EP0589888A1 - Be- und/oder entladeeinrichtungen für fähranlagen - Google Patents

Be- und/oder entladeeinrichtungen für fähranlagen

Info

Publication number
EP0589888A1
EP0589888A1 EP92906256A EP92906256A EP0589888A1 EP 0589888 A1 EP0589888 A1 EP 0589888A1 EP 92906256 A EP92906256 A EP 92906256A EP 92906256 A EP92906256 A EP 92906256A EP 0589888 A1 EP0589888 A1 EP 0589888A1
Authority
EP
European Patent Office
Prior art keywords
ramp
lifting
ramps
towers
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP92906256A
Other languages
German (de)
English (en)
French (fr)
Inventor
Joachim Mett
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ThyssenKrupp Industrial Solutions AG
Original Assignee
Krupp Foerdertechnik GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Krupp Foerdertechnik GmbH filed Critical Krupp Foerdertechnik GmbH
Publication of EP0589888A1 publication Critical patent/EP0589888A1/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/24Bridges or similar structures, based on land or on a fixed structure and designed to give access to ships or other floating structures

Definitions

  • the invention relates to a loading and / or unloading device for ferry systems with a plurality of ramps for rail and road traffic which are arranged one above the other and can be controlled independently of one another and which, if necessary, are displaceable on the land side pivotably about horizontal axes and on the sea side for the purpose of loading and / or unloading can be guided into the respective working position by means of lifting devices, a substantial proportion of the weight of the ramp or ramps being able to be compensated for by counterweights.
  • a method for loading and unloading a railway freight ferry located in a ferry basin as well as shore and ship side arrangement for carrying out the method is known.
  • the ferry is equipped with several decks, each deck having a track arrangement.
  • a multi-day loading ramp the individual ramps of which can be moved independently of one another into a loading and unloading position for the associated deck, is provided in order to be able to implement the respective loading or unloading process.
  • the ferry is held in the ferry basin by means of a land-side fender arrangement, which is assigned to this deck and which can be shifted between a rest position and a working position, against displacement in the deck plane perpendicular to the longitudinal axis of the ship.
  • DE-OS 17 56338 shows a loading ramp, in particular for use in connection with an opening in the side wall of a ship, which is pivotally connected to a cross member which extends across the lower part of the opening and by means of an elec ⁇ tric motor is vertically adjustable, the ends of the carrier running in guides which are attached to the vertical sides of the opening.
  • a switch which is operated by means of a sensor which detects the contact with a fixed support to which the ramp leads.
  • Each end of the cross member is designed as a roller frame which is provided with wheels and runs in the guides.
  • the ramp is constructed as a cantilever arm and is pivotally attached to the cross member by means of a series of joints. Except _ _
  • the main part of the ramp's own weight is compensated for by counterweights that run up and down in the counterweight shafts in the pillars and are connected to the lifting crossbeams by means of special counterweight ropes that are guided in rope pulleys are. Since only a one-day ramp is provided here, which is coupled to the main deck of the ferry, the problems that arise with two- and multi-day ramps do not necessarily arise.
  • the object of the invention is the further development of the loading and / or unloading device for ferry systems described in the generic part of the first claim to the effect that combined ro-ro traffic of rail and and road vehicles can be brought about, the loading and / or unloading device being able to be actuated by simple means.
  • lifting towers are provided on both sides, approximately in the area of the free end of the ramp, on which the ramps can be raised and lowered, and that at least one hydraulic cylinder acting as a lifting element is provided in the area of the lifting towers.
  • the one with the lower ramp and the other is connected to components of the associated lifting tower, and that at least the further ramp provided above the lower ramp, which is smaller in width, is displaced relative to the lifting towers via a corresponding suspension.
  • the lower ramp is at least partially provided with rails, while the following ramp is intended exclusively for road traffic.
  • the lower ramp is supported on the land side on longitudinally displaceable rotary bearings and is held in the lifting towers on the sea side.
  • the dead weight of the ramp or ramps is absorbed by the stern of the ship through counterweights on the lifting towers except for a relatively low residual force at the support points on the flap edge on the ship's side.
  • the loads including loads from the ship's hatch and traffic loads are absorbed by the lifting cylinders.
  • the associated ramp is supported at the support points on the stern of the ship.
  • the bearing pressures are monitored by load cells.
  • the horizontal guiding and centering of the ramp on the ship intended for rail traffic on the ship transversely to the ramp axis is carried out by the link arranged on the ship's end cross member.
  • Two counterweights are provided, which are suspended from the lifting towers by ropes.
  • the rope guide is low-friction with few pulleys. Accessibility for inspection and replacement of the ropes is guaranteed.
  • the design of the lower ramp is such that the heel of the ship can be at least 3 °.
  • the construction is torsionally soft, so that it adapts to the ship's heel without resistance and a lifting of the flap tip is avoided.
  • Horizontal forces transversely to the lower ramp axis from the ship, from wind and from lateral forces due to traffic are dissipated into the lift tower foundations on the ship-side part of the ramp via the lifting cross member.
  • elastically mounted guide rollers with a predetermined spring travel can be provided on the end faces of the lifting cross member.
  • the ramp or the ramps are controlled from a central control station, with all the pump units and control devices being accommodated there.
  • the ramp provided vertically above the lower ramp is intended for trucks and cars and is formed on the water side by a height-adjustable bridge flap which is guided in strong bearing shells on the land side.
  • the height of the upper ramp is analogous to that of the first ramp, by means of hydraulic cylinders which are attached to the ramp itself on the one hand and to the framework construction of the ramp suspension on the other hand.
  • Figure 2 top view of the lower ramp of the loading and / or unloading device
  • Figure 1 shows the loading and / or unloading device 1, which is essentially formed from the following components: a lower ramp 2, an upper ramp 3 and lifting towers 4 attached to the sea.
  • the lower ramp 2 is partially equipped with rails 5 and is for the Ro-ro traffic of rail and road vehicles is provided.
  • the lower ramp 2 is held or guided on the land side in longitudinally displaceable bearings (not shown), the elastic displacement due to impacts, which are generated, for example, when ships 6 are docked, being compensated for by means of a length compensation device 7.
  • the upper ramp 3 is shifted on the land side to an access bridge 8 and is provided for the ro-ro traffic of road vehicles.
  • Both the lower 2 and the upper ramp 3 are displaced on the sea side in the area of the lifting towers 4, whereby they can be pivoted about the land-side horizontal axes 9, 10 by means of the lifting devices shown in FIG.
  • Different working positions of ramps 2 and 3 are dependent on different water levels and auxiliary states of the ship 6 indicated.
  • the lower ramp 2 is deposited in a manner known per se on the cross member 11 of the ship 6, the horizontal guidance and centering of the ramp 1 on the ship 6 being carried out by at least one link provided on the cross member 11 of the ship 6 (not shown) ).
  • FIG. 2 shows a top view of the lower ramp 2, which, as already described, is equipped with rails 5.
  • lifting towers 4 are provided on both sides, which contain the corresponding lifting means for positioning the ramp 2 in the desired working and rest positions.
  • a holding and guiding device 14 or 15 Provided in the area of the inlet mouth 12 of the ferry pier 13 is a holding and guiding device 14 or 15, which can be set in the direction of the ship's hull and is capable of accommodating a wide variety of ship sizes and positioning them precisely.
  • the ramp 2 is equipped with elastic damping elements 16, which easily absorb shocks of the ship 6 when docking, without causing a displacement of the length compensation device 7 and thus a longitudinal displacement of the entire ramp 2.
  • FIG. 3 shows a front view of the loading and / or unloading device 1, from which the following components can be seen: the lower ramp 2, the upper ramp 3 and the lateral lifting towers 4.
  • counterweights 17, 18 are provided, which are connected by ropes 19, 20 are connected to the lower ramp 2 in such a way that the ropes 19 are guided over deflection rollers 21, 22 and 23, 24 and are connected to a cross member 25 arranged below the ramp 2.
  • the vertical displacement of the lower ramp 2 about the horizontal axis 9 (FIG. 1) is brought about by means of two hydraulic cylinders 26, 27, which are connected on the one hand to the ramp 2 and on the other hand to components 28, 29 of the lifting towers 4.
  • the upper ramp 3 is displaced relative to the lifting towers 4 via a half-timbered steel structure 30 and is pivoted into its respective operating position about the pivot point 10 (FIG. 1) by means of further hydraulic cylinders 31, 32.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ship Loading And Unloading (AREA)
EP92906256A 1991-06-08 1992-03-04 Be- und/oder entladeeinrichtungen für fähranlagen Withdrawn EP0589888A1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE4118920 1991-06-08
DE4118920A DE4118920C1 (enrdf_load_stackoverflow) 1991-06-08 1991-06-08
PCT/EP1992/000484 WO1992022707A1 (de) 1991-06-08 1992-03-04 Be- und/oder entladeeinrichtungen für fähranlagen

Publications (1)

Publication Number Publication Date
EP0589888A1 true EP0589888A1 (de) 1994-04-06

Family

ID=6433518

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92906256A Withdrawn EP0589888A1 (de) 1991-06-08 1992-03-04 Be- und/oder entladeeinrichtungen für fähranlagen

Country Status (5)

Country Link
EP (1) EP0589888A1 (enrdf_load_stackoverflow)
DE (1) DE4118920C1 (enrdf_load_stackoverflow)
FI (1) FI934560L (enrdf_load_stackoverflow)
NO (2) NO934448L (enrdf_load_stackoverflow)
WO (1) WO1992022707A1 (enrdf_load_stackoverflow)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004001656U1 (de) * 2004-02-03 2004-05-19 Storch, Hinrich Verladevorrichtung

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1913207A (en) * 1932-01-02 1933-06-06 Alexander M Mcdougall Vessel
SE316394B (enrdf_load_stackoverflow) * 1967-05-10 1969-10-20 Ass Cargo Gear Ab
DE3437673A1 (de) * 1983-12-19 1985-06-27 Thesen Mathias Werft Verfahren und anordnung zum be- und entladen von eisenbahngueterfaehrschiffen
FR2586003B1 (fr) * 1985-08-07 1987-12-18 Som Delattre Systeme de passerelle double pour quai d'embarquement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9222707A1 *

Also Published As

Publication number Publication date
FI934560A0 (fi) 1993-10-15
FI934560A7 (fi) 1993-10-15
WO1992022707A1 (de) 1992-12-23
NO934448D0 (no) 1993-12-07
DE4118920C1 (enrdf_load_stackoverflow) 1992-05-07
NO934448L (no) 1994-01-26
FI934560L (fi) 1993-10-15

Similar Documents

Publication Publication Date Title
DE2336964C2 (de) Laderampe für Wasserfahrzeuge
DE2858061C2 (de) Ablauframpenanordnung für ein als Halbtaucher ausgebildetes Rohrverlegeschiff
DE2416642C3 (de) Vorrichtung zum Transport eines Lastkörpers in Tagebaubetrieben, insbesondere zum Rücken von Bandantriebsstationen
DE2441278C3 (de) Abstützung für einen Drehkran
DE3124183A1 (de) "einrichtung zum befahren der unterseite von bruecken"
DE10009736B4 (de) Hafenmobilkran zum kombinierten Container-und Schüttgutumschlag
DE2726407A1 (de) Verfahren zum ein- und ausbringen von schweren objekten in ein oder aus einem schiff sowie vorrichtung zur durchfuehrung dieses verfahrens
DE69705109T2 (de) Unterkonstruktion für einen auf einem wasserfahrzeug angeordneten kran
DE3332227C2 (de) Brückenuntersichtgerät
EP1188707A1 (de) Materialumschlaggerät
EP0589888A1 (de) Be- und/oder entladeeinrichtungen für fähranlagen
DE1961132B2 (de) Verriegelungsvorrichtung für einen verfahrbaren Schiffsportalkran
EP1565619B1 (de) Vorrichtung zum anlegen eines wasserfahrzeuges an einem wasserbauwerk
DE9107062U1 (de) Be- und/oder Entladeeinrichtungen für Fähranlagen
DE4311074C2 (de) Schiffsbe- und/oder -entlader
DE10254680A1 (de) Portalhubwagen
DE2715779A1 (de) Portalkran
DE19833184C2 (de) Containerbrücke mit höhenverstellbarem Brückenträger
DE1106357B (de) Rampe zur Verbindung eines Wasserfahrzeugs, insbesondere eines als Faehre und zur Bildung von Pontonbruecken verwendbaren Amphibienfahrzeugs, mit dem Ufer
DE1294841B (de) Verriegelungseinrichtung fuer einen Schiffsportalkran
DE10053406C1 (de) Vorrichtung zum Transport einer Rollenlinie einer Metall-, insbesondere Stahlstranggießanlage
WO2023151761A1 (de) Vorrichtung zur verbindung eines schiffes mit einem landseitigen versorgungsnetz
DE1815896A1 (de) UEbernahmevorrichtung fuer Personen und Lasten,insbesondere fuer hochbordige Schiffe
DE3735696A1 (de) Instandsetzungsgeruest fuer das tragwerk einer schienenschwebebahn
DD266542B5 (de) Vorrichtung zur Montage und zum Transport von Schiffssektionen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19930303

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE DK GB NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

17Q First examination report despatched

Effective date: 19950407

18W Application withdrawn

Withdrawal date: 19950415