JP2015042891A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2015042891A5 JP2015042891A5 JP2013174759A JP2013174759A JP2015042891A5 JP 2015042891 A5 JP2015042891 A5 JP 2015042891A5 JP 2013174759 A JP2013174759 A JP 2013174759A JP 2013174759 A JP2013174759 A JP 2013174759A JP 2015042891 A5 JP2015042891 A5 JP 2015042891A5
- Authority
- JP
- Japan
- Prior art keywords
- rod
- manufacturing
- piston rod
- rod head
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 239000007787 solid Substances 0.000 claims description 4
- 238000005304 joining Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims 2
- 230000001066 destructive Effects 0.000 claims 1
- 238000005553 drilling Methods 0.000 claims 1
- 238000007689 inspection Methods 0.000 claims 1
- 230000002093 peripheral Effects 0.000 description 3
- 239000012535 impurity Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Description
本発明は、中実のロッド本体と負荷に連結される環状のクレビス及び中実の胴部を有するロッドヘッドとを接合してピストンロッドを製造するピストンロッドの製造方法であって、ロッド本体の端面とロッドヘッドの胴部の端面とを摩擦圧接にて接合する第1工程と、ロッドヘッド側から、クレビス及び胴部にわたってロッド本体とロッドヘッドとの接合面を貫通するように軸心部に穴加工を施す第2工程と、を備え、第1工程の後に第2工程が行われることを特徴とする。
(4)ロッド本体2を大きな荷重でさらにロッドヘッド3側に押し付け、接合面11近傍の高温部を、図2に示すように、外周側に塑性流動させてバリ12として排出する。このように、接合面11近傍の高温部は、外周側にバリ12として排出されるため、仮に、接合面11に不純物が存在していたとしても、不純物を排出する効果が高く、接合面11は清浄となる。なお、バリ12の排出は、ロッド本体2のバリ12aとロッドヘッド3のバリ12bとの境界点12cが、図2に示すように、ロッド本体2及びロッドヘッド3の外周面の外側となるまで行われる。
Claims (3)
- 中実のロッド本体と負荷に連結される環状のクレビス及び中実の胴部を有するロッドヘッドとを接合してピストンロッドを製造するピストンロッドの製造方法であって、
前記ロッド本体の端面と前記ロッドヘッドの前記胴部の端面とを摩擦圧接にて接合する第1工程と、
前記ロッドヘッド側から、前記クレビス及び前記胴部にわたって前記ロッド本体と前記ロッドヘッドとの接合面を貫通するように軸心部に穴加工を施す第2工程と、を備え、
前記第1工程の後に前記第2工程が行われることを特徴とするピストンロッドの製造方法。 - 前記第2工程において形成される穴の開口部を封止部材によって封止する第3工程をさらに備えることを特徴とする請求項1に記載のピストンロッドの製造方法。
- 前記第1工程と前記第2工程との間に行われ、前記ロッド本体と前記ロッドヘッドとの摩擦圧接部に対して非破壊試験による品質検査を行う工程をさらに備えることを特徴とする請求項1又は2に記載のピストンロッドの製造方法。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013174759A JP5795785B2 (ja) | 2013-08-26 | 2013-08-26 | ピストンロッドの製造方法 |
EP14840755.4A EP3040587B1 (en) | 2013-08-26 | 2014-08-11 | Method for manufacturing piston rod |
CN201480046515.3A CN105473908B (zh) | 2013-08-26 | 2014-08-11 | 活塞杆的制造方法 |
KR1020167004308A KR101805326B1 (ko) | 2013-08-26 | 2014-08-11 | 피스톤 로드의 제조 방법 |
PCT/JP2014/071190 WO2015029762A1 (ja) | 2013-08-26 | 2014-08-11 | ピストンロッドの製造方法 |
US14/914,006 US9873165B2 (en) | 2013-08-26 | 2014-08-11 | Piston rod manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013174759A JP5795785B2 (ja) | 2013-08-26 | 2013-08-26 | ピストンロッドの製造方法 |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2015042891A JP2015042891A (ja) | 2015-03-05 |
JP2015042891A5 true JP2015042891A5 (ja) | 2015-08-13 |
JP5795785B2 JP5795785B2 (ja) | 2015-10-14 |
Family
ID=52586331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013174759A Active JP5795785B2 (ja) | 2013-08-26 | 2013-08-26 | ピストンロッドの製造方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US9873165B2 (ja) |
EP (1) | EP3040587B1 (ja) |
JP (1) | JP5795785B2 (ja) |
KR (1) | KR101805326B1 (ja) |
CN (1) | CN105473908B (ja) |
WO (1) | WO2015029762A1 (ja) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6071132B2 (ja) * | 2013-03-28 | 2017-02-01 | Kyb株式会社 | 接合体 |
CN107498273A (zh) * | 2017-08-04 | 2017-12-22 | 原平市恒泰隆机械有限公司 | 一种活塞杆的不锈钢焊接及车削工艺 |
KR102469617B1 (ko) * | 2018-09-27 | 2022-11-21 | 케이와이비-와이에스 가부시키가이샤 | 접합체의 제조 방법 |
JP7229380B2 (ja) * | 2019-09-26 | 2023-02-27 | 日立Astemo株式会社 | ロッドの製造方法 |
CN111590040B (zh) * | 2020-04-16 | 2022-04-01 | 攀钢集团攀枝花钢铁研究院有限公司 | 一种提升齿轮钢质量的小方坯连铸生产方法 |
US11654506B2 (en) * | 2021-10-22 | 2023-05-23 | Halliburton Energy Services, Inc. | Processing route to design and manufacture highly configurable non-magnetic down-hole sensor collars |
DE202022002445U1 (de) * | 2022-11-14 | 2024-02-15 | Bümach Engineering lnternational B.V. | Arbeitszylinder |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3399801A (en) * | 1967-09-06 | 1968-09-03 | John H. Bent | Expansible plug for fluid systems |
JPS61123488A (ja) * | 1984-11-20 | 1986-06-11 | Yamaha Motor Co Ltd | シリンダスリ−ブの製造方法 |
US20100163601A1 (en) * | 2008-12-31 | 2010-07-01 | General Electric Company | Friction weld vibration quality monitoring system |
GB0903101D0 (en) * | 2009-02-25 | 2009-04-08 | Rolls Royce Plc | A method of welding tubular components |
JP2011056531A (ja) * | 2009-09-09 | 2011-03-24 | Kyb Co Ltd | ピストンロッドの製造方法 |
DE102009059055A1 (de) * | 2009-12-18 | 2011-06-22 | MAHLE International GmbH, 70376 | Reibschweißverfahren, Reibschweißverbindung sowie Kolben für einen Verbrennungsmotor |
CN201714894U (zh) * | 2010-07-05 | 2011-01-19 | 南阳淅减汽车减振器有限公司 | 一种减振器活塞杆总成 |
DE102011103883A1 (de) * | 2011-06-10 | 2012-12-13 | Robert Bosch Gmbh | Verfahren zur Herstellung eines Kolbens und Kolben für eine Kolbenmaschine |
CN103062399A (zh) * | 2013-01-15 | 2013-04-24 | 哈尔滨东安液压机械股份有限公司 | 减速顶用组合结构摩擦焊接活塞毛料 |
-
2013
- 2013-08-26 JP JP2013174759A patent/JP5795785B2/ja active Active
-
2014
- 2014-08-11 CN CN201480046515.3A patent/CN105473908B/zh active Active
- 2014-08-11 WO PCT/JP2014/071190 patent/WO2015029762A1/ja active Application Filing
- 2014-08-11 US US14/914,006 patent/US9873165B2/en active Active
- 2014-08-11 EP EP14840755.4A patent/EP3040587B1/en active Active
- 2014-08-11 KR KR1020167004308A patent/KR101805326B1/ko active IP Right Grant
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2015042891A5 (ja) | ||
US9873165B2 (en) | Piston rod manufacturing method | |
JP6215156B2 (ja) | 中空エンジンバルブ及びその製造方法 | |
JP2009103187A5 (ja) | ||
WO2014020420A3 (en) | Method and system of hot wire joint design for out-of-position welding | |
JP2017516041A5 (ja) | ||
WO2011030595A1 (ja) | ピストンロッドの製造方法 | |
WO2018024481A8 (de) | Vorrichtung und verfahren zur herstellung einer geprüften schweissverbindung | |
JP2013177957A5 (ja) | ||
US10065265B2 (en) | Joined body | |
JP2018167276A5 (ja) | ||
JP2020004543A5 (ja) | ||
RU2019129292A (ru) | Способ изготовления соединенного корпуса и соединенный корпус | |
CN105882729A (zh) | 汽车转向柱轴叉整体件 | |
EP3272503A8 (en) | Joined synthetic resin body, and production method therefor | |
JP2015024418A5 (ja) | ||
JP2017208499A5 (ja) | ||
JP2016068127A (ja) | 接合方法及び接合体 | |
JP2016049561A (ja) | 接合構造および接合方法 | |
JP2007203359A (ja) | 中空部を有する製品の製造方法 | |
CN203835938U (zh) | 用于汽车的应力臂 | |
JP6009417B2 (ja) | 中空エンジンバルブの製造方法 | |
CN204003777U (zh) | 一种液压缸用新型活塞杆组件 | |
KR20140145083A (ko) | 빌트 중공 밸브 제작 방법 | |
JP2015142925A (ja) | ステアリングステムコンポーネントの結合 |