EP3978707A2 - Method for retrofitting a building with an elevator and prefabricated transportable elevator tower - Google Patents

Method for retrofitting a building with an elevator and prefabricated transportable elevator tower Download PDF

Info

Publication number
EP3978707A2
EP3978707A2 EP21196059.6A EP21196059A EP3978707A2 EP 3978707 A2 EP3978707 A2 EP 3978707A2 EP 21196059 A EP21196059 A EP 21196059A EP 3978707 A2 EP3978707 A2 EP 3978707A2
Authority
EP
European Patent Office
Prior art keywords
elevator
stairwell
staircase
landings
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP21196059.6A
Other languages
German (de)
French (fr)
Other versions
EP3978707A3 (en
Inventor
Manfred Greschbach
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE102020129790.4A external-priority patent/DE102020129790A1/en
Application filed by Individual filed Critical Individual
Publication of EP3978707A2 publication Critical patent/EP3978707A2/en
Publication of EP3978707A3 publication Critical patent/EP3978707A3/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0005Constructional features of hoistways
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Definitions

  • the invention relates to a method for retrofitting a building with an elevator system according to the preamble of patent claim 1 and a prefabricated, transportable elevator tower for use in such a method.
  • a building having a plurality of floors is being retrofitted. These each have at least one floor door, with the floor doors being accessible via a shared staircase.
  • the stairwell is within the building envelope and is adjacent to a front of the building such that that portion of the building envelope front that coincides with the front of the stairwell forms a stairwell facade.
  • a main platform for the storey doors in the stairwell is provided on each floor of the building. Between the floors there is an intermediate landing arranged on the stairwell facade for a double flight of stairs, which connects the intermediate landings and the main landings with each other.
  • Elevator systems to be added to a building or to retrofit a building are generally used in older buildings where barrier-free access has not yet been ensured.
  • older residential buildings with a plurality of residential units that are spread over several floors but also administrative buildings and commercial buildings have often been built in the aforementioned construction; they have a plurality of floors, which are divided in particular into several residential units or other self-contained units and have corresponding floor doors that are accessible via a common stairwell.
  • This design integrates the stairwell at the front of the building, with an entrance door at ground level and a double flight of stairs that enables access to all storey doors via intermediate landings and main landings on each floor.
  • a corresponding building is to be modernized to be largely barrier-free by retrofitting a lift system, it is therefore still the method of choice to gut the stairwell and completely rebuild it with a lift system build up. Since access to the storey doors is generally not possible during the corresponding construction period, retrofitting a corresponding building with a lift system is often avoided, at least from the point of view of the greatest possible accessibility.
  • the intermediate platforms of the stairwell are removed and the double-flight staircase dismantled.
  • walkways are installed in the stairwell, which extend horizontally from the main landings to the elevator landings and only partially cover the floor plan of the stairwell in projection, in order to leave clear space for a single flight of stairs, which connects the main landings and the elevator landings.
  • the prefabricated elevator system is then placed on the staircase prepared in this way and now provided with a single-flight staircase, aligned and connected to the elevator landings or the outer landing elements. The result is a stairwell in which the doors of the elevator system are level with the landing doors via the elevator landings, the webs and the main landings and are therefore barrier-free.
  • the present invention is based on this state of the art and is based on the object of designing the method just described more cost-effectively and further developing it in the sense of the greatest possible sustainability. and to provide a prefabricated, transportable elevator tower for use in such a method.
  • the method according to the invention therefore differs from the method of the last-mentioned prior art mainly in that the double-flight staircase is not removed and completely replaced by a new, single-flight staircase, but the double-flight staircase is converted into a single-flight staircase, i.e. the two sections of the two-flight staircase, which are attached to one and the same intermediate landing, are placed together in the same orientation (for which one of the two sections must first be rotated by 180 degrees around the vertical axis) in order to form a section of a single-flight staircase, which has a main landing with the elevator platform of a floor above or below.
  • Which half of the double-flight staircase is dismantled can vary depending on the structural conditions, with the stair sections of the same half of the staircase being naturally dismantled on all floors. In any case, it makes sense to leave that half of the double flight of stairs in the stairwell that connects the front door on the ground floor with the first main landing. Because the stairway connection between the front door and the first main landing of the building must remain in place anyway in order to ensure an escape route without using the elevator.
  • the frame can be placed against the stairwell facade before or after opening the front of the building.
  • the foundation for the prefabricated elevator system can also be prepared later.
  • the frame is not placed as such on the stairwell facade, but it is prefabricated together with the elevator system and delivered together with this to the construction site, and also together with this the foundation was placed and aligned, thus placed on the stairwell facade.
  • This is preferably done in the form of a prefabricated, transportable elevator tower, as defined in patent claim 11 as a further aspect of the present invention.
  • Such a prefabricated, transportable elevator tower contains an elevator system with a shaft, which has a passage opening for each floor to be approached, and with a car mounted in the shaft so that it can be moved in a longitudinal direction of the shaft, and its drive.
  • the elevator tower contains the frame, which has an elevator landing on each floor in front of the corresponding passage opening of the shaft, or which is provided with receptacles for such elevator landings.
  • the frame is preferably manufactured as a steel construction and, more preferably, provided with side walls in metal construction, since it becomes part of the stairwell after the elevator system has been attached. This makes it possible to prefabricate the frame, possibly even with side walls. However, it is also possible within the scope of the present invention to first produce the frame on site and to adapt it to the circumstances. It can also be provided within the scope of the present invention to prefabricate the frame with elevator platforms, or to prefabricate the frame with elevator platforms and webs already attached thereto in order to make the degree of prefabrication as high as possible. As mentioned, in a variant of the present invention, the frame is prefabricated together with the elevator system and transported together with it to the construction site and positioned against the open staircase.
  • the frame which is preferably prefabricated as a steel construction with four longitudinal beams and a number of transverse beams and is equipped with or without elevator platforms, can also be used as a scaffold for opening the front.
  • the tools required for opening the front of the building such as concrete saws or the like, are then expediently guided on the frame.
  • the frame can therefore be used in a preferred manner as an auxiliary construction for some process steps according to the invention, which in turn can contribute to cost containment and sustainability.
  • figure 1 shows the initial situation: A building 1 with a basement 2 and six floors 3, 3.1, 3.2 ... is to be equipped with a prefabricated elevator system (cf. 4 ) to be retrofitted.
  • a prefabricated elevator system cf. 4
  • windows 9 for illuminating the stairwell 5 and a front door 10 are present.
  • the front door 10 leads to a ground-level slab 11 in front of the building 1.
  • the front door 10 leads to a first intermediate landing 12, from which the main landing 6 for the first floor 3, which forms the ground floor, can be reached via a first stair section 13 of a double flight of stairs.
  • a second stair section 14 of the double flight of stairs leads from the intermediate landing 12 to the basement 2.
  • the double flight of stairs of the staircase 5 connects with its first half of the staircase, which consists of the first staircase sections 13.1, 13.2..., and its second half of the staircase, the is formed from the second stair sections 14.1, 14.2..., the main landings 6, 6.1, 6.2..., in each case via intermediate landings 12, 12.1, 12.2... between the floors.
  • the intermediate landings 12, 12.1, 12.2... adjoin the staircase facade 8 from the inside.
  • FIG 2 shows a first phase in the retrofitting of the building 1 according to the invention with an elevator system.
  • a foundation 15 is produced in front of the stairwell facade 8, in particular to be able to securely base the elevator system (not shown here).
  • the foundation 15 can also be used to set up a frame 8 (see figure 3 ) to serve.
  • This foundation 15 is made of concrete in a known manner.
  • FIG. 3 A further phase of the method according to the invention is in figure 3 shown, whereby the degree of abstraction of the drawing was increased here in order to better illustrate the procedural steps.
  • part of the front 7 of the building 1, which was not removed when removing the stairwell facade 8, has only been omitted for the sake of clarity.
  • a frame 16 made of steel profiles welded to one another with four longitudinal beams 26 and a plurality of transverse beams 27 is placed in a recess in the foundation 15 provided for this purpose.
  • the frame 16 is anchored to the facade of the building 1 (not shown in more detail here) in order to create a fixed connection to the building 1.
  • the frame 16 is provided with additional steel profiles at the level of the main landings 6 . . . which form a receptacle 17 , 17 . How symbolic in figure 3 is shown, the intermediate landings 12... are released from their anchoring in the stairwell 5 and placed in the receptacles 17... (and fastened there), where they are used as elevator landings 18, 18.1, 18.2.... There is therefore no need to manufacture new elevator platforms 18... or to dispose of the intermediate platforms 12...
  • the frame 16 can also be placed against the building before the front side 7 of the building 1 is opened and serve as an auxiliary construction for removing the stairwell facade 8 .
  • the elevator system 22 only covers about half the width of the elevator landings 18... and thus of the frame 16, so that the window openings 21 can be attached next to them, but on the other hand there is also space for a house door 10' that is offset upwards to ground floor level . This can be reached from the "ground floor” elevator landing 18 and ensures access to the stairwell 5 from the outside that is independent of the elevator system 22 .
  • the front door 10' (not visible here) is made accessible via an outside staircase 31, while the elevator system 22 is provided to the outside with a ground-level door opening 30 (also not visible here).
  • FIG 5 An exemplary embodiment of a prefabricated, transportable elevator tower 24 is shown, which is used according to a variant of a method according to the invention for retrofitting a building with an elevator system 22.
  • This elevator tower 24 contains an operationally prepared elevator system 22, the shaft 25 of which is not clad and can be seen in the foundation 15 underride of the elevator system 22; the floor level is indicated with a broken line 28 .
  • the elevator tower 24 also contains the frame 16, which here also consists of longitudinal bars 26 and transverse bars 27 (not visible here).
  • the longitudinal beams 26 are again visible below the ground level 28, specifically in that area which is to be placed in the foundation 15.
  • the combination of elevator system 22 and frame 16 is covered with metal plates or side walls 29 .
  • the front door 10' which has an escape route or Access to the stairwell from the outside is already guaranteed as part of the prefabricated elevator tower 24.
  • the elevator system 22 is provided with a ground floor door opening 30 at ground level, which opens outwards and forms the barrier-free "front door".
  • the figures 6 and 7 show from different perspectives how the elevator tower 24 looks like figure 5 before the opened and prepared according to the method according to the invention (cf. Figures 1 to 4 ) staircase of building 1 is applied: After the elevator tower 24 has been inserted into the foundation 15 and the elevator tower 24 has been attached to the building 1, it is only necessary to connect the elevator platforms 18 (not visible here) to the single-flight stairs and the webs 19 - the elevator platforms 18 either being attached during the prefabrication of the Elevator tower 24 were used in the frame 16 - or the expanded intermediate platforms 12 are used as elevator platforms 18 in the frame 16 - and the elevator tower 24 is anchored to the building 1 for safety reasons in order to complete the retrofitting of the building with an elevator system. All that then remains is to provide the front door 10' with an outside staircase 31 in order to enable access to the building 1 without using the elevator system 22.
  • the staircase 8 Due to the prefabrication of the elevator tower 24, the staircase 8 has already been expanded to include the elevator system 22 and the elevator landings 18 in the frame 16, with the side walls 29 forming the new outer shell of the building 1. If no corresponding seals are prefabricated, it is advisable to seal the joints between the elevator tower 24 and the building 1, e.g. with sealing foam.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

Die vorliegende Erfindung betrifft ein Verfahren zum Nachrüsten eines Gebäudes 1 mit einer Aufzugsanlage 22, welches Gebäude 1 eine Mehrzahl von Etagen 3 aufweist, die über ein gemeinsames Treppenhaus 5 mit Hauptpodesten 6 und Zwischenpodesten 12 zugänglich sind.Hierbei werden die Treppenhausfassade 8 entfernt, ein Gestell 16 an das geöffnete Treppenhaus 5 gestellt, das mit Aufzugspodesten versehen ist oder ausgestattet wird, die Zwischenpodeste 12 entfernt, Stege 19 eingebaut, die sich von den Hauptpodesten 6 waagrecht bis zu den Aufzugspodesten 18 erstrecken und lichten Raum für eine einläufige Treppe lassen, und eine vorgefertigte Aufzugsanlage 22 an das Gestell 16 angestellt. Die Aufzugsanlage 22 kann auch zusammen mit dem Gestell 16 als Aufzugsturm 24 vorgefertigt werden.Die zweiläufige Treppe wird in eine einläufige Treppe umgebaut, indem eine erste Hälfte der zweiläufigen Treppe bestehen bleibt und die andere Hälfte der zweiläufigen Treppe ausgebaut und, abschnittsweise um 180 Winkelgrade um die Hochachse gedreht, an die erste Hälfte der zweiläufigen Treppe angesetzt wird, um zusammen mit dieser die einläufige Treppe zu bilden, die die Hauptpodeste 6 mit den Aufzugspodesten 18 verbindet.The present invention relates to a method for retrofitting a building 1 with an elevator system 22, which building 1 has a plurality of floors 3, which are accessible via a common staircase 5 with main landings 6 and intermediate landings 12. Here, the staircase facade 8 is removed, a frame 16 placed on the open stairwell 5, which is provided or equipped with elevator landings, the intermediate landings 12 are removed, webs 19 are installed, which extend horizontally from the main landings 6 to the elevator landings 18 and leave clear space for a single flight of stairs, and one prefabricated elevator system 22 employed on the frame 16. The elevator system 22 can also be prefabricated together with the frame 16 as an elevator tower 24. The double-flight staircase is converted into a single-flight staircase by leaving a first half of the double-flight staircase in place and removing the other half of the double-flight staircase and turning it by 180 degrees in sections rotated the vertical axis, is attached to the first half of the two-flight staircase in order to form the single-flight staircase together with this, which connects the main platforms 6 with the elevator platforms 18.

Description

Die Erfindung betrifft ein Verfahren zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage nach dem Oberbegriff des Patentanspruchs 1 sowie einen vorgefertigten, transportierbaren Aufzugsturm zur Verwendung in einem solchen Verfahren. Demnach wird ein Gebäude nachgerüstet, das eine Mehrzahl von Etagen aufweist. Diese verfügen über jeweils mindestens eine Etagentüre, wobei die Etagentüren über ein gemeinsames Treppenhaus zugänglich sind. Das Treppenhaus liegt innerhalb der Gebäudehülle und grenzt an eine Frontseite des Gebäudes an, so dass derjenige Abschnitt der Gebäudehüllen-Frontseite, der mit der Frontseite des Treppenhauses zusammenfällt, eine Treppenhausfassade ausbildet. Je Etage des Gebäudes ist ein Hauptpodest für die Etagentüren im Treppenhaus vorgesehen. Zwischen den Etagen befindet sich jeweils ein an der Treppenhausfassade angeordnetes Zwischenpodest für eine zweiläufige Treppe, welche die Zwischenpodeste und die Hauptpodeste untereinander verbindet.The invention relates to a method for retrofitting a building with an elevator system according to the preamble of patent claim 1 and a prefabricated, transportable elevator tower for use in such a method. Accordingly, a building having a plurality of floors is being retrofitted. These each have at least one floor door, with the floor doors being accessible via a shared staircase. The stairwell is within the building envelope and is adjacent to a front of the building such that that portion of the building envelope front that coincides with the front of the stairwell forms a stairwell facade. A main platform for the storey doors in the stairwell is provided on each floor of the building. Between the floors there is an intermediate landing arranged on the stairwell facade for a double flight of stairs, which connects the intermediate landings and the main landings with each other.

Aufzugsanlagen zum Anbauen an ein Gebäude bzw. zum Nachrüsten eines Gebäudes kommen in der Regel bei älteren Gebäuden zum Einsatz, bei denen noch nicht auf einen barrierefreien Zugang geachtet wurde. Insbesondere ältere Wohngebäude mit einer Mehrzahl von Wohneinheiten, die über mehrere Etagen verteilt sind, aber auch Verwaltungsgebäude und gewerblich genutzte Gebäude sind oft in der eingangs genannten Bauweise gebaut worden; sie weisen eine Mehrzahl von Etagen auf, die insbesondere in mehrere Wohneinheiten oder sonstige abgeschlossenen Einheiten unterteilt sind und über entsprechende Etagentüren verfügen, die über ein gemeinsames Treppenhaus zugänglich sind. Diese Bauweise integriert das Treppenhaus an der Frontseite des Gebäudes, mit einer Eingangstüre auf Geländeniveau und einer zweiläufigen Treppe, die über Zwischenpodeste und Hauptpodeste in jeder Etage den Zugang zu allen Etagentüren ermöglicht.Elevator systems to be added to a building or to retrofit a building are generally used in older buildings where barrier-free access has not yet been ensured. In particular, older residential buildings with a plurality of residential units that are spread over several floors, but also administrative buildings and commercial buildings have often been built in the aforementioned construction; they have a plurality of floors, which are divided in particular into several residential units or other self-contained units and have corresponding floor doors that are accessible via a common stairwell. This design integrates the stairwell at the front of the building, with an entrance door at ground level and a double flight of stairs that enables access to all storey doors via intermediate landings and main landings on each floor.

Es liegt auf der Hand, dass Menschen mit Gehbehinderung in solchen Gebäuden kaum eine Chance haben, aus eigener Kraft zu den Etagentüren zu gelangen. Auch der Transport von schweren Gegenständen muss in der Regel über das Treppenhaus erfolgen und kann deshalb oft nicht mit entsprechenden Hilfsmitteln erleichtert werden. Es ist daher oft wünschenswert, ein solches mehrgeschossiges Gebäude mit einer Aufzugsanlage nachzurüsten, insbesondere mit einer vorgefertigten Aufzugsanlage, wie sie beispielsweise aus der EP 3 315 448 A2 des Anmelders bekannt geworden ist. Durch die Vorfertigung der Aufzugsanlage, die im Wesentlichen vor Ort nur noch aufgestellt und angeschlossen werden muss, kann die Bauzeit für das Nachrüsten auf ein für Bewohner bzw. Nutzer des Gebäudes erträgliches Maß begrenzt werden, was oft ein maßgebliches Entscheidungskriterium für oder gegen das Nachrüsten des Gebäudes mit einer Aufzugsanlage ist.It is obvious that people with walking disabilities in such buildings have little chance of reaching the storey doors on their own. Heavy objects also usually have to be transported via the stairwell and can therefore often not be made easier with the appropriate aids. It is therefore often desirable to retrofit such a multi-storey building with an elevator system, in particular with a prefabricated elevator system, as for example from EP 3 315 448 A2 of the applicant has become known. Due to the prefabrication of the elevator system, which essentially only has to be set up and connected on site, the construction time for retrofitting can be limited to an extent that is tolerable for residents or users of the building, which is often a decisive criterion for deciding whether or not to retrofit the elevator building with an elevator system.

Aus der DE 196 33 636 A1 ist ein Verfahren zum Nachrüsten eines Gebäudes mit einer modular vorgefertigten Aufzugsanlage bekannt. Aus diesem Stand der Technik ist ersichtlich, dass ein Nachrüsten des Gebäudes mit einer Aufzugsanlage ohne weitere Umbaumaßnahmen die Problematik eines ungehinderten Zugangs für gehbehinderte Personen nur zum Teil löst. Denn wenn die nachgerüstete Aufzugsanlage an der Frontseite des Gebäudes vor das Treppenhaus gestellt und die Übergänge zwischen dem Aufzugsschacht und entsprechenden Gebäudeöffnungen in der Treppenhausfassade hergestellt sind, gelangt eine Person, die aus der Aufzugskabine heraustritt, jeweils nur auf ein Zwischenpodest des Treppenhauses, so dass für einen Zugang zu den Etagentüren noch eine halbe Etage nach oben oder unten mittels eines Treppenabschnitts der zweiläufigen Treppe überwunden werden muss.From the DE 196 33 636 A1 a method for retrofitting a building with a modular, prefabricated elevator system is known. From this state of the art it can be seen that retrofitting the building with an elevator system without further conversion measures only partially solves the problem of unhindered access for people with walking disabilities. Because if the retrofitted elevator system is placed on the front side of the building in front of the stairwell and the transitions between the elevator shaft and the corresponding building openings in the stairwell facade have been made, a person who steps out of the elevator car only gets onto an intermediate landing of the stairwell, so that for access to the storey doors still has to be overcome half a storey up or down by means of a stair section of the double flight of stairs.

Soll ein entsprechendes Gebäude durch Nachrüsten einer Aufzugsanlage weitgehend barrierefrei modernisiert werden, ist es daher noch immer das Mittel der Wahl, das Treppenhaus zu entkernen und mit einer Aufzugsanlage völlig neu aufzubauen. Da während der entsprechenden Bauzeit ein Zugang zu den Etagentüren in der Regel nicht möglich ist, sieht man jedoch oft von einem Nachrüsten eines entsprechenden Gebäudes mit einer Aufzugsanlage ab, jedenfalls unter dem Gesichtspunkt einer möglichst weitgehenden Barrierefreiheit.If a corresponding building is to be modernized to be largely barrier-free by retrofitting a lift system, it is therefore still the method of choice to gut the stairwell and completely rebuild it with a lift system build up. Since access to the storey doors is generally not possible during the corresponding construction period, retrofitting a corresponding building with a lift system is often avoided, at least from the point of view of the greatest possible accessibility.

Alternativ wurde in der DE 203 00 662 U1 ein Verfahren zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage vorgeschlagen, bei dem eine vorgefertigte Aufzugsanlage auf ein Fundament vor der Treppenhausfassade gestellt wird. Zuvor wird die Frontseite des Gebäudes durch Entfernen der Treppenhausfassade geöffnet und ein einteiliges oder mehrteiliges Gestell an die Treppenhausfassade angestellt, wobei das Gestell pro Etage mit je einem, im Wesentlichen treppenhausbreiten Aufzugspodest in Höhe des Hauptpodests des Treppenhauses ausgestattet ist. Bei diesem Gestell handelt es sich um zusammenmontierte Außenpodestelemente, die jeweils geschosshoch als tischförmiges Fertigelement mit einem plattenförmigen Außenpodest und mehreren tischbeinartigen Stützen ausgebildet ist. Nach Öffnen der Frontseite des Gebäudes und Anbringen des aus Außenpodestelementen bestehenden Gestells werden die Zwischenpodeste des Treppenhauses entfernt und die zweiläufige Treppe abgebaut. Danach werden Stege in das Treppenhaus eingebaut, die sich von den Hauptpodesten waagrecht bis zu den Aufzugspodesten erstrecken und den Grundriss des Treppenhauses in Projektion nur zum Teil überdecken, um lichten Raum für eine einläufige Treppe zu lassen, welche die Hauptpodeste und die Aufzugspodeste verbindet. An das so vorbereitete, nunmehr mit einer einläufigen Treppe versehene Treppenhaus wird sodann die vorgefertigte Aufzugsanlage angestellt, ausgerichtet und an die Aufzugspodeste bzw. die Außenpodestelemente angeschlossen. Im Ergebnis erhält man ein Treppenhaus, in dem die Türen der Aufzugsanlage über die Aufzugspodeste, die Stege und die Hauptpodeste eben und damit barrierefrei mit den Etagentüren verbunden sind.Alternatively, in the DE 203 00 662 U1 proposed a method for retrofitting a building with an elevator system, in which a prefabricated elevator system is placed on a foundation in front of the stairwell facade. Before that, the front of the building is opened by removing the stairwell facade and a one-part or multi-part frame is placed on the stairwell facade, the frame per floor being equipped with one elevator landing, essentially the width of the staircase, at the height of the main landing of the staircase. This frame consists of outer pedestal elements that have been assembled together and are designed floor-to-ceiling as table-shaped prefabricated elements with a plate-shaped outer pedestal and several table-leg-like supports. After opening the front of the building and attaching the frame consisting of outer platform elements, the intermediate platforms of the stairwell are removed and the double-flight staircase dismantled. After that, walkways are installed in the stairwell, which extend horizontally from the main landings to the elevator landings and only partially cover the floor plan of the stairwell in projection, in order to leave clear space for a single flight of stairs, which connects the main landings and the elevator landings. The prefabricated elevator system is then placed on the staircase prepared in this way and now provided with a single-flight staircase, aligned and connected to the elevator landings or the outer landing elements. The result is a stairwell in which the doors of the elevator system are level with the landing doors via the elevator landings, the webs and the main landings and are therefore barrier-free.

Von diesem Stand der Technik geht die vorliegende Erfindung aus, wobei ihr die Aufgabe zugrunde liegt, das eben beschriebene Verfahren kostengünstiger auszugestalten und im Sinne einer möglichst hohen Nachhaltigkeit weiterzubilden, und einen vorgefertigten, transportierbaren Aufzugsturm zur Verwendung in einem solchen Verfahren zur Verfügung zu stellen.The present invention is based on this state of the art and is based on the object of designing the method just described more cost-effectively and further developing it in the sense of the greatest possible sustainability. and to provide a prefabricated, transportable elevator tower for use in such a method.

Gelöst ist diese Aufgabe durch ein Verfahren mit den Merkmalen des Patentanspruchs 1 und durch ein Verfahren mit den Merkmalen des Patentanspruchs 6, sowie durch einen vorgefertigten, transportierbaren Aufzugsturm mit den Merkmalen des Patentanspruchs 11. Vorteilhafte Weiterbildungen des erfindungsgemäßen Verfahrens sind in den Patentansprüchen 2 bis 5 sowie 7 bis 10 niedergelegt, eine bevorzugte Ausgestaltung des erfindungsgemäßen Aufzugsturms findet sich im Patentanspruch 12.This object is achieved by a method with the features of patent claim 1 and by a method with the features of patent claim 6, as well as by a prefabricated, transportable elevator tower with the features of patent claim 11. Advantageous developments of the method according to the invention are in patent claims 2 to 5 and 7 to 10, a preferred embodiment of the elevator tower according to the invention can be found in patent claim 12.

Das erfindungsgemäße Verfahren unterscheidet sich demnach vom Verfahren des zuletzt genannten Standes der Technik hauptsächlich dadurch, dass die zweiläufige Treppe nicht entfernt und vollständig durch eine neue, einläufige Treppe ersetzt wird, sondern ein Umbau der zweiläufigen Treppe in eine einläufige Treppe erfolgt, d.h. die beiden Teilabschnitte der zweiläufigen Treppe, die an ein und demselben Zwischenpodest angebracht sind, werden gleich orientiert aneinandergesetzt (wofür einer der beiden Teilabschnitte zuvor um 180 Winkelgrade um die Hochachse gedreht werden muss), um zusammen einen Teilabschnitt einer einläufigen Treppe zu bilden, der ein Hauptpodest mit dem Aufzugspodest einer darüber oder darunter liegenden Etage verbindet.The method according to the invention therefore differs from the method of the last-mentioned prior art mainly in that the double-flight staircase is not removed and completely replaced by a new, single-flight staircase, but the double-flight staircase is converted into a single-flight staircase, i.e. the two sections of the two-flight staircase, which are attached to one and the same intermediate landing, are placed together in the same orientation (for which one of the two sections must first be rotated by 180 degrees around the vertical axis) in order to form a section of a single-flight staircase, which has a main landing with the elevator platform of a floor above or below.

Erfindungsgemäß entfällt also das Entsorgen einer ausgebauten zweiläufigen Treppe und das Herstellen einer neuen einläufigen Treppe, was nicht nur erhebliche Kosteneinsparungen ermöglicht, sondern auch unter dem Gesichtspunkt der Nachhaltigkeit große Vorteile bietet. Darüber hinaus ergeben sich Zeitvorteile, weil in der Regel nur eine Hälfte der zweiläufigen Treppe aus dem Treppenhaus ausgebaut (und gedreht sowie wieder eingebaut) werden muss, während die andere Hälfte der zweiläufigen Treppe im Treppenhaus verankert bleiben kann, um zusammen mit der gedrehten Hälfte der zweiläufigen Treppe die neue einläufige Treppe zu bilden.According to the invention, there is therefore no need to dispose of a removed double-flight staircase and produce a new single-flight staircase, which not only enables considerable cost savings, but also offers great advantages from the point of view of sustainability. In addition, there are time advantages because usually only one half of the double-flight staircase has to be removed from the stairwell (and turned and reinstalled), while the other half of the double-flighted stair can remain anchored in the stairwell in order to work together with the turned half of the staircase double-flight staircase to form the new single-flight staircase.

Welche Hälfte der zweiläufigen Treppe abgebaut wird, kann je nach den baulichen Voraussetzungen variieren, wobei naturgemäß in allen Etagen die Treppenabschnitte derselben Treppenhälfte abgebaut werden. Es bietet sich jedenfalls an, diejenige Hälfte der zweiläufigen Treppe im Treppenhaus zu belassen, die die Haustüre im Erdgeschoss mit dem ersten Hauptpodest verbindet. Denn die Treppenverbindung zwischen der Haustüre und dem ersten Hauptpodest des Gebäudes muss ohnehin bestehen bleiben, um einen Fluchtweg ohne Aufzugsbenutzung zu gewährleisten.Which half of the double-flight staircase is dismantled can vary depending on the structural conditions, with the stair sections of the same half of the staircase being naturally dismantled on all floors. In any case, it makes sense to leave that half of the double flight of stairs in the stairwell that connects the front door on the ground floor with the first main landing. Because the stairway connection between the front door and the first main landing of the building must remain in place anyway in order to ensure an escape route without using the elevator.

Die Verfahrensschritte des erfindungsgemäßen Verfahrens müssen nicht zwingend in der Reihenfolge abgearbeitet werden, in der sie im Patentanspruch 1 aufgelistet sind. So kann beispielsweise das Gestell vor oder nach dem Öffnen der Frontseite des Gebäudes an die Treppenhausfassade angestellt werden. Ebenso kann das Fundament für die vorgefertigte Aufzugsanlage auch später angefertigt werden.The method steps of the method according to the invention do not necessarily have to be processed in the order in which they are listed in patent claim 1. For example, the frame can be placed against the stairwell facade before or after opening the front of the building. Likewise, the foundation for the prefabricated elevator system can also be prepared later.

Nach einer Variante des erfindungsgemäßen Verfahrens, wie sie im Anspruch 6 niedergelegt ist, wird das Gestell gar nicht als solches an die Treppenhausfassade angestellt, sondern es wird zusammen mit der Aufzugsanlage vorgefertigt und gemeinsam mit diesem an die Baustelle angeliefert, und auch gemeinsam mit diesem auf das Fundament gestellt und ausgerichtet, mithin also an die Treppenhausfassade angestellt. Vorzugsweise geschieht dies in Form eines vorgefertigten, transportierbaren Aufzugsturms, wie er als weiterer Aspekt der vorliegenden Erfindung im Patentanspruch 11 definiert ist.According to a variant of the method according to the invention, as laid down in claim 6, the frame is not placed as such on the stairwell facade, but it is prefabricated together with the elevator system and delivered together with this to the construction site, and also together with this the foundation was placed and aligned, thus placed on the stairwell facade. This is preferably done in the form of a prefabricated, transportable elevator tower, as defined in patent claim 11 as a further aspect of the present invention.

Solch ein vorgefertigter, transportierbarer Aufzugsturm enthält eine Aufzugsanlage mit einem Schacht, der eine Durchtrittsöffnung für jede anzufahrende Etage aufweist, und mit einer in einer Längsrichtung des Schachtes verfahrbar im Schacht gelagerten Kabine sowie deren Antrieb. Zusätzlich zur Aufzugsanlage enthält der Aufzugsturm das Gestell, das pro Etage je ein Aufzugspodest vor der entsprechenden Durchtrittsöffnung des Schachts aufweist, oder das mit Aufnahmen für solche Aufzugspodeste versehen ist.Such a prefabricated, transportable elevator tower contains an elevator system with a shaft, which has a passage opening for each floor to be approached, and with a car mounted in the shaft so that it can be moved in a longitudinal direction of the shaft, and its drive. In addition to the elevator system, the elevator tower contains the frame, which has an elevator landing on each floor in front of the corresponding passage opening of the shaft, or which is provided with receptacles for such elevator landings.

Weitere Vorteile hinsichtlich Kosten und Nachhaltigkeit ergeben sich mit einer bevorzugten Weiterbildung der Erfindung, bei welcher das Gestell ohne Aufzugspodeste, jedoch mit Aufnahmen für die Aufzugspodeste in Höhe der Hauptpodeste vorgefertigt wird, so dass die beim Umbau des Treppenhauses entfernten Zwischenpodeste in diese Aufnahmen des Gestells eingesetzt und als Aufzugspodest weiterverwendet werden können.Further advantages in terms of costs and sustainability result from a preferred development of the invention, in which the frame is prefabricated without elevator landings, but with mounts for the elevator platforms at the level of the main landings, so that the intermediate platforms removed when converting the stairwell are inserted into these mounts of the frame and can be reused as a lift platform.

Das Gestell wird vorzugsweise als Stahlkonstruktion gefertigt sowie weiter bevorzugt im Metallbau mit Seitenwänden versehen, da es nach dem Anbringen der Aufzugsanlage Teil des Treppenhauses wird. Dies ermöglicht, das Gestell, gegebenenfalls auch schon mit Seitenwänden, vorzufertigen. Es ist im Rahmen der vorliegenden Erfindung jedoch auch möglich, das Gestell erst vor Ort herzustellen und an die Gegebenheiten anzupassen. Ebenso kann im Rahmen der vorliegenden Erfindung vorgesehen sein, das Gestell mit Aufzugspodesten vorzufertigen, oder das Gestell mit Aufzugspodesten und bereits daran angebrachten Stegen vorzufertigen, um den Vorfertigungsgrad möglichst hoch zu gestalten. Wie erwähnt, wird das Gestell in einer Variante der vorliegenden Erfindung zusammen mit der Aufzugsanlage vorgefertigt und zusammen mit dieser zur Baustelle transportiert und an das geöffnete Treppenhaus angestellt.The frame is preferably manufactured as a steel construction and, more preferably, provided with side walls in metal construction, since it becomes part of the stairwell after the elevator system has been attached. This makes it possible to prefabricate the frame, possibly even with side walls. However, it is also possible within the scope of the present invention to first produce the frame on site and to adapt it to the circumstances. It can also be provided within the scope of the present invention to prefabricate the frame with elevator platforms, or to prefabricate the frame with elevator platforms and webs already attached thereto in order to make the degree of prefabrication as high as possible. As mentioned, in a variant of the present invention, the frame is prefabricated together with the elevator system and transported together with it to the construction site and positioned against the open staircase.

Das Gestell, das vorzugsweise als Stahlkonstruktion mit vier Längsholmen und einer Anzahl von Querholmen vorgefertigt ist sowie mit oder ohne Aufzugspodeste ausgestattet ist, kann auch als Gerüst für das Öffnen der Frontseite verwendet werden. Hierzu werden dann zweckmäßigerweise die für das Öffnen der Frontseite des Gebäudes benötigten Werkzeuge, wie Betonsägen oder ähnliches, am Gestell geführt. Das Gestell kann also in bevorzugter Weise als Hilfskonstruktion für einige erfindungsgemäße Verfahrensschritte verwendet werden, was wiederum zur Kostendämpfung und Nachhaltigkeit beitragen kann.The frame, which is preferably prefabricated as a steel construction with four longitudinal beams and a number of transverse beams and is equipped with or without elevator platforms, can also be used as a scaffold for opening the front. For this purpose, the tools required for opening the front of the building, such as concrete saws or the like, are then expediently guided on the frame. The frame can therefore be used in a preferred manner as an auxiliary construction for some process steps according to the invention, which in turn can contribute to cost containment and sustainability.

Zwei Ausführungsbeispiele für die Anwendung der erfindungsgemäßen Verfahren bei einem mehretagigen Gebäude der eingangs beschriebenen Art wird anhand der beigefügten Zeichnungen näher beschrieben und erläutert. Es zeigen:

Figur 1
ein Gebäude, das mit einer Aufzugsanlage nachgerüstet werden soll, vor Beginn des erfindungsgemäßen Verfahrens;
Figur 2
das Gebäude aus Figur 1 mit bereits hergestelltem Fundament für die Aufzugsanlage, beim Öffnen der Treppenhausfassade;
Figur 3
das Gebäude aus den vorangehenden Figuren, beim Umbau des Treppenhauses;
Figur 4
das Gebäude aus den vorangehenden Figuren, mit nachgerüsteter Aufzugsanlage;
Figur 5
ein erfindungsgemäß ausgestalteter, vorgefertigter und transportierbarer Aufzugsturm zur Verwendung in einem zweiten Ausführungsbeispiel;
Figur 6
der Aufzugsturm aus Figur 5, nach dem Ansetzen an ein Gebäude 1;
Figur 7
eine Darstellung wie Figur 6, jedoch aus einem anderen Blickwinkel.
Two exemplary embodiments for the application of the method according to the invention in a multi-storey building of the type described above are described and explained in more detail with reference to the accompanying drawings. Show it:
figure 1
a building that is to be retrofitted with an elevator system, before the start of the method according to the invention;
figure 2
the building off figure 1 with the foundation for the elevator system already in place when opening the stairwell facade;
figure 3
the building of the previous figures, in the remodeling of the stairwell;
figure 4
the building of the previous figures, with retrofitted elevator system;
figure 5
a prefabricated and transportable elevator tower configured according to the invention for use in a second exemplary embodiment;
figure 6
the elevator tower figure 5 , after attaching to a building 1;
figure 7
a representation like figure 6 , but from a different perspective.

In den Figuren 1 bis 4 sind schematisch und unter Weglassung von nicht interessierenden, aber eigentlich vorhandenen Gebäudeteilen verschiedene Verfahrensstadien bei der beispielhaften Durchführung eines erfindungsgemäßen Verfahrens an einem Mehrfamilienhaus mit sechs Stockwerken und einem Keller dargestellt.In the Figures 1 to 4 are shown schematically and with the omission of parts of the building that are not of interest but are actually present, various stages of the method in the exemplary implementation of a method according to the invention on an apartment building with six floors and a basement.

Figur 1 zeigt die Ausgangslage: Ein Gebäude 1 mit einem Kellergeschoss 2 und sechs Stockwerken 3, 3.1, 3.2 ... soll mit einer vorgefertigten Aufzugsanlage (vgl. Fig. 4) nachgerüstet werden. In jeder Etage 3, 3.1, 3.2 ... befinden sich Wohnungen, die über Etagentüren 4, 4.1, 4.2... zugänglich sind. Ein Treppenhaus 5 mit je einem Hauptpodest 6, 6.1, 6.2... vor den Etagentüren 4, 4.1, 4.2... grenzt an eine Frontseite 7 des Gebäudes an, wodurch in der Breite des Treppenhauses 5 ein Teil der Frontseite 7 des Gebäudes 1 zu einer Treppenhausfassade 8 wird. In der Treppenhausfassade 8 sind vorliegend Fenster 9 zur Beleuchtung des Treppenhauses 5 sowie eine Haustüre 10 angeordnet. Die Haustüre 10 führt zu einer ebenerdigen Platte 11 vor dem Gebäude 1. figure 1 shows the initial situation: A building 1 with a basement 2 and six floors 3, 3.1, 3.2 ... is to be equipped with a prefabricated elevator system (cf. 4 ) to be retrofitted. On each floor 3, 3.1, 3.2... there are apartments that are accessible via floor doors 4, 4.1, 4.2... A stairwell 5, each with a main landing 6, 6.1, 6.2... in front of the storey doors 4, 4.1, 4.2... adjoins a front side 7 of the building, which increases the width of the stairwell 5 part of the front 7 of the building 1 becomes a staircase facade 8 . In the stairwell facade 8, windows 9 for illuminating the stairwell 5 and a front door 10 are present. The front door 10 leads to a ground-level slab 11 in front of the building 1.

Im Inneren des Treppenhauses 5 führt die Haustüre 10 auf ein erstes Zwischenpodest 12, von dem aus das Hauptpodest 6 für die erste Etage 3, die das Erdgeschoss bildet, über einen ersten Treppenabschnitt 13 einer zweiläufigen Treppe erreichbar ist. Ein zweiter Treppenabschnitt 14 der zweiläufigen Treppe führt vom Zwischenpodest 12 in das Kellergeschoss 2. In entsprechender Weise verbindet die zweiläufige Treppe des Treppenhauses 5 mit ihrer ersten Treppenhälfte, die aus den ersten Treppenabschnitten 13.1, 13.2... besteht, und ihrer zweiten Treppenhälfte, die aus den zweiten Treppenabschnitten 14.1, 14.2... gebildet wird, die Hauptpodeste 6, 6.1, 6.2..., und zwar jeweils über Zwischenpodeste 12, 12.1, 12.2... zwischen den Etagen. Die Zwischenpodeste 12, 12.1, 12.2... grenzen von innen an die Treppenhausfassade 8 an.Inside the stairwell 5, the front door 10 leads to a first intermediate landing 12, from which the main landing 6 for the first floor 3, which forms the ground floor, can be reached via a first stair section 13 of a double flight of stairs. A second stair section 14 of the double flight of stairs leads from the intermediate landing 12 to the basement 2. In a corresponding manner, the double flight of stairs of the staircase 5 connects with its first half of the staircase, which consists of the first staircase sections 13.1, 13.2..., and its second half of the staircase, the is formed from the second stair sections 14.1, 14.2..., the main landings 6, 6.1, 6.2..., in each case via intermediate landings 12, 12.1, 12.2... between the floors. The intermediate landings 12, 12.1, 12.2... adjoin the staircase facade 8 from the inside.

Anhand dieser Darstellung eines mit einer Aufzugsanlage nachzurüstenden, mehretagigen Gebäudes in der Ausgangsposition gemäß Figur 1 ist das grundsätzliche Problem leicht erkennbar, dass dann, wenn eine Aufzugsanlage von außen an die Treppenhausfassade 8 angestellt wird und die einzelnen Türöffnungen der Aufzugsanlage auf die Zwischenpodeste 12, 12.1, 12.2... führen, eine Barrierefreiheit des Treppenhauses 5 noch nicht gegeben ist. Denn von jedem Zwischenpodest 12... muss entweder über einen ersten Treppenabschnitt 13... nach oben oder über einen zweiten Treppenabschnitt 14... der zweiläufigen Treppe nach unten gestiegen werden, um eines der Hauptpodeste 6... und damit eine Etagentür 4... erreichen zu können.Based on this representation of a multi-storey building to be retrofitted with an elevator system in the starting position according to figure 1 the fundamental problem is easily recognizable that when an elevator system is placed on the stairwell facade 8 from the outside and the individual door openings of the elevator system lead to the intermediate landings 12, 12.1, 12.2..., the stairwell 5 is not yet barrier-free. Because from each intermediate landing 12... one has to climb either up a first stair section 13... or down a second stair section 14... of the two-flight staircase in order to reach one of the main landings 6... and thus a floor door 4 ... to be able to reach.

Figur 2 zeigt eine erste Phase bei der erfindungsgemäßen Nachrüstung des Gebäudes 1 mit einer Aufzugsanlage. Zunächst wird anstelle der Platte 11 ein Fundament 15 vor der Treppenhausfassade 8 hergestellt, um insbesondere die Aufzugsanlage (hier nicht dargestellt) sicher gründen zu können. Gleichzeitig soll das Fundament 15 auch zum Aufstellen eines Gestells 8 (s. Figur 3) dienen. Dieses Fundament 15 wird in bekannter Art und Weise aus Beton gefertigt. figure 2 shows a first phase in the retrofitting of the building 1 according to the invention with an elevator system. First, instead of the plate 11, a foundation 15 is produced in front of the stairwell facade 8, in particular to be able to securely base the elevator system (not shown here). At the same time should the foundation 15 can also be used to set up a frame 8 (see figure 3 ) to serve. This foundation 15 is made of concrete in a known manner.

In der in Figur 2 dargestellten Phase wird auch die Frontseite 7 des Gebäudes 1 durch Entfernen der Treppenhausfassade 8 geöffnet. Somit sind sämtliche Zwischenpodeste 12... von außen zugänglich.in the in figure 2 In the phase shown, the front 7 of the building 1 is also opened by removing the stairwell facade 8 . Thus, all intermediate platforms 12... are accessible from the outside.

Eine weitere Phase des erfindungsgemäßen Verfahrens ist in Figur 3 dargestellt, wobei hier der Abstraktionsgrad der Zeichnung erhöht wurde, um die Verfahrensschritte besser zu verdeutlichen. Insbesondere ist ein Teil der Frontseite 7 des Gebäudes 1, der beim Entfernen der Treppenhausfassade 8 nicht mit entfernt wurde, lediglich der besseren Übersichtlichkeit wegen weggelassen worden.A further phase of the method according to the invention is in figure 3 shown, whereby the degree of abstraction of the drawing was increased here in order to better illustrate the procedural steps. In particular, part of the front 7 of the building 1, which was not removed when removing the stairwell facade 8, has only been omitted for the sake of clarity.

Nach Fertigstellen des Fundaments 15 und Entfernen der Treppenhausfassade 8 wird ein Gestell 16 aus miteinander verschweißten Stahlprofilen mit vier Längsholmen 26 und einer Mehrzahl von Querholmen 27 in eine dafür vorgesehene Ausnehmung im Fundament 15 gestellt. Gleichzeit erfolgt eine hier nicht näher dargestellte Verankerung des Gestells 16 an der Fassade des Gebäudes 1, um eine feste Verbindung mit dem Gebäude 1 herzustellen.After the foundation 15 has been completed and the stairwell facade 8 has been removed, a frame 16 made of steel profiles welded to one another with four longitudinal beams 26 and a plurality of transverse beams 27 is placed in a recess in the foundation 15 provided for this purpose. At the same time, the frame 16 is anchored to the facade of the building 1 (not shown in more detail here) in order to create a fixed connection to the building 1.

Das Gestell 16 ist jeweils in Höhe der Hauptpodeste 6... mit zusätzlichen Stahlprofilen versehen, die je Etage eine Aufnahme 17, 17.1, 17.2... für die aus dem Treppenhaus 5 zu entfernenden Zwischenpodeste 12, 12.1, 12.2... bilden. Wie symbolisch in Figur 3 dargestellt ist, werden die Zwischenpodeste 12... aus ihrer Verankerung im Treppenhaus 5 gelöst und in die Aufnahmen 17... gesetzt (und dort befestigt), wo sie als Aufzugspodeste 18, 18.1, 18.2... weiterverwendet werden. Es entfallen also sowohl eine Neuanfertigung von Aufzugspodesten 18... als auch das Entsorgen der Zwischenpodeste 12...The frame 16 is provided with additional steel profiles at the level of the main landings 6 . . . which form a receptacle 17 , 17 . How symbolic in figure 3 is shown, the intermediate landings 12... are released from their anchoring in the stairwell 5 and placed in the receptacles 17... (and fastened there), where they are used as elevator landings 18, 18.1, 18.2.... There is therefore no need to manufacture new elevator platforms 18... or to dispose of the intermediate platforms 12...

Das Gestell 16 kann im Rahmen der vorliegenden Erfindung allerdings auch schon vor dem Öffnen der Frontseite 7 des Gebäudes 1 an das Gebäude angestellt werden und als Hilfskonstruktion zum Entfernen der Treppenhausfassade 8 dienen.Within the scope of the present invention, however, the frame 16 can also be placed against the building before the front side 7 of the building 1 is opened and serve as an auxiliary construction for removing the stairwell facade 8 .

Wie ebenfalls aus Figur 3 ersichtlich ist, werden die ersten und zweiten Treppenhälften 13, 13.1, 13.2..., 14, 14.1, 14.2... zu einer einläufigen Treppe zusammengesetzt, indem die zweiten Treppenabschnitte 14, 14.1, 14.2... der zweiten Treppenhälfte jeweils zusammen mit dem zugehörigen Zwischenpodest 12, 12.1..., oder nach Entfernen desselben, aus dem Treppenhaus 5 herausgenommen, um 180 Winkelgrade um die Hochachse gedreht und an die ersten Treppenabschnitte 13, 13.1, 13.2... der ersten Treppenhälfte angesetzt werden, um diese mit den zu Aufzugspodesten 18... gewordenen Zwischenpodesten 12... zu verbinden. Zweckmäßigerweise wird hierbei von oben nach unten gearbeitet, wobei das oberste Hauptpodest 6.5 mit der zugehörigen ersten Treppenhälfte 13.5 in seinen Verankerungen im Treppenhaus 5 verbleibt und damit denjenigen Teil der Grundrissfläche des Treppenhauses 5 festlegt, in dem sich die einläufige Treppe befindet. Der andere Teil der Grundrissfläche wird durch Entfernen, Drehen und Anbauen der zweiten Treppenabschnitte 14... an die ersten Treppenabschnitte 13... frei von Treppenstufen, so dass hier Stege 19, 19.1, 19.2... eingebaut werden können, die jeweils ein Hauptpodest 6... mit jeweils einem Aufzugspodest 18... horizontal und eben, somit also barrierefrei verbinden.How also from figure 3 can be seen, the first and second halves of the staircase 13, 13.1, 13.2 ..., 14, 14.1, 14.2 ... assembled into a single-flight staircase by the second staircase sections 14, 14.1, 14.2 ... the second half of the staircase each together with the associated intermediate landing 12, 12.1 ..., or after removing the same, taken out of the stairwell 5, rotated 180 degrees around the vertical axis and attached to the first stair sections 13, 13.1, 13.2 ... the first half of the staircase to this with to connect the intermediate landings 12... which have become elevator landings 18... It is expedient to work from top to bottom, with the uppermost main landing 6.5 with the associated first half of the staircase 13.5 remaining in its anchorages in the staircase 5 and thus defining that part of the floor plan of the staircase 5 in which the single-flight staircase is located. The other part of the floor plan area is removed, rotated and attached to the second stair sections 14... to the first stair sections 13... free of steps, so that webs 19, 19.1, 19.2... can be installed here, each one Main platform 6... each with a lift platform 18... horizontal and level, thus connecting without barriers.

Diese Situation ist in Figur 4 dargestellt. In dieser ist unmittelbar erkennbar, dass das Treppenhaus 5 nun eine einläufige Treppe beinhaltet, wobei jeweils zusammengesetzte erste und zweite Treppenabschnitte 13..., 14... die Treppenabschnitte der einläufigen Treppe bilden, welche die unverändert gebliebenen Hauptpodeste 6... mit den Aufzugspodesten 18... einer jeweils darunter liegenden Etage 3... verbinden.This situation is in figure 4 shown. In this it is immediately apparent that the stairwell 5 now includes a single-flight staircase, each composite first and second stair sections 13 ..., 14 ... form the stair sections of the single-flight staircase, which the main landings 6 ... remained unchanged with the Elevator platforms 18... connect a floor 3 below.

Wie in Figur 4 außerdem erkennbar ist, ist das Gestell 16 nun zu einem Teil des Treppenhauses 5 geworden, das somit über die ursprüngliche Treppenhausfassade 8 hinaus erweitert worden ist. Hierzu wird das Gestell 16 mit Metallplatten 20 verkleidet, wobei auch Fensteröffnungen 21 nicht vergessen worden sind.As in figure 4 It can also be seen that the frame 16 has now become part of the stairwell 5, which has thus been extended beyond the original stairwell facade 8. For this purpose, the frame 16 is clad with metal plates 20, with window openings 21 not having been forgotten.

Eine an sich aus der EP 3 315 448 A2 bekannte, im Werk vorgefertigte und komplett angelieferte Aufzugsanlage 22, von der im Wesentlichen nur der aus einer abgekanteten Metallplatte gefertigte Schacht 25 zu sehen ist, wurde in eine dafür vorgesehene Ausnehmung im Fundament 15 eingestellt, auf dem Fundament 15 ausgerichtet und an das Gestell 16 angesetzt sowie abdichtend mit diesem verbunden. Die Aufzugsanlage weist zum Treppenhaus 5 hin insgesamt fünf Türöffnungen 23, 23.1, 23.2 ... auf, die in Höhe der Aufzugspodeste 18, 18.1, 18.2 ... angeordnet sind und einen barrierefreien Zugang über die Stege 19... zu den Hauptpodesten 6... und damit zu den Etagentüren 4... gewährleisten. Lediglich die oberste Etage 3.5 konnte aus baulichen Gründen nicht barrierefrei angeschlossen werden.One in itself from the EP 3 315 448 A2 well-known elevator system 22, prefabricated in the factory and delivered completely, of which essentially only the shaft 25 made of a folded metal plate can be seen, was placed in a recess provided for this purpose in the foundation 15, aligned on the foundation 15 and attached to the frame 16 and sealingly connected to it. The elevator system has a total of five door openings 23, 23.1, 23.2... towards the staircase 5, which are arranged at the height of the elevator landings 18, 18.1, 18.2... and barrier-free access via the webs 19... to the main landings 6 ... and thus to the storey doors 4... ensure. Only the top floor 3.5 could not be connected barrier-free for structural reasons.

Die Aufzugsanlage 22 überdeckt nur etwa die halbe Breite der Aufzugspodeste 18... und damit des Gestells 16, so dass daneben zum einen die Fensteröffnungen 21 angebracht werden können, zum anderen jedoch insbesondere auch Platz für eine nach oben auf Erdgeschosshöhe versetzte Haustüre 10' verbleibt. Diese ist vom "Erdgeschoss"-Aufzugspodest 18 zu erreichen und gewährleistet einen von der Aufzugsanlage 22 unabhängigen Zugang zum Treppenhaus 5 von außen. Außerhalb des Gebäudes 1 wird die Haustüre 10' (hier nicht sichtbar) über eine Außentreppe 31 zugänglich gemacht, während die Aufzugsanlage 22 nach außen mit einer (hier ebenfalls nicht sichtbaren) ebenerdigen Erdgeschoss-Türöffnung 30 versehen ist.The elevator system 22 only covers about half the width of the elevator landings 18... and thus of the frame 16, so that the window openings 21 can be attached next to them, but on the other hand there is also space for a house door 10' that is offset upwards to ground floor level . This can be reached from the "ground floor" elevator landing 18 and ensures access to the stairwell 5 from the outside that is independent of the elevator system 22 . Outside the building 1, the front door 10' (not visible here) is made accessible via an outside staircase 31, while the elevator system 22 is provided to the outside with a ground-level door opening 30 (also not visible here).

Anhand der Figuren 1 bis 4 wird nochmals beispielhaft verdeutlicht, welche Effizienz-, Kosteneinsparungs- und Nachhaltigkeitsgewinne durch das erfindungsgemäße Verfahren erzielbar sind. Das Nachrüsten eines Gebäudes, wie es beispielhaft in Figur 1 dargestellt ist, mit einer Aufzugsanlage 22 mit gleichzeitigem Umbauen des Treppenhauses 5 in eine barrierefreie Ausgestaltung, wie sie aus Figur 4 ersichtlich ist, kann somit innerhalb weniger Tage und mit vergleichsweise sehr geringen Kosten durchgeführt werden.Based on Figures 1 to 4 it is again illustrated by way of example which gains in efficiency, cost savings and sustainability can be achieved by the method according to the invention. Retrofitting a building, as exemplified in figure 1 is shown, with an elevator system 22 with simultaneous conversion of the staircase 5 in a barrier-free design, as shown in figure 4 can thus be carried out within a few days and at comparatively very low costs.

An dieser Stelle soll nochmals darauf hingewiesen werden, dass anhand der Figuren 1 bis 4 lediglich ein Ausführungsbeispiel für ein erfindungsgemäßes Verfahren beschrieben worden ist. Andere Ausgestaltungen, wie beispielsweise das Vorfertigen des Gestells 16 zusammen mit bereits fest installierten Aufzugspodesten 18 oder das Verwenden des Gestells 16 als Gerüst für das Entfernen der Treppenhausfassade 8 und das Umbauen des Treppenhauses 5 sowie auch das Vorfertigen des Fundamentes 15 und andere Varianten sind im Rahmen der vorliegenden Erfindung möglich.At this point it should be pointed out again that only one exemplary embodiment of a method according to the invention has been described with reference to FIGS. Other configurations, such as prefabricating the frame 16 together with elevator platforms 18 that are already permanently installed or using the frame 16 as scaffolding for removing the stairwell facade 8 and converting the stairwell 5 as well as prefabricating the foundation 15 and other variants are within the scope of the present invention possible.

Es versteht sich schließlich auch, dass zur Durchführung des erfindungsgemäßen Verfahrens ein sorgfältiges initiales Vermessen des Treppenhauses 5 und seiner Teile sowie der sonstigen baulichen Gegebenheiten, vorzugsweise unter Zuhilfenahme von 3D-Modellierungen, unerlässlich ist, insbesondere wenn ein hoher Vorfertigungsgrad angestrebt wird.Finally, it also goes without saying that a careful initial measurement of the staircase 5 and its parts as well as the other structural conditions, preferably with the aid of 3D models, is essential for carrying out the method according to the invention, particularly if a high degree of prefabrication is desired.

In Figur 5 ist ein Ausführungsbeispiel für einen vorgefertigten, transportierbaren Aufzugsturm 24 dargestellt, der nach einer Variante eines erfindungsgemäßen Verfahrens zum Nachrüsten eines Gebäudes mit einer Aufzugsanlage 22 verwendet wird. Dieser Aufzugsturm 24 enthält eine funktionsfähig vorbereitete Aufzugsanlage 22, deren Schacht 25 an der nicht verkleideten, und in das Fundament 15 einzustellenden Unterfahrt der Aufzugsanlage 22 zu sehen ist; das Bodenniveau ist mit einer durchbrochenen Linie 28 angedeutet. Der Aufzugsturm 24 enthält ferner das Gestell 16, das auch hier aus Längsholmen 26 und (hier nicht sichtbaren) Querholmen 27 besteht. Die Längsholme 26 sind wiederum unterhalb des Bodenniveaus 28 sichtbar, und zwar in demjenigen Bereich, der in das Fundament 15 eingestellt werden soll.In figure 5 An exemplary embodiment of a prefabricated, transportable elevator tower 24 is shown, which is used according to a variant of a method according to the invention for retrofitting a building with an elevator system 22. This elevator tower 24 contains an operationally prepared elevator system 22, the shaft 25 of which is not clad and can be seen in the foundation 15 underride of the elevator system 22; the floor level is indicated with a broken line 28 . The elevator tower 24 also contains the frame 16, which here also consists of longitudinal bars 26 and transverse bars 27 (not visible here). The longitudinal beams 26 are again visible below the ground level 28, specifically in that area which is to be placed in the foundation 15.

Die Kombination aus Aufzugsanlage 22 und Gestell 16 ist mit Metallplatten bzw. Seitenwänden 29 verkleidet. Auch die Haustüre 10', die einen Fluchtweg bzw. Zugang zum Treppenhaus von außen gewährleistet, ist bereits Teil des vorgefertigten Aufzugsturms 24. Für den barrierefreien Zugang ist die Aufzugsanlage 22 ebenerdig mit einer Erdgeschoss-Türöffnung 30 versehen, die sich nach außen öffnet und die barrierefreie "Haustüre" bildet.The combination of elevator system 22 and frame 16 is covered with metal plates or side walls 29 . The front door 10', which has an escape route or Access to the stairwell from the outside is already guaranteed as part of the prefabricated elevator tower 24. For barrier-free access, the elevator system 22 is provided with a ground floor door opening 30 at ground level, which opens outwards and forms the barrier-free "front door".

Die Figuren 6 und 7 zeigen aus unterschiedlichen Perspektiven, wie der Aufzugsturm 24 aus Figur 5 vor das geöffnete und nach dem erfindungsgemäßen Verfahren vorbereitete (vgl. Figuren 1 bis 4) Treppenhaus des Gebäudes 1 angesetzt wird:
Nach dem Einsetzen des Aufzugsturms 24 in das Fundament 15 und dem Ansetzen des Aufzugsturms 24 an das Gebäude 1 müssen nur noch die (hier nicht sichtbaren) Aufzugspodeste 18 an die einläufigen Treppen und die Stege 19 angeschlossen werden - wobei die Aufzugspodeste 18 entweder beim Vorfertigen des Aufzugsturms 24 in das Gestell 16 eingesetzt wurden - oder die ausgebauten Zwischenpodeste 12 als Aufzugspodeste 18 in das Gestell 16 eingesetzt werden - und der Aufzugsturm 24 aus Sicherheitsgründen am Gebäude 1 verankert werden, um das Nachrüsten des Gebäudes mit einer Aufzugsanlage zu vollenden. Es bleibt dann nur noch, die Haustüre 10' mit einer Außentreppe 31 zu versehen, um einen Zugang zum Gebäude 1 ohne Benutzung der Aufzugsanlage 22 zu ermöglichen.
the figures 6 and 7 show from different perspectives how the elevator tower 24 looks like figure 5 before the opened and prepared according to the method according to the invention (cf. Figures 1 to 4 ) staircase of building 1 is applied:
After the elevator tower 24 has been inserted into the foundation 15 and the elevator tower 24 has been attached to the building 1, it is only necessary to connect the elevator platforms 18 (not visible here) to the single-flight stairs and the webs 19 - the elevator platforms 18 either being attached during the prefabrication of the Elevator tower 24 were used in the frame 16 - or the expanded intermediate platforms 12 are used as elevator platforms 18 in the frame 16 - and the elevator tower 24 is anchored to the building 1 for safety reasons in order to complete the retrofitting of the building with an elevator system. All that then remains is to provide the front door 10' with an outside staircase 31 in order to enable access to the building 1 without using the elevator system 22.

Durch die Vorfertigung des Aufzugsturms 24 ist das Treppenhaus 8 bereits um die Aufzugsanlage 22 und die Aufzugspodeste 18 im Gestell 16 erweitert, wobei die Seitenwände 29 die neue Außenhülle des Gebäudes 1 bilden. Soweit keine entsprechenden Dichtungen vorgefertigt sind, empfiehlt es sich, die Stoßstellen zwischen dem Aufzugsturm 24 und dem Gebäude 1 noch abzudichten, z.B. mit Dichtschaum.Due to the prefabrication of the elevator tower 24, the staircase 8 has already been expanded to include the elevator system 22 and the elevator landings 18 in the frame 16, with the side walls 29 forming the new outer shell of the building 1. If no corresponding seals are prefabricated, it is advisable to seal the joints between the elevator tower 24 and the building 1, e.g. with sealing foam.

Die in den Figuren 5 bis 7 dargestellte Variante des erfindungsgemäßen Verfahrens unter Verwendung des erfindungsgemäßen vorgefertigten, transportierbaren Aufzugsturms 24 ermöglicht gegenüber der ersten Variante des erfindungsgemäßen Verfahrens weitere Zeit- und Effizienzvorteile. Denn das Gestell 16 und die Aufzugsanlage 22 werden weder separat an die Baustelle transportiert noch separat mit einem Kran in das Fundament 15 eingehoben, sondern vielmehr mit einem einzigen Transport zur Baustelle gefahren und mit nur einem Kranhub an das Gebäude 1 angesetzt. Das Gestell 16, das beispielsweise an den Schacht 25 der Aufzugsanlage 22 angeflanscht werden kann, stabilisiert den Schacht 25 zusätzlich, was die funktionsfähige Vorbereitung der Aufzugsanlage 22 im Werk vereinfacht.The in the Figures 5 to 7 The illustrated variant of the method according to the invention using the prefabricated, transportable elevator tower 24 according to the invention enables further time and efficiency advantages compared to the first variant of the method according to the invention. Because the frame 16 and the elevator system 22 are neither transported separately to the construction site nor lifted separately into the foundation 15 with a crane, but rather are transported to the construction site with a single transport and attached to the building 1 with only one crane lift. The frame 16, which can be flanged to the shaft 25 of the elevator system 22, for example, additionally stabilizes the shaft 25, which simplifies the functional preparation of the elevator system 22 in the factory.

Bezugszeichenliste:Reference list:

11
Gebäudebuilding
22
Kellergeschossbasement
33
Etagefloor
44
Etagentürlanding door
55
Treppenhausstaircase
66
Hauptpodestmain landing
77
Frontseitefront
88th
Treppenhausfassadestaircase facade
99
Fensterwindow
1010
Haustürefront door
1111
Platteplate
1212
Zwischenpodestintermediate platform
1313
Erster TreppenabschnittFirst flight of stairs
1414
Zweiter TreppenabschnittSecond flight of stairs
1515
Fundamentfoundation
1616
Gestellframe
1717
Aufnahmeadmission
1818
Aufzugspodestelevator platform
1919
Stegweb
2020
Metallplattemetal plate
2121
Fensteröffnungwindow opening
2222
Aufzugsanlageelevator system
2323
Türöffnungdoorway
2424
Aufzugsturmelevator tower
2525
Schachtshaft
2626
Längsholmelongitudinal bars
2727
Querholmecrossbars
2828
Bodenniveaufloor level
2929
Seitenwändeside walls
3030
Erdgeschoss-TüröffnungGround floor doorway
3131
Außentreppeexternal staircase

Claims (12)

Verfahren zum Nachrüsten eines Gebäudes (1) mit einer Aufzugsanlage (22), welches Gebäude (1) eine Mehrzahl von Etagen (3, 3.1, 3.2...) mit jeweils mindestens einer Etagentüre (4, 4.1, 4.2...) aufweist, die über ein gemeinsames Treppenhaus (5) zugänglich sind, wobei das Treppenhaus (5) unter Ausbildung einer Treppenhausfassade (8) an einer Frontseite (7) des Gebäudes (1) angrenzt und je Etage (3,...) ein Hauptpodest (6, 6.1, 6.2...) für die Etagentüren (4...) sowie zwischen den Etagen (3...) jeweils ein an der Treppenhausfassade (8) angeordnetes Zwischenpodest (12, 12.1, 12.2...) für eine zweiläufige Treppe aufweist,
umfassend die Verfahrensschritte: - Anfertigen eines Fundaments (15) für eine vorgefertigte Aufzugsanlage (22) vor der Treppenhausfassade (8), - Öffnen der Frontseite (7) des Gebäudes (1) durch Entfernen der Treppenhausfassade (8), - Anstellen eines Gestells (16) an das geöffnete Treppenhaus (5), wobei das Gestell (16) pro barrierefrei zu erschließender Etage (3...) mit je einem, im Wesentlichen treppenhausbreiten Aufzugspodest (18, 18.1, 18.2...) in Höhe des jeweiligen Hauptpodests (6...) ausgestattet ist oder wird, - Entfernen der Zwischenpodeste (12...) und zumindest teilweises Abbauen der zweiläufigen Treppe, - Einbau von Stegen (19, 19.1, 19.2...) in das Treppenhaus (5), die sich von den Hauptpodesten (6...) waagrecht bis zu den Aufzugspodesten (18...) erstrecken und in Projektion die Grundfläche des Treppenhauses (5) nur zum Teil überdecken, um lichten Raum für eine einläufige Treppe zu lassen, - Verbinden der Hauptpodeste (6...) mit den Aufzugspodesten (18...) von übereinander liegenden Etagen (3...) über eine einläufige Treppe, - Aufstellen der vorgefertigten Aufzugsanlage (22) auf das Fundament (15), - Ausrichten der Aufzugsanlage (22) auf dem Fundament (15) und Herstellen von Anschlüssen zwischen der Aufzugsanlage (22) und den Aufzugspodesten (18...) und/oder dem Gestell (16), dadurch gekennzeichnet,
dass, beim Verfahrensschritt des Entfernens der Zwischenpodeste (12...) und zumindest teilweisen Abbauens der zweiläufigen Treppe, erste Treppenabschnitte (13, 13.1, 13.2...) einer ersten Hälfte der zweiläufigen Treppe, die jeweils ein Hauptpodest (6...) mit dem abzubauenden Zwischenpodest (12...) verbinden, im Treppenhaus (5) verbleiben und zweite Treppenabschnitte (14, 14.1, 14.2...) der anderen Hälfte der zweiläufigen Treppe ausgebaut und, um 180 Winkelgrade um die Hochachse gedreht, an die jeweiligen ersten Treppenabschnitte (13...) angesetzt werden, um zusammen mit diesen die Treppenabschnitte einer einläufige Treppe zu bilden, die die Hauptpodeste (6...) mit den Aufzugspodesten (18...) von darüber oder darunter liegenden Etagen (3...) verbinden.
Method for retrofitting a building (1) with an elevator installation (22), which building (1) has a plurality of floors (3, 3.1, 3.2...) each with at least one floor door (4, 4.1, 4.2...). which are accessible via a common stairwell (5), the stairwell (5) forming a stairwell facade (8) on a front side (7) of the building (1) adjoins and each floor (3,...) has a main platform ( 6, 6.1, 6.2...) for the storey doors (4...) and between each storey (3...) an intermediate landing (12, 12.1, 12.2...) arranged on the staircase facade (8) for a has two flights of stairs,
including the process steps: - Preparation of a foundation (15) for a prefabricated elevator system (22) in front of the stairwell facade (8), - Opening the front (7) of the building (1) by removing the staircase facade (8), - Positioning a frame (16) on the open stairwell (5), the frame (16) per floor (3...) to be developed barrier-free with one elevator platform (18, 18.1, 18.2...) essentially the width of the stairwell. is or will be equipped at the height of the respective main platform (6...), - Removal of the intermediate landings (12...) and at least partial dismantling of the double flight of stairs, - Installation of webs (19, 19.1, 19.2...) in the stairwell (5), which extend horizontally from the main landings (6...) to the elevator landings (18...) and project the base of the only partially cover the stairwell (5) in order to leave clear space for a single flight of stairs, - Connecting the main landings (6...) with the elevator landings (18...) of floors (3...) above one another via a single-flight staircase, - Setting up the prefabricated elevator system (22) on the foundation (15), - Aligning the elevator system (22) on the foundation (15) and making connections between the elevator system (22) and the elevator platforms (18...) and/or the frame (16), characterized,
that , in the method step of removing the intermediate landings (12...) and at least partially dismantling the double-flight staircase, first stair sections (13, 13.1, 13.2...) of a first half of the double-flight staircase, each of which has a main landing (6... ) with the intermediate landing (12...) to be dismantled, remain in the stairwell (5) and remove second stair sections (14, 14.1, 14.2...) of the other half of the double flight of stairs and rotate them by 180 degrees around the vertical axis the respective first stair sections (13...) are applied in order to form together with them the stair sections of a single-flight stairway which has the main landings (6...) with the elevator landings (18...) from floors above or below ( 3...) connect.
Verfahren nach Anspruch 1,
dadurch gekennzeichnet,
dass das Gestell (16) als Gerüst für das Öffnen der Frontseite (7) verwendet wird.
Method according to claim 1,
characterized,
that the frame (16) is used as a framework for opening the front panel (7).
Verfahren nach Anspruch 2,
dadurch gekennzeichnet,
dass Werkzeuge für das Öffnen der Frontseite (7) des Gebäudes (1) am Gestell (16) geführt und/oder gehalten werden.
Method according to claim 2,
characterized,
that tools for opening the front (7) of the building (1) are guided and/or held on the frame (16).
Verfahren nach mindestens einem der Ansprüche 1 bis 3,
dadurch gekennzeichnet,
dass das Gestell (16) mit Aufzugspodesten (18...) vorgefertigt wird.
Method according to at least one of claims 1 to 3,
characterized,
that the frame (16) with elevator platforms (18 ...) is prefabricated.
Verfahren nach Anspruch 4,
dadurch gekennzeichnet,
dass das Gestell (16) mit Aufzugspodesten (18...) und daran angebrachten Stegen (19...) vorgefertigt wird.
Method according to claim 4,
characterized,
that the frame (16) with lift platforms (18...) and attached webs (19...) is prefabricated.
Verfahren zum Nachrüsten eines Gebäudes (1) mit einer Aufzugsanlage (22), welches Gebäude (1) eine Mehrzahl von Etagen (3, 3.1, 3.2...) mit jeweils mindestens einer Etagentüre (4, 4.1, 4.2...) aufweist, die über ein gemeinsames Treppenhaus (5) zugänglich sind, wobei das Treppenhaus (5) unter Ausbildung einer Treppenhausfassade (8) an einer Frontseite (7) des Gebäudes (1) angrenzt und je Etage (3,...) ein Hauptpodest (6, 6.1, 6.2...) für die Etagentüren (4...) sowie zwischen den Etagen (3...) jeweils ein an der Treppenhausfassade (8) angeordnetes Zwischenpodest (12, 12.1, 12.2...) für eine zweiläufige Treppe aufweist,
umfassend die Verfahrensschritte: - Anfertigen eines Fundaments (15) für eine vorgefertigte Aufzugsanlage (22) vor der Treppenhausfassade (8), - Öffnen der Frontseite (7) des Gebäudes (1) durch Entfernen der Treppenhausfassade (8), - Entfernen der Zwischenpodeste (12...) und zumindest teilweises Abbauen der zweiläufigen Treppe, - Einbau von Stegen (19, 19.1, 19.2...) in das Treppenhaus (5), die sich von den Hauptpodesten (6...) waagrecht bis zu noch jeweils in gleicher Höhe einzubauenden, im Wesentlichen treppenhausbreiten Aufzugspodesten (18, 18.1, 18.2...) erstrecken und in Projektion die Grundfläche des Treppenhauses (5) nur zum Teil überdecken, um lichten Raum für eine einläufige Treppe zu lassen, - Vorbereiten einer Verbindung der Hauptpodeste (6...) mit den noch einzubauenden Aufzugspodesten (18...) von übereinander liegenden Etagen (3...) über eine einläufige Treppe, - Aufstellen der vorgefertigten Aufzugsanlage (22) auf das Fundament (15), und - Ausrichten der Aufzugsanlage (22) auf dem Fundament (15), dadurch gekennzeichnet, - dass, beim Verfahrensschritt des Entfernens der Zwischenpodeste (12...) und zumindest teilweisen Abbauens der zweiläufigen Treppe, erste Treppenabschnitte (13, 13.1, 13.2...) einer ersten Hälfte der zweiläufigen Treppe, die jeweils ein Hauptpodest (6...) mit dem abzubauenden Zwischenpodest (12...) verbinden, im Treppenhaus (5) verbleiben und zweite Treppenabschnitte (14, 14.1, 14.2...) der anderen Hälfte der zweiläufigen Treppe ausgebaut und, um 180 Winkelgrade um die Hochachse gedreht, an die jeweiligen ersten Treppenabschnitte (13...) angesetzt werden, um zusammen mit diesen die Treppenabschnitte einer einläufige Treppe zu bilden, die die Hauptpodeste (6...) mit den Aufzugspodesten (18...) von darüber oder darunter liegenden Etagen (3...) verbinden, - dass die Aufzugsanlage zusammen mit einem Gestell (16) vorgefertigt und gemeinsam mit diesem auf das Fundament gestellt und ausgerichtet wird, wobei das Gestell (16) pro barrierefrei zu erschließender Etage (3...) mit je einem Aufzugspodest (18...) in Höhe des jeweiligen Hauptpodests (6...) ausgestattet ist oder wird, - und dass die Aufzugspodeste (18...) an die einläufigen Treppen und die Stege (19) angeschlossen werden.
Method for retrofitting a building (1) with an elevator installation (22), which building (1) has a plurality of floors (3, 3.1, 3.2...) each with at least one floor door (4, 4.1, 4.2...). which are accessible via a common stairwell (5), the stairwell (5) forming a stairwell facade (8) on a front side (7) of the building (1) adjoins and each floor (3,...) has a main platform ( 6, 6.1, 6.2...) for the storey doors (4...) and between each storey (3...) an intermediate landing (12, 12.1, 12.2...) arranged on the staircase facade (8) for a has two flights of stairs,
including the process steps: - Preparation of a foundation (15) for a prefabricated elevator system (22) in front of the stairwell facade (8), - opening the front (7) of the building (1) by removing the staircase facade (8), - Removal of the intermediate landings (12...) and at least partial dismantling of the double flight of stairs, - Installation of webs (19, 19.1, 19.2...) in the stairwell (5), which extend horizontally from the main platforms (6...) to elevator platforms (18, 18.1 , 18.2...) and only partially cover the base of the stairwell (5) in projection in order to leave clear space for a single flight of stairs, - Preparing a connection of the main platforms (6...) with the elevator platforms (18...) still to be installed from floors (3...) lying one above the other via a single-flight staircase, - Setting up the prefabricated elevator system (22) on the foundation (15), and - Aligning the elevator system (22) on the foundation (15), characterized, - that , in the process step of removing the intermediate landings (12...) and at least partially dismantling the double-flight staircase, first stair sections (13, 13.1, 13.2...) of a first half of the double-flight staircase, each of which has a main landing (6... .) connect to the intermediate landing (12...) to be dismantled, remain in the stairwell (5) and remove the second stair sections (14, 14.1, 14.2...) of the other half of the double-flight staircase and rotate them by 180 degrees around the vertical axis, be attached to the respective first stair sections (13...) in order to form together with them the stair sections of a single-flight stairway which has the main platforms (6...) with the elevator platforms (18...) from floors above or below (3...) connect, - that the elevator system is prefabricated together with a frame (16) and placed and aligned together with this on the foundation, the frame (16) for each barrier-free floor (3...) with one elevator platform (18...) ) is or will be equipped at the height of the respective main platform (6...), - And that the elevator platforms (18...) are connected to the single-flight stairs and the webs (19).
Verfahren nach einem der Ansprüche 1 bis 3 oder 6,
dadurch gekennzeichnet,
dass das Gestell (16) ohne Aufzugspodeste (18...), jedoch mit Aufnahmen (17, 17.1, 17.2...) für die Aufzugspodeste (18...) jeweils in Höhe der Hauptpodeste (6...) vorgefertigt wird, und dass die entfernten Zwischenpodeste (12...) jeweils als Aufzugspodest (18...) in die Aufnahmen (17...) des Gestells (16) eingesetzt werden.
Method according to one of claims 1 to 3 or 6,
characterized,
that the frame (16) without elevator landings (18...), but with recordings (17, 17.1, 17.2...) for the elevator landings (18...) is prefabricated in each case at the level of the main landings (6...). , and that the removed intermediate landings (12...) are used as elevator landings (18...) in the receptacles (17...) of the frame (16).
Verfahren nach einem der Ansprüche 1 bis 7,
dadurch gekennzeichnet,
dass das Gestell (16) als Stahlkonstruktion mit mindestens vier Längsholmen (26) und einer Anzahl von Querholmen (27) gefertigt wird.
Method according to one of claims 1 to 7,
characterized,
that the frame (16) is manufactured as a steel construction with at least four longitudinal bars (26) and a number of transverse bars (27).
Verfahren nach Anspruch 8,
dadurch gekennzeichnet,
dass das Gestell (16) in Metallbau mit Seitenwänden (29) versehen wird.
Method according to claim 8,
characterized,
that the frame (16) is provided in metal construction with side walls (29).
Verfahren nach einem der Ansprüche 6 bis 9,
dadurch gekennzeichnet,
dass die zusammen mit dem Gestell (16) vorgefertigte Aufzugsanlage (22) als das Treppenhaus (5) erweiternder Aufzugsturm (24) an das geöffnete Treppenhaus (5) angestellt wird.
Method according to one of claims 6 to 9,
characterized,
that the elevator system (22) prefabricated together with the frame (16) is placed on the opened staircase (5) as the elevator tower (24) that expands the staircase (5).
Vorgefertigter, transportierbarer Aufzugsturm (24) zur Verwendung in einem Verfahren nach Anspruch 10, enthaltend eine Aufzugsanlage (22) mit einem Schacht (25), der eine Durchtrittsöffnung für jede anzufahrende Etage (3, 3.1, 3.2...) aufweist, und mit einer in einer Längsrichtung des Schachtes verfahrbar im Schacht gelagerten Kabine und deren Antrieb, sowie ein Gestell (16), das pro Etage (3...) je ein Aufzugspodest (18, 18.1, 18.2...) vor der entsprechenden Durchtrittsöffnung des Schachts aufweist, oder das mit Aufnahmen (17, 17.1, 17.2...) für solche Aufzugspodeste (18...) versehen ist.Prefabricated, transportable elevator tower (24) for use in a method according to Claim 10, containing an elevator system (22) with a shaft (25) which has a passage opening for each floor (3, 3.1, 3.2...) to be approached, and with a car mounted in the shaft so that it can be moved in a longitudinal direction of the shaft and its drive, and a frame (16) which has one elevator platform (18, 18.1, 18.2...) on each floor (3...) in front of the corresponding passage opening of the shaft has, or is provided with receptacles (17, 17.1, 17.2...) for such elevator platforms (18...). Vorgefertigter, transportierbarer Aufzugsturm (24) nach Anspruch 11,
dadurch gekennzeichnet,
dass das Gestell (16) eine Stahlkonstruktion mit mindestens vier Längsholmen (26) und einer Anzahl von Querholmen (27) ist.
Prefabricated, transportable elevator tower (24) according to claim 11,
characterized,
that the frame (16) is a steel construction with at least four longitudinal beams (26) and a number of transverse beams (27).
EP21196059.6A 2020-09-30 2021-09-10 Method for retrofitting a building with an elevator and prefabricated transportable elevator tower Pending EP3978707A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102020125569 2020-09-30
DE102020129790.4A DE102020129790A1 (en) 2020-09-30 2020-11-11 Method for retrofitting a building with elevator equipment and prefabricated, transportable elevator tower

Publications (2)

Publication Number Publication Date
EP3978707A2 true EP3978707A2 (en) 2022-04-06
EP3978707A3 EP3978707A3 (en) 2022-07-20

Family

ID=77710684

Family Applications (1)

Application Number Title Priority Date Filing Date
EP21196059.6A Pending EP3978707A3 (en) 2020-09-30 2021-09-10 Method for retrofitting a building with an elevator and prefabricated transportable elevator tower

Country Status (2)

Country Link
EP (1) EP3978707A3 (en)
DE (1) DE202021004270U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116517325A (en) * 2022-09-07 2023-08-01 金陵科技学院 Novel assembled steel-wood stair for existing building additionally provided with elevator and construction method thereof
EP4253297A1 (en) * 2022-03-30 2023-10-04 Manfred Greschbach Auxiliary scaffolding and method for retrofitting a building with a lift system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19633636A1 (en) 1996-08-21 1998-02-26 Grohs Gerwald Dipl Bauing Lift shaft cabin and connection walkways for existing buildings
DE20300662U1 (en) 2003-01-16 2003-04-10 Bwh Construction Gmbh Outdoor lift construction retrofitted onto stairway, has outdoor landings adjoining stairway and connected to single flight staircases and lift shaft
EP3315448A2 (en) 2016-10-28 2018-05-02 Manfred Greschbach Lift system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19522046C2 (en) * 1995-06-17 1998-04-09 Spannkeramik Und Bau Gmbh Trib Outside elevator shaft
JP2007238315A (en) * 2006-03-10 2007-09-20 Yutaka Komyo Partition wall structure for post-installed apartment elevator cab shaft
DE102011052727A1 (en) * 2011-08-16 2013-03-07 Rico Müller Lift for attachment to multi-storey building, has intermediate landings, and set of staircase run units, where each run unit extends from intermediate stair platform of building staircase to floor level of upper floors
CN204588379U (en) * 2015-03-11 2015-08-26 上海长江斯迈普电梯有限公司 For the Dokdo type elevator of outdoor
JP5946576B1 (en) * 2015-10-09 2016-07-06 松尾建設株式会社 Elevator retrofit method for existing staircase type apartment houses
DE102019107165A1 (en) * 2019-03-20 2020-09-24 Manfred Greschbach Method for retrofitting a building with an elevator system, component set for carrying out the method, elevator system and prefabricated shaft for the elevator system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19633636A1 (en) 1996-08-21 1998-02-26 Grohs Gerwald Dipl Bauing Lift shaft cabin and connection walkways for existing buildings
DE20300662U1 (en) 2003-01-16 2003-04-10 Bwh Construction Gmbh Outdoor lift construction retrofitted onto stairway, has outdoor landings adjoining stairway and connected to single flight staircases and lift shaft
EP3315448A2 (en) 2016-10-28 2018-05-02 Manfred Greschbach Lift system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4253297A1 (en) * 2022-03-30 2023-10-04 Manfred Greschbach Auxiliary scaffolding and method for retrofitting a building with a lift system
CN116517325A (en) * 2022-09-07 2023-08-01 金陵科技学院 Novel assembled steel-wood stair for existing building additionally provided with elevator and construction method thereof
CN116517325B (en) * 2022-09-07 2024-01-19 金陵科技学院 Novel assembled steel-wood stair for existing building additionally provided with elevator and construction method thereof

Also Published As

Publication number Publication date
EP3978707A3 (en) 2022-07-20
DE202021004270U1 (en) 2023-05-08

Similar Documents

Publication Publication Date Title
EP3712355B1 (en) Method for retrofitting a building with an elevator and set of components for carrying out the method
EP3978707A2 (en) Method for retrofitting a building with an elevator and prefabricated transportable elevator tower
WO2017220653A1 (en) Method for modernizing a building and structure with a lift system constructed in a building
DE102011052727A1 (en) Lift for attachment to multi-storey building, has intermediate landings, and set of staircase run units, where each run unit extends from intermediate stair platform of building staircase to floor level of upper floors
DE102020129790A1 (en) Method for retrofitting a building with elevator equipment and prefabricated, transportable elevator tower
DE3714053C2 (en) Elevator for passenger transportation
DE1271968B (en) Multi-storey building made of prefabricated parts
DE10210909B4 (en) Prefabricated wall panel
EP4253298A1 (en) Foundation frame and method for retrofitting a building with an elevator system
DE3304907A1 (en) Reinforced concrete room cell for erecting the smallest room unit of a building
EP4253299A1 (en) Method for retrofitting a building with a lift assembly amd staircase module
EP0513949A2 (en) Framework consisting of two elements by four rectangular trihedrons each for the load bearing structure of a uniform measured building
EP0955419B1 (en) Framework system for prefabricated buildings
EP4253297A1 (en) Auxiliary scaffolding and method for retrofitting a building with a lift system
EP3502374B1 (en) Method for creating a staircase with integrated lift shaft on or in an existing building
DE19919463A1 (en) Roof lift anchor for accommodating all force-transmitting parts used during installation of roof truss of house
EP0567070B1 (en) Staircase for multi-floor building
DE102008058930B3 (en) Method for erecting shaft scaffolding for lift system in building with two floors, involves mounting scaffold segment in lower floor which has static load-carrying capacity for carrying load to floor slab, where opening is cut in floor slab
DE4239057C2 (en) Process and prefabricated module for the production of structures and buildings
DE4423423A1 (en) Transportable living unit with half-timbered structure
DE2112335C3 (en) Prefabricated, transportable room element for the erection of structures
AT403820B (en) Balcony or similar extension structure, and process for producing a balcony or similar extension structure for retrofitting purposes
CH484336A (en) Monolithic space box
DE3426898A1 (en) Process for constructing a multi-storey building and partial column for carrying out the process
DE4127223A1 (en) Method of erection of part pre-fabricated building - has outer wall full fitted out and finished and hinge connected to component floor for swinging into position on site

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: E04F 17/00 20060101ALI20220611BHEP

Ipc: B66B 11/00 20060101ALI20220611BHEP

Ipc: E04F 11/02 20060101ALI20220611BHEP

Ipc: E04G 23/02 20060101AFI20220611BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20230118

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR