JP2006072413A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2006072413A5 JP2006072413A5 JP2004251324A JP2004251324A JP2006072413A5 JP 2006072413 A5 JP2006072413 A5 JP 2006072413A5 JP 2004251324 A JP2004251324 A JP 2004251324A JP 2004251324 A JP2004251324 A JP 2004251324A JP 2006072413 A5 JP2006072413 A5 JP 2006072413A5
- Authority
- JP
- Japan
- Prior art keywords
- task
- progress
- project
- importance
- lowest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 claims 14
- 238000004590 computer program Methods 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004251324A JP2006072413A (ja) | 2004-08-31 | 2004-08-31 | プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム |
| US11/206,165 US8028294B2 (en) | 2004-08-31 | 2005-08-17 | Progress management for projects |
| US13/218,410 US8621466B2 (en) | 2004-08-31 | 2011-08-25 | Progress management for projects |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004251324A JP2006072413A (ja) | 2004-08-31 | 2004-08-31 | プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2006072413A JP2006072413A (ja) | 2006-03-16 |
| JP2006072413A5 true JP2006072413A5 (enExample) | 2007-09-13 |
Family
ID=35945006
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2004251324A Pending JP2006072413A (ja) | 2004-08-31 | 2004-08-31 | プロジェクトの進捗管理方法、プロジェクトの進捗管理システム、プロジェクトの進捗管理用コンピュータプログラム |
Country Status (2)
| Country | Link |
|---|---|
| US (2) | US8028294B2 (enExample) |
| JP (1) | JP2006072413A (enExample) |
Families Citing this family (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008021296A (ja) * | 2006-06-15 | 2008-01-31 | Dainippon Screen Mfg Co Ltd | テスト計画支援装置およびテスト計画支援プログラム |
| US8510229B1 (en) * | 2007-01-31 | 2013-08-13 | Sprint Communications Company L.P. | Project efficiency analysis |
| US20090169008A1 (en) * | 2007-12-26 | 2009-07-02 | Gonzales Jesus Orlando Ii | System and method for tracking testing of software modification projects from a wireless mobile device |
| US20090192836A1 (en) * | 2008-01-24 | 2009-07-30 | Patrick Kelly | Automated test system project management |
| US20090259505A1 (en) * | 2008-04-09 | 2009-10-15 | Vali Tadayon | Inventory management system and method |
| WO2010084570A1 (ja) * | 2009-01-20 | 2010-07-29 | 株式会社日立製作所 | プロジェクト管理支援装置 |
| CN103649974B (zh) * | 2011-03-21 | 2019-02-22 | 塔雷科·莫哈梅德·莫哈梅德·赫加兹 | 工期优化系统与方法 |
| JP5766013B2 (ja) * | 2011-05-10 | 2015-08-19 | 三菱電機株式会社 | 進捗管理装置、進捗管理システム、進捗管理方法および進捗管理プログラム |
| KR101685213B1 (ko) * | 2011-06-08 | 2016-12-21 | 매그나칩 반도체 유한회사 | 워크 프로세스 기반의 신규 제품 및 기술 개발 관리 장치 및 방법 |
| US20130159197A1 (en) * | 2011-12-19 | 2013-06-20 | General Electric Company | Project management charting |
| US20140278715A1 (en) * | 2013-03-15 | 2014-09-18 | International Business Machines Corporation | Estimating required time for process granularization |
| US9805326B2 (en) * | 2014-04-24 | 2017-10-31 | International Business Machines Corporation | Task management integrated design environment for complex data integration applications |
| US20160078380A1 (en) * | 2014-09-17 | 2016-03-17 | International Business Machines Corporation | Generating cross-skill training plans for application management service accounts |
| US9405810B2 (en) | 2014-11-24 | 2016-08-02 | Asana, Inc. | Server side system and method for search backed calendar user interface |
| US10977434B2 (en) | 2017-07-11 | 2021-04-13 | Asana, Inc. | Database model which provides management of custom fields and methods and apparatus therfor |
| JP6571844B2 (ja) * | 2018-07-03 | 2019-09-04 | グリー株式会社 | アイテム管理システム、アイテム管理方法及びアイテム管理プログラム |
| CN109828708A (zh) * | 2019-01-28 | 2019-05-31 | 南京创世德意信息技术有限公司 | 一种任务管理方法及智能终端 |
| JP2021149492A (ja) * | 2020-03-19 | 2021-09-27 | 株式会社アンドパッド | 情報処理装置、情報処理方法、情報処理プログラム |
| US20220004993A1 (en) * | 2020-07-02 | 2022-01-06 | Dassault Systemes Americas Corp. | System and Method for Updating Real-Time Project Status Based on Deliverable Status |
| US12401655B1 (en) | 2023-04-24 | 2025-08-26 | Asana, Inc. | Systems and methods to manage access to assets of a computer environment based on user and asset grouping |
Family Cites Families (28)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0223401A (ja) * | 1988-07-12 | 1990-01-25 | Fujitsu Ltd | 工程管理システムにおける出材促進指示装置 |
| JPH04141730A (ja) * | 1990-10-03 | 1992-05-15 | Nec Corp | ソフトウェア開発進捗管理装置 |
| US5381332A (en) * | 1991-12-09 | 1995-01-10 | Motorola, Inc. | Project management system with automated schedule and cost integration |
| JPH07306778A (ja) | 1994-05-16 | 1995-11-21 | Fujitsu Ltd | ソフトウェアの分散開発環境における開発管理方式 |
| US5671360A (en) * | 1995-01-20 | 1997-09-23 | International Business Machines Corporation | Project management tool implementing authority for a people oriented work environment tool |
| US5848394A (en) * | 1996-09-18 | 1998-12-08 | Leonard & Caroline White | Method and system for producing a work breakdown structure for a project |
| US6519763B1 (en) * | 1998-03-30 | 2003-02-11 | Compuware Corporation | Time management and task completion and prediction software |
| JPH11345259A (ja) * | 1998-06-03 | 1999-12-14 | Hitachi Ltd | 成果物の管理方法及び管理システム並びに情報記憶媒体 |
| JP2963450B1 (ja) | 1998-07-03 | 1999-10-18 | 住友特殊金属株式会社 | 回転機 |
| JP2000029941A (ja) * | 1998-07-15 | 2000-01-28 | Hitachi Inf & Control Syst Ltd | スケジュールの進捗管理方法、スケジュール管理装置、スケジュール作成方法およびスケジュール管理用cdrom |
| JP3926496B2 (ja) | 1999-01-06 | 2007-06-06 | 株式会社日立製作所 | プロジェクト管理システム |
| US7113923B1 (en) * | 1999-02-03 | 2006-09-26 | Electronic Data Systems Corporation | System and method of managing an office of programs |
| US6678716B1 (en) * | 2000-06-19 | 2004-01-13 | J. D. Edwards World Source Company | System and method for managing processes |
| JP2002073934A (ja) * | 2000-08-29 | 2002-03-12 | Ranseputo Kk | プロジェクト管理システム |
| JP2002073739A (ja) * | 2000-09-01 | 2002-03-12 | Sumitomo Forestry Co Ltd | 工程進捗状況報告システム |
| JP2002123577A (ja) | 2000-10-17 | 2002-04-26 | Sangikyou:Kk | 工事支援システムおよび工事支援方法 |
| US20020156671A1 (en) * | 2000-11-08 | 2002-10-24 | The Boeing Company | System and method for collaborative action |
| JP2002236788A (ja) | 2001-02-09 | 2002-08-23 | Kawasaki Steel Corp | コンピュータ支援設計用プロジェクト進捗管理装置 |
| JP2002259651A (ja) * | 2001-03-06 | 2002-09-13 | Toshiba Corp | 情報管理システム、同システムに適用される情報表示方法及びプログラム |
| JP3964632B2 (ja) * | 2001-05-23 | 2007-08-22 | 株式会社日立製作所 | プロジェクト管理方法及びその実施システム並びにその処理プログラム |
| US20030014434A1 (en) * | 2001-07-03 | 2003-01-16 | International Business Machines Corporation | Method to summarize field values at all document levels in a Lotus Notes response document hierarchy |
| US20030233267A1 (en) * | 2002-05-30 | 2003-12-18 | Martin Hertel-Szabadi | Project management |
| US20040024629A1 (en) * | 2002-08-02 | 2004-02-05 | Kirby Jack Reese | Methods and apparatus for project management |
| JP2004157834A (ja) | 2002-11-07 | 2004-06-03 | Canon Inc | 印刷システム |
| JP2004157837A (ja) * | 2002-11-07 | 2004-06-03 | Canon Inc | 進捗管理システム、進捗管理方法、進捗管理コンピュータプログラム、記憶媒体、端末装置、サーバ装置 |
| JP2004185346A (ja) * | 2002-12-04 | 2004-07-02 | Hitachi Ltd | プロジェクト作業支援方法およびシステム |
| US20050137924A1 (en) * | 2003-12-23 | 2005-06-23 | Vish Aiyah | Method and System for a resource allocation and analysis decision support tool |
| US7958507B2 (en) * | 2005-06-16 | 2011-06-07 | Hewlett-Packard Development Company, L.P. | Job scheduling system and method |
-
2004
- 2004-08-31 JP JP2004251324A patent/JP2006072413A/ja active Pending
-
2005
- 2005-08-17 US US11/206,165 patent/US8028294B2/en not_active Expired - Fee Related
-
2011
- 2011-08-25 US US13/218,410 patent/US8621466B2/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2006072413A5 (enExample) | ||
| CN105190611B (zh) | 用于数据库横向扩展的方法及装置 | |
| JP2005216180A5 (enExample) | ||
| JP2008165739A5 (enExample) | ||
| JP2011076604A5 (enExample) | ||
| WO2016091038A1 (zh) | 高速列车快速设计方法及系统 | |
| CA3052470C (en) | An interface on a computing device for interacting with multi-dimensional data | |
| CN101540012A (zh) | 一种产品研发质量控制系统及方法 | |
| JP2010257020A5 (enExample) | ||
| CN103577906A (zh) | 工作流生成方法、工作流执行方法以及工作流执行系统 | |
| JP2013097748A5 (enExample) | ||
| CN104573184A (zh) | 高速列车产品元模型构建方法和装置 | |
| JP2011119871A5 (enExample) | ||
| US20120078971A1 (en) | Data management method | |
| JP2013257761A5 (enExample) | ||
| JP6290716B2 (ja) | 環境影響評価システムおよび方法 | |
| JP2021022016A (ja) | 出荷作業支援システム、その方法、及びコンピュータプログラム | |
| JP2005285130A5 (enExample) | ||
| Kaveh et al. | Optimal priority functions for profile reduction using ant colony optimization | |
| JP6296486B2 (ja) | マトリクス処理システム、マトリクス処理方法及びマトリクス処理プログラム | |
| CN108171394A (zh) | 基于分层式结构和资源整合的多机器人任务分配方法 | |
| JP2019079086A (ja) | 要員管理システム | |
| JP5319653B2 (ja) | データ管理システム、データ管理方法、およびデータ管理プログラム | |
| JPWO2022085426A5 (enExample) | ||
| JP2011002985A5 (enExample) |