EP2562348A1 - Agencement de forage sous-marin et procédé d'exécution d'un forage - Google Patents
Agencement de forage sous-marin et procédé d'exécution d'un forage Download PDFInfo
- Publication number
- EP2562348A1 EP2562348A1 EP11006880A EP11006880A EP2562348A1 EP 2562348 A1 EP2562348 A1 EP 2562348A1 EP 11006880 A EP11006880 A EP 11006880A EP 11006880 A EP11006880 A EP 11006880A EP 2562348 A1 EP2562348 A1 EP 2562348A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- drill
- guide tube
- drive
- drill drive
- drilling assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 74
- 238000004519 manufacturing process Methods 0.000 title description 2
- 238000000034 method Methods 0.000 claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 29
- 238000011010 flushing procedure Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 2
- 238000005520 cutting process Methods 0.000 description 4
- 230000005484 gravity Effects 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000002000 scavenging effect Effects 0.000 description 2
- 230000036346 tooth eruption Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/124—Underwater drilling with underwater tool drive prime mover, e.g. portable drilling rigs for use on underwater floors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/18—Anchoring or feeding in the borehole
Definitions
- the invention relates to an underwater drilling arrangement for producing a well in a river bed according to the preamble of claim 1. Furthermore, the invention relates to a method for creating a well in a riverbed according to claim 10.
- the underwater drilling assembly comprises a submersible working platform for placement on the river bed, a drilling drive, which is arranged on the working platform, and a drill pipe with drill head, which is rotatably drivable via the drill drive.
- the underwater drilling arrangement and the drilling method are used in particular for the creation of foundations or foundation piles in the river bottom, for example for anchoring offshore wind turbines, flow turbines of tidal power plants or oil and gas conveyors in the sea.
- An underwater drilling assembly is for example from the EP 2 322 724 A1 known.
- the drill drive is placed on an upper tube collar of a tubular foundation element to be introduced into the body of the water, which remains after the drilling process in the riverbed.
- the foundation element to be introduced into the body of water is guided along a sleeve-like linear guide, which is arranged above the water bottom at the working platform.
- the drilling assembly comprises a work platform with a plurality of hollow support feet, through which fastening piles can be introduced for fixing the platform at the bottom of the water in the ground.
- the device comprises a drill pipe, which is rotationally driven by means of a pipe lathe with simultaneous application of a feed force, wherein for excavating Bohrkerngut a Imrohrbohr réelle is used, which is retractable to a rope in the drill pipe and extendable from this.
- the Imrohrbohr réelle can be fixed to the drill pipe and entrained by the drill pipe in rotary drilling motion and thereby drivable.
- a further device for producing a cased bore with a rotatable drive which can be fixed in the drill pipe is disclosed in US Pat DE 27 34 185 C2 described.
- the invention has for its object to provide an underwater drilling assembly and a method for creating a hole in a body of water, which allow a particularly economical creation of a subsea well.
- the underwater drilling arrangement according to the invention is characterized in that the working platform has a guide tube, on the inside of the tube at least one linear guide is arranged, along which at least a portion of the drill drive is guided axially movable, and that the guide tube mounted adjustable and fixable in a recording of the working platform is.
- the inventive method which can be carried out in particular with an underwater drilling arrangement according to the invention, comprises the following method steps: A working platform with a guide tube is sunk and placed on the bottom of the water. In the guide tube, a drill string with drill head is arranged and guided axially, wherein the drill string is driven to rotate by means of a drill drive. After creating the hole, the work platform becomes with the guide tube again removed from the water body and lifted.
- a first basic idea of the invention can be seen in guiding the drill drive along an inner side of a tubular guide structure, namely the guide tube, of the working platform.
- the guide tube thus assumes the function of a leader, along which the drill drive is movably guided.
- the guide tube allows guided movement of the drill drive along the direction of drilling progress.
- the guide tube has a guide device extending in the axial direction of the guide tube, which is designed as a linear guide.
- the linear guide may in particular comprise a guide groove extending in the axial direction of the guide tube and cooperate with a corresponding guide element of the drill drive.
- the guide element of the drill drive for example, a guide shoe, this is preferably provided on the outside of a housing of the drill drive.
- the linear guide tube guide ensures a guided, exclusive axial movement of the drill drive inside the guide tube. Due to the linear guide, the housing of the drill drive can be secured against rotation with respect to the guide tube, so that reaction forces, in particular rotational forces, can be absorbed by the guide tube during a rotary operation of the drill drive and be derived therefrom.
- a second basic idea of the invention is that the guide tube is adjustable, in particular axially displaceable and / or rotatable, to be supported in the receptacle of the working platform, so that the guide tube can be moved and in particular lowered and raised or rotated during the creation of the bore. Furthermore, the invention provides that the guide tube can be fixed to the receptacle. When fixed guide tube this is secured against rotation and / or axial movement with respect to a base body of the platform.
- the fixed guide tube can serve as an abutment or support for the drill drive during operation of the drill drive. This allows the derivation of reaction forces via the guide tube to the base body of the platform and on this further to the body of water. Furthermore, the guide tube can be tracked in the drilling direction due to its adjustable mounting on the base body of the working platform, in particular during an interruption of the operation of the drill drive. Thus, the leadership of the drill drive can be extended down to allow a greater depth. Alternatively or in addition to the axial movement, a rotational movement of the guide tube relative to the main body of the working platform is possible.
- the guide tube into the body of water in order to allow guidance of the drill drive both above and below the body of the water.
- the guide tube as part of the working platform of the underwater drilling assembly is raised again after creating the bore and removed together with the base of the work platform from the bottom of the water.
- the drill drive has a drill drive upper part and a drill drive lower part, which are axially movable relative to one another.
- both the drill drive upper part and the drill drive lower part have a passage for the drill pipe.
- the drill drive lower part is equipped with a driver device, which causes a coupling of drill drive lower part and drill pipe for a common axial movement.
- the Bohranretesoberteil and / or the Bohrantriebsunterteil are preferably fixed to the guide tube and releasably mounted.
- the Bohrantriebsunterteil may have at least one outwardly facing guide element which cooperates for axial guidance with the at least one linear guide.
- the Bohranretesoberteil and / or the Bohrantriebsunterteil is adjustable relative to the guide tube. Due to the adjustable, in particular axially movable storage Bohrantriebsoberteil and / or Bohranretesunterteil can be moved along the entire length of the guide tube to create a fixed guide tube with a bore approximately the length of the guide tube. Preferably, the Bohranretesoberteil and the Bohranretesunterteil are independently fixed to the guide tube. In order to carry out a drilling step, it is particularly preferred that the drill drive upper part can be fixed in the guide tube and the drill drive lower part can be moved axially in the guide tube together with the drill pipe when the drill drive upper part is fixed.
- the feed movement of the drill string with drill head can basically be achieved by gravity.
- an axial actuator is arranged for moving the bottom drill drive part relative to the drill drive top part.
- the actuator which can also be referred to as a feed device, allows a demand-optimized control of the load on the drill head, in particular by increasing or decreasing the load caused by gravity.
- the pressure force is particularly provided to brace the Bohrantriebsoberteil in the guide tube and exert an axial force on the Bohrantriebsunterteil by the actuator, so that a defined pressure force is transmitted to the drill head.
- An advantageous axial actuator is given by having at least one, preferably three, hydraulic cylinders.
- the hydraulic cylinder or cylinders can be arranged to save space within the guide tube.
- a plurality of hydraulic cylinders are arranged symmetrically about a central longitudinal axis of the drill pipe.
- the guide tube is rotatably and axially movably mounted in the receptacle and that a rotary drive for rotating the guide tube is arranged on the working platform.
- the guide tube can be extended upward, if appropriate so far that it projects beyond the water surface.
- a particularly robust rotary drive which at the same time allows a secure fixing of the guide tube on the main body of the working platform, is given by the fact that the rotary drive has at least one hydraulically tensionable collet for clamping the guide tube and that the collet with at least a horizontal cylinder is rotatable.
- the horizontal cylinder is articulated, on the one hand, to the collet and, on the other hand, to the main body of the working platform.
- the rotary drive thus formed allows intermittent rotation of the guide tube by tensioning the collet, rotating the collet by means of the horizontal cylinder, loosening the collet, returning the collet and re-tightening and turning.
- the introduction of the guide tube in the body of water can be facilitated by the fact that the guide tube has a cutting device on its underside.
- the cutting device may in particular comprise a cutting ring with cutting teeth formed on the axial end face of the guide tube.
- load plates are disposed on the drill string above the drill bit.
- the load plates can in particular be releasably attached to the drill string, in particular attached to this.
- the load plates comprise a central passage for the drill pipe.
- a variable number of load plates can be attached to the drill pipe.
- the Bohranretesoberteil and / or the Bohrantriebsunterteil has at least one locking device with an adjustable locking element.
- a plurality of supporting elements for example inwardly projecting wedges or indentations formed in the inner wall of the pipe, are provided on the guide pipe over its length, which optionally interact with the locking element to form a form-locking connection. This allows an axial fixation of the corresponding drive part at different points of the guide tube. By releasing the locking element, an axial movability of the corresponding drive part can be ensured.
- the support elements are preferably arranged in the region of the linear guide on the guide tube.
- the adjustable locking elements on the drill drive are preferably arranged in the region of a guide element of the drill drive, which interacts with the linear guide.
- a locking cylinder in particular a hydraulic cylinder is provided for adjusting the locking element.
- the drill drive upper part of the drill drive is fixed to an upper side of the guide tube and that the drill drive lower part is guided along at least one linear guide on a tube inner side of the guide tube and moved axially together with the drill pipe.
- the drill head arranged on the drill string creates a bore, preferably leading the guide tube.
- the pressure force of the drill head can basically be effected by the weight of the drill head and drill pipe and the optionally arranged load plates.
- the pressing force of the drill head is controlled by means of an axial actuator, which is arranged between the Bohrantriebsoberteil and the Bohrantriebsunterteil.
- the axial actuator for example, at least one hydraulic cylinder, can either increase or decrease the pressure provided by the weight of the drill string and the optionally arranged Auflastplatten pressure force. As a result, a predetermined pressure force can be selectively generated and changed during the drilling operation.
- the borehole depth at a given length of the guide tube can be increased according to the invention in an advantageous manner that the drill string is telescoped or extended by inserting an intermediate piece.
- the drill drive is pulled out of the guide tube remaining in the bottom, connected to the intermediate piece and re-introduced into the guide tube.
- the drill drive lower part is extended by a defined stroke relative to the Bohrantriebsoberteil and then tracked the guide tube in the well and thereby the Bohrantriebsunterteil is retracted into the Bohrantriebsoberteil, so that a further drilling step is feasible.
- drill head and guide tube are gradually and alternately driven into the body of water.
- the drill head leading the guide tube introduced into the ground. Since the guide tube thus only has to widen the borehole, the feed force is for lowering the guide tube comparatively low.
- the guide tube can continue to serve as a guide device for the drill drive and the drill drive can be moved along the guide tube to the lower end of the guide tube.
- the maximum drilling depth thus corresponds approximately to the sum of the lengths of the guide tube and the optionally extended drill string.
- the procedure is as follows: After the drill drive base moves down and the at least one hydraulic cylinder is maximally extended, the drill drive base is fixed to the guide tube and the drill drive shell detached from the guide tube and moved in the direction of the Bohrantriebsunterteil. By re-setting the drill drive shell on the guide tube and loosening the drill drive base, another drilling step can be performed. In this way, with a fixed guide tube, a bore can be made approximately with the length of the guide tube, with the drill drive upper part and the drill drive lower part being moved stepwise and alternately in the manner described. This method can be carried out independently of the position of the guide tube, that is also in the case of a guide tube which is not or not completely screwed in.
- a further preferred embodiment of the method is that the drilled soil material is conveyed out of the borehole via a flushing channel in the drill pipe and ejected above the drill drive.
- a flushing channel in the drill pipe and ejected above the drill drive.
- Spülbohr compiler allows a comparatively simple removal of the drilled soil material.
- a feed channel is provided in addition to the flushing channel.
- Fig. 1 shows an underwater drilling assembly 10 according to the invention with a mountable on a body of water platform 20 and guided on the platform 20 drilling unit 50.
- the platform 20 includes a base body 30, which may also be referred to as a base frame.
- the main body 30 has a plurality of Aufstellfchipe 32 for placement on the bottom of the water.
- the feet 32 are preferably designed to be adjustable, so that unevenness in the body of water can be compensated and the platform 20 in the desired orientation, in particular horizontally, can be placed on the bottom of the water.
- the main body 30 further includes a plurality of struts 34 and a central receptacle 36 for a guide tube 22.
- the guide tube 22 as part of the working platform 20 is adjustably mounted in the receptacle 36.
- a rotary drive 40 is provided on the base body of the working platform 20.
- the rotary drive 40 comprises a hydraulically tensionable collet 42, which is rotatable by means of a horizontal cylinder 44.
- a vertical cylinder 46 is further provided.
- An inventive guide tube 22 is in the Figures 2 and 3 shown.
- the guide tube 22 has at its lower end a cutting device 28 with a plurality of cutting teeth, which are arranged in a ring.
- the guide tube 22 has a cylindrical outer circumferential surface.
- On the outer circumference of the guide tube 22 a plurality of securing elements 23 for securing the guide tube 22 relative to the base body 30 are arranged.
- a linear guide 24 is formed, which comprises in the illustrated embodiment, three extending in the longitudinal direction of the guide tube 22 grooves.
- 22 wedge-shaped support elements 26 are provided on the inner circumferential surface of the guide tube, which can also be referred to as a locking pin, locking wedges or guide wedges.
- a plurality of support elements 26 are arranged at equal intervals along the longitudinal direction of the guide tube 22.
- the support members 26 are in the region of the linear guide 24, that is in the longitudinal grooves of the guide tube 22.
- the radial extent of the support elements 26 is less than or equal to the depth of the formed in the guide tube 22 grooves, so that the support elements 26 not beyond the cylindrical inner lateral surface of the guide tube 22 protrude.
- a drilling unit 50 can be arranged, which in more detail in the FIGS. 4 to 6 is shown. How the particular Fig. 1 can be seen, the drilling unit 50 can be placed on the guide tube 22 via a not shown rope or at least partially inserted into this.
- the drilling unit 50 comprises a drill drive 52 for driving a drill pipe 70 with a drill drive head element 51 which can be placed on the guide tube 22 and a drill drive upper part 54 which can be axially moved in the guide tube 22 and a likewise drivable drill drive lower part 56.
- the drill drive 52 serves on the one hand to drive the drill pipe in a rotating manner 70 and on the other hand, the axial feed of the drill pipe 70 for creating a hole in the riverbed.
- a drill head 78 is arranged on which drilling tools 79 are attached.
- the drilling unit 50 can be equipped with drilling tools 79 of many kinds, for example, roller bits, cross cutters, both optionally with air lift, auger or drilling bucket.
- a scavenging passage 74 is formed to perform a scavenging operation.
- the contact force required for drilling is applied via ballast weights, in particular load plates 76.
- the Auflastplatten 76 are disposed between the drill drive 52 and the drill head 78 on the drill pipe 70, in particular the so-called drill collar.
- the drilling unit 50 can thus also be referred to as a gravity drilling unit, in which the loading of the drill head is largely provided by gravity.
- FIGS. 7 to 10 Details of the auger top 54 and auger bottom 56 are shown in FIGS FIGS. 7 to 10 shown.
- Both the auger top 54 and bottom auger 56 have a central opening 53 as a passageway for the drill string 70.
- the Bohrantriebsoberteil 54 includes a plurality of, in the illustrated embodiment, three guide members 58 which can be brought into engagement with the guide grooves 22 of the guide tube.
- Drill drive base 56 includes respective guide elements 60.
- locking devices 61 are arranged on the drill drive upper part 54, with which the drill drive upper part 54 can be locked in a form-fitting manner with respect to the guide tube 22.
- the locking devices 61 each include an adjustable locking element 64 and a hydraulic latching cylinder 66 for actuating the locking element 64.
- the drill drive upper part 54 and the drill drive lower part 56 can be clamped or fixed independently of one another in the guide tube 22.
- the locking devices 61, 62 can therefore also be referred to as clamping or tensioning devices.
- the guide elements 58, 60 and the locking devices 61, 62 are respectively arranged on transverse members 55 of the drill drive upper part 54 and the drill drive lower part 56.
- an axial drive 80 is arranged between the top drive part 54 and the bottom drive drive part 56.
- the actuator 80 includes a plurality of, in the illustrated embodiment, three feed cylinder, which are designed as a hydraulic cylinder 82.
- the drill pipe 70 is axially fixedly coupled to the drill drive base 56.
- Fig. 11 shows a drilling unit 50 arranged in a guide tube 22 with Bohrantriebsoberteil 54, Bohrantriebsunterteil 56, drill pipe 70 and drill head 78.
- the drill string is extended by means of an intermediate piece 72 which is disposed between the drill drive 52 and the drill head 78.
- the drill head 78 protrudes downwards over the guide tube 22 with the drill drive 52 arranged above in the guide tube 22. Due to the extended drill pipe 70, a greater drilling depth can be achieved.
- the drilling unit 50 is taken out of the guide tube 22, the linkage is extended and the drilling unit 50 is again lifted into the guide tube 22.
- FIG Fig. 12 A drilling unit 50 with a telescopic drill string is shown in FIG Fig. 12 shown.
- the drill pipe 70 is constructed telescopically above the load plates 76.
- tappets or retainers 73 On the outer circumference of the telescoping part of the drill string 70, there are disposed tappets or retainers 73 which engage the drill drive base 56 to axially move the drill string 70.
- Fig. 13 shows a drill pipe with a kelly extension.
- the driver elements or retaining wedges 73 are arranged here on the outer circumference of an extendable Kelly bar 69.
- the work platform 20 including guide tube 22 by means of a rope (not shown) by a arranged on the water surface support means, such as a platform or a ship, lowered and placed on the bottom of the water.
- the platform 20 is then aligned and can be additionally attached to the ground.
- a drilling unit 50 with a drill drive 52, a drill string 70 and a drill head 78 is inserted into the guide tube 22.
- the drill drive upper part 54 is clamped in a form-fitting manner by means of the upper locking device 61 in the guide tube 22.
- the drill string 70 is rotationally driven by the auger drive 52 and a first drilling step is performed.
- the drill head 78 moves down with fixed guide tube 22 together with the Bohrantriebsunterteil 56 down to the hydraulic cylinder 82 of the feed device 80 are fully extended.
- drill head 78 and guide tube 22 are drilled alternately stepwise in the ground.
- the drill head 78 which hangs by means of the upper locking device 61 in the guide tube 22, again withdrawn from the bottom of the hole.
- the hydraulic cylinders 82 are retracted again.
- the Bohrantriebsunterteil 56 is by means of the lower locking means provided thereon 62 positively clamped in the guide tube 22, so that the drilling unit 50 is fixed again in the guide tube.
- the guide tube 22 is screwed by means of the rotary drive 40 approximately to the bottom hole.
- the lower locking device 62 is released, so that the Bohrantriebsunterteil 56 is again axially movable and a further drilling step can be performed.
- the drill head 78 is screwed into the ground in a plurality of successive drilling steps with the guide tube 22 stationary.
- the drill drive lower part 56 is clamped in a form-fitting manner by means of the lower locking device 62 provided thereon in the guide tube 22.
- the upper locking device 61 is released and the Bohrantriebsoberteil 54 along the guide tube 22 moved down until the hydraulic cylinder 82 are retracted again. It is now again the Bohrantriebsoberteil 54 braced within the guide tube 22 and the tension of the Bohrantriebsunterteils 56 solved.
- a further drilling step can be performed.
- the guide tube 22 can be sunk by operating the rotary drive 40 along the created wellbore.
- the drilling unit 50 is preferably withdrawn within the guide tube 22, thus preferably does not protrude downwards.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11006880.6A EP2562348B1 (fr) | 2011-08-23 | 2011-08-23 | Agencement de forage sous-marin et procédé d'exécution d'un forage |
US13/592,332 US8720603B2 (en) | 2011-08-23 | 2012-08-22 | Underwater drilling arrangement and method for making a bore |
CA2787592A CA2787592C (fr) | 2011-08-23 | 2012-08-22 | Installation de forage sous-marin et methode de forage de trou |
CN201210401584.4A CN103015897B (zh) | 2011-08-23 | 2012-08-23 | 用于钻孔的水下钻探装置和方法 |
KR1020120092651A KR101419513B1 (ko) | 2011-08-23 | 2012-08-23 | 수중 드릴링 장치 및 시추공의 형성방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11006880.6A EP2562348B1 (fr) | 2011-08-23 | 2011-08-23 | Agencement de forage sous-marin et procédé d'exécution d'un forage |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2562348A1 true EP2562348A1 (fr) | 2013-02-27 |
EP2562348B1 EP2562348B1 (fr) | 2017-10-04 |
Family
ID=44508624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11006880.6A Not-in-force EP2562348B1 (fr) | 2011-08-23 | 2011-08-23 | Agencement de forage sous-marin et procédé d'exécution d'un forage |
Country Status (5)
Country | Link |
---|---|
US (1) | US8720603B2 (fr) |
EP (1) | EP2562348B1 (fr) |
KR (1) | KR101419513B1 (fr) |
CN (1) | CN103015897B (fr) |
CA (1) | CA2787592C (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2930275A1 (fr) | 2014-04-08 | 2015-10-14 | Herrenknecht AG | Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau |
DE102022121237A1 (de) | 2022-08-23 | 2024-02-29 | Gühring KG | Bohrvorrichtung mit einer Absaugeinheit |
EP4350119A1 (fr) * | 2022-10-06 | 2024-04-10 | BAUER Maschinen GmbH | Dispositif de forage sous-marin et procédé de construction d'un tubage sous-marin |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2010356823B2 (en) * | 2010-06-30 | 2016-03-03 | Marl Technologies Inc. | Remotely operable underwater drilling system and drilling method |
DE102011103636B4 (de) * | 2011-06-08 | 2018-09-13 | Iml Instrumenta Mechanik Labor Gmbh | Bohrmessgerät und Nadel-Wechselkartusche |
US20150197989A1 (en) * | 2014-01-16 | 2015-07-16 | Conocophillips Company | Underwater drilling rig assembly and method of operating the underwater drilling rig assembly |
CN105370208A (zh) * | 2015-10-29 | 2016-03-02 | 广东宏大广航工程有限公司 | 一种水下钻爆船及其钻孔施工方法 |
NO343861B1 (no) * | 2016-02-16 | 2019-06-24 | Comrod As | Fremgangsmåte for innfesting av en komposittmast til grunnen. |
CN106351590B (zh) * | 2016-09-30 | 2019-01-08 | 宁波介量机器人技术有限公司 | 一种用于深海取样的钻探机器人支架 |
CA3125477A1 (fr) | 2019-01-09 | 2020-07-16 | Bly Ip Inc. | Tige de forage dotee d'un passage de derivation de fluide interne |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2655885A (en) * | 1949-10-18 | 1953-10-20 | Stanislaw Jozwiak | Sewing machine |
DE1648696A1 (de) * | 1966-08-17 | 1971-08-12 | Shell Int Research | Verfahren und Vorrichtung zum Ermitteln des Bodenwiderstandes bzw. der Bodentragfaehigkeit |
GB1506388A (en) * | 1975-05-23 | 1978-04-05 | Lilley Waddington Ltd | Excavation of bore holes |
DE2734185A1 (de) * | 1977-07-29 | 1979-02-08 | Leffer Stahl & App | Verfahren und anlage zum niederbringen einer verrohrten tiefbohrung zur herstellung von verrohrten pfahlgruendungen |
DE3515276A1 (de) * | 1985-04-27 | 1986-10-30 | Otto Alfred Dr. 6600 Saarbrücken Becker | Bohr-gestaenge mit bohr-meisel |
DE8535088U1 (de) * | 1985-12-13 | 1988-08-18 | Ing. Günter Klemm, Spezialunternehmen für Bohrtechnik, 5962 Drolshagen | Erdbohrgerät |
DE4308856C1 (de) | 1993-03-19 | 1994-05-26 | Leffer Stahl & App | Verfahren und Bohrgerät zur Herstellung einer verrohrten Tiefbohrung, insbesondere für Pfahlgründungen |
US20080226398A1 (en) * | 2005-10-14 | 2008-09-18 | George Gibberd | Installation of Underwater Anchorages |
GB2448358A (en) | 2007-04-12 | 2008-10-15 | Tidal Generation Ltd | Installation of underwater ground anchorages |
EP2299006A1 (fr) * | 2009-09-14 | 2011-03-23 | Blade Offshore Services Ltd. | Procédé de fixation d'une structure submergée au fond d'un corps d'eau |
EP2322724A1 (fr) | 2009-11-17 | 2011-05-18 | BAUER Maschinen GmbH | Installation de forage d'eau souterraine et procédé d'entrée d'un élément de fondation cylindrique au fond de l'eau |
Family Cites Families (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2023966A (en) * | 1935-06-01 | 1935-12-10 | Jesse A Montee | Method and means for sinking foundation columns |
US2669431A (en) * | 1948-04-24 | 1954-02-16 | Crowell Consulting Company | Earth drilling apparatus |
US3282356A (en) * | 1963-12-02 | 1966-11-01 | Ingersoll Rand Co | Drilling device |
US3519071A (en) * | 1967-12-21 | 1970-07-07 | Armco Steel Corp | Method and apparatus for casing offshore wells |
US3621910A (en) * | 1968-04-22 | 1971-11-23 | A Z Int Tool Co | Method of and apparatus for setting an underwater structure |
US3631932A (en) * | 1968-09-03 | 1972-01-04 | Longyear Co E J | Offshore drilling apparatus and method |
US3672447A (en) * | 1968-09-10 | 1972-06-27 | Richfield Oil Corp | Marine well drilling method and apparatus |
US3602320A (en) * | 1968-10-16 | 1971-08-31 | Amoco Prod Co | Deep sea pile setting and coring vessel |
US3608652A (en) * | 1968-11-13 | 1971-09-28 | A Z Int Tool Co | Underwater drilling apparatus |
US3635295A (en) * | 1969-12-02 | 1972-01-18 | Fenix & Scisson Inc | Apparatus for drilling a small borehole downwardly from the bottom of a large borehole |
GB1249440A (en) * | 1970-06-17 | 1971-10-13 | Shell Int Research | Method and apparatus for use in drilling offshore wells |
NO760391L (fr) * | 1976-02-05 | 1976-08-09 | Taywood Seltrust Offshore | |
FR2442953A1 (fr) * | 1978-07-04 | 1980-06-27 | Tim Tech Ind Minieres | Procede de forage sous-marin et dispositif s'y rapportant |
IT1166864B (it) * | 1979-05-29 | 1987-05-06 | Saipem Spa | Apparecchiatura perfezionata per il supporto di tubazioni sospese su avvallamenti situati anche a grandi profondita' del mare e metodo perfezionato per l'installazione di essa |
US4558744A (en) * | 1982-09-14 | 1985-12-17 | Canocean Resources Ltd. | Subsea caisson and method of installing same |
US4510985A (en) * | 1983-09-20 | 1985-04-16 | Phillips Petroleum Company | Stacked open bottom temporary guide base for offshore drilling |
FR2588297B1 (fr) * | 1985-10-09 | 1987-12-04 | Soletanche | Dispositif pour le forage sous-marin de fondations |
FR2597543B1 (fr) * | 1986-04-17 | 1988-06-24 | Soletanche | Dispositif pour le forage immerge de fondations |
GB2200672B (en) * | 1986-09-10 | 1991-01-23 | David Sidney Dallimer | Apparatus for installing marine silos |
FR2605657A1 (fr) * | 1986-10-22 | 1988-04-29 | Soletanche | Procede pour la realisation d'un pieu dans le sol, machine de forage et dispositif pour la mise en oeuvre de ce procede |
US5035291A (en) * | 1990-07-06 | 1991-07-30 | Amoco Corporation | Seafloor drilling apparatus |
JP3151453B2 (ja) * | 1991-12-20 | 2001-04-03 | 清水建設株式会社 | 管埋設用掘削装置 |
CN2169683Y (zh) * | 1993-07-23 | 1994-06-22 | 辽宁省有色勘察研究院 | 潮间带步履式钻台 |
DE19702983C1 (de) * | 1997-01-28 | 1998-06-04 | Wirth Co Kg Masch Bohr | Verfahren und Vorrichtung zum Niederbringen von Bohrlöchern, insbesondere für Schürf- und Gewinnungsbohrungen |
NO971478D0 (no) * | 1997-04-02 | 1997-04-02 | Norwegian Anchoring Technology | Metode for etablering samt til- og frakopling av posisjonerte punktfester ned i varierende havbunnsformasjoner, samt utstyr for sådan |
KR200248161Y1 (ko) * | 1999-06-22 | 2001-10-27 | 성학중 | 암반 천공장치 |
US6530430B2 (en) * | 2000-06-15 | 2003-03-11 | Control Flow Inc. | Tensioner/slip-joint assembly |
US7381011B2 (en) * | 2005-05-09 | 2008-06-03 | Mkt Manufacturing, Inc. | Lubrication system for pile and method of using the same |
US7703534B2 (en) * | 2006-10-19 | 2010-04-27 | Adel Sheshtawy | Underwater seafloor drilling rig |
US7380614B1 (en) * | 2007-05-11 | 2008-06-03 | Williamson & Associates, Inc. | Remotely operated water bottom based drilling system using cable for auxiliary operations |
US7681662B2 (en) * | 2008-02-29 | 2010-03-23 | Williamson Deep Ocean Engineering, Inc. | Water bottom ore sampler and method of using the same |
NO330317B1 (no) * | 2008-06-23 | 2011-03-28 | Fensfjord Mooring As | Fremgangsmate for forankring av en fortoyningsline til et undervannsfeste |
GB0814341D0 (en) * | 2008-08-06 | 2008-09-10 | Aws Ocean Energy Ltd | Pile system |
GB0905663D0 (en) | 2009-04-01 | 2009-05-13 | Marine Current Turbines Ltd | Methods of and apparatus for the installation of columns/piles |
CN201460780U (zh) | 2009-05-26 | 2010-05-12 | 长沙矿山研究院 | 一种海底深孔取芯钻机 |
EP2527539B1 (fr) | 2011-05-27 | 2013-09-11 | BAUER Maschinen GmbH | Agencement de forage sous-marin et procédé d'introduction d'un élément de fondation dans le sol d'une étendue d'eau |
-
2011
- 2011-08-23 EP EP11006880.6A patent/EP2562348B1/fr not_active Not-in-force
-
2012
- 2012-08-22 US US13/592,332 patent/US8720603B2/en not_active Expired - Fee Related
- 2012-08-22 CA CA2787592A patent/CA2787592C/fr not_active Expired - Fee Related
- 2012-08-23 KR KR1020120092651A patent/KR101419513B1/ko not_active IP Right Cessation
- 2012-08-23 CN CN201210401584.4A patent/CN103015897B/zh not_active Expired - Fee Related
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2655885A (en) * | 1949-10-18 | 1953-10-20 | Stanislaw Jozwiak | Sewing machine |
DE1648696A1 (de) * | 1966-08-17 | 1971-08-12 | Shell Int Research | Verfahren und Vorrichtung zum Ermitteln des Bodenwiderstandes bzw. der Bodentragfaehigkeit |
GB1506388A (en) * | 1975-05-23 | 1978-04-05 | Lilley Waddington Ltd | Excavation of bore holes |
DE2734185A1 (de) * | 1977-07-29 | 1979-02-08 | Leffer Stahl & App | Verfahren und anlage zum niederbringen einer verrohrten tiefbohrung zur herstellung von verrohrten pfahlgruendungen |
DE2734185C2 (de) | 1977-07-29 | 1983-02-10 | Stahl- Und Apparatebau Hans Leffer Gmbh, 6602 Dudweiler | Anlage zum Niederbringen eines Bohrlochs für Pfahlgründungen |
DE3515276A1 (de) * | 1985-04-27 | 1986-10-30 | Otto Alfred Dr. 6600 Saarbrücken Becker | Bohr-gestaenge mit bohr-meisel |
DE8535088U1 (de) * | 1985-12-13 | 1988-08-18 | Ing. Günter Klemm, Spezialunternehmen für Bohrtechnik, 5962 Drolshagen | Erdbohrgerät |
DE4308856C1 (de) | 1993-03-19 | 1994-05-26 | Leffer Stahl & App | Verfahren und Bohrgerät zur Herstellung einer verrohrten Tiefbohrung, insbesondere für Pfahlgründungen |
US20080226398A1 (en) * | 2005-10-14 | 2008-09-18 | George Gibberd | Installation of Underwater Anchorages |
GB2448358A (en) | 2007-04-12 | 2008-10-15 | Tidal Generation Ltd | Installation of underwater ground anchorages |
EP2299006A1 (fr) * | 2009-09-14 | 2011-03-23 | Blade Offshore Services Ltd. | Procédé de fixation d'une structure submergée au fond d'un corps d'eau |
EP2322724A1 (fr) | 2009-11-17 | 2011-05-18 | BAUER Maschinen GmbH | Installation de forage d'eau souterraine et procédé d'entrée d'un élément de fondation cylindrique au fond de l'eau |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2930275A1 (fr) | 2014-04-08 | 2015-10-14 | Herrenknecht AG | Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau |
EP3333324A1 (fr) * | 2014-04-08 | 2018-06-13 | Herrenknecht AG | System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau |
DE102022121237A1 (de) | 2022-08-23 | 2024-02-29 | Gühring KG | Bohrvorrichtung mit einer Absaugeinheit |
EP4350119A1 (fr) * | 2022-10-06 | 2024-04-10 | BAUER Maschinen GmbH | Dispositif de forage sous-marin et procédé de construction d'un tubage sous-marin |
Also Published As
Publication number | Publication date |
---|---|
EP2562348B1 (fr) | 2017-10-04 |
CA2787592A1 (fr) | 2013-02-23 |
US8720603B2 (en) | 2014-05-13 |
KR101419513B1 (ko) | 2014-07-15 |
KR20130023136A (ko) | 2013-03-07 |
CA2787592C (fr) | 2014-12-16 |
CN103015897B (zh) | 2015-10-21 |
US20130220700A1 (en) | 2013-08-29 |
CN103015897A (zh) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2562348B1 (fr) | Agencement de forage sous-marin et procédé d'exécution d'un forage | |
EP2527539B1 (fr) | Agencement de forage sous-marin et procédé d'introduction d'un élément de fondation dans le sol d'une étendue d'eau | |
EP2562310B1 (fr) | Agencement de forage sous-marin et procédé d'exécution d'un forage au fond de l'eau | |
EP2322724B1 (fr) | Installation de forage d'eau souterraine et procédé d'entrée d'un élément de fondation cylindrique au fond de l'eau | |
DE60113763T2 (de) | Einrichtung und Methode zum Erdbohren | |
EP2085566B1 (fr) | Installation de forage | |
DE10155105C1 (de) | Bohrvorrichtung und Bohrverfahren | |
EP2728104B1 (fr) | Procédé de réalisation d'un forage horizontal dans le sol et dispositif de forage horizontal | |
DE3114612A1 (de) | In ein in hartem gestein, insbesondere felsen, vorzutreibendes bohrloch absenkbare bohrvorrichtung und verfahren zur herstellung eines bohrloches | |
EP2703564B1 (fr) | Cadre de guidage pour guider un dispositif de fraisage | |
EP0900319B1 (fr) | Procece et dispositif pour decouper des tubes ou des piliers ancres dans le sol | |
EP1580398B1 (fr) | Appareil et méthode pour constructions souterraines | |
EP0958446B1 (fr) | Procede et dispositif pour forer des sondages, notamment des sondages de recherche et d'extraction | |
EP0819819B1 (fr) | Tête de fraisage, dispositif de forage et procédé de forage sous-marin | |
CH704416A2 (de) | Bohranlage zum Durchführen von Bohrungen im Erdreich. | |
AT363044B (de) | Vorrichtung zum niederbringen einer verrohrten tiefbohrung zur herstellung einer verrohrten pfahlgruendung | |
DE4308856C1 (de) | Verfahren und Bohrgerät zur Herstellung einer verrohrten Tiefbohrung, insbesondere für Pfahlgründungen | |
EP1630299B1 (fr) | Procedée de renforcement du fondations par injection | |
EP2843138B1 (fr) | Procédé et dispositif destinés à la fabrication de poteaux de sol | |
DE3601713A1 (de) | Fahrbare bohr- und rammanlage | |
EP2759641B1 (fr) | Nacelle, dispositif de formation d'un élément de fondation et procédé de fondation | |
DE102012218285A1 (de) | Vorrichtung und Verfahren zum Erstellen einer Gründung und Gründung | |
DE19729882C1 (de) | Verfahren und Vorrichtung zum Herstellen eines Bohrpfahls | |
DE3622934C2 (de) | Bohrgerät kompakter Bauweise | |
DE8504359U1 (de) | Vorrichtung zum erweitern von bohrloechern insbesondere fuer die herstellung von bohrpfaehlen mit erweitertem pfahlfuss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20120329 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 7/124 20060101AFI20170322BHEP Ipc: E21B 4/18 20060101ALI20170322BHEP |
|
INTG | Intention to grant announced |
Effective date: 20170419 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: BAUER MASCHINEN GMBH |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 934232 Country of ref document: AT Kind code of ref document: T Effective date: 20171015 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502011013073 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 502011013073 Country of ref document: DE Representative=s name: WUNDERLICH & HEIM PATENTANWAELTE PARTNERSCHAFT, DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180204 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180104 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180105 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 502011013073 Country of ref document: DE |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
26 | Opposition filed |
Opponent name: KOERNER, ANDREAS Effective date: 20180704 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180823 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180823 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180831 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 934232 Country of ref document: AT Kind code of ref document: T Effective date: 20180823 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180823 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20190827 Year of fee payment: 9 |
|
PLBP | Opposition withdrawn |
Free format text: ORIGINAL CODE: 0009264 |
|
PLBD | Termination of opposition procedure: decision despatched |
Free format text: ORIGINAL CODE: EPIDOSNOPC1 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R100 Ref document number: 502011013073 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180823 |
|
PLBM | Termination of opposition procedure: date of legal effect published |
Free format text: ORIGINAL CODE: 0009276 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION PROCEDURE CLOSED |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
27C | Opposition proceedings terminated |
Effective date: 20191202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110823 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171004 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180823 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502011013073 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210302 |