JP2006072413A5 - - Google Patents

Download PDF

Info

Publication number
JP2006072413A5
JP2006072413A5 JP2004251324A JP2004251324A JP2006072413A5 JP 2006072413 A5 JP2006072413 A5 JP 2006072413A5 JP 2004251324 A JP2004251324 A JP 2004251324A JP 2004251324 A JP2004251324 A JP 2004251324A JP 2006072413 A5 JP2006072413 A5 JP 2006072413A5
Authority
JP
Japan
Prior art keywords
task
progress
project
importance
lowest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004251324A
Other languages
English (en)
Japanese (ja)
Other versions
JP2006072413A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2004251324A priority Critical patent/JP2006072413A/ja
Priority claimed from JP2004251324A external-priority patent/JP2006072413A/ja
Priority to US11/206,165 priority patent/US8028294B2/en
Publication of JP2006072413A publication Critical patent/JP2006072413A/ja
Publication of JP2006072413A5 publication Critical patent/JP2006072413A5/ja
Priority to US13/218,410 priority patent/US8621466B2/en
Pending legal-status Critical Current

Links

JP2004251324A 2004-08-31 2004-08-31 プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム Pending JP2006072413A (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2004251324A JP2006072413A (ja) 2004-08-31 2004-08-31 プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム
US11/206,165 US8028294B2 (en) 2004-08-31 2005-08-17 Progress management for projects
US13/218,410 US8621466B2 (en) 2004-08-31 2011-08-25 Progress management for projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004251324A JP2006072413A (ja) 2004-08-31 2004-08-31 プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム

Publications (2)

Publication Number Publication Date
JP2006072413A JP2006072413A (ja) 2006-03-16
JP2006072413A5 true JP2006072413A5 (enExample) 2007-09-13

Family

ID=35945006

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004251324A Pending JP2006072413A (ja) 2004-08-31 2004-08-31 プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム

Country Status (2)

Country Link
US (2) US8028294B2 (enExample)
JP (1) JP2006072413A (enExample)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008021296A (ja) * 2006-06-15 2008-01-31 Dainippon Screen Mfg Co Ltd テスト計画支援装置およびテスト計画支援プログラム
US8510229B1 (en) * 2007-01-31 2013-08-13 Sprint Communications Company L.P. Project efficiency analysis
US20090169008A1 (en) * 2007-12-26 2009-07-02 Gonzales Jesus Orlando Ii System and method for tracking testing of software modification projects from a wireless mobile device
US20090192836A1 (en) * 2008-01-24 2009-07-30 Patrick Kelly Automated test system project management
US20090259505A1 (en) * 2008-04-09 2009-10-15 Vali Tadayon Inventory management system and method
WO2010084570A1 (ja) * 2009-01-20 2010-07-29 株式会社日立製作所 プロジェクト管理支援装置
CN103649974B (zh) * 2011-03-21 2019-02-22 塔雷科·莫哈梅德·莫哈梅德·赫加兹 工期优化系统与方法
JP5766013B2 (ja) * 2011-05-10 2015-08-19 三菱電機株式会社 進捗管理装置、進捗管理システム、進捗管理方法および進捗管理プログラム
KR101685213B1 (ko) * 2011-06-08 2016-12-21 매그나칩 반도체 유한회사 워크 프로세스 기반의 신규 제품 및 기술 개발 관리 장치 및 방법
US20130159197A1 (en) * 2011-12-19 2013-06-20 General Electric Company Project management charting
US20140278715A1 (en) * 2013-03-15 2014-09-18 International Business Machines Corporation Estimating required time for process granularization
US9805326B2 (en) * 2014-04-24 2017-10-31 International Business Machines Corporation Task management integrated design environment for complex data integration applications
US20160078380A1 (en) * 2014-09-17 2016-03-17 International Business Machines Corporation Generating cross-skill training plans for application management service accounts
US9405810B2 (en) 2014-11-24 2016-08-02 Asana, Inc. Server side system and method for search backed calendar user interface
US10977434B2 (en) 2017-07-11 2021-04-13 Asana, Inc. Database model which provides management of custom fields and methods and apparatus therfor
JP6571844B2 (ja) * 2018-07-03 2019-09-04 グリー株式会社 アイテム管理システム、アイテム管理方法及びアイテム管理プログラム
CN109828708A (zh) * 2019-01-28 2019-05-31 南京创世德意信息技术有限公司 一种任务管理方法及智能终端
JP2021149492A (ja) * 2020-03-19 2021-09-27 株式会社アンドパッド 情報処理装置、情報処理方法、情報処理プログラム
US20220004993A1 (en) * 2020-07-02 2022-01-06 Dassault Systemes Americas Corp. System and Method for Updating Real-Time Project Status Based on Deliverable Status
US12401655B1 (en) 2023-04-24 2025-08-26 Asana, Inc. Systems and methods to manage access to assets of a computer environment based on user and asset grouping

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0223401A (ja) * 1988-07-12 1990-01-25 Fujitsu Ltd 工程管理システムにおける出材促進指示装置
JPH04141730A (ja) * 1990-10-03 1992-05-15 Nec Corp ソフトウェア開発進捗管理装置
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
JPH07306778A (ja) 1994-05-16 1995-11-21 Fujitsu Ltd ソフトウェアの分散開発環境における開発管理方式
US5671360A (en) * 1995-01-20 1997-09-23 International Business Machines Corporation Project management tool implementing authority for a people oriented work environment tool
US5848394A (en) * 1996-09-18 1998-12-08 Leonard & Caroline White Method and system for producing a work breakdown structure for a project
US6519763B1 (en) * 1998-03-30 2003-02-11 Compuware Corporation Time management and task completion and prediction software
JPH11345259A (ja) * 1998-06-03 1999-12-14 Hitachi Ltd 成果物の管理方法及び管理システム並びに情報記憶媒体
JP2963450B1 (ja) 1998-07-03 1999-10-18 住友特殊金属株式会社 回転機
JP2000029941A (ja) * 1998-07-15 2000-01-28 Hitachi Inf & Control Syst Ltd スケジュールの進捗管理方法、スケジュール管理装置、スケジュール作成方法およびスケジュール管理用cdrom
JP3926496B2 (ja) 1999-01-06 2007-06-06 株式会社日立製作所 プロジェクト管理システム
US7113923B1 (en) * 1999-02-03 2006-09-26 Electronic Data Systems Corporation System and method of managing an office of programs
US6678716B1 (en) * 2000-06-19 2004-01-13 J. D. Edwards World Source Company System and method for managing processes
JP2002073934A (ja) * 2000-08-29 2002-03-12 Ranseputo Kk プロジェクト管理システム
JP2002073739A (ja) * 2000-09-01 2002-03-12 Sumitomo Forestry Co Ltd 工程進捗状況報告システム
JP2002123577A (ja) 2000-10-17 2002-04-26 Sangikyou:Kk 工事支援システムおよび工事支援方法
US20020156671A1 (en) * 2000-11-08 2002-10-24 The Boeing Company System and method for collaborative action
JP2002236788A (ja) 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置
JP2002259651A (ja) * 2001-03-06 2002-09-13 Toshiba Corp 情報管理システム、同システムに適用される情報表示方法及びプログラム
JP3964632B2 (ja) * 2001-05-23 2007-08-22 株式会社日立製作所 プロジェクト管理方法及びその実施システム並びにその処理プログラム
US20030014434A1 (en) * 2001-07-03 2003-01-16 International Business Machines Corporation Method to summarize field values at all document levels in a Lotus Notes response document hierarchy
US20030233267A1 (en) * 2002-05-30 2003-12-18 Martin Hertel-Szabadi Project management
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
JP2004157834A (ja) 2002-11-07 2004-06-03 Canon Inc 印刷システム
JP2004157837A (ja) * 2002-11-07 2004-06-03 Canon Inc 進捗管理システム、進捗管理方法、進捗管理コンピュータプログラム、記憶媒体、端末装置、サーバ装置
JP2004185346A (ja) * 2002-12-04 2004-07-02 Hitachi Ltd プロジェクト作業支援方法およびシステム
US20050137924A1 (en) * 2003-12-23 2005-06-23 Vish Aiyah Method and System for a resource allocation and analysis decision support tool
US7958507B2 (en) * 2005-06-16 2011-06-07 Hewlett-Packard Development Company, L.P. Job scheduling system and method

Similar Documents

Publication Publication Date Title
JP2006072413A5 (enExample)
CN105190611B (zh) 用于数据库横向扩展的方法及装置
JP2005216180A5 (enExample)
JP2008165739A5 (enExample)
JP2011076604A5 (enExample)
WO2016091038A1 (zh) 高速列车快速设计方法及系统
CA3052470C (en) An interface on a computing device for interacting with multi-dimensional data
CN101540012A (zh) 一种产品研发质量控制系统及方法
JP2010257020A5 (enExample)
CN103577906A (zh) 工作流生成方法、工作流执行方法以及工作流执行系统
JP2013097748A5 (enExample)
CN104573184A (zh) 高速列车产品元模型构建方法和装置
JP2011119871A5 (enExample)
US20120078971A1 (en) Data management method
JP2013257761A5 (enExample)
JP6290716B2 (ja) 環境影響評価システムおよび方法
JP2021022016A (ja) 出荷作業支援システム、その方法、及びコンピュータプログラム
JP2005285130A5 (enExample)
Kaveh et al. Optimal priority functions for profile reduction using ant colony optimization
JP6296486B2 (ja) マトリクス処理システム、マトリクス処理方法及びマトリクス処理プログラム
CN108171394A (zh) 基于分层式结构和资源整合的多机器人任务分配方法
JP2019079086A (ja) 要員管理システム
JP5319653B2 (ja) データ管理システム、データ管理方法、およびデータ管理プログラム
JPWO2022085426A5 (enExample)
JP2011002985A5 (enExample)