EP0650920A1 - Grue, particulièrement grande grue mobile - Google Patents

Grue, particulièrement grande grue mobile Download PDF

Info

Publication number
EP0650920A1
EP0650920A1 EP94250245A EP94250245A EP0650920A1 EP 0650920 A1 EP0650920 A1 EP 0650920A1 EP 94250245 A EP94250245 A EP 94250245A EP 94250245 A EP94250245 A EP 94250245A EP 0650920 A1 EP0650920 A1 EP 0650920A1
Authority
EP
European Patent Office
Prior art keywords
crane
main boom
crane according
platform
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP94250245A
Other languages
German (de)
English (en)
Inventor
Jan Van Seumeren
Hermann Dipl. Ing. Franzen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vodafone GmbH
Original Assignee
Mannesmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mannesmann AG filed Critical Mannesmann AG
Publication of EP0650920A1 publication Critical patent/EP0650920A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes

Definitions

  • the invention relates to a crane, in particular a large mobile crane, with a lower crane frame, an upper crane frame rotatably arranged thereon, which has a lightweight construction and is provided with additional load-increasing devices.
  • Such a large crane with a crane subframe, a crane upper frame, a first main boom, a luffing jib, a lower luffing support and an upper luffing support as well as with a super lift device is known and is in principle successfully used in practice for lifting heavy loads (cf. DE -C2-31 08 454).
  • the invention specified in claim 1 is therefore based on the problem of creating a crane device which saves a second complete crane, in particular a large crane, and which increases its load-bearing capacity without the need for a second crane, i.e. without taking up a larger footprint and is therefore more economical.
  • the object is achieved according to the invention in that a second main boom, which is supported on a platform, is articulated on the first main boom via an essentially horizontally arranged supporting structure.
  • the advantage of this design not only includes an increase in load capacity of almost 100%, hardly any additional space or floor space is required, and not only very heavy transport objects but also very long objects can be lifted.
  • FIG. 2 An advantageous embodiment of the invention is specified in claim 2.
  • the development according to claim 2 is that the structure consists of an original luffing jib, which is used as a pressure support, and that the structure is held by means of guy rods or cables, to which a crossbar is attached.
  • the advantage of this solution is that an existing boom can be taken over and that the crossbar is clearly centered.
  • An improvement of the invention is that the crane-side pulley is connected to ropes from the hoisting winches of the crane upper frame. This results in an advantageous symmetrical arrangement of the assemblies on both sides.
  • At least two hydraulically operated cable lifting devices are arranged on the crossmember, to which load-carrying means are attached.
  • Such a design supports any height and therefore hardly takes up space below the cross member, which can thus be kept free for the load or the load stroke.
  • the supporting structure consists of a bending beam articulated on the first and on the second main boom and that the upper roller sets of the two pulley blocks are mounted directly on the bending beam.
  • a further embodiment of the invention consists in that the structure consists of a tie rod forming the base of a triangle and of supports forming the triangular legs. This saves a too heavy bending beam without having to accept a loss of overall height.
  • the task set out is further achieved according to a second alternative in that a first main boom and a second main boom are coupled by means of a relatively short pressure rod, that at least two guy rods or ropes are articulated on a stationary platform and that a crane-side pulley system with ropes the hoisting winches of the upper crane frame and a pulley facing away from the crane can be actuated with ropes from hoisting winches of the platform.
  • a correspondingly short pressure rod the roller sets for the pulley blocks are accordingly close together, so that the structure can shrink considerably, provided that an approximately trapezoidal space underneath is sufficient for the necessary lifting work.
  • a mobile platform is provided for mobile use instead of the stationary platform, which can be moved in parallel with the crane subframe in parallel trajectories.
  • the advantage of this is not only being able to lift long objects, but also to be able to raise.
  • the load can be connected to the platform at least temporarily by means of a coupling frame for the travel process.
  • the second main boom is arranged essentially upright. This solution is particularly suitable for heavy objects to be transported in a horizontal position, e.g. Refinery columns.
  • a further development of the invention is that the cable lifting devices can be moved horizontally on the supporting structure. Such a device enables the said columns to be erected, lifted and laterally lifted in refineries.
  • a hydraulic cylinder with its cylinder housing is rigidly arranged and another hydraulic cylinder is articulated with its cylinder housing, the piston rods being articulated on the second main boom and engaging in external support points.
  • Fig. 1 shows a mobile lattice boom crane, consisting of a crane subframe 1, a crane upper frame 2, a first main boom 3, a luffing jib 4, a lower luffing jib 5, an upper luffing jib 6 and a super lift device 7 to increase the load capacity.
  • Such an assembly is regarded as a basic device and serves as the basis for the present invention.
  • the upper crane frame 2 which is rotatably arranged on the crane subframe 1, has the first main boom 3, which is of lightweight construction, and in addition to the additional load-increasing devices, such as the super lift device 7 is now articulated on the first main boom 3 via a substantially horizontally arranged supporting structure 30, a second main boom 8, which is supported on a platform 10.
  • These two described sides of the large crane thus form a lifting frame which in the area of a load 41 has a considerable amount of free space, i.e. Has displacement (Fig. 1).
  • the structure 30 is formed from an original luffing jib 4, which is used as a pressure support 4a, and the structure 30 is held by means of guy rods or ropes 11, to which a cross member 12 is attached.
  • Two upper roller sets 12a and 12b for two pulley blocks 13 and 15 are mounted in the traverse 12.
  • the crane-side pulley 13 is connected to ropes 14a and 14b from the lifting winches 14 of the crane upper frame 2.
  • the pulley 15 facing away from the crane side is connected to ropes 16a and 16b from lifting winches 16 arranged on the stationary platform 10.
  • the first main boom 3 and the second main boom 8 can be designed in exactly the same way for economical production to guarantee.
  • At least two hydraulically operated cable lifting devices 17 are arranged on the cross member 12, to which load-carrying means 40 for the load 41, which may consist of cables, are fastened.
  • These rope lifting devices 17 can be used, for example, if the rope capacity of the lifting winches 14 and 16 should not be sufficient for a special lift.
  • the supporting structure 30 consists of a bending beam 18 articulated on the first and on the second main boom 3 and 8, and the upper roller sets 12a and 12b of the two pulleys 13 and 15 are mounted directly on the bending beam 18.
  • the bending beam 18 is replaced 1, the two guy rods or ropes 11 and the traverse 12.
  • the upper roller sets 12a and 12b of the two pulley blocks 13 and 15 are mounted directly on the bending beam 18.
  • the hydraulically operated cable lifting devices 17 are arranged directly on the bending beam 18. This means that different lifting devices can be used variably.
  • the cable lifting devices 17 described in FIG. 2 are mounted directly on the bending beam 18, so that the space below the bending beam 15 is free for the load 41.
  • the supporting structure 30 consists of a tie rod 19 forming the base of a triangle and of supports 20 and 21 forming the triangle legs.
  • the pull rod 19, the two Supports 20 and 21 and guy ropes 22 replace the pressure support 4a shown in FIG. 1, the two guy rods or ropes 11 and the crossbar 12.
  • the rope lifting devices 17 shown in FIG. 2 are mounted directly on the pull rod 19. For the lifting height the same advantages result as in the solutions according to FIGS. 3 and 4.
  • FIG. 6 An alternative solution is shown in FIG. 6.
  • the crane in particular a large crane, is also provided with a crane subframe 1, a (rotatable) crane upper frame 2 arranged thereon, which has a lightweight main boom 3 and with additional load-increasing devices, such as e.g. the super lift device 7 is provided.
  • additional load-increasing devices such as e.g. the super lift device 7 is provided.
  • first main boom 3 and the second main boom 8 are coupled by means of a relatively short pressure rod 23, furthermore at least two guy rods or ropes 9 are articulated on the stationary platform 10, and a pulley 13 on the crane side with ropes 14a and 14b is out of the lifting winches 14 of the crane upper frame 2 and a pulley 15 facing away from the crane can be actuated with ropes 16a and 16b from lifting winches 16 of the platform 10.
  • the short pressure rod 23 couples the first main boom 3 to the second main boom 8.
  • a base 24 and a plurality of support beams 25 are provided for stationary use instead of the crane subframe 1.
  • the load 41 can be connected at least temporarily to the platform 26 by a coupling frame 28 for the travel process.
  • the one shown in FIG to 6 shown stationary platform 10 replaced by the mobile platform 26, which can be moved, for example, on two slideways (movement paths 27) in parallel with the crawler track.
  • the load After the load has been raised, it is connected to the platform 26 by at least one coupling frame 28, but only for the movement process.
  • the second main boom 8 is arranged substantially upright. This creates an even higher space for the load 41 which, as drawn, consists of a column for a refinery.
  • the cable lifting devices 17 can be seen to be horizontally displaceable on the supporting structure 30, a trolley 29 being used.
  • FIG. 11 shows a view A according to FIG. 9, so that the vertical second main boom 8 can also be seen from the side, as well as guy rods or cables 9 and ballast 34 on a platform 32.
  • the essentially upright second main boom 8 is supported on vertically actuatable hydraulic cylinders 35 and 36.
  • the hydraulic cylinder 35 is rigidly arranged with its cylinder housing as shown, and another hydraulic cylinder 36 is articulated with its cylinder housing, the piston rods each being articulated on the second main boom 8 and resting on the platform 32 spaced apart in external supports.
  • the hydraulic cylinders 35 and 36 serve essentially as an assembly aid to compensate for inaccuracies in the articulation points in the area of the supporting structure 30.
  • the second main boom 8 is here via four hydraulic cylinders 35, 36 mounted on the platform 32 and two guy rods or ropes 9 provide lateral stability for the second main boom 8, and in addition the ballast 34 increases the stability of the entire system.
  • the four hydraulic cylinders 35 and 36 which are rigidly and articulated in pairs on the platform 32, not only enable a height correction, but also an angle correction of the second main boom 8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
EP94250245A 1993-10-27 1994-10-11 Grue, particulièrement grande grue mobile Withdrawn EP0650920A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE4337415 1993-10-27
DE19934337415 DE4337415C2 (de) 1993-10-27 1993-10-27 Kran, insbesondere mobiler Großkran

Publications (1)

Publication Number Publication Date
EP0650920A1 true EP0650920A1 (fr) 1995-05-03

Family

ID=6501636

Family Applications (1)

Application Number Title Priority Date Filing Date
EP94250245A Withdrawn EP0650920A1 (fr) 1993-10-27 1994-10-11 Grue, particulièrement grande grue mobile

Country Status (3)

Country Link
EP (1) EP0650920A1 (fr)
JP (1) JPH07172769A (fr)
DE (1) DE4337415C2 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004010503U1 (de) * 2004-07-05 2005-11-24 Liebherr-Werk Ehingen Gmbh Kran mit Hauptausleger und Spitzenausleger
NL2015606B1 (en) * 2015-10-12 2017-05-02 Mammoet Eng B V Crane and method for increasing a load lifting capacity of such a crane.
US9802796B2 (en) 2014-02-17 2017-10-31 Terex Global Gmbh Connector and combination crane and connecting method using the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20023565U1 (de) * 1999-06-28 2004-11-25 Terex-Demag Gmbh & Co. Kg Teleskopkran

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2739177A1 (de) * 1976-09-02 1978-06-22 Technion Res & Dev Foundation Turm-portalkran
US4128229A (en) * 1977-11-17 1978-12-05 Hydra-Rig, Inc. Hoist apparatus with dual mast structure and compound power transmission system
DE3138460A1 (de) * 1981-09-26 1983-05-26 Lampert, Dieter, 7505 Ettlingen Fahrbarer kran mit transportwagen
DE3108454C2 (de) * 1980-03-07 1984-12-13 The Manitowoc Co., Inc., Manitowoc, Wis. Fahrbarer Kran mit geteiltem Stützring
DD253351A3 (de) * 1985-12-10 1988-01-20 Schwermasch Kirow Veb K Stuetzeinrichtung fuer ausleger von kranen und baggern

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1408712A (fr) * 1964-01-09 1965-08-20 Wilhelm Reich Fa Maschf Grue à flèche
FR1406065A (fr) * 1964-06-06 1965-07-16 équipement de levage à grue transformable
GB1162405A (en) * 1967-08-26 1969-08-27 Mobile Lifting Services Ltd Improvements in or Relating to Mobile Lifting Equipment
FR2388756A1 (fr) * 1977-04-29 1978-11-24 Creusot Loire Grue de forte capacite equipee d'un dispositif d'equilibrage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2739177A1 (de) * 1976-09-02 1978-06-22 Technion Res & Dev Foundation Turm-portalkran
US4128229A (en) * 1977-11-17 1978-12-05 Hydra-Rig, Inc. Hoist apparatus with dual mast structure and compound power transmission system
DE3108454C2 (de) * 1980-03-07 1984-12-13 The Manitowoc Co., Inc., Manitowoc, Wis. Fahrbarer Kran mit geteiltem Stützring
DE3138460A1 (de) * 1981-09-26 1983-05-26 Lampert, Dieter, 7505 Ettlingen Fahrbarer kran mit transportwagen
DD253351A3 (de) * 1985-12-10 1988-01-20 Schwermasch Kirow Veb K Stuetzeinrichtung fuer ausleger von kranen und baggern

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Derwent World Patents Index; *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004010503U1 (de) * 2004-07-05 2005-11-24 Liebherr-Werk Ehingen Gmbh Kran mit Hauptausleger und Spitzenausleger
US9802796B2 (en) 2014-02-17 2017-10-31 Terex Global Gmbh Connector and combination crane and connecting method using the same
NL2015606B1 (en) * 2015-10-12 2017-05-02 Mammoet Eng B V Crane and method for increasing a load lifting capacity of such a crane.

Also Published As

Publication number Publication date
JPH07172769A (ja) 1995-07-11
DE4337415C2 (de) 1996-09-26
DE4337415A1 (de) 1995-05-04

Similar Documents

Publication Publication Date Title
DE3528996C1 (de) Teleskopsaeule
DE102009016033B4 (de) Gittermastkran und Gittermastausleger
DE1292577B (de) Portallader mit Hubtraverse
EP3519344B1 (fr) Flèche télescopique dotée d'un système de haubanage pour une grue mobile et procédé de haubanage correspondant
DE102014012661A1 (de) Verfahren zum Betrieb eines Krans und Kran
DE8005117U1 (de) Trägerkonstruktion zum Überführen eines Krans von einem Turm auf einen diesem benachbarten Platz
DE102020001976A1 (de) Portalkran
DE3911868C2 (fr)
DE2430359A1 (de) Fahrgestellrahmen fuer eine hebebuehne
EP0650920A1 (fr) Grue, particulièrement grande grue mobile
DE202022103551U1 (de) Auslegerabschnitt, Ausleger und Fahrzeugkran hiermit
EP1640309B1 (fr) Dispositif de levage et arrangement de câble
DE4437815A1 (de) Vorrichtung zum Güterumschlag von Ladungseinheiten, insbesondere von Containern
DE2647227A1 (de) Umschlaggeraet zum heben und kippen von frachtcontainern
DE19956411C2 (de) Schwerlastrangiersystem für schienengebundene Fahrzeuge
DE102020134714B4 (de) Fahrzeugkran mit einem wippbaren Hauptausleger und mit einem Zusatzauslegersystem
DE19914195A1 (de) Ringliftkran
DE1658602B1 (de) Vorrichtung zum Montieren der jeweils einen vollstaendigen Brueckenabschnitt umfassenden Fertigbauteile einer Spannbetonbruecke im abschnittsweisen Freivorbau
DE19833184C2 (de) Containerbrücke mit höhenverstellbarem Brückenträger
DE2849322A1 (de) Flaschenzug
DE102022128653A1 (de) Fahrbarer Kran mit Gittermastausleger, Gittermastausleger sowie Verfahren zur Montage eines solchen
WO2023057150A1 (fr) Dispositif permettant de disposer de manière flexible dans l'espace un système de levage et son procédé d'adaptation
DE2840588C2 (de) Schwerlastgehänge zum Heben, Senken und Transportieren sperriger und schwerer Lasten an Profilschienen, insbesondere an einer Fahrschiene von Einschienenhängebahnen im untertägigen Grubenbetrieb
DE102021006101A1 (de) Arbeitsbühne für Brücken
DE4138559A1 (de) Fahrbarer konsolkran

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DK GB IT LU NL

17P Request for examination filed

Effective date: 19950321

17Q First examination report despatched

Effective date: 19970414

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19970826