EP2088075A1 - Rohrstruktur für einen öltanker - Google Patents

Rohrstruktur für einen öltanker Download PDF

Info

Publication number
EP2088075A1
EP2088075A1 EP07830830A EP07830830A EP2088075A1 EP 2088075 A1 EP2088075 A1 EP 2088075A1 EP 07830830 A EP07830830 A EP 07830830A EP 07830830 A EP07830830 A EP 07830830A EP 2088075 A1 EP2088075 A1 EP 2088075A1
Authority
EP
European Patent Office
Prior art keywords
passage
cargo
piping
hull
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07830830A
Other languages
English (en)
French (fr)
Other versions
EP2088075A4 (de
Inventor
Nobuyoshi Morimoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP2088075A1 publication Critical patent/EP2088075A1/de
Publication of EP2088075A4 publication Critical patent/EP2088075A4/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B11/00Interior subdivision of hulls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines

Definitions

  • the present invention relates to oil tankers in a broad sense, namely pure oil tankers and convertible oil tankers capable of loading solid cargo such as ore or coal as well. More particularly it relates to their piping structures for cargo oil and other pipes.
  • Fig. 8(a) shows one known oil tanker, in which cargo oil pumps 17 are provided in a pump room 16 in front of an engine room 18.
  • Cargo oil suction pipes 57 interconnect the cargo pump 17 and each of cargo tanks; cargo oil delivery pipes 50 interconnect the pump 17 and shore connections 48 provided amidship on an upper deck.
  • cargo oil suction pipes 57 are passed as low as possible in the cargo tanks to improve suction efficiency.
  • cargo oil delivery pipes 50 are raised from the pump room up to an upper deck 30 and extends on the upper deck to the midship portion of the hull.
  • the cargo oil delivery pipes 50 running on the upper deck may be exposed to spray from sea water waves, and susceptible to corrosive damage, resulting in much maintenance costs. Further, since cargo oil delivery pipes are normally large in diameter, the existence of the pipes on upper deck may obstruct the worker's traffic particularly in transverse direction of the ship.
  • the cargo oil delivery pipes 50 should be passed within cargo oil tanks, at midship raised above the upper deck, and then connected to the shore connection 48 as shown in Fig. 8(b) .
  • Such pipe arrangement can make the upper deck free of the cargo oil delivery pipe 50, thus eliminating pipe corrosion by sea spray and an obstruction to worker's traffic on the upper deck.
  • pipes which may obstruct traffic on an upper deck are not only cargo oil delivery pipes but also a fuel oil loading pipe, a cargo oil stripper pipe, a fire main pipe, a tank cleaning pipe, an electric wire duct pipe, and so on.
  • an inert gas system in order to prevent an explosion accident, recent large tankers are provided with an inert gas system.
  • the system has an inert gas generator disposed aft portion of the hull, from which an inert gas main pipe extends forward on upper deck, resulting in obstruction to traffic on the upper deck.
  • the object of the present invention is to solve such problems in pure or convertible oil tankers.
  • a taker having a piping passage longitudinally extending within a hull of the tanker.
  • a cargo delivery pipe is run through in said passage to interconnect a pump room at an aft portion of the hull and a shore- connection provided amidship on the upper deck.
  • the passage is surrounded by watertight structures and particularly an inside top portion thereof is formed by the upper deck.
  • the piping passage under the upper deck for housing cargo delivery pipes, it is possible to minimize the possibility of the oil flowing down into the sea in the event of oil leakage in the cargo delivery pipe.
  • the upper deck can be kept free of the cargo oil delivery pipes, it is easy for workers or carts to move on the upper deck. Further, the cargo oil delivery pipes within the piping passage are not exposed to spray from sea water waves, thus preventing corrosive damage and maintenance costs reduced.
  • Such pipes may include an inert gas pipe, a tank cleaning pipe, a fire main pipe, an electric wire pipe, a cargo oil stripper pipe, and a fuel oil loading pipe.
  • This arrangement may solve the problems of on-deck traffic, deck cleaning, and corrosion of the pipes.
  • the pipes such as the inert gas pipe, the tank cleaning pipe, and the fire main pipe are run near to a bow part, therefore, the piping passage housing these pipes have to also extend near to the bow.
  • the piping passage is arranged in contact with longitudinal bulkheads for dividing the inside of the hull into the oil tanks in rows or in contact with a side ballast tank.
  • hull structure members can serve as a part of walls of the piping passage. Thus the amount of structural material and building cost can be saved.
  • the piping passage is preferably fitted with some doorways leading to the upper deck.
  • the inside of the passage have enough space for worker to pass through it.
  • the piping passage is equippeded with a ventilator, a gas detector, a sprinkler system, and the like to provide for gas explosion or fire.
  • a hull space of an ore/oil carrier is divided by transverse bulkheads 10, into a bow portion 12, a cargo space 14, a pump room 16, an engine room 18, and a stem portion 20.
  • An accommodation space 22 is located on the engine room 18 and a wheelhouse 24 is thereon.
  • the cargo space 14 has a double hull structure at both of hull bottom and hull sides, and insides of them form ballast tanks 26, 28.
  • the cargo space surrounded by these double hull structures and an upper deck 30 is divided by two longitudinal bulkheads 32 into central cargo oil tanks (or ore hold) 34 and wing cargo oil tanks 36.
  • cargo hatch 38 is provided on the upper deck 30, and the hatch is equipped with an oil-tight hatch cover 40.
  • Water-tight piping passages 42 with almost rectangular cross sections are extending longitudinally within an upper portion of the central cargo oil tank 34.
  • the passage is located between the longitudinal bulkheads 32 and cargo hatches 38, the upper side of the passage 42 is defined by the upper deck 30; the outer and inner sides thereof are defined by a longitudinal bulkhead 32 and a hatch side girder 46, respectively.
  • Hull structure members 32, 46 serve as side walls of the piping passage so that the passage can be built at reduced costs.
  • Some pipes 54 including a fuel oil loading pipe and a cargo oil stripper pipe are passing through the starboard passage 42 and connected to the shore connection 48.
  • Inert gas supply pipe 58 which have big diameter like the cargo oil delivery pipe 50, are passed through the port passage to the bow. As shown in Fig. 4 , branch pipes 60 branching off from the inert gas pipe 58 run above the upper deck and reach the respective cargo oil tanks 34, 36.
  • some pipes 62 including a tank cleaning pipe, a fire main pipe and an electric wire pipe pass through the port passage and extend to the bow portion as shown in Fig. 3 and Fig. 4 ,
  • access hatches 68 having watertight covers are provided. Passages 42 are preferably sufficiently large to permit workers to pass through.
  • Passages 42 are preferably equipped with ventilators, gas detectors, fire extinguisher (for example, of a carbon dioxide type), and the like to provide for gas explosion.
  • a numerical reference 57 indicates cargo oil suction pipes, which are located at a bottom portion of the wing cargo tanks 36 to extend toward the pump room 16.
  • passages 42 are sandwiched between the longitudinal bulkheads and the cargo hatch.
  • Fig. 5 shows another passage arrangement, where the passages are located in contact with the side ballast tanks 28, and the outer side of the passage 42 is defined by an inner wall 29 of the side ballast tank 28. Piping disposition in the passage 42 are the same as those in the case of Fig. 3 .
  • Fig. 6 is the case for a pure oil tanker. Since it has no cargo hatches, a single passage 42 is provided along a center line of a hull as shown with chain lines in the drawing, in which a cargo delivery pipe, an inert gas pipe, and other pipes are accommodated. Instead of centerline passage, two passages 42 may be located at both sides symmetrically and in contact with side ballast tanks as shown with solid lines in the same drawing.
  • Fig. 7 shows an embodiment of an OBO, that is, oil/bulk/ore carrier.
  • Piping passages 42 are formed between side ballast tanks 28 and cargo hatches 38.
  • the cargo hatch is so wide that hatch side space on upper deck is very narrow. So it is of a great advantage to provide piping passages under the upper deck.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
EP07830830A 2006-10-31 2007-10-30 Rohrstruktur für einen öltanker Withdrawn EP2088075A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006295169 2006-10-31
PCT/JP2007/071096 WO2008053876A1 (fr) 2006-10-31 2007-10-30 Structure de tuyauterie pour navire pétrolier

Publications (2)

Publication Number Publication Date
EP2088075A1 true EP2088075A1 (de) 2009-08-12
EP2088075A4 EP2088075A4 (de) 2013-01-02

Family

ID=39344217

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07830830A Withdrawn EP2088075A4 (de) 2006-10-31 2007-10-30 Rohrstruktur für einen öltanker

Country Status (5)

Country Link
US (1) US20100139547A1 (de)
EP (1) EP2088075A4 (de)
KR (1) KR101147568B1 (de)
CN (1) CN101528537B (de)
WO (1) WO2008053876A1 (de)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2347953A1 (de) * 2010-01-20 2011-07-27 Shell Internationale Research Maatschappij B.V. Schiff mit einer modifizierten Rohranordnung
EP2473398A1 (de) * 2009-09-03 2012-07-11 Viking Dredging AS Vorrichtung für ein frachtschiff zum transportieren von sand und zur flüssigkeitsentladung
FR2982838A1 (fr) * 2011-11-23 2013-05-24 Stx France Sa Navire pourvu d'une zone de transfert d'un produit liquide potentiellement dangereux
ITPD20130093A1 (it) * 2013-04-12 2014-10-13 Fincantieri Cantieri Navali It Nave per trivellazioni
WO2015082627A1 (en) * 2013-12-06 2015-06-11 Gva Consultants Ab Floating vessel with tunnel

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101125107B1 (ko) * 2009-05-22 2012-03-21 대우조선해양 주식회사 저장탱크의 다열 배치 구조를 가지는 부유식 구조물
US10081412B2 (en) * 2013-12-06 2018-09-25 Gva Consultants Ab Floating vessel with tank trough deck
JP6174475B2 (ja) * 2013-12-19 2017-08-02 三井造船株式会社 船形構造物
JP6712569B2 (ja) * 2017-04-13 2020-06-24 三菱造船株式会社 船舶
KR20210029896A (ko) * 2019-09-06 2021-03-17 주식회사 포스코 액화가스 저장탱크 및 이를 포함하는 선박
JP7252281B2 (ja) * 2021-07-21 2023-04-04 株式会社新来島どっく 波形隔壁タンク上部スツール内配管構造
CN116834892A (zh) * 2023-06-25 2023-10-03 南通中远海运船务工程有限公司 一种原油船的货油舱布置结构

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1302547A (en) * 1918-08-29 1919-05-06 Eyvind Lee Heidenreich Piping system for concrete ships and tankers.
US2979009A (en) * 1956-06-07 1961-04-11 Goetaverken Ab Tankers or like ships
US3113544A (en) * 1962-07-12 1963-12-10 Texaco Inc Underdeck tunnel for tankers
JPS5587684A (en) * 1978-12-26 1980-07-02 Nippon Kokan Kk <Nkk> Chemical tanker

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3745960A (en) * 1971-05-06 1973-07-17 Exxon Research Engineering Co Tanker vessel
US3848559A (en) * 1973-01-15 1974-11-19 Exxon Research Engineering Co Centralized cargo handling system for cryogenic vessels
JPS55107498A (en) 1979-02-09 1980-08-18 Hitachi Maxell Electricallyydriven pencil sharpener
NO300586B1 (no) * 1991-06-27 1997-06-23 Walter Nilsen Anordning ved selvlossersystem
JPH06309488A (ja) * 1993-04-22 1994-11-04 Oki Electric Ind Co Ltd 通番印字装置
JPH08295288A (ja) 1995-04-26 1996-11-12 Sumitomo Heavy Ind Ltd タンカーの荷油配管構造
JP3550356B2 (ja) * 2000-12-08 2004-08-04 株式会社新来島どっく 液状貨物輸送船のステンレス鋼製カーゴタンクの防食方法および防食装置
US6899046B2 (en) * 2002-11-26 2005-05-31 Exxonmobil Chemical Patents Inc. Shipping methanol for a methanol to olefin unit in non-methanol carriers
JP2005104187A (ja) * 2003-09-29 2005-04-21 Shin Kurushima Dockyard Co Ltd タンカーのダクト装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1302547A (en) * 1918-08-29 1919-05-06 Eyvind Lee Heidenreich Piping system for concrete ships and tankers.
US2979009A (en) * 1956-06-07 1961-04-11 Goetaverken Ab Tankers or like ships
US3113544A (en) * 1962-07-12 1963-12-10 Texaco Inc Underdeck tunnel for tankers
JPS5587684A (en) * 1978-12-26 1980-07-02 Nippon Kokan Kk <Nkk> Chemical tanker

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2008053876A1 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2473398A1 (de) * 2009-09-03 2012-07-11 Viking Dredging AS Vorrichtung für ein frachtschiff zum transportieren von sand und zur flüssigkeitsentladung
EP2473398A4 (de) * 2009-09-03 2014-04-09 Viking Dredging As Vorrichtung für ein frachtschiff zum transportieren von sand und zur flüssigkeitsentladung
EP2347953A1 (de) * 2010-01-20 2011-07-27 Shell Internationale Research Maatschappij B.V. Schiff mit einer modifizierten Rohranordnung
WO2011089108A1 (en) 2010-01-20 2011-07-28 Shell Internationale Research Maatschappij B.V. Vessel with a modified pipe arrangement
FR2982838A1 (fr) * 2011-11-23 2013-05-24 Stx France Sa Navire pourvu d'une zone de transfert d'un produit liquide potentiellement dangereux
EP2597025A1 (de) * 2011-11-23 2013-05-29 Stx France S.A. Schiff, das mit einer Transferzone eines potenziell gefährlichen flüssigen Produkts ausgestattet ist
CN103129708A (zh) * 2011-11-23 2013-06-05 Stx法国股份有限公司 具有输送潜在危险液体产品区域的船舶
CN103129708B (zh) * 2011-11-23 2016-08-17 Stx法国股份有限公司 具有输送潜在危险液体产品区域的船舶
ITPD20130093A1 (it) * 2013-04-12 2014-10-13 Fincantieri Cantieri Navali It Nave per trivellazioni
WO2014167438A1 (en) * 2013-04-12 2014-10-16 Fincantieri S.P.A. Drillship
WO2015082627A1 (en) * 2013-12-06 2015-06-11 Gva Consultants Ab Floating vessel with tunnel

Also Published As

Publication number Publication date
CN101528537A (zh) 2009-09-09
WO2008053876A1 (fr) 2008-05-08
EP2088075A4 (de) 2013-01-02
US20100139547A1 (en) 2010-06-10
KR101147568B1 (ko) 2012-05-21
CN101528537B (zh) 2012-09-05
KR20090074734A (ko) 2009-07-07

Similar Documents

Publication Publication Date Title
EP2088075A1 (de) Rohrstruktur für einen öltanker
CN1946607B (zh) 内设利用管道的自动压载系统的船舶
JP4357555B2 (ja) 油槽船の配管構造
CN107000814B (zh) 具备液化气体储存设备的浮体结构物
CN102039982A (zh) 无压载水船
CN210391494U (zh) 一种半潜运输船船型
US20190009864A1 (en) Oil Tanker
JP2010269690A (ja) コンテナ船における排ガス設備及びコンテナ船
KR960010527B1 (ko) 화물유(油) 누출방지용 유조선
CN110662694B (zh) 海上浮体结构物
RU2332326C1 (ru) Танкер-химовоз
US5901656A (en) Watercraft with stacked wing ballast tanks
JP4401346B2 (ja) 船舶機関室のダブルハル構造
CN113386919B (zh) 一种具备干式压载管系的浮式生产储油装置
WO2014013584A1 (ja) 船舶
JP2012153334A (ja) 船舶
TW201139211A (en) Oil tank allowing the type of ship to be easily changed
CN216153988U (zh) 一种带有独立连通舱室的浮式储油船
CN116729545B (zh) 一种原油船的储油系统
CN116215766A (zh) 一种大型远洋油轮的内部输油管路系统
CN114754293B (zh) 一种客船容积泵流量控制系统、方法及客船
KR101519535B1 (ko) 적하역 배관시스템 및 이를 구비한 유조선
RU62888U1 (ru) Танкер-химовоз
KR20150009273A (ko) 탱커의 오일 적하역 장치
KR20230113173A (ko) 선박

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20090406

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20121204

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 25/08 20060101AFI20121128BHEP

Ipc: B63B 11/00 20060101ALI20121128BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20130503