EP3978707A2 - Procédé d'équipement ultérieur d'un bâtiment avec un ascenseur et tour d'ascenseur préfabriquée et transportable - Google Patents
Procédé d'équipement ultérieur d'un bâtiment avec un ascenseur et tour d'ascenseur préfabriquée et transportable Download PDFInfo
- Publication number
- EP3978707A2 EP3978707A2 EP21196059.6A EP21196059A EP3978707A2 EP 3978707 A2 EP3978707 A2 EP 3978707A2 EP 21196059 A EP21196059 A EP 21196059A EP 3978707 A2 EP3978707 A2 EP 3978707A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- elevator
- stairwell
- staircase
- landings
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 45
- 238000009420 retrofitting Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims 4
- 230000010006 flight Effects 0.000 claims 2
- 238000009417 prefabrication Methods 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0005—Constructional features of hoistways
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/005—Lift shafts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
Definitions
- the invention relates to a method for retrofitting a building with an elevator system according to the preamble of patent claim 1 and a prefabricated, transportable elevator tower for use in such a method.
- a building having a plurality of floors is being retrofitted. These each have at least one floor door, with the floor doors being accessible via a shared staircase.
- the stairwell is within the building envelope and is adjacent to a front of the building such that that portion of the building envelope front that coincides with the front of the stairwell forms a stairwell facade.
- a main platform for the storey doors in the stairwell is provided on each floor of the building. Between the floors there is an intermediate landing arranged on the stairwell facade for a double flight of stairs, which connects the intermediate landings and the main landings with each other.
- Elevator systems to be added to a building or to retrofit a building are generally used in older buildings where barrier-free access has not yet been ensured.
- older residential buildings with a plurality of residential units that are spread over several floors but also administrative buildings and commercial buildings have often been built in the aforementioned construction; they have a plurality of floors, which are divided in particular into several residential units or other self-contained units and have corresponding floor doors that are accessible via a common stairwell.
- This design integrates the stairwell at the front of the building, with an entrance door at ground level and a double flight of stairs that enables access to all storey doors via intermediate landings and main landings on each floor.
- a corresponding building is to be modernized to be largely barrier-free by retrofitting a lift system, it is therefore still the method of choice to gut the stairwell and completely rebuild it with a lift system build up. Since access to the storey doors is generally not possible during the corresponding construction period, retrofitting a corresponding building with a lift system is often avoided, at least from the point of view of the greatest possible accessibility.
- the intermediate platforms of the stairwell are removed and the double-flight staircase dismantled.
- walkways are installed in the stairwell, which extend horizontally from the main landings to the elevator landings and only partially cover the floor plan of the stairwell in projection, in order to leave clear space for a single flight of stairs, which connects the main landings and the elevator landings.
- the prefabricated elevator system is then placed on the staircase prepared in this way and now provided with a single-flight staircase, aligned and connected to the elevator landings or the outer landing elements. The result is a stairwell in which the doors of the elevator system are level with the landing doors via the elevator landings, the webs and the main landings and are therefore barrier-free.
- the present invention is based on this state of the art and is based on the object of designing the method just described more cost-effectively and further developing it in the sense of the greatest possible sustainability. and to provide a prefabricated, transportable elevator tower for use in such a method.
- the method according to the invention therefore differs from the method of the last-mentioned prior art mainly in that the double-flight staircase is not removed and completely replaced by a new, single-flight staircase, but the double-flight staircase is converted into a single-flight staircase, i.e. the two sections of the two-flight staircase, which are attached to one and the same intermediate landing, are placed together in the same orientation (for which one of the two sections must first be rotated by 180 degrees around the vertical axis) in order to form a section of a single-flight staircase, which has a main landing with the elevator platform of a floor above or below.
- Which half of the double-flight staircase is dismantled can vary depending on the structural conditions, with the stair sections of the same half of the staircase being naturally dismantled on all floors. In any case, it makes sense to leave that half of the double flight of stairs in the stairwell that connects the front door on the ground floor with the first main landing. Because the stairway connection between the front door and the first main landing of the building must remain in place anyway in order to ensure an escape route without using the elevator.
- the frame can be placed against the stairwell facade before or after opening the front of the building.
- the foundation for the prefabricated elevator system can also be prepared later.
- the frame is not placed as such on the stairwell facade, but it is prefabricated together with the elevator system and delivered together with this to the construction site, and also together with this the foundation was placed and aligned, thus placed on the stairwell facade.
- This is preferably done in the form of a prefabricated, transportable elevator tower, as defined in patent claim 11 as a further aspect of the present invention.
- Such a prefabricated, transportable elevator tower contains an elevator system with a shaft, which has a passage opening for each floor to be approached, and with a car mounted in the shaft so that it can be moved in a longitudinal direction of the shaft, and its drive.
- the elevator tower contains the frame, which has an elevator landing on each floor in front of the corresponding passage opening of the shaft, or which is provided with receptacles for such elevator landings.
- the frame is preferably manufactured as a steel construction and, more preferably, provided with side walls in metal construction, since it becomes part of the stairwell after the elevator system has been attached. This makes it possible to prefabricate the frame, possibly even with side walls. However, it is also possible within the scope of the present invention to first produce the frame on site and to adapt it to the circumstances. It can also be provided within the scope of the present invention to prefabricate the frame with elevator platforms, or to prefabricate the frame with elevator platforms and webs already attached thereto in order to make the degree of prefabrication as high as possible. As mentioned, in a variant of the present invention, the frame is prefabricated together with the elevator system and transported together with it to the construction site and positioned against the open staircase.
- the frame which is preferably prefabricated as a steel construction with four longitudinal beams and a number of transverse beams and is equipped with or without elevator platforms, can also be used as a scaffold for opening the front.
- the tools required for opening the front of the building such as concrete saws or the like, are then expediently guided on the frame.
- the frame can therefore be used in a preferred manner as an auxiliary construction for some process steps according to the invention, which in turn can contribute to cost containment and sustainability.
- figure 1 shows the initial situation: A building 1 with a basement 2 and six floors 3, 3.1, 3.2 ... is to be equipped with a prefabricated elevator system (cf. 4 ) to be retrofitted.
- a prefabricated elevator system cf. 4
- windows 9 for illuminating the stairwell 5 and a front door 10 are present.
- the front door 10 leads to a ground-level slab 11 in front of the building 1.
- the front door 10 leads to a first intermediate landing 12, from which the main landing 6 for the first floor 3, which forms the ground floor, can be reached via a first stair section 13 of a double flight of stairs.
- a second stair section 14 of the double flight of stairs leads from the intermediate landing 12 to the basement 2.
- the double flight of stairs of the staircase 5 connects with its first half of the staircase, which consists of the first staircase sections 13.1, 13.2..., and its second half of the staircase, the is formed from the second stair sections 14.1, 14.2..., the main landings 6, 6.1, 6.2..., in each case via intermediate landings 12, 12.1, 12.2... between the floors.
- the intermediate landings 12, 12.1, 12.2... adjoin the staircase facade 8 from the inside.
- FIG 2 shows a first phase in the retrofitting of the building 1 according to the invention with an elevator system.
- a foundation 15 is produced in front of the stairwell facade 8, in particular to be able to securely base the elevator system (not shown here).
- the foundation 15 can also be used to set up a frame 8 (see figure 3 ) to serve.
- This foundation 15 is made of concrete in a known manner.
- FIG. 3 A further phase of the method according to the invention is in figure 3 shown, whereby the degree of abstraction of the drawing was increased here in order to better illustrate the procedural steps.
- part of the front 7 of the building 1, which was not removed when removing the stairwell facade 8, has only been omitted for the sake of clarity.
- a frame 16 made of steel profiles welded to one another with four longitudinal beams 26 and a plurality of transverse beams 27 is placed in a recess in the foundation 15 provided for this purpose.
- the frame 16 is anchored to the facade of the building 1 (not shown in more detail here) in order to create a fixed connection to the building 1.
- the frame 16 is provided with additional steel profiles at the level of the main landings 6 . . . which form a receptacle 17 , 17 . How symbolic in figure 3 is shown, the intermediate landings 12... are released from their anchoring in the stairwell 5 and placed in the receptacles 17... (and fastened there), where they are used as elevator landings 18, 18.1, 18.2.... There is therefore no need to manufacture new elevator platforms 18... or to dispose of the intermediate platforms 12...
- the frame 16 can also be placed against the building before the front side 7 of the building 1 is opened and serve as an auxiliary construction for removing the stairwell facade 8 .
- the elevator system 22 only covers about half the width of the elevator landings 18... and thus of the frame 16, so that the window openings 21 can be attached next to them, but on the other hand there is also space for a house door 10' that is offset upwards to ground floor level . This can be reached from the "ground floor” elevator landing 18 and ensures access to the stairwell 5 from the outside that is independent of the elevator system 22 .
- the front door 10' (not visible here) is made accessible via an outside staircase 31, while the elevator system 22 is provided to the outside with a ground-level door opening 30 (also not visible here).
- FIG 5 An exemplary embodiment of a prefabricated, transportable elevator tower 24 is shown, which is used according to a variant of a method according to the invention for retrofitting a building with an elevator system 22.
- This elevator tower 24 contains an operationally prepared elevator system 22, the shaft 25 of which is not clad and can be seen in the foundation 15 underride of the elevator system 22; the floor level is indicated with a broken line 28 .
- the elevator tower 24 also contains the frame 16, which here also consists of longitudinal bars 26 and transverse bars 27 (not visible here).
- the longitudinal beams 26 are again visible below the ground level 28, specifically in that area which is to be placed in the foundation 15.
- the combination of elevator system 22 and frame 16 is covered with metal plates or side walls 29 .
- the front door 10' which has an escape route or Access to the stairwell from the outside is already guaranteed as part of the prefabricated elevator tower 24.
- the elevator system 22 is provided with a ground floor door opening 30 at ground level, which opens outwards and forms the barrier-free "front door".
- the figures 6 and 7 show from different perspectives how the elevator tower 24 looks like figure 5 before the opened and prepared according to the method according to the invention (cf. Figures 1 to 4 ) staircase of building 1 is applied: After the elevator tower 24 has been inserted into the foundation 15 and the elevator tower 24 has been attached to the building 1, it is only necessary to connect the elevator platforms 18 (not visible here) to the single-flight stairs and the webs 19 - the elevator platforms 18 either being attached during the prefabrication of the Elevator tower 24 were used in the frame 16 - or the expanded intermediate platforms 12 are used as elevator platforms 18 in the frame 16 - and the elevator tower 24 is anchored to the building 1 for safety reasons in order to complete the retrofitting of the building with an elevator system. All that then remains is to provide the front door 10' with an outside staircase 31 in order to enable access to the building 1 without using the elevator system 22.
- the staircase 8 Due to the prefabrication of the elevator tower 24, the staircase 8 has already been expanded to include the elevator system 22 and the elevator landings 18 in the frame 16, with the side walls 29 forming the new outer shell of the building 1. If no corresponding seals are prefabricated, it is advisable to seal the joints between the elevator tower 24 and the building 1, e.g. with sealing foam.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102020125569 | 2020-09-30 | ||
DE102020129790.4A DE102020129790A1 (de) | 2020-09-30 | 2020-11-11 | Verfahren zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage und vorgefertigter, transportierbarer Aufzugsturm |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3978707A2 true EP3978707A2 (fr) | 2022-04-06 |
EP3978707A3 EP3978707A3 (fr) | 2022-07-20 |
Family
ID=77710684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21196059.6A Pending EP3978707A3 (fr) | 2020-09-30 | 2021-09-10 | Procédé d'équipement ultérieur d'un bâtiment avec un ascenseur et tour d'ascenseur préfabriquée et transportable |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3978707A3 (fr) |
DE (1) | DE202021004270U1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116517325A (zh) * | 2022-09-07 | 2023-08-01 | 金陵科技学院 | 一种新型的用于既有建筑加装电梯的装配式钢木楼梯及其施工方法 |
EP4253297A1 (fr) * | 2022-03-30 | 2023-10-04 | Manfred Greschbach | Échafaudage auxiliaire et procédé de rééquipement d'un bâtiment avec un ascenseur |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19633636A1 (de) | 1996-08-21 | 1998-02-26 | Grohs Gerwald Dipl Bauing | Aufzugsschächte, Aufzugskabine und Verbindungsgänge als Raumzelle |
DE20300662U1 (de) | 2003-01-16 | 2003-04-10 | bwh Construction GmbH, 14109 Berlin | Baukonstruktion zur nachträglichen Anbindung eines Außenaufzuges an ein Treppenhaus eines mehrgeschossigen Gebäudes |
EP3315448A2 (fr) | 2016-10-28 | 2018-05-02 | Manfred Greschbach | Installation d'ascenseur |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19522046C2 (de) * | 1995-06-17 | 1998-04-09 | Spannkeramik Und Bau Gmbh Trib | Außenaufzugsschacht |
JP2007238315A (ja) * | 2006-03-10 | 2007-09-20 | Yutaka Komyo | 集合住宅用後付けエレベータのかご室昇降路の隔壁構造物 |
DE102011052727A1 (de) * | 2011-08-16 | 2013-03-07 | Rico Müller | Aufzugsanlage und Verfahren zu deren Anbindung an das Treppenhaus eines bestehenden Gebäudes |
CN204588379U (zh) * | 2015-03-11 | 2015-08-26 | 上海长江斯迈普电梯有限公司 | 用于室外的独岛型电梯 |
JP5946576B1 (ja) * | 2015-10-09 | 2016-07-06 | 松尾建設株式会社 | 既存階段室型集合住宅へのエレベータ後付け工法 |
DE102019107165A1 (de) * | 2019-03-20 | 2020-09-24 | Manfred Greschbach | Verfahren zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage, Bauteilsatz zur Durchführung des Verfahrens, Aufzugsanlage und vorgefertigter Schacht für die Aufzugsanlage |
-
2021
- 2021-09-10 DE DE202021004270.9U patent/DE202021004270U1/de active Active
- 2021-09-10 EP EP21196059.6A patent/EP3978707A3/fr active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19633636A1 (de) | 1996-08-21 | 1998-02-26 | Grohs Gerwald Dipl Bauing | Aufzugsschächte, Aufzugskabine und Verbindungsgänge als Raumzelle |
DE20300662U1 (de) | 2003-01-16 | 2003-04-10 | bwh Construction GmbH, 14109 Berlin | Baukonstruktion zur nachträglichen Anbindung eines Außenaufzuges an ein Treppenhaus eines mehrgeschossigen Gebäudes |
EP3315448A2 (fr) | 2016-10-28 | 2018-05-02 | Manfred Greschbach | Installation d'ascenseur |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4253297A1 (fr) * | 2022-03-30 | 2023-10-04 | Manfred Greschbach | Échafaudage auxiliaire et procédé de rééquipement d'un bâtiment avec un ascenseur |
CN116517325A (zh) * | 2022-09-07 | 2023-08-01 | 金陵科技学院 | 一种新型的用于既有建筑加装电梯的装配式钢木楼梯及其施工方法 |
CN116517325B (zh) * | 2022-09-07 | 2024-01-19 | 金陵科技学院 | 一种新型的用于既有建筑加装电梯的装配式钢木楼梯及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
DE202021004270U1 (de) | 2023-05-08 |
EP3978707A3 (fr) | 2022-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3712355B1 (fr) | Procédé d'équipement ultérieur d'un bâtiment d'une installation d'ascenseur et ensemble de composants destiné à la mise en uvre du procédé | |
EP3472402B1 (fr) | Procede de modernisation d'un batiment et systeme comprenant un ascenseur installe dans un batiment | |
EP3978707A2 (fr) | Procédé d'équipement ultérieur d'un bâtiment avec un ascenseur et tour d'ascenseur préfabriquée et transportable | |
DE102011052727A1 (de) | Aufzugsanlage und Verfahren zu deren Anbindung an das Treppenhaus eines bestehenden Gebäudes | |
DE20002775U1 (de) | Aufzugs-Treppenhausmodul mit variablen Abmessungen | |
DE102020129790A1 (de) | Verfahren zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage und vorgefertigter, transportierbarer Aufzugsturm | |
DE3714053C2 (de) | Aufzug für Personentransport | |
DE1271968B (de) | Gebaeude mit mehreren Stockwerken aus vorgefertigten Teilen | |
DE10210909B4 (de) | Fertigwandteil | |
DE20300662U1 (de) | Baukonstruktion zur nachträglichen Anbindung eines Außenaufzuges an ein Treppenhaus eines mehrgeschossigen Gebäudes | |
EP4253298A1 (fr) | Cadre de fondation et procédé de rééquipement d'un bâtiment avec un ascenseur | |
DE3304907A1 (de) | Stahlbetonraumzelle zur errichtung der kleinsten raumeinheit eines gebaeudes | |
EP4253299A1 (fr) | Procédé de rééquipement d'un bâtiment avec une installation d'ascenseur et module de cage d'escalier | |
EP0513949A2 (fr) | Cadre se composant de deux éléments quatre par quatre tièdres rectangulaires pour la structure portante d'un bâtiment standardisé en dimension | |
EP0955419B1 (fr) | Système d'ossature à cadres pour bâtiments préfabriqués | |
EP4253297A1 (fr) | Échafaudage auxiliaire et procédé de rééquipement d'un bâtiment avec un ascenseur | |
DE19954649C2 (de) | Verfahren und Vorrichtung zur nachträglichen Montage eines vorgefertigten Aufzugschachtgerüstes an einem Gebäude | |
EP0665341A1 (fr) | Unité d'habitation et procédé pour sa fabrication et cadre plancher pour celle-ci | |
EP3502374B1 (fr) | Procédé de construction d'une cage d'escalier pourvu d'une cage d'ascenseur intégrée sur ou dans un bâtiment existant | |
DE19919463A1 (de) | Errichten des Dachstuhls inclusive Dacheindeckung und Rinne sowie große Teile des Dachgeschosses auf der Bodenplatte des Gebäudes und Anheben desselben auf Sollhöhe mit einem Autokran | |
EP0567070B1 (fr) | Cage d'escalier pour bâtiment à plusieurs étages | |
DE102008058930B3 (de) | Errichtung eines Schachtgerüstes für vereinfachte Aufzugsanlagen | |
DE4239057C2 (de) | Verfahren und vorgefertigter Modul zur Herstellung von Bauwerken und Gebäuden | |
DE4423423A1 (de) | Verfahren zur Herstellung einer Wohneinheit - Fertighaus - sowie Bodenrahmen dazu | |
AT395451B (de) | Raumeinschliessender fertigteil mit einem ziegelgewoelbe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04F 17/00 20060101ALI20220611BHEP Ipc: B66B 11/00 20060101ALI20220611BHEP Ipc: E04F 11/02 20060101ALI20220611BHEP Ipc: E04G 23/02 20060101AFI20220611BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20230118 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20240604 |