JP6994895B2 - 覆工コンクリート打設システム - Google Patents
覆工コンクリート打設システム Download PDFInfo
- Publication number
- JP6994895B2 JP6994895B2 JP2017200174A JP2017200174A JP6994895B2 JP 6994895 B2 JP6994895 B2 JP 6994895B2 JP 2017200174 A JP2017200174 A JP 2017200174A JP 2017200174 A JP2017200174 A JP 2017200174A JP 6994895 B2 JP6994895 B2 JP 6994895B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- primary
- blow
- switching
- switching device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims description 335
- 238000005266 casting Methods 0.000 claims description 107
- 238000005086 pumping Methods 0.000 claims description 80
- 238000001514 detection method Methods 0.000 claims description 32
- 238000009826 distribution Methods 0.000 claims description 19
- 238000000034 method Methods 0.000 description 30
- 238000012545 processing Methods 0.000 description 9
- 238000007664 blowing Methods 0.000 description 5
- 238000009415 formwork Methods 0.000 description 5
- 238000002360 preparation method Methods 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 238000005056 compaction Methods 0.000 description 4
- 238000000926 separation method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000010415 tidying Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
10 覆工コンクリート打設システム
11 セントル
11A 側壁
11B 天端
15 打設窓
15A 側部打設窓
15B 吹上打設窓
16(16A、16B、16C、16D) 側壁窓群
17 吹上窓群
18 コンクリートポンプ
19 配送管
20 1次切替装置
21 1次分配管
21A 1次側壁分配管
21B 1次吹上分配管
22 2次切替装置
23(23A、23B、23C、23D) 2次分配管
24 2次吹上切替装置
25(25A、25B、25C) 2次吹上分配管
26 コンクリートセンサ
27 バイブレータ
28 リール
30 制御装置
34 操作表示装置
Claims (6)
- 高さが異なる複数の打設窓からなる複数の窓群がトンネル軸方向に異なる複数の位置にて左右の側壁のそれぞれに形成されたセントルと、
コンクリートを配送管に圧送するコンクリートポンプと、
前記配送管の下流端に設けられ、コンクリートの圧送先として選択的に切り替えられる複数の出口を有する1次切替装置と、
前記1次切替装置の前記複数の出口から前記複数の窓群に向けて延びる複数の1次分配管と、
前記複数の1次分配管のそれぞれの下流端に設けられ、コンクリートの圧送先として選択的に切り替えられる複数の出口を有する複数の2次切替装置と、
各2次切替装置の前記複数の出口から対応する窓群の前記複数の打設窓に向けて延びる複数の2次分配管と、
前記コンクリートポンプ、前記1次切替装置及び前記複数の2次切替装置の動作を制御する制御装置と、
前記セントルにおける前記複数の窓群に対応する位置に設けられ、打設されたコンクリートの高さを検出する複数のコンクリートセンサとを備え、
前記制御装置は、前記複数の1次分配管が所定の順に複数回に亘ってコンクリートの圧送先になるように前記1次切替装置を切り替え、前記複数の2次分配管が低い側から順にコンクリートの圧送先になるように前記複数の2次切替装置を切り替え、
前記制御装置は、前記複数のコンクリートセンサの検出信号に基づいて、前記コンクリートポンプの圧送を停止し、その後前記1次切替装置を切り替え、前記1次切替装置の切り替え完了後に前記コンクリートポンプの圧送を再開する1次分配管切替制御を繰り返すことを特徴とする覆工コンクリート打設システム。 - 前記制御装置は、前記複数のコンクリートセンサの検出信号に基づいて、前記複数の窓群が設けられた部分のコンクリートの高さが概ね均等に高くなるように前記1次分配管切替制御を繰り返すことを特徴とする請求項1に記載の覆工コンクリート打設システム。
- 前記制御装置は、前記複数のコンクリートセンサの検出信号に基づいて、コンクリートの落下高さが大きくなることを抑制し且つコンクリートが前記複数の打設窓から溢れないように前記2次切替装置を切り替えることを特徴とする請求項2に記載の覆工コンクリート打設システム。
- 前記複数の窓群に対応する位置に高さ変更可能に設けられた複数のバイブレータを更に備え、
前記制御装置が、前記複数のコンクリートセンサの検出信号に基づいて、前記複数のバイブレータの動作及び高さを制御することを特徴とする請求項2又は請求項3に記載の覆工コンクリート打設システム。 - 前記セントルには、天端におけるトンネル軸方向の異なる位置に設けられた複数の吹上打設窓からなる吹上窓群が更に形成され、
前記複数の1次分配管が、前記1次切替装置から前記吹上窓群に向けて延びる1次吹上分配管を含み、
前記1次吹上分配管上に、互いに隣接する1対の吹上打設窓に対応して直列に設けられた複数の2次吹上切替装置と、
前記複数の2次吹上切替装置から対応する吹上打設窓に向けて延びる複数の2次吹上分配管とを更に備え、
前記制御装置は、前記1次吹上分配管が最後にコンクリートの圧送先になるように前記1次切替装置を切り替え、前記複数の2次吹上分配管が構築済みの覆工コンクリート側から順にコンクリートの圧送先になるように前記複数の2次吹上切替装置を切り替えることを特徴とする請求項1~請求項4のいずれかに記載の覆工コンクリート打設システム。 - 前記1次切替装置及び前記複数の2次切替装置の切替状態、前記コンクリートポンプの作動状態、並びに、コンクリートが圧送されている配管ルートを表示する表示装置を更に備えることを特徴とする請求項1~請求項5のいずれかに記載の覆工コンクリート打設システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017200174A JP6994895B2 (ja) | 2017-10-16 | 2017-10-16 | 覆工コンクリート打設システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017200174A JP6994895B2 (ja) | 2017-10-16 | 2017-10-16 | 覆工コンクリート打設システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019073893A JP2019073893A (ja) | 2019-05-16 |
JP6994895B2 true JP6994895B2 (ja) | 2022-01-14 |
Family
ID=66544989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017200174A Active JP6994895B2 (ja) | 2017-10-16 | 2017-10-16 | 覆工コンクリート打設システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6994895B2 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185472A (zh) * | 2019-06-23 | 2019-08-30 | 四川奥达智远科技有限公司 | 隧道二次衬砌施工过程监控系统 |
JP7294995B2 (ja) * | 2019-11-25 | 2023-06-20 | 前田建設工業株式会社 | トンネル覆工におけるコンクリート打設高さ指示装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001280094A (ja) | 2000-01-27 | 2001-10-10 | Nishimatsu Constr Co Ltd | トンネル覆工装置及びトンネルの覆工方法 |
JP2013108243A (ja) | 2011-11-18 | 2013-06-06 | Maeda Corp | トンネル覆工の施工工法 |
JP2015094167A (ja) | 2013-11-13 | 2015-05-18 | 鹿島建設株式会社 | コンクリート打設方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55168600U (ja) * | 1979-05-16 | 1980-12-03 | ||
JPH0419119Y2 (ja) * | 1985-04-22 | 1992-04-28 | ||
JPH0430096A (ja) * | 1990-05-25 | 1992-02-03 | Gifu Kogyo Kk | コンクリート打上り高さを表示しコンクリート打設制御できるトンネル用型枠 |
JP2761152B2 (ja) * | 1992-06-17 | 1998-06-04 | 前田建設工業株式会社 | 打設コンクリートに対する振動付与装置 |
JP2711627B2 (ja) * | 1993-09-21 | 1998-02-10 | 岐阜工業株式会社 | トンネル用コンクリート打設方法、検査窓開閉機、コンクリート分流機およびトンネル用コンクリート打設装置 |
JPH1162490A (ja) * | 1997-08-26 | 1999-03-05 | Saga Kogyo Kk | コンクリート打設工法とそれに使用されるコンクリート打設配管切替装置 |
-
2017
- 2017-10-16 JP JP2017200174A patent/JP6994895B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001280094A (ja) | 2000-01-27 | 2001-10-10 | Nishimatsu Constr Co Ltd | トンネル覆工装置及びトンネルの覆工方法 |
JP2013108243A (ja) | 2011-11-18 | 2013-06-06 | Maeda Corp | トンネル覆工の施工工法 |
JP2015094167A (ja) | 2013-11-13 | 2015-05-18 | 鹿島建設株式会社 | コンクリート打設方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2019073893A (ja) | 2019-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6994895B2 (ja) | 覆工コンクリート打設システム | |
JP2020023864A (ja) | トンネル覆工コンクリートの打設方法 | |
CN105350777A (zh) | 一种用于超高混凝土柱一次浇筑成型的装置及方法 | |
JP6240478B2 (ja) | コンクリート打設方法 | |
JP2020023797A (ja) | トンネル覆工コンクリートの天端部打設方法 | |
JP2810836B2 (ja) | コンクリート覆工用クラック防止装置 | |
US3720493A (en) | Machine for the manufacture of reinforced concrete or prestressed concrete elements | |
KR100833527B1 (ko) | 캡슐형 또는 동굴형 지하구조물의 미경화 콘크리트 성형틀 | |
JP5479143B2 (ja) | トンネル覆工コンクリートへの養生剤吹き付け装置及び吹き付け方法 | |
US4298296A (en) | Form handling system | |
JP7498910B2 (ja) | トンネル覆工施工システム、及びトンネル覆工施工方法 | |
JP7153266B2 (ja) | トンネル覆工施工システム、トンネル覆工施工方法 | |
JP7076363B2 (ja) | トンネル覆工コンクリートの打設方法 | |
KR100902753B1 (ko) | 공기배출장치를 구비한 터널 라이닝용 거푸집 및 이용한터널의 라이닝 시공방법 | |
JP2014084568A (ja) | コンクリート打設システム及びコンクリート打設方法 | |
JP6942025B2 (ja) | トンネル覆工における施工継ぎ目の締め固め方法 | |
JP2020056201A (ja) | トンネル改修工法 | |
CN104164974A (zh) | 建筑物浇筑方法及其使用的浇筑模具系统 | |
JP7152327B2 (ja) | コンクリート打設装置、型枠ユニット及びコンクリート打設方法 | |
KR20180048780A (ko) | 오목형 플로어 형성 장치를 위한 권상 장치 | |
RU2346123C1 (ru) | Способ бетонирования на пневмоопалубке и устройство для его осуществления | |
JP2000073564A (ja) | スリップフォーム工法におけるコンクリート打設設備および打設方法 | |
JP3127329B2 (ja) | 二次覆工コンクリート打設装置とその工法 | |
JP2002070498A (ja) | トンネル用コンクリート打設方法およびその装置 | |
JP6931976B2 (ja) | 後打ち施工による鉛直躯体部のコンクリート打設方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200716 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210428 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210511 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210707 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20211124 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20211214 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6994895 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |