EP3333324A1 - System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau - Google Patents

System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau Download PDF

Info

Publication number
EP3333324A1
EP3333324A1 EP17208006.1A EP17208006A EP3333324A1 EP 3333324 A1 EP3333324 A1 EP 3333324A1 EP 17208006 A EP17208006 A EP 17208006A EP 3333324 A1 EP3333324 A1 EP 3333324A1
Authority
EP
European Patent Office
Prior art keywords
hollow body
foundation
cavity
water
drilling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP17208006.1A
Other languages
German (de)
English (en)
Inventor
Marc Peters
Ulrich Schaffhauser
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Herrenknecht AG
Original Assignee
Herrenknecht AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Herrenknecht AG filed Critical Herrenknecht AG
Priority to EP17208006.1A priority Critical patent/EP3333324A1/fr
Publication of EP3333324A1 publication Critical patent/EP3333324A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • E21B7/124Underwater drilling with underwater tool drive prime mover, e.g. portable drilling rigs for use on underwater floors

Definitions

  • the invention relates to a method for producing a foundation for a building in the water in which a tubular hollow body is arranged at the bottom of the water, a drilling device is arranged in the hollow body, in the bottom of the water a cavity below the hollow body is generated, in which the soil is removed by means of the drilling device , and the hollow body is lowered into the cavity until a predetermined depth in the soil is reached, the drilling device is then removed from the hollow body, a foundation element is introduced and lowered into the cavity in the interior of the hollow body, and the space between the cavity wall and the outside of the foundation element is filled.
  • the invention relates to a system for producing a foundation for a structure in the water with a tubular hollow body, with a drivable in the hollow body boring device, which is adapted to produce in the bottom of the water a cavity below the hollow body, in which the soil is removed by means of the drilling device , And in which the hollow body is lowered, with a foundation element, which is embeddable and lowerable into the cavity in the interior of the hollow body, and with a filling material that is suitable, a gap, which after removal of the hollow body between the cavity wall and the outside of the Foundation element is present, to fill.
  • a platform is arranged at a foundation site, which is a guide element for a having to be introduced monopile.
  • the monopile is placed in the soil and then the annulus is filled between the monopile in the soil.
  • a wind turbine is installed via a connecting section.
  • the foundation structure is divided into two parts, in which a monopile is first introduced, in which then subsequently a second tubular element is set, on which then the connection adapter and on the turn the wind turbine are applied.
  • a lost formwork is placed in the ground in which then the monopile is placed on the then the connection adapter and the wind turbine are placed.
  • a jack-up platform or a comparable carrier vehicle is provided at the foundation site, with which in particular the guidance of the monopile during the introduction is accomplished. The use of such jack-up platforms is expensive.
  • the invention provides that at the place of foundation a guide device is placed on the water base surface, in which the tubular hollow body is arranged in the guide device in the insertion direction, that the hollow body is removed from the cavity after the introduction of the foundation element , And that the guide element is removed.
  • the guide device is deposited as a separate unit on the water base surface.
  • the tubular hollow body is used, which acts as a kind of casing.
  • the drilling device is introduced, which then subsequently removes the soil in the foundation area.
  • the casing is optionally introduced controlled by the guide device. Once the casing has been inserted into the ground to its final depth, drilling is stopped and the drilling device removed from the casing.
  • a further teaching of the invention provides that the guide element is removed before or after the introduction of the foundation element in the hollow body. Furthermore, it is advantageous that the hollow body is closed after removal of the drilling device with a closure element, wherein preferably before the introduction of the foundation element, the closure element is removed and / or it is preferably in the closure element is a lid. By closing the hollow body, it is possible, especially in waters with strong currents or high sediment content to close the hollow body to prevent material entry in a simple manner.
  • Another teaching of the invention provides that a cementitious material is used to fill the cavity between the cavity wall and the foundation element. This makes it possible in a particularly simple manner to achieve a corresponding fixation of the foundation element in the ground. Furthermore, it is advantageous that the foundation element is a pile. Furthermore, it is advantageous that the building is a wind turbine.
  • the solution according to the invention provides that a guide device is provided, which is deductible at the foundation on the water base surface and in which the hollow body can be arranged in the direction of insertion, and that the hollow body is designed so that it is after the introduction of the foundation member of the Cavity is removable.
  • An advantageous embodiment of the invention provides that a closure element is provided, with which the hollow body is closable. This is preferably a lid.
  • the foundation element is a pile, and / or that the backfill material is a cementitious material.
  • a guide device 13 is arranged in the water 11 on the ground 12 (see Fig. 1 ).
  • the guide device 13 has a pipe section 14 which is connected to a flat support body 15 on the body of water 12.
  • To support diagonal struts 16 are arranged between the pipe section and the support body.
  • a hollow body arranged in the form of a casing 18.
  • a drilling device 20 is arranged in the interior 19 of the casing 18. With a drill head 21 of the drilling device 20 located in the removal area to be solved bottom 22 is removed. This creates a cavity 23, in the progress of Bohrfort suits (see Fig. 4 ) the casing tube 18 is lowered into the cavity 23.
  • the drilling device 20 is removed from the interior 19 of the casing 18.
  • Fig. 6 can then be applied to the closing of the interior 19 of the casing 18, a cover member 25 on the projecting into the water 11 end 26 of the casing, so that then the interior 19 is closed to material input by inflowing water.
  • the thus-prepared foundation site 10 can now be found in the in Fig. 6 state shown remain until the subsequent construction steps of the structure 100 are performed.
  • Fig. 7 is shown, the lid 25 removed and then, as in Fig. 8 is shown, introduced into the interior 19 of the casing 18, a foundation pile 27 and parked on the cavity deepest. Subsequently, the casing tube 18 is removed from the cavity 23, as in Fig.
  • annular space 30 Between the outer wall 28 of the cavity 23 and the outer wall 29 of the foundation pile 27 thus there is an annular space 30 (see Fig. 10 ).
  • a filling material 31 is introduced and the previously located in the annular space 30 water displaced thereby. This is continued until the filling material 31 in the annular space 30 has reached the height of the body of water 12.
  • the guide device 13 After hardening of the filling material 31, the guide device 13 is then removed and the foundation pile 27 is located free-standing in the body of water 11 starting from the water bottom 12.
  • a connecting element 32 is then arranged on the foundation pile 27 (see FIG Fig. 14 ), on which then the wind turbine 100 (see Fig. 15 ) is built.
EP17208006.1A 2014-04-08 2014-04-08 System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau Withdrawn EP3333324A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP17208006.1A EP3333324A1 (fr) 2014-04-08 2014-04-08 System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP17208006.1A EP3333324A1 (fr) 2014-04-08 2014-04-08 System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau
EP14001284.0A EP2930275B1 (fr) 2014-04-08 2014-04-08 Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
EP14001284.0A Division EP2930275B1 (fr) 2014-04-08 2014-04-08 Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau

Publications (1)

Publication Number Publication Date
EP3333324A1 true EP3333324A1 (fr) 2018-06-13

Family

ID=50472976

Family Applications (2)

Application Number Title Priority Date Filing Date
EP14001284.0A Active EP2930275B1 (fr) 2014-04-08 2014-04-08 Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau
EP17208006.1A Withdrawn EP3333324A1 (fr) 2014-04-08 2014-04-08 System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP14001284.0A Active EP2930275B1 (fr) 2014-04-08 2014-04-08 Système et procédé de fabrication d'une fondation pour un ouvrage situé dans l'eau

Country Status (2)

Country Link
EP (2) EP2930275B1 (fr)
DK (1) DK2930275T3 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4273326A1 (fr) 2022-05-06 2023-11-08 Optum Computational Engineering ApS Fondation d'une superstructure, en particulier d'une éolienne, éolienne dotée de la fondation, procédé de formation d'une fondation d'éolienne
EP4350119A1 (fr) 2022-10-06 2024-04-10 BAUER Maschinen GmbH Dispositif de forage sous-marin et procédé de construction d'un tubage sous-marin

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299632A (zh) * 2017-05-25 2017-10-27 中国电建集团华东勘测设计研究院有限公司 海上钻岩复打型大直径桩结构及施工方法
CN109295972A (zh) 2018-09-25 2019-02-01 高永光 全套管工法预制桩灌注浆和后注浆固结技术
CN114215049A (zh) * 2021-12-09 2022-03-22 中铁大桥局集团第五工程有限公司 一种深水基础、裸岩环境下钻孔桩主体钢护筒的施工方法
EP4286593A1 (fr) 2022-05-30 2023-12-06 BAUER Spezialtiefbau GmbH Dispositif d'excavation et procede de creation d'un trou
BE1030675B1 (nl) * 2022-06-29 2024-01-29 Deme Offshore Be Nv Werkwijze voor het vanaf een vaartuig aanbrengen van een fundering in een onderwaterbodem
EP4339377A1 (fr) 2022-09-16 2024-03-20 BAUER Spezialtiefbau GmbH Pieu tubulaire et procédé de formation d'un pieu de fondation
EP4339378A1 (fr) 2022-09-16 2024-03-20 BAUER Maschinen GmbH Dispositif de manipulation et procédé de préhension et d'insertion d'un tube de pieu dans un forage
EP4339376A1 (fr) 2022-09-16 2024-03-20 BAUER Spezialtiefbau GmbH Procédé de formation d'un pieu de fondation dans le sol

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431189A (en) * 2005-10-14 2007-04-18 Tidal Generation Ltd Installation of underwater anchorages
GB2448358A (en) * 2007-04-12 2008-10-15 Tidal Generation Ltd Installation of underwater ground anchorages
WO2010015799A2 (fr) * 2008-08-06 2010-02-11 Aws Ocean Energy Ltd Système de pieux
EP2500473A1 (fr) * 2011-03-16 2012-09-19 HOCHTIEF Solutions AG Procédé de fabrication d'une fondation pour une installation offshore
EP2527539A1 (fr) * 2011-05-27 2012-11-28 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'introduction d'un élément de fondation dans le sol d'une étendue d'eau
EP2562348A1 (fr) * 2011-08-23 2013-02-27 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'exécution d'un forage
EP2562310A1 (fr) * 2011-08-23 2013-02-27 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'exécution d'un forage au fond de l'eau

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202011005583U1 (de) * 2011-04-26 2013-09-30 Herrenknecht Ag Gründungspfahl zum Herstellen einer Gründung für ein Bauwerk im Wasser

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431189A (en) * 2005-10-14 2007-04-18 Tidal Generation Ltd Installation of underwater anchorages
GB2448358A (en) * 2007-04-12 2008-10-15 Tidal Generation Ltd Installation of underwater ground anchorages
WO2010015799A2 (fr) * 2008-08-06 2010-02-11 Aws Ocean Energy Ltd Système de pieux
EP2500473A1 (fr) * 2011-03-16 2012-09-19 HOCHTIEF Solutions AG Procédé de fabrication d'une fondation pour une installation offshore
EP2500473B1 (fr) 2011-03-16 2013-08-21 HOCHTIEF Solutions AG Procédé de fabrication d'une fondation pour une installation offshore
EP2527539A1 (fr) * 2011-05-27 2012-11-28 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'introduction d'un élément de fondation dans le sol d'une étendue d'eau
EP2562348A1 (fr) * 2011-08-23 2013-02-27 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'exécution d'un forage
EP2562310A1 (fr) * 2011-08-23 2013-02-27 BAUER Maschinen GmbH Agencement de forage sous-marin et procédé d'exécution d'un forage au fond de l'eau

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
KATZENBACH, ROLF: "Mitteilungen des Institutes und der Versuchsanstalt f?r Geotechnik der Technischen Universit?t Darmstadt. Helf Nr. 91", vol. 91, 1 March 2012, TU DARMSTADT, Darmstadt, ISBN: 978-3-942068-03-1, article PAUL SCHELLER ET AL: "Monopfahlgr?ndung f?r eine Gezeitenturbine in Schottland", pages: 139 - 149, XP055309828 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4273326A1 (fr) 2022-05-06 2023-11-08 Optum Computational Engineering ApS Fondation d'une superstructure, en particulier d'une éolienne, éolienne dotée de la fondation, procédé de formation d'une fondation d'éolienne
WO2023214094A1 (fr) 2022-05-06 2023-11-09 Optum Computational Engineering Aps Fondation pour une superstructure et pour une éolienne, éolienne dotée d'une fondation, procédé de formation d'une fondation d'éolienne
EP4350119A1 (fr) 2022-10-06 2024-04-10 BAUER Maschinen GmbH Dispositif de forage sous-marin et procédé de construction d'un tubage sous-marin

Also Published As

Publication number Publication date
EP2930275A1 (fr) 2015-10-14
DK2930275T3 (en) 2018-04-03
EP2930275B1 (fr) 2017-12-20

Similar Documents

Publication Publication Date Title
EP3333324A1 (fr) System et procèdé de fabrication d'une fondation pour un ouvrage situé dans l'eau
EP2562310B1 (fr) Agencement de forage sous-marin et procédé d'exécution d'un forage au fond de l'eau
EP2500473B1 (fr) Procédé de fabrication d'une fondation pour une installation offshore
EP2700750B1 (fr) Pieu de fondation pour des ouvrages offshore et procédé de fabrication d'un pieu de fondation pour des ouvrages offshore
EP2698476B1 (fr) Procédé de fondation d'un ouvrage offshore et fondation pour un ouvrage offshore
EP2702209B1 (fr) Pieu de fondation
DE2005960A1 (de) Anlage einer Gruppe von Unterwasser-Bohrlöchern
DE202017106275U1 (de) Unterwasserführungsvorrichtung zum Einsatz beim Erstellen eines Unterwasserfundaments eines Bauwerks
EP2884006B1 (fr) Pieux et procédé de pose d'un pieu battu au fond de la mer
DE10047526C2 (de) Herstellen eines Horizontalbrunnens
DE102016107899A1 (de) Verfahren zum Herstellen einer Rohrspundwand und Tragrohr
EP3542000B1 (fr) Procédé de démantèlement de structures de fondation en mer
DE4413471C1 (de) Verfahren zur Herstellung von liegenden und/oder geneigten, verfestigten Säulen im Baugrund sowie Vorrichtung zur Durchführung des Verfahrens nebst Anwendung
DE19647706C1 (de) Verfahren und Vorrichtung zum Fluten von Speicherkavernen
DE618955C (de) Einrichtung zur Herstellung von Ortpfaehlen mit auffaltbarem Mantel
WO1997012114A1 (fr) Procede de realisation d'un puits d'extraction tube
EP3272946B1 (fr) Dispositif de guidage et procede de production d'une fente
EP2873775B1 (fr) Procédé de fondation d'une structure offshore et pieu de fondation destiné à l'utilisation pendant l'exécution du procédé
EP4339376A1 (fr) Procédé de formation d'un pieu de fondation dans le sol
EP0982470A2 (fr) Methode pour construire un puits
DE2504921A1 (de) Unterwasserbauwerk
DE102010022817A1 (de) Verfahren und Verbindungselement zur Herstellung einer direkten Verbindung eines verlaufsgesteuerten Horizontalfilterbrunnens mit einem vertikalen Sickerbrunnen
EP2896750B1 (fr) Dispositif et procédé d'ancrage d'une construction
DE1634486A1 (de) Gruendungspfahl
EP2695998A2 (fr) Procédé de fabrication d'un pieu injecté sous pression au-dessous de la surface de l'eau

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 2930275

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20181214