CN105888082A - 一种新旧楼房混凝土交接无缝的方法 - Google Patents

一种新旧楼房混凝土交接无缝的方法 Download PDF

Info

Publication number
CN105888082A
CN105888082A CN201610275379.6A CN201610275379A CN105888082A CN 105888082 A CN105888082 A CN 105888082A CN 201610275379 A CN201610275379 A CN 201610275379A CN 105888082 A CN105888082 A CN 105888082A
Authority
CN
China
Prior art keywords
concrete
new
butt joint
muscle
main force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610275379.6A
Other languages
English (en)
Other versions
CN105888082B (zh
Inventor
陆庆祥
陆春燕
蒙之凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Jinsheng Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610275379.6A priority Critical patent/CN105888082B/zh
Publication of CN105888082A publication Critical patent/CN105888082A/zh
Application granted granted Critical
Publication of CN105888082B publication Critical patent/CN105888082B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:(1)新旧楼房对接的楼层面,均往下切割5‑8厘米,清理碎石、混凝土块;(2)在切割得到的两块对接面上,均采用冲击钻进行钻孔,钻得的孔中打入膨胀螺栓,对应的两颗膨胀螺栓之间连接钢筋,并将钢筋的两端分别固定于对应的膨胀螺栓上;再在固定的钢筋上布置与之垂直的分布钢筋,形成网格形状;(3)用水喷洒两块对接面3‑5分钟;(4)浇筑混凝土,利用振动器振实,振动2‑3分钟,消除混凝土内含有的气泡;(5)在新浇筑的两对接面上,敷设防晒或避雨物件。本发明对接无缝隙,对接表面平整,结构牢固等特点。

Description

一种新旧楼房混凝土交接无缝的方法
技术领域
本发明涉及一种楼房建筑领域,具体涉及一种新旧楼房混凝土交接无缝的方法。
技术背景
随着我国经济不断发展,人们生活水平不断提高,混凝土楼房也随处可见。
人多就会对应于需求房子量就越多,当两栋楼房靠一起,一栋为旧楼房,另一栋为新楼房;两楼房楼层之间进行对接时就会存在缝隙;缝隙容易发生上一楼层的物件坠落至下一个楼层上,这就容易砸中人,存在很大的安全隐患。为了消除这个缝隙,有的在缝隙上盖一块木板或铁皮;这样的缺点有:(1)不够牢固,容易折断;(2)不美观;(3)盖木板或铁皮,这部位就相对其余的楼层板面高出一点,对于老人或小孩,极易造成摔跤或踢到,造成不必要的伤害。
为了克服现有技术的缺陷,本发明对现有技术进行改进。
发明内容
本发明的目的是针对现有技术的缺陷,提供一种能将新旧楼房对接楼层面之间的缝隙消除,对接结构坚固和稳定,通过钢筋稳固牢靠连接,两个对接平面相齐平的新旧楼房混凝土交接无缝的方法。
为了实现上述本发明目的,采用的技术方案为:
一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:
(1)新旧楼房对接的混凝土楼层面,均往下切割8-12厘米,清理碎石、混凝土块;
(2)量取一定长度的钢筋,将主力筋的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋的竖直段;再在固定的主力筋上布置与之在水平面垂直的定位筋,构成网格形状;
(4)用水喷洒两块对接面3-5分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动2-3分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实。
所述的物件为木板、甘蔗叶、黑色薄膜或铁皮中任一种。
本发明相对于现有技术具有突出的实质性特点和显著进步:
1、本发明对接的两块对接面结构稳定,楼面相齐平,消除新旧楼房之间的缝隙,能将新旧楼房紧密相连;而主力筋两端折弯成竖直段,竖直段插入孔中,能将主力筋固定良好;增强了主力筋抗拉能力,提高了整体稳定性。
2、本发明采用混凝土包裹钢筋,主力筋顶面距离混凝土面的距离为1.5-2cm,既能防止钢筋生锈,又能提高连接强度;整体结构稳定,接触面平整无缝隙;还能耐用。
附图说明
图1为本发明一种新旧楼房混凝土交接无缝的方法的主视结构示意图。
图2为图1的俯视结构示意图。
图3为主力筋的主视结构示意图。
图中元件名称及序号为:新楼房1,混凝土楼层2,填补混凝土层3,主力筋4,旧楼房 5,定位筋6。
具体实施方式
结合本发明的实施例对本发明进一步详细说明。
实施例1:
参看图1,2,3所示,一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:
(1)新楼房1与旧楼房5对接的混凝土楼层面2,均往下切割8厘米,清理碎石、混凝土块;
(2)量取一定长度的主力筋4,将主力筋4的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋4的竖直段;再在固定的主力筋4上布置与之在水平面垂直的定位筋6,构成网格形状;
(4)用水喷洒两块对接面3分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动2分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实,即得填补混凝土层3。
所述的物件为木板。
实施例2:
参看图1,2,3所示,一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:
(1)新楼房1与旧楼房5对接的混凝土楼层面2,均往下切割10厘米,清理碎石、混凝土块;
(2)量取一定长度的主力筋4,将主力筋4的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋4的竖直段;再在固定的主力筋4上布置与之在水平面垂直的定位筋6,构成网格形状;
(4)用水喷洒两块对接面4分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动3分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实,即得填补混凝土层3。
所述的物件为甘蔗叶。
实施例3:
参看图1,2,3所示,一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:
(1)新楼房1与旧楼房5对接的混凝土楼层面2,均往下切割12厘米,清理碎石、混凝土块;
(2)量取一定长度的主力筋4,将主力筋4的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋4的竖直段;再在固定的主力筋4上布置与之在水平面垂直的定位筋6,构成网格形状;
(4)用水喷洒两块对接面5分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动3分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实,即得填补混凝土层3。
所述的物件为黑色薄膜。
实施例4:
参看图1,2,3所示,一种新旧楼房混凝土交接无缝的方法,所述的方法包括以下步骤:
(1)新楼房1与旧楼房5对接的混凝土楼层面2,均往下切割12厘米,清理碎石、混凝土块;
(2)量取一定长度的主力筋4,将主力筋4的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋4的竖直段;再在固定的主力筋4上布置与之在水平面垂直的定位筋6,构成网格形状;
(4)用水喷洒两块对接面5分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动3分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实,即得填补混凝土层3。
所述的物件为铁皮。

Claims (2)

1.一种新旧楼房混凝土交接无缝的方法,其特征在于:所述的方法包括以下步骤:
(1)新旧楼房对接的混凝土楼层面,均往下切割8-12厘米,清理碎石、混凝土块;
(2)量取一定长度的钢筋,将主力筋的两端均折弯一节竖直段;
(3)在切割得到的两块对接面上,采用冲击钻进行钻取若干个孔,孔与孔之间的间距为等间距;钻得的孔用水进行清理,孔中浇入适量水泥沙浆,插入主力筋的竖直段;再在固定的主力筋上布置与之在水平面垂直的定位筋,构成网格形状;
(4)用水喷洒两块对接面3-5分钟,使其浸湿透彻;
(5)浇筑混凝土,利用振动器振实,振动2-3分钟,消除混凝土内含有的气泡;
(6)在新浇筑的对接面上,敷设防晒或避雨物件,并保养至混凝土密实。
2.根据权利要求1所述的新旧楼房混凝土交接无缝的方法,其特征在于:所述的物件为木板、甘蔗叶、黑色薄膜或铁皮中任一种。
CN201610275379.6A 2016-04-29 2016-04-29 一种新旧楼房混凝土交接无缝的方法 Expired - Fee Related CN105888082B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610275379.6A CN105888082B (zh) 2016-04-29 2016-04-29 一种新旧楼房混凝土交接无缝的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610275379.6A CN105888082B (zh) 2016-04-29 2016-04-29 一种新旧楼房混凝土交接无缝的方法

Publications (2)

Publication Number Publication Date
CN105888082A true CN105888082A (zh) 2016-08-24
CN105888082B CN105888082B (zh) 2018-08-14

Family

ID=56702929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610275379.6A Expired - Fee Related CN105888082B (zh) 2016-04-29 2016-04-29 一种新旧楼房混凝土交接无缝的方法

Country Status (1)

Country Link
CN (1) CN105888082B (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1229177A2 (de) * 2001-02-01 2002-08-07 Jutta Quinting Verfahren zum Abdichten einer Bauwerksfuge und Fugenband dafür
WO2004099519A1 (de) * 2003-05-09 2004-11-18 Roland Wolf Stossfugenanordnung bei einem bauwerkteil, betonfertigteile hierfür und bauwekteil mit solchen betonfertigteilen und stossfugenanordnungen
CN1837528A (zh) * 2005-03-23 2006-09-27 贵阳铝镁设计研究院 新旧混凝土建筑接头伸缩缝的防水构造方法及结构
CN101591882A (zh) * 2009-06-29 2009-12-02 邢台路桥建设总公司 应力吸收带及其施工方法
CN201502174U (zh) * 2009-08-14 2010-06-09 中国二十冶建设有限公司 一种超长结构钢筋混凝土施工缝的免拆模板
CN201908363U (zh) * 2010-12-22 2011-07-27 中国建筑第六工程局有限公司 新旧混凝土交接处耐久止水结构
CN202017266U (zh) * 2011-03-30 2011-10-26 浙江金典建设有限公司 一种建筑接缝的连接结构
CN202787526U (zh) * 2012-07-16 2013-03-13 浙江稠城建筑工程有限公司 一种新旧混凝土防水接缝结构
CN203383142U (zh) * 2013-02-04 2014-01-08 郑州长发电子科技有限公司 适用于空心板桥拓宽的半刚性拼缝
CN203475710U (zh) * 2013-09-24 2014-03-12 扬州大学 一种平缝型、可卸式屋面变形缝
KR20160000005A (ko) * 2014-06-23 2016-01-04 한국섬유특수건설주식회사 철물을 이용한 장스판 콘크리트 바닥 보강 신축이음장치와 보강방법

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1229177A2 (de) * 2001-02-01 2002-08-07 Jutta Quinting Verfahren zum Abdichten einer Bauwerksfuge und Fugenband dafür
WO2004099519A1 (de) * 2003-05-09 2004-11-18 Roland Wolf Stossfugenanordnung bei einem bauwerkteil, betonfertigteile hierfür und bauwekteil mit solchen betonfertigteilen und stossfugenanordnungen
CN1837528A (zh) * 2005-03-23 2006-09-27 贵阳铝镁设计研究院 新旧混凝土建筑接头伸缩缝的防水构造方法及结构
CN101591882A (zh) * 2009-06-29 2009-12-02 邢台路桥建设总公司 应力吸收带及其施工方法
CN201502174U (zh) * 2009-08-14 2010-06-09 中国二十冶建设有限公司 一种超长结构钢筋混凝土施工缝的免拆模板
CN201908363U (zh) * 2010-12-22 2011-07-27 中国建筑第六工程局有限公司 新旧混凝土交接处耐久止水结构
CN202017266U (zh) * 2011-03-30 2011-10-26 浙江金典建设有限公司 一种建筑接缝的连接结构
CN202787526U (zh) * 2012-07-16 2013-03-13 浙江稠城建筑工程有限公司 一种新旧混凝土防水接缝结构
CN203383142U (zh) * 2013-02-04 2014-01-08 郑州长发电子科技有限公司 适用于空心板桥拓宽的半刚性拼缝
CN203475710U (zh) * 2013-09-24 2014-03-12 扬州大学 一种平缝型、可卸式屋面变形缝
KR20160000005A (ko) * 2014-06-23 2016-01-04 한국섬유특수건설주식회사 철물을 이용한 장스판 콘크리트 바닥 보강 신축이음장치와 보강방법

Also Published As

Publication number Publication date
CN105888082B (zh) 2018-08-14

Similar Documents

Publication Publication Date Title
CN204343339U (zh) 一种临时支撑柱防水底板
CN104060781A (zh) 一种梯段无缝的现浇板式楼梯及施工方法
CN110344530B (zh) 一种局部叠合板连接节点及其施工方法
CN104060760B (zh) 高层建筑结构转换层混凝土超大梁分层施工方法
CN107859223A (zh) 一种新型预制楼板及由其筑成整块楼板的浇筑方法
CN107460985A (zh) 一种秸秆混凝土免拆模密肋叠合楼板施工工艺
CN106436732A (zh) 一种条形基础置换成筏板基础的加固方法及加固结构
CN217579587U (zh) 一种增设耐磨薄层和胶黏层增强固化土道路
CN108005255A (zh) 一种墙体的施工方法
CN206467824U (zh) 一种装配式混凝土框架填充墙
CN101831971B (zh) 混凝土短肢剪力墙
CN103835401B (zh) 外包钢丝网砂浆板十字形边框发泡混凝土承重墙体及作法
CN111719869B (zh) 一种砌筑工程施工工艺
CN103161322A (zh) 一种既有建筑楼面结构改造的加固方法及加固结构
CN203905331U (zh) 一种梯段无缝的现浇板式楼梯
CN203603525U (zh) 石结构外加夹板梁及夹板柱加固结构
KR101270697B1 (ko) 프리캐스트 블록과 그 블록을 이용한 중저층 건물의 기둥 리모델링 보강공법
CN103498572B (zh) 石结构外加夹板梁及夹板柱加固结构的施工方法
CN105888082A (zh) 一种新旧楼房混凝土交接无缝的方法
CN110468998A (zh) 一种水平连接的装配式rc剪力墙结构及其施工方法
CN207812739U (zh) 一种施加有水平预应力的砌体结构
CN207348280U (zh) 一种新型预制楼板
CN104675138A (zh) 一种用于隔声降噪改造的板式阳台加固方法与加固结构
CN210597796U (zh) 一种局部叠合板连接节点
CN204475146U (zh) 一种增强横向刚度的空心板桥结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220407

Address after: 224000 No. 49, group 13, Guanghui neighborhood committee, Dongtai town, Dongtai City, Yancheng City, Jiangsu Province

Patentee after: Feng Kaibiao

Address before: 530408 No. 218, ZhangMo village, Dacheng village committee, Daqiao Town, Binyang County, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: Lu Qingxiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220420

Address after: 224000 No. 32, hailing South Road, Dongtai City, Yancheng City, Jiangsu Province

Patentee after: Yancheng Jinsheng Construction Engineering Co.,Ltd.

Address before: 224000 No. 49, group 13, Guanghui neighborhood committee, Dongtai town, Dongtai City, Yancheng City, Jiangsu Province

Patentee before: Feng Kaibiao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814