Einrichtung zur Client-Server-Kommunikation gemäß dem Standardprotokoll OPC UA |
| US20100076806A1 (en) * | 2008-09-25 | 2010-03-25 | Solar Turbines Incorporated | Inventory management tool using a criticality measure |
| JP5212221B2 (ja) * | 2009-03-30 | 2013-06-19 | 富士通株式会社 | 計画立案装置、計画立案方法及び計画立案プログラム |
| JP5803693B2 (ja) * | 2011-02-17 | 2015-11-04 | Jfeスチール株式会社 | 生産物流スケジュール作成システム及び生産物流スケジュール作成方法 |
| JP6413072B2 (ja) * | 2014-07-17 | 2018-10-31 | パナソニックIpマネジメント株式会社 | 部品実装方法および部品実装システム |
| JP7126045B2 (ja) * | 2018-03-30 | 2022-08-26 | パナソニックIpマネジメント株式会社 | 計画管理方法および計画管理装置 |
| CN112561253A (zh) * | 2020-11-18 | 2021-03-26 | 广东赛意信息科技有限公司 | 基于生产计划的订单分派方法、系统、平台及存储介质 |
| CN112419082B (zh) * | 2020-11-18 | 2023-12-19 | 广东赛意信息科技有限公司 | 一种基于电子柔性制造的智能转产方法 |
| CN115660310B (zh) * | 2022-08-18 | 2026-08-25 | 杉数科技(上海)有限公司 | 服装订单的生产分配方法、装置、介质及电子设备 |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5101352A (en) * | 1989-06-29 | 1992-03-31 | Carolina Cipher | Material requirements planning system |
| US5040123A (en) * | 1989-09-08 | 1991-08-13 | General Motors Corporation | Expert system scheduler |
| US5212791A (en) * | 1989-09-27 | 1993-05-18 | International Business Machines Corporation | Dynamic scheduling |
| US5233533A (en) * | 1989-12-19 | 1993-08-03 | Symmetrix, Inc. | Scheduling method and apparatus |
| US5295065A (en) * | 1990-06-01 | 1994-03-15 | Motorola, Inc. | Resource-lot association coordinator |
| JP2828526B2 (ja) * | 1991-06-20 | 1998-11-25 | 三菱電機株式会社 | 生産ラインの制御情報自動生成方式 |
| US5369570A (en) * | 1991-11-14 | 1994-11-29 | Parad; Harvey A. | Method and system for continuous integrated resource management |
| JPH05174030A (ja) * | 1991-12-20 | 1993-07-13 | Shimizu Corp | ジョブショップスケジューリングエキスパートシステム |
| JP3610581B2 (ja) * | 1992-07-07 | 2005-01-12 | 株式会社日立製作所 | 生産計画調整装置 |
| JP2954439B2 (ja) * | 1992-11-27 | 1999-09-27 | 松下電器産業株式会社 | 生産計画作成方法およびその装置 |
| JPH06251026A (ja) * | 1993-02-23 | 1994-09-09 | Ntn Corp | 生産計画自動立案装置 |
| JPH07271864A (ja) * | 1994-03-31 | 1995-10-20 | Kawasaki Steel Corp | 生産管理方法 |
| JP3240237B2 (ja) * | 1994-04-08 | 2001-12-17 | 株式会社日立製作所 | 生産計画システム |
| US5841659A (en) * | 1994-05-26 | 1998-11-24 | Matsushita Electric Industrial Co., Ltd. | Production plan generating method and apparatus |
-
1995
- 1995-11-30 JP JP31218995A patent/JPH09153090A/ja active Pending
-
1996
- 1996-11-27 US US08/757,566 patent/US5946663A/en not_active Expired - Fee Related
- 1996-11-28 SG SG1996011456A patent/SG77125A1/en unknown
- 1996-11-29 MY MYPI96005003A patent/MY114733A/en unknown
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH09153090A (ja) | 加工工程生産計画立案方法及び装置 | |
| Yu et al. | Scheduling of unrelated parallel machines: an application to PWB manufacturing | |
| CN1674025B (zh) | 计划操作管理支持系统 | |
| JP4921727B2 (ja) | 時間的拘束条件利用型複数プラニングセッション協調システム、方法及び製造物 | |
| Schroer et al. | Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer | |
| WO2003094107A2 (en) | Constraint-based production planning and scheduling | |
| JP2002373013A (ja) | 生産スケジューリング方法、その生産スケジューリング方法をコンピュータに実行させるためのプログラム、並びにその生産スケジューリング方法をコンピュータに実行させるためのプログラムを記録したコンピュータ読み取り可能な記録媒体 | |
| US8170703B2 (en) | Method for controlling a plurality of production processes | |
| EP0992868A2 (en) | Device and method for calculating required quantity of material | |
| Arakawa et al. | An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function | |
| JP2800795B2 (ja) | 生産制御方法及び生産制御装置 | |
| US6917843B2 (en) | System and method for scheduling production of molds | |
| JP3832235B2 (ja) | 生産制御方法 | |
| JPH05174030A (ja) | ジョブショップスケジューリングエキスパートシステム | |
| JP5212221B2 (ja) | 計画立案装置、計画立案方法及び計画立案プログラム | |
| WO2023228748A1 (ja) | スケジューリング装置、スケジューリング方法、及びスケジューリングプログラム | |
| Aslaner et al. | A parallel machine scheduling problem for a plastic injection company | |
| JP2002230110A (ja) | 出荷品引当プログラム、出荷品引当方法、および記録媒体 | |
| Emery | Job shop scheduling by means of simulation and an optimum-seeking search | |
| JP3526516B2 (ja) | 生産工程スケジューラ | |
| WO1994001826A1 (en) | Systems and methods for planning and simulation | |
| JP2953223B2 (ja) | 日程計画立案装置 | |
| JP2002215220A (ja) | 外注を考慮したスケジューリング・システムおよびスケジューリング方法 | |
| Ozdagoglu et al. | A special purpose multi-criteria heuristic function for a single machine scheduling problem with forward dynamic programming | |
| Thürer et al. | Labour assignment with convergent product structures: an assessment by simulation |