EP1229177A2 EP02001825A EP02001825A EP1229177A2 EP 1229177 A2 EP1229177 A2 EP 1229177A2 EP 02001825 A EP02001825 A EP 02001825A EP 02001825 A EP02001825 A EP 02001825A EP 1229177 A2 EP1229177 A2 EP 1229177A2
Authority
EP
European Patent Office
Prior art keywords
joint tape
longitudinal edge
joint
groove
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP02001825A
Other languages
German (de)
English (en)
Other versions
EP1229177A3 (fr
Inventor
Jutta Quinting
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1229177A2 publication Critical patent/EP1229177A2/fr
Publication of EP1229177A3 publication Critical patent/EP1229177A3/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6816Porous tubular seals for injecting sealing material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6807Expansion elements for parts cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B2001/6818Joints with swellable parts

Definitions

  • the present invention relates to a method for sealing a building joint between an existing one Old concrete construction and an attached freshly poured new concrete construction, whereby for sealing a joint tape is used. Furthermore concerns the invention a joint tape for sealing a Structural joint, according to the preamble of claim 7.
  • WO 00/04247 is a joint tape for the above known use.
  • This well-known joint tape is T-shaped in cross-section, with the T-beam forms a back part of the joint tape.
  • this Back part is the joint tape on an existing one Old concrete construction attachable.
  • the back part using an adhesive bed flat on the old concrete structure glued on, the adhesive for example is a synthetic resin.
  • the back part using fasteners such as screws or Nails to be connected to the old concrete structure.
  • the fasteners are preferred with continuous, separate pressure bars made of metal highlighted.
  • a bridge projects from the middle of the back, in the freshly poured new concrete construction the casting of which is embedded.
  • joint tape for a water-impermeable Sealing of individual sections of concrete between these occurring joints
  • the joint tape is a profile made of an elastic material, like thermoplastic, and with in provided in its longitudinal direction upstanding webs is. Furthermore, it is for combined use with injection hoses or volume changing Sealing cords with at least one integrally molded Holder for the injection hoses or sealing cords educated. Because of its shape, too this joint tape only for sealing between immediately successively manufactured concreting sections be used because it is in the individual concrete areas must be poured.
  • a method for sealing a building joint between an existing old concrete structure and one fresh concrete to be poured onto it specify, for sealing a joint tape is used. Furthermore, a joint tape for Use created in the inventive method become.
  • the joint tape in both the old concrete construction as well as in the new concrete construction mechanically firm and at the same time sealingly anchored.
  • the groove for the joint tape in the old concrete construction is freshly milled, the groove is after its manufacture smooth and clean and therefore easy to use for a firm, tight and permanent connection with the filling compound.
  • the groove is included during filling the filling compound freely accessible and clearly visible, so that a complete filling of the groove with the filling compound can be easily checked with the eye.
  • the filling the groove can, for example, by filling the Filling compound or by injecting the filling compound Cartridges or other suitable storage containers.
  • An alternative embodiment of the method provides that after milling the groove, the joint tape with its first Longitudinal edge is inserted into the groove and that then the groove is filled with the filling compound.
  • the procedure is the insertion of the first longitudinal edge of the joint tape in the groove easier because still there is no filling compound in the groove. Filling the remaining one
  • the groove with the filling compound is then free expedient both from the top and from the bottom of the joint tape to completely cover the groove Filling compound to fill in and around the joint tape Embed filling compound within the groove.
  • the joint tape before introducing the filling compound to secure in its position, it is provided that the joint tape additionally by means of selective lanyards the old concrete structure is fixed.
  • Another embodiment of the second method variant provides that before the filling material is introduced into the Only this is sealed to the building joint. In order to is a leakage or flow of filler from the Groove in the joint space prevented, so that a complete Then keep the groove filled with the filling compound remains when the filling compound is relative before it hardens is liquid.
  • the filling compound be replaced by a injection channel provided on the first longitudinal edge of the joint tape and / or hose introduced into the groove becomes.
  • the joint tape Due to its asymmetrical shape, the joint tape needs only one groove on the side of the old concrete structure with a limited depth that is still acceptable Effort can be produced on the construction site; on his other The joint tape is in the freshly made side New concrete construction embedded sufficiently far, so that on this side the tightness in the known way is achieved and guaranteed. The tightness against the passage of water is reduced the side of the old concrete structure through the combination guaranteed by joint tape and filling compound, whereby for the Tightness here also a relatively small depth of the groove is sufficient.
  • the joint tape is provided that on the first longitudinal edge and / or on the second longitudinal edge (each) at least one injection channel and / or Holding means for holding (in each case) at least one injection hose are provided.
  • the injection channel or the one possibly attached to the holding means Injection hose can either be used to introduce the filling compound used in the groove when attaching the joint tape or he can later, if necessary should be used to inject a sealant become.
  • This sealant injection is e.g. then required if the concrete is in the vicinity of the groove the old concrete construction and / or in the new concrete construction should be additionally sealed or if the joint is found to be permeable to moisture becomes.
  • an injection channel and an injection hose can be provided on the joint tape. It can then e.g. the injection channel or the injection hose first for filling the groove with the filling compound or for a first sealing injection can be used; for a later one Injection of a sealant is then still available injection hose or channel not in use yet Available.
  • the injection hose holding means mentioned are preferred through one or more continuously or in sections integrally formed clamping grooves.
  • the injection hose can be simple if necessary be snapped into place by hand. If not a clamping groove is used to hold an injection hose, ensures that the joint tape is securely anchored in the filling compound filling the groove or in the freshly cast Concrete.
  • the first longitudinal edge of the joint tape with a surface-enlarging and friction-enhancing structure is.
  • a further embodiment of the joint tape is that its middle part is hollow.
  • the cross section of the middle part of the joint tape is a rectangle or Is oval or round hollow body.
  • the outer width this hollow body suitably corresponds to the width a movement joint between the two concrete structures, so that an exact positioning of the joint tape is facilitated.
  • These also offer cross-sectional shapes the joint tape the possibility of movement of the concrete structures relative to each other, e.g. in later Settlement or thermally caused dimensional changes, to follow harmlessly. This can be both a broadening or narrowing of the joint as well as parallel displacements of the concrete structures relative to each other from hollow middle part of the joint tape without destruction in one sufficient dimensions can be traced
  • joint tape is on the top and / or bottom of the joint tape (each) an upright, perpendicular to the joint tape level, Mounting and sealing flange running in the longitudinal direction of the joint tape provided that in the installed state of the Joint tape on the end face of the old concrete structure is applied.
  • This flange, or in pairs these flanges ensure that the Joint tape on the old concrete structure, especially if the procedure in its variant with the subsequent Introducing the filling compound is applied.
  • the mounting and sealing flange can be spaced at a grid Breakthroughs are appropriate through which selective connection means, especially nails or screws, to fix the joint tape at his Laying can be introduced into the old concrete structure.
  • the second longitudinal edge is useful of the joint tape with a surface enlarging and friction-increasing structure and / or from the joint tape level upward and / or downward projecting anchoring webs Mistake.
  • the joint tape can be made from an elastic-flexible Material or from several materials different Properties exist.
  • the materials have to not just be plastic; as known per se, can part of the joint tape also through a metal profile, e.g. a sheet metal strip.
  • the joint tape In order to be able to produce the joint tape inexpensively, is it is preferably extruded in one piece from a material or co-extruded from multiple materials.
  • a preferred material for the joint tape is due to its favorable mechanical and chemical properties and its low cost polyvinyl chloride (PVC).
  • the hardness or strength of the first is preferred Longitudinal edge is higher than the hardness or strength of the second longitudinal margin. This ensures that the joint tape itself when it is pressed into the filling compound the joint is not accidentally deformed and that after the Hardening of the filling compound is firmly anchored in it. at the same time the joint tape remains sufficient in its remaining parts elastic and flexible to handle relative movements follow between old and new concrete construction to be able to.
  • Figure 1 of the drawing shows the edge area of the right Old concrete construction 7 and the one facing it on the left Edge area of a new concrete construction 8, in the present Case two sole plates.
  • the old concrete construction 7 is part of an existing structure at a time after its completion, for example by one Cultivation should be supplemented.
  • concreting is one New concrete construction 8 following the existing one Old concrete construction 7 required.
  • a building joint 6 are kept free, the relative movements of the concrete structures 7, 8 allowed to each other. simultaneously but this building joint 6 must be liquid-tight to moisture penetration through the building joint 6 inside the building or, if necessary, in reverse Exclude direction.
  • the joint tape 1 is in its Considered transverse direction asymmetrical, whereby its first longitudinal edge 2 on the right in the drawing or the first wing is significantly narrower than that in the Drawing left longitudinal edge 4 or second Wing. Runs between the two longitudinal edges 2, 4 a central part designed with a rectangular hollow channel 30 3.
  • the middle part 3 and the second longitudinal edge 4 are of known design.
  • the first longitudinal edge 2 with its relatively small width is in the installed state as the drawing figure shows, in a groove 71, before concreting the new concrete structure 8 in the end face facing this 70 of the old concrete structure was milled.
  • the depth the groove 71 is slightly larger than the width of the first Longitudinal edge 2 of the joint tape 1, so that the first Longitudinal edge 2 can be inserted into the groove 71 without to hit the bottom of the groove.
  • the groove 71 with a Filling compound 72 filled, which is initially liquid or pasty and then it hardens. Depending on the type of filling compound is it rigid or still elastic after it has hardened, in any case, but with the joint delimiting concrete and with the part inside of the joint tape.
  • the filling compound 72 ensures on the one hand for anchoring that is sufficiently strong mechanically of the first longitudinal edge 2 of the joint tape 1 within the Old concrete construction 7 and at the same time for waterproofing against the ingress of moisture or water this area.
  • the groove 71 is initially filled with the filling compound 72, this being done, for example, by filling or injecting can be done from cartridges. After that it will Joint tape 1 with its first longitudinal edge 2 from the end face 70 of the old concrete structure 7 into the groove 71 and the filling compound 72 located therein is pressed in. there any filling compound 72 emerging from the groove 71 can on the end face 70 of the old concrete structure 7 and improve the seal.
  • the joint tape 1 sufficiently safe and in the old concrete construction 7 held tight, so that afterwards the new concrete construction 8 can be concreted.
  • the one from the End faces 70, 80 of the two concrete structures 7, 8 limited building joint 6 is with a compressible joint filling 60 filled, e.g. made of a foam plastic consists.
  • the middle part 3 of the joint tape 1 corresponds in its width the dimension of the building joint width. Possible relative movements between later Old concrete construction 7 and new concrete construction 8 from the middle part 3 of the joint tape 1 in a known manner Wisely received and taken part.
  • the joint tape 1 also has both its first Longitudinal edge 2 as well as on its second longitudinal edge 4 in each case Holding means 20, 40 for holding one injection hose each 52, 54.
  • the injection hoses 52, 54 can if necessary for later injection of a sealant be used if there is a leak later should point out in the area of the construction joint 6. That under high pressure through the injection hoses 52, 54 supplied sealant penetrates through the hoses 52, 54 provided openings in all accessible Cavities and gaps, also in the neighboring concrete area, and closes it against the passage of Humidity. This means that later sealing is required in a manner known per se also with this special joint tape 1 for connecting the old concrete construction 7 possible with the new concrete construction 8.
  • joint tape 1 in the new concrete construction 8 has the one located there second longitudinal edge 4 of the joint tape 1 several from the joint tape level towering anchor bars 41 like this is also known per se. Besides, the whole Surface of the joint tape 1 to increase friction with a rough structure executed.
  • Sealing membrane 92 can be used in the new concrete construction 8 to be omitted, provided this is what is now common is, as a liquid-tight concrete structure (waterproof concrete) is performed.
  • FIG. 2 of the drawing shows the same representation like that in Figure 1, a modified version of the joint tape 1.
  • the change is that the joint tape 1 here with an upper and lower mounting and sealing flange 32 is executed.
  • the flanges 32 are in the installed condition of the joint tape 1 on the end face 70 of the old concrete construction 7. It is between these parts additionally a sealing material layer 33, e.g. Made of a foam plastic that arranged the seal if the end face 70 of the old concrete construction is uneven or rough 7 improved.
  • Joint tape 1 is here by means of nails or screws 34 passing through the flanges 32 are introduced into the old concrete structure 7, supported.
  • This joint tape 1 is therefore particularly suitable for the execution of the procedure, in which initially the joint tape 1 attached to the old concrete structure 7 is and then the filling compound 72 is introduced into the groove 71 becomes.
  • the filling compound 72 is introduced here expediently by injecting one of the foreheads the groove 71 out.
  • the filling compound can e.g. a Fine cement emulsion, the swelling agent if necessary added to compensate for shrinkage and shrinkage could be.
  • An outflow of the filling compound 72 into the building joint 6 is due to the existing on joint tape 1 Flanges 32 excluded here.
  • the required structural joint 6 is also here with a compressible joint filling 60 filled, the joint filling 60 relative movements of the old concrete structure 7 and the new concrete construction 8 not relative to each other with special needs.
  • the joint tape corresponds to 1 2 of the embodiment according to Figure 1. Also in the Example according to Figure 2, the middle part 3 is in the building joint 6, the middle part 3 on the end faces 70, 80 of old concrete construction 7 and new concrete construction 8 is present.
  • the injection hose 52 the first longitudinal edge 2 of the joint tape 1 also for filling the groove 71 can be used with the filling compound 72.
  • the filling compound 72 the filling compound 72.
  • the first longitudinal edge 2 of the joint tape 1 also with two injection hoses or alternatively with an additional or with two injection channels his.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
EP02001825A 2001-02-01 2002-01-26 Procédé d'étanchéification d'un joint de bétonnage et joint d'étanchéité correspondant Withdrawn EP1229177A3 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10104376 2001-02-01
DE2001104376 DE10104376C1 (de) 2001-02-01 2001-02-01 Verfahren zum Abdichten einer Bauwerksfuge und Fugenband dafür

Publications (2)

Publication Number Publication Date
EP1229177A2 true EP1229177A2 (fr) 2002-08-07
EP1229177A3 EP1229177A3 (fr) 2003-12-17

Family

ID=7672388

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02001825A Withdrawn EP1229177A3 (fr) 2001-02-01 2002-01-26 Procédé d'étanchéification d'un joint de bétonnage et joint d'étanchéité correspondant

Country Status (2)

Country Link
EP (1) EP1229177A3 (fr)
DE (1) DE10104376C1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1600572A2 (fr) * 2004-05-29 2005-11-30 Willi Kuznik Support de joints de bétonnage et méthode de réalisation de sections en béton
CN103437431A (zh) * 2013-09-05 2013-12-11 中国建筑第八工程局有限公司 电缆排管混凝土包封伸缩缝结构及其施工方法
CN105888082A (zh) * 2016-04-29 2016-08-24 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN109518985A (zh) * 2018-10-10 2019-03-26 广东省建筑设计研究院 一种提高新旧混凝土界面传力的设计及施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502929A (zh) * 2021-06-23 2021-10-15 新余学院 一种装配式钢结构建筑墙板顶面间隙处理结构及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1116369B (de) 1957-11-14 1961-11-02 Gruenau Gmbh Chem Fab Verfahren zum Abdichten einer Fuge zwischen Bauteilen mit einem Fugenband und Fugenband hierzu
DE4217711A1 (de) 1992-06-01 1993-12-02 Rene Quinting Fugenband
WO2000004247A1 (fr) 1998-07-16 2000-01-27 Westec Barrier Technologies, Inc. Dispositif a bande d'arret d'eau ameliore

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3119204A (en) * 1960-06-10 1964-01-28 Gladys M Williams Sealing device for building structure joints
DE1658445B1 (de) * 1967-02-01 1971-08-26 Dyckerhoff & Widmann Ag Fugenausbildung fuer Fahrbahnbelaege und Verfahren zu ihrer Herstellung
DE2111324C3 (de) * 1971-03-10 1979-07-05 Migua-Mitteldeutsche Gummi Und Asbestgesellschaft Hammerschmidt & Co, 5628 Heiligenhaus Vorrichtung zum Dichten von Fugen zwischen Bauteilen
FR2540911A1 (fr) * 1983-02-11 1984-08-17 Morillon Corvol Courbot Entr Procede pour la realisation de l'etancheite entre les panneaux prefabriques d'une paroi dans le sol, et joint d'etancheite pour la mise en oeuvre de ce procede
DE3417294A1 (de) * 1984-05-10 1985-11-14 Köder, Kurt, 7443 Frickenhausen Sanierungsfaehiges dehnfugenband
US4916878A (en) * 1987-02-09 1990-04-17 Mm Systems Corporation Compression seal with integral surface cover plate
DE3900853A1 (de) * 1989-01-13 1990-07-19 Niederberg Chemie Anschlussprofil
DE19713778A1 (de) * 1997-04-03 1998-02-19 Zueblin Ag Vorrichtung und Verfahren zur Formung, zum Abschluß und zur gleichzeitigen Dichtung von Fugen an Betonbauwerken

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1116369B (de) 1957-11-14 1961-11-02 Gruenau Gmbh Chem Fab Verfahren zum Abdichten einer Fuge zwischen Bauteilen mit einem Fugenband und Fugenband hierzu
DE4217711A1 (de) 1992-06-01 1993-12-02 Rene Quinting Fugenband
WO2000004247A1 (fr) 1998-07-16 2000-01-27 Westec Barrier Technologies, Inc. Dispositif a bande d'arret d'eau ameliore

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1600572A2 (fr) * 2004-05-29 2005-11-30 Willi Kuznik Support de joints de bétonnage et méthode de réalisation de sections en béton
EP1600572A3 (fr) * 2004-05-29 2006-11-02 Willi Kuznik Support de joints de bétonnage et méthode de réalisation de sections en béton
CN103437431A (zh) * 2013-09-05 2013-12-11 中国建筑第八工程局有限公司 电缆排管混凝土包封伸缩缝结构及其施工方法
CN103437431B (zh) * 2013-09-05 2016-05-04 中国建筑第八工程局有限公司 电缆排管混凝土包封伸缩缝结构及其施工方法
CN105888082A (zh) * 2016-04-29 2016-08-24 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN105888082B (zh) * 2016-04-29 2018-08-14 陆庆祥 一种新旧楼房混凝土交接无缝的方法
CN109518985A (zh) * 2018-10-10 2019-03-26 广东省建筑设计研究院 一种提高新旧混凝土界面传力的设计及施工方法

Also Published As

Publication number Publication date
EP1229177A3 (fr) 2003-12-17
DE10104376C1 (de) 2002-08-22

Similar Documents

Publication Publication Date Title
DE2652323C2 (de) Verfahren zum Abdichten der Stoßfuge zwischen Betonteilen sowie Fugenband mit Abdichtvorrichtung
DE19501384C9 (de) Dichtungsvorrichtung zum Abdichten von Betonierfugen
DE2910090A1 (de) Dichtungsstreifen zum abdichten von stossfugen und kreuzungsstellen zwischen bauelementen
DE4140616C2 (de) Injektionsschlauch
DE19722449A1 (de) Abschalelement
EP0760885B1 (fr) Rail de joint de retrait
EP2610412A1 (fr) Procédé et dispositif d'étanchéification d'un joint de séparation et joint d'étanchéité à ancrage pour un joint de séparation
EP0825300B1 (fr) Procédé et dispositif pour le montage de rails dans la construction d'une voie ferrée
EP0652330B1 (fr) Objets moulés contenant du béton pour des éqouts, des puisards et similaires et le procédé de fabrication
EP1229177A2 (fr) Procédé d'étanchéification d'un joint de bétonnage et joint d'étanchéité correspondant
DE102019110683A1 (de) Vorrichtung zur Abdichtung von Betonfugen
DE3404073A1 (de) Verfahren zum herstellen einer schlitzwand aus beton
EP1956174B1 (fr) Rail de profilé destiné au positionnement d'un élément de fixation et procédé de fabrication d'une unité de vitrification multiple
EP1422355B1 (fr) Plaque de coffrage et procédés de fabrication et d'installation relatifs
EP0003720B2 (fr) Procédé de raccordement étanche, à l'épreuve de la fissuration, d'un revêtement d'asphalte à un élément de construction, jeu des profilés pour la mise en oeuvre du procédé et contruction construit selon ce procédé
DE4217711A1 (de) Fugenband
DE3401289A1 (de) Plattenwand-baugruppe
DE19649476A1 (de) Verfahren und Fugendichtung zum nachträglichen Abdichten von Bauwerksfugen zwischen Betonbauteilen
DE202004017823U1 (de) Vorrichtung zum Abdichten von Betonfugen
DE2249879B2 (de) U-förmige Dehnfugenleiste für einen Estrich und Verfahren zu deren Einbau
DE202012007784U1 (de) Zargenkonstruktion
DE3506974C2 (fr)
DE10146678A1 (de) Fugenband für Betonbauwerke
DE10361083A1 (de) Anordnung und Verfahren zum Abdichten von Fugen an Bauwerken, insbesondere von Dehnfugen in einer Außenfassade
DE102019130867A1 (de) Vorrichtung zur Abdichtung von Betonfugen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RIC1 Information provided on ipc code assigned before grant

Ipc: 7E 01C 11/04 B

Ipc: 7E 04B 1/68 A

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20040327