DE29500454U1 - Tunnel-Längsentwässerungseinrichtung - Google Patents
Tunnel-LängsentwässerungseinrichtungInfo
- Publication number
- DE29500454U1 DE29500454U1 DE29500454U DE29500454U DE29500454U1 DE 29500454 U1 DE29500454 U1 DE 29500454U1 DE 29500454 U DE29500454 U DE 29500454U DE 29500454 U DE29500454 U DE 29500454U DE 29500454 U1 DE29500454 U1 DE 29500454U1
- Authority
- DE
- Germany
- Prior art keywords
- tunnel
- water
- longitudinal drainage
- vacuum
- existing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 24
- 238000009434 installation Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000011888 foil Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000005871 repellent Substances 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Cyclones (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Separation By Low-Temperature Treatments (AREA)
- Lining And Supports For Tunnels (AREA)
Description
Die Erfindung betrifft eine Tunnel-Längsentwässerungseinrichtung nach dem Oberbegriff des
Anspruchs 1.
Bei der Planung und Trassierung von Tunneln ist die Bauweise auf die topographische Lage und die geologischen
Verhältnisse auszurichten. Hier spielen Entwässerungseinrichtungen eine große Rolle. Die zu
erstellenden Tunnel bedürfen zwecks Betriebssicherheit des Schutzes gegenüber Wassereinfluß. Hier müssen sowohl
wasserabweisende wie auch entwässernde Einrichtungen und Maßnahmen getroffen werden. Insbesondere Berg- oder
Sickerwasser muß vor dem Eindringen in den Verkehrsraum gehindert werden. Hier kennt man Misch- und Trennsysteme
der Tunnelentwässerung. Bei Mischsystemen werden alle anfallenden Wässer über einen Tunnelhauptkanal abgeführt.
Im Trennsystem werden die Bergwässer oder auch Sickerwässer gegenüber den auf der Verkehrsfläche
auftretenden Wässer und Flüssigkeiten getrennt erfaßt und auch in getrennten Sammlern aus dem Tunnel herausgeführt.
Unter dem Sammelbegriff "Tunnel-Längsentwässerung"
versteht man herkömmlicherweise Drainageleitungen, die das
Sickerwasser auffangen und ableiten. Diese Leitungen müssen wie jeder andere Kanal mit einem Gefalle verlegt
werden.
Die Praxis hat nun gezeigt, daß auftretende Versickerungen, Verstopfungen und Beschädigungen der
Tunnel-Längsentwässerung bzw. der Tunneldrainage zu Betriebsstörungen führen, so daß die einwandfreie
Entsorgung der Tunnel-Längsentwässerung, d.h. des auftretenden Sickerwassers nicht mehr gewährleistet ist.
Der vorliegenden Erfindung liegt daher die Aufgabe zugrunde, eine Einrichtung zur Tunnel-Längsentwässerung zu
schaffen, die unanfällig gegen Verstopfungen und Ausspülungen des Gebirgsgesteins ist und mittels der
bestehende Längs-Entwässerungen saniert werden können, wobei der bauliche und betriebsbedingte Zustand der
vorhandenen Anlagen eine untergeordnete Rolle spielen kann.
Diese Aufgabe wird erfindungsgemäß durch eine Tunnel-Längsentwässerung
nach dem Kennzeichen des vorgeschlagenen Anspruchs 1 gelöst.
Besonders bevorzugte Weiterbildungen der Erfindung sind in
den Unteransprüchen gekennzeichnet.
Erfindungsgemäß wird nun vorgeschlagen, eine Tunnel-Längsentwässerungseinrichtung,
insbesondere zur Entfernung des im Tunnel anfallenden Sickerwassers derart zu gestalten, daß entlang der zu entwässernden Tunnelstrecke
sogenannte Wasserfänger angeordnet werden, in die mit Vakuum beaufschlagte Saugleitungen einführen. Diese
Saugleitungen stehen wiederum mit mindestens einer innerhalb oder außerhalb des Tunnels angeordneten
Vakuumstation in Verbindung. Die Wasserfänger können als Drainagebehälter oder Bohrlöcher ausgebildet sein, die
bevorzugterweise einen Angriff auf die vorhandene Drainage ermöglichen, d.h. diese erstrecken sich in den
Verlegebereich der vorhandenen Drainagerohre. ßevorzugterweise ist vorgesehen, die Wasserfänger
beidseits der Fahrbahn anzuordnen. Die mit Vakuum beaufschlagten Saugleitungen sind vorwiegend im
Deckenbereich des Tunnels angeordnet. Als Positionen für die Vakuumstationen eignen sich vorhandene Tunnelkavernen.
Anhand der beigefügten Zeichnungen, die ein besonders bevorzugtes Ausführungsbeispiel der Erfindung zeigen, wird
diese nun näher beschrieben.
Dabei zeigen:
Dabei zeigen:
Figur 1 ' einen Querschnitt durch einen herkömmlichen
Tunnel mit schematischer Darstellung der erfindungsgemäßen Längsentwässerung;
Figur 2 eine schematische Darstellung der zu entwässernden Tunnelstrecke.
Die Figur 1 zeigt einen Querschnitt durch einen Tunnel Der Tunnel 6 besteht aus einem Fahrraum 8 mit Fahrbahn
und einem Zuluftkanal 9 sowie einem Abluftkanal 10. Zuluftkanal 9 und Abluftkanal 10 sind durch eine
Zwischendecke 11 vom Fahrraum 8 getrennt. Zwischen Abluftkanal 10 und Zuluftkanal 9 ist eine Trennwand 12
eingezogen. Zur Gewährleistung der Luftzirkulation sind im Abluftkanal 10 Abluftöffnungen 13 und im Zuluftkanal 9
Zuluftöffnungen 14 angeordnet.
Der Tunnelquerschnitt kennzeichnet sich in an sich bekannter Weise durch den Ausbruch 15, das Außengewölbe
16, die Flächenisolierung 17, beispielweise aus Vlies- und
PVC-Folie, sowie dem Innengewölbe 18. Etwa mittig der Tunnelsohle befindet sich die Anordnung der
Hauptentwässerung 19. Im unteren Ulmenbereich 20 beim übergang zur Tunnelsohle 21 ist das vorhandene
Drainagerohr 22 der Tunnel-Längsentwässerung erkennbar.
In der Randfigur 1a ist eine Vergrößerung dieses Bereiches dargestellt. Hier ist bereits schematisch der Wasserfänger
1 angedeutet. Dieser liegt im Einzugsbereich des vorhandenen Drainagerohres 22, so daß diese angegriffen
werden können. In den Wasserfänger 1 ist die Saugleitung 2 eingeführt. Diese führt hoch zum Deckenbereich 5, wo sie
in eine Hauptleitung einmündet.
Anhand der Figur 2 ist eine schematische Darstellung der erfindungsgemäßen Tunnel-Längsentwässerungseinrichtung
dargestellt. Beidseits der Fahrbahn 4 sind die Wasserfänger 1, beispielsweise in Form von Bohrlöchern
angeordnet. Die Saugleitungen 2 stehen mit Vakuumstationen 3, die hier in Tunnelkavernen 7 angeordnet sind in
Verbindung.
Die Wasserfänger 1 sind so angeordnet, daß sie ein Angriff an die vorhandene Drainageleitung 22 ermöglichen.
Mit der vorliegenden Erfindung wird eine Tunnel-Längsentwässerungseinrichtung
geschaffen, mit der auch bereits bestehende Anlagen saniert werden können.
Die erfindungsgemäße Einrichtung ist nahezu unabhängig vom
Zustand der Altanlage. Bei der Nachrüstung in bereits verkehrsbelasteten Tunneln ist eine nur sehr unaufwendige
Baustelleneinrichtung und ein geringer Bauraum erforderlich, so daß sich dies nur geringfügig auf den
Verkehrsfluß auswirkt.
1 Wasserfänger/Bohrlöcher >
2 Saugleitung/Vakuumleitungen
3 Vakuumstation
4 Fahrbahn
5 Deckenbereich
6 Tunnel
7 Kavernen
8 Fahrraum
9 Zuluftkanal
10 Abluftkanal
11 Zwischendecke
12 Trennwand
13 Abluftöffnungen
14 Zuluftöffnungen
15 Ausbruch
16 Außengewölbe
17 Flächenisolierung
18 Innengewölbe
19 Hauptentwässerung
20 unterer Ulmenbereich
21 Tunnelsohle
22 vorhandenes Drainagerohr
Claims (6)
1. Tunnel-Längsentwässerungseinrichtung, insbesondere zur Entfernung des im Tunnel anfallenden
Sickerwassers,
dadurch gekennzeichnet,
daß entlang der zu entwässernden Tunnelstrecke Wasserfänger (1) angeordnet sind, in die mit Vakuum
beaufschlagte Saugleitungen (2) einführen, welche mit
mindestens einer internen oder externen Vakuumstation (3) kommunizieren.
2. Tunnel-Längsentwässerungseinrichtung nach Anspruch 1,
dadurch gekennzeichnet,
daß die Wasserfänger (1) als Bohrlöcher ausgebildet sind.
3. Tunnel-Längsentwässerungseinrichtung nach Anspruch 1 und 2,
dadurch gekennzeichnet,
daß sich die Wasserfänger (1) in den Verlegebereich der vorhandenen Drainagerohre (22) erstrecken.
4. Tunnel-Längsentwässerungseinrichtung nach Anspruch 1 bis 3,
dadurch gekennzeichnet,
daß die Wasserfänger (1) beidseits der Fahrbahn (4) angeordnet sind.
5. Tunnel-Längsentwässerungseinrichtung nach Anspruch 1 bis 4,
dadurch gekennzeichnet,
daß die mit Vakuum beaufschlagten Saugleitungen (2)
im Deckenbereich (5) des Tunnels (6) angeordnet sind
6. Tunnel-Längsentwässerungseinrichtung nach Anspruch 1 bis 5,
dadurch gekennzeichnet,
daß die Vakuumstationen (3) in vorhandenen Tunnelkavernen (7) angeordnet sind.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29500454U DE29500454U1 (de) | 1995-01-13 | 1995-01-13 | Tunnel-Längsentwässerungseinrichtung |
DE59505199T DE59505199D1 (de) | 1995-01-13 | 1995-12-21 | Tunnel-Längsentwässerungseinrichtung |
AT95120331T ATE177169T1 (de) | 1995-01-13 | 1995-12-21 | Tunnel-längsentwässerungseinrichtung |
EP95120331A EP0722038B1 (de) | 1995-01-13 | 1995-12-21 | Tunnel-Längsentwässerungseinrichtung |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29500454U DE29500454U1 (de) | 1995-01-13 | 1995-01-13 | Tunnel-Längsentwässerungseinrichtung |
Publications (1)
Publication Number | Publication Date |
---|---|
DE29500454U1 true DE29500454U1 (de) | 1996-05-15 |
Family
ID=8002437
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE29500454U Expired - Lifetime DE29500454U1 (de) | 1995-01-13 | 1995-01-13 | Tunnel-Längsentwässerungseinrichtung |
DE59505199T Expired - Lifetime DE59505199D1 (de) | 1995-01-13 | 1995-12-21 | Tunnel-Längsentwässerungseinrichtung |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE59505199T Expired - Lifetime DE59505199D1 (de) | 1995-01-13 | 1995-12-21 | Tunnel-Längsentwässerungseinrichtung |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0722038B1 (de) |
AT (1) | ATE177169T1 (de) |
DE (2) | DE29500454U1 (de) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19960988A1 (de) * | 1999-10-05 | 2000-06-29 | Zueblin Ag | Bergwasserdrainage |
EP1091088A2 (de) | 1999-10-05 | 2001-04-11 | Ed. Züblin Ag | Tunnelentwässerungseinrichtung |
ITFI20130047A1 (it) * | 2013-03-06 | 2014-09-07 | Elettricita Renai S R L | Impianto di aspirazione per liquami infiammabili o inquinanti sversati all'interno di un ambiente quale una galleria stradale o ferroviaria |
CN106968712A (zh) * | 2017-05-12 | 2017-07-21 | 西南交通大学 | 富水地层隧底排水结构及其施工方法 |
CN110410144A (zh) * | 2019-07-18 | 2019-11-05 | 中交第二公路勘察设计研究院有限公司 | 一种盾构隧道的防排水结构 |
CN112922670A (zh) * | 2021-03-24 | 2021-06-08 | 广东大潮高速公路有限公司 | 一种可视可维护型公路隧道防淤堵排水系统 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT4562U3 (de) * | 2001-05-17 | 2002-04-25 | Gls Baugmbh & Co Kg | Verfahren zur sanierung von tunnel-rückflächenentwässerungen |
CN102808636A (zh) * | 2012-08-09 | 2012-12-05 | 大同煤矿集团有限责任公司 | 富水复杂地质体大断面巷道支护方法 |
CN104196564A (zh) * | 2014-08-15 | 2014-12-10 | 重庆国翔新材料有限公司 | 一种隧道排水系统及其结晶堵塞的处理方法 |
CN106596278A (zh) * | 2016-12-07 | 2017-04-26 | 北京工业大学 | 一种验证富水地区隧道底部排水减压效果的试验装置 |
CN106917626A (zh) * | 2017-05-04 | 2017-07-04 | 西安理工大学 | 基于饱和黄土隧道的双侧壁洞内降水施工方法 |
CN109653795B (zh) * | 2018-11-08 | 2020-08-14 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | 一种隧道结晶防治方法 |
CN109869189A (zh) * | 2019-03-22 | 2019-06-11 | 云南建投基础工程有限责任公司 | 一种隧道有害气体与地下水分离排放系统装置 |
CN112031868A (zh) * | 2020-09-04 | 2020-12-04 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | 一种40t轴重单线有砟轨道重载铁路隧道底部排水系统 |
CN113217097B (zh) * | 2021-05-19 | 2022-06-24 | 中国建筑第二工程局有限公司 | 富水复合地层暗挖隧洞深层敞开式综合降水方法及抽水器 |
CN114109494B (zh) * | 2021-11-29 | 2024-01-16 | 中铁第一勘察设计院集团有限公司 | 一种膨胀岩地区两单特长隧道分区排水系统的实现方法 |
CN115680763A (zh) * | 2022-09-09 | 2023-02-03 | 中铁八局集团昆明铁路建设有限公司 | 一种水工隧道大坡度斜井排水系统的施工工艺及排水系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT203044B (de) * | 1957-11-22 | 1959-04-25 | Zd Za Raziskavo Materiala | Bauweise zur Ableitung von ansickerndem Wasser |
DE1534643A1 (de) * | 1964-07-08 | 1969-08-21 | Magerle Ing Otto | Draenschicht fuer eine Tunnel- oder Stollenauskleidung und Verfahren zu ihrer Herstellung |
CH490576A (de) * | 1969-04-30 | 1970-05-15 | Kaspar Winkler & Co | Tunnelbauverfahren |
DE3637063A1 (de) * | 1986-10-31 | 1988-05-05 | Ere Kunststoff Ram Extrusion G | Abdeckung fuer abflusskanaele |
CH681475A5 (en) * | 1990-04-20 | 1993-03-31 | Peter Ellenberger | Water-drainage system for tunnel walls - uses mats made of different layers, an outer sealing layer and filter layer made of cloth and has openings |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE511970A (de) * | ||||
GB483924A (en) * | 1936-11-02 | 1938-04-28 | William Lowe Lowe Brown | Improvements in and relating to tunnelling |
FR2522703A1 (fr) * | 1982-03-04 | 1983-09-09 | Cofex | Procede de realisation par collage d'un pontage souple etanche sur l'intervalle entre deux parois |
-
1995
- 1995-01-13 DE DE29500454U patent/DE29500454U1/de not_active Expired - Lifetime
- 1995-12-21 DE DE59505199T patent/DE59505199D1/de not_active Expired - Lifetime
- 1995-12-21 AT AT95120331T patent/ATE177169T1/de not_active IP Right Cessation
- 1995-12-21 EP EP95120331A patent/EP0722038B1/de not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT203044B (de) * | 1957-11-22 | 1959-04-25 | Zd Za Raziskavo Materiala | Bauweise zur Ableitung von ansickerndem Wasser |
DE1534643A1 (de) * | 1964-07-08 | 1969-08-21 | Magerle Ing Otto | Draenschicht fuer eine Tunnel- oder Stollenauskleidung und Verfahren zu ihrer Herstellung |
CH490576A (de) * | 1969-04-30 | 1970-05-15 | Kaspar Winkler & Co | Tunnelbauverfahren |
DE2019775A1 (de) * | 1969-04-30 | 1970-11-19 | Kaspar Winkler & Co Inhaber Dr | Tunnelbauverfahren |
DE3637063A1 (de) * | 1986-10-31 | 1988-05-05 | Ere Kunststoff Ram Extrusion G | Abdeckung fuer abflusskanaele |
CH681475A5 (en) * | 1990-04-20 | 1993-03-31 | Peter Ellenberger | Water-drainage system for tunnel walls - uses mats made of different layers, an outer sealing layer and filter layer made of cloth and has openings |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19960988A1 (de) * | 1999-10-05 | 2000-06-29 | Zueblin Ag | Bergwasserdrainage |
EP1091088A2 (de) | 1999-10-05 | 2001-04-11 | Ed. Züblin Ag | Tunnelentwässerungseinrichtung |
EP1091088A3 (de) * | 1999-10-05 | 2003-07-30 | Ed. Züblin Ag | Tunnelentwässerungseinrichtung |
ITFI20130047A1 (it) * | 2013-03-06 | 2014-09-07 | Elettricita Renai S R L | Impianto di aspirazione per liquami infiammabili o inquinanti sversati all'interno di un ambiente quale una galleria stradale o ferroviaria |
WO2014136132A1 (en) * | 2013-03-06 | 2014-09-12 | Autostrade Per L'italia S.P.A. | Suction system for flammable or polluting liquids |
CN106968712A (zh) * | 2017-05-12 | 2017-07-21 | 西南交通大学 | 富水地层隧底排水结构及其施工方法 |
CN110410144A (zh) * | 2019-07-18 | 2019-11-05 | 中交第二公路勘察设计研究院有限公司 | 一种盾构隧道的防排水结构 |
CN110410144B (zh) * | 2019-07-18 | 2024-05-10 | 中交第二公路勘察设计研究院有限公司 | 一种盾构隧道的防排水结构 |
CN112922670A (zh) * | 2021-03-24 | 2021-06-08 | 广东大潮高速公路有限公司 | 一种可视可维护型公路隧道防淤堵排水系统 |
Also Published As
Publication number | Publication date |
---|---|
DE59505199D1 (de) | 1999-04-08 |
EP0722038A1 (de) | 1996-07-17 |
EP0722038B1 (de) | 1999-03-03 |
ATE177169T1 (de) | 1999-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0722038B1 (de) | Tunnel-Längsentwässerungseinrichtung | |
DE4313221C2 (de) | Verfahren zum Verlegen von unterirdischen Sammelleitungen für Flüssigkeiten und Gase, insbesondere zum Bau von Horizontalfilterbrunnen und Drainageleitungen, und Arbeitsmittel zur Durchführung des Verfahrens | |
EP0471158B1 (de) | Anlage zur Sicherung einer Deponie gegen vagabundierendes Austreten von Sickerwasser und verfahrensmässige Massnahmen | |
DE3743393A1 (de) | Vorrichtung zur energieversorgung von luftfahrzeugen | |
EP0461472A2 (de) | Baukomplex für die Sicherung einer Deponie und Verfahren zur Herstellung des Baukomplexes | |
DE4102266C1 (en) | Multilayer resilient roadway or tunnel lining - has temporary lining reinforced by heavy duty textile fabric roller mats | |
EP1972753B1 (de) | Verfahren zum Aufweiten eines Tunnels und Vorrichtung zum Durchführen des Verfahrens | |
DE2737646B2 (de) | Verfahren zur Errichtung einer Baugrubenwand | |
DE4135445C2 (de) | Bahnsteigkante | |
Wagner et al. | Maintenance‐optimised drainage system for the New Semmering Base tunnel and Pummersdorf Tunnel/Instandhaltungsoptimiertes Entwässerungssystem für den Semmering‐Basistunnel neu und Tunnel Pummersdorf | |
DE102006017673B4 (de) | Anlage zur Bewetterung von Streckenvortrieben mit Vortriebsmaschine | |
DE2712869C2 (de) | Verfahren zum Vermeiden von Wassereinbrüchen in untertägige Hohlräume | |
DE102008025091B4 (de) | Verfahren zur Behandlung von Gesteinsoberflächen | |
DE10120186C1 (de) | Verfahren zur grabenlosen Errichtung und zum Betrieb eines erdverlegten Telekommunikations(Fest-(netzes, das der Trasse bestehender Abwassernetze folgt | |
DE20206800U1 (de) | Infrastruktur-Kanal | |
Strappler et al. | Two‐layer lining for ÖBB railway tunnel projects with TBM/Ein‐und zweischalige Auskleidung bei Tunnelbauprojekten der ÖBB mit kontinuierlichem Vortrieb | |
DE4026049C1 (en) | Rubbish dump drainage system - uses slot trenches by roadways feeding pipes lying on impermeable layer | |
EP3486428B1 (de) | Einrichtung zum erweitern eines tunnels | |
DE915556C (de) | Verfahren und Vorrichtung zum Entfernen von schaedlichen Gasen aus Kanalanlagen, unterirdischen Bauwerken, Rohrleitungen od. dgl. durch Absaugen | |
DE4026048C2 (de) | ||
Scheller | The second S‐Bahn trunk line in Munich/Die zweite S‐Bahn‐Stammstrecke München | |
Sala et al. | Gotthard Base Tunnel–Technical project overview/Gotthard‐Basistunnel–Technische Projektübersicht | |
DE1515669C3 (de) | Kabelkanal für Stromversorgungs- und/oder Fernsprechleitungen | |
DE4114859C2 (de) | Verfahren zum Erneuern eines Abwasserkanals | |
DE19847672C1 (de) | Drainageelement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified | ||
R207 | Utility model specification |
Effective date: 19960627 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 19980408 |
|
R157 | Lapse of ip right after 6 years |
Effective date: 20011101 |
|
R081 | Change of applicant/patentee |
Owner name: BILFINGER BERGER AG, DE Free format text: FORMER OWNER: BILFINGER + BERGER BAUAKTIENGESELLSCHAFT, 68165 MANNHEIM, DE Effective date: 20020320 |