CN106596278A - 一种验证富水地区隧道底部排水减压效果的试验装置 - Google Patents
一种验证富水地区隧道底部排水减压效果的试验装置 Download PDFInfo
- Publication number
- CN106596278A CN106596278A CN201611113833.4A CN201611113833A CN106596278A CN 106596278 A CN106596278 A CN 106596278A CN 201611113833 A CN201611113833 A CN 201611113833A CN 106596278 A CN106596278 A CN 106596278A
- Authority
- CN
- China
- Prior art keywords
- water
- concrete slab
- tunnel
- pressure
- assay device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
- G01N3/10—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
- G01N3/12—Pressure testing
Abstract
一种验证富水地区隧道底部排水减压效果的试验装置,属于隧道工程技术领域。该试验装置分为主体结构和外接结构两个部分。试验箱的两端底部各分设有一个进水口,试验箱的底部铺设有石子,两块第一混凝土板设置在石子上,两块第一混凝土板之间设有模拟施工缝;汇水管设置在第一混凝土板和防排水板之间。模拟二次衬砌的第二混凝土板的下部设置有防排水板,上部设有砂土填充。排水管与汇水管连接,汇水管水平铺设,排水管竖直铺设,汇水管和排水管相垂直。试验箱盖板将试验箱上部封闭。外接结构为进水口外接的加压泵,试验箱盖板的上部外接有液压千斤顶。本装置结构形式简单,可备选材料多样,可以模拟多种围岩条件下的隧道防排水试验。
Description
技术领域
本试验装置适用于模拟验证隧道防排水性能,属于隧道工程技术领域。
背景技术
随着我国交通、能源、水利等基础设施建设的飞速发展,隧道工程的建设规模越来越大。仅以铁路隧道为例,截止到2015年12月底,我国己经建成并投入运营的铁路隧道已有13000多座,总长度超过了13000公里;在建铁路隧道超过了3700座,总长度超过了8700公里,超过了其他所有国家的总和。隧道建设中防排水系统是十分重要的环节,需要根据不同地质条件确定不同的防排水方案。一般的防排水系统都倾向于做现场试验,然而由于各种隧道所处地质条件不同,方案的效果实际应用效果拥有不确定性,容易造成工程安全隐患和试验人员人身威胁。因此如何将此类试验小型化在实验室环境下完成是解决这一问题的突破口,如何模拟隧道环境将是一个难点。
本试验装置通过模拟隧道结构,可以对不同条件下隧道多种防排水做法的实际效果在实验室进行试验验证,相比现场试验既节约成本又减小风险,同时也为是否需要进一步进行现场试验提供技术支撑。
发明内容
本发明的目的在于提出了一种验证富水地区隧道防排水方案效果的试验装置,该试验装置分为主体结构和外接结构两个部分。
主体结构设在一个钢制的试验箱12内,试验箱12的两端底部各分设有一个进水口1,试验箱12的底部铺设有石子2,两块第一混凝土板4设置在石子2上,两块第一混凝土板4之间设有模拟施工缝3;汇水管5设置在第一混凝土板4和防排水板6之间。
模拟二次衬砌的第二混凝土板7的下部设置有防排水板6,上部设有砂土填充8。排水管11与汇水管5连接,汇水管5水平铺设,排水管11竖直铺设,汇水管5和排水管11相垂直。试验箱盖板9将试验箱12上部封闭。
外接结构为进水口1外接的加压泵,试验箱盖板9的上部外接有液压千斤顶10。
水流进入试验箱12后经过填充的石子2进行减缓流速,从模拟初次衬砌的两块第一混凝土板4中间设置的模拟施工缝3进入汇水管5,再由排水管11排出试验箱12。
第一混凝土板4用以模拟初衬。
第二混凝土板7用以模拟二次初衬。
砂土填充8用以模拟仰拱填充。
本装置主体部分模拟隧道结构以及围岩环境,外接部分用于模拟不同水压和不同围岩初始压力。
本试验装置的优点是:
1、采用本试验装置可以对多种隧道防排水做法的效果进行试验验证;
2、本装置结构形式简单,可备选材料多样,可以模拟多种围岩条件下的隧道防排水试验;
3、本装置可根据试验要求灵活更改尺寸,相比现场试验工序简单,节约成本,参与试验的人员人身安全受保障。
附图说明
图1为本试验装置正剖视图。
图2为本试验装置右剖视图。
图3为本试验装置三维效果剖视图。
图中:1-进水管,2-填充石子,3-模拟施工缝,4-第一混凝土板,5-汇水管,6-防排水板,7-第二混凝土板,8-砂土填充,9-试验箱盖板,10-液压千斤顶,11-排水管,12-试验箱。
具体实施方式
下面结合附图对本试验装置的安装步骤进行进一步描述。
步骤1、将工厂预制好的试验箱12固定在试验台;
步骤2、将填充石子2装入试验箱12底部,并安装流速传感器,振捣密实;
步骤3、将混凝土板4安装好,模拟施工缝3用蓬松材料填充,并安装好汇水管5和排水管11;
步骤4、在混凝土板4上安装压力传感器,铺设防排水板6,再安装混凝土板7,四周用止水胶条密封;
步骤5、装填填充砂土8,振捣密实;
步骤6、安装试验箱盖板9,并安装外接有液压千斤顶10和外接加压泵。
步骤7、启动液压千斤顶10加至预定压力,启动外接加压泵;
步骤8、改变进水口压力,记录传感器压力数据和水流流速数据。
Claims (7)
1.一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:该试验装置分为主体结构和外接结构两个部分;
主体结构设在一个钢制的试验箱(12)内,试验箱(12)的两端底部各分设有一个进水口(1),试验箱(12)的底部铺设有石子(2),两块第一混凝土板(4)设置在石子(2)上,两块第一混凝土板(4)之间设有模拟施工缝(3);汇水管(5)设置在第一混凝土板(4)和防排水板(6)之间;
模拟二次衬砌的第二混凝土板(7)的下部设置有防排水板(6),上部设有砂土填充(8);排水管(11)与汇水管(5)连接,汇水管(5)水平铺设,排水管(11)竖直铺设,汇水管(5)和排水管(11)相垂直;试验箱盖板(9)将试验箱(12)上部封闭;
外接结构为进水口(1)外接的加压泵,试验箱盖板(9)的上部外接有液压千斤顶(10)。
2.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:水流进入试验箱(12)后经过填充的石子(2)进行减缓流速,从模拟初次衬砌的两块第一混凝土板(4)中间设置的模拟施工缝(3)进入汇水管(5),再由排水管(11)排出试验箱(12)。
3.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:第一混凝土板(4)用以模拟初衬。
4.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:第二混凝土板(7)用以模拟二次初衬。
5.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:砂土填充(8)用以模拟仰拱填充。
6.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:本装置主体部分模拟隧道结构以及围岩环境,外接部分用于模拟不同水压和不同围岩初始压力。
7.根据权利要求1一种验证富水地区隧道底部排水减压效果的试验装置,其特征在于:
步骤1、将工厂预制好的试验箱(12)固定在试验台;
步骤2、将填充石子(2)装入试验箱(12)底部,并安装流速传感器,振捣密实;
步骤3、将混凝土板(4)安装好,模拟施工缝(3)用蓬松材料填充,并安装好汇水管(5)和排水管(11);
步骤4、在混凝土板(4)上安装压力传感器,铺设防排水板(6),再安装混凝土板(7),四周用止水胶条密封;
步骤5、装填填充砂土(8),振捣密实;
步骤6、安装试验箱盖板(9),并安装外接有液压千斤顶(10)和外接加压泵;
步骤7、启动液压千斤顶(10)加至预定压力,启动外接加压泵;
步骤8、改变进水口压力,记录传感器压力数据和水流流速数据。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611113833.4A CN106596278A (zh) | 2016-12-07 | 2016-12-07 | 一种验证富水地区隧道底部排水减压效果的试验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611113833.4A CN106596278A (zh) | 2016-12-07 | 2016-12-07 | 一种验证富水地区隧道底部排水减压效果的试验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106596278A true CN106596278A (zh) | 2017-04-26 |
Family
ID=58597182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611113833.4A Pending CN106596278A (zh) | 2016-12-07 | 2016-12-07 | 一种验证富水地区隧道底部排水减压效果的试验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106596278A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107036955A (zh) * | 2017-06-09 | 2017-08-11 | 北京工业大学 | 模拟隧道单层衬砌整体防排水系统性能的模型试验装置 |
CN107084832A (zh) * | 2017-06-09 | 2017-08-22 | 北京工业大学 | 模拟隧道单层衬砌局部防排水系统性能的模型试验装置 |
CN107894384A (zh) * | 2017-11-10 | 2018-04-10 | 石家庄铁道大学 | 富水区裂隙岩体隧道衬砌水压力分布试验模拟系统 |
CN115615903A (zh) * | 2022-10-31 | 2023-01-17 | 华东交通大学 | 一种凹凸排水板受压排水性能试验装置和测试方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0722038A1 (de) * | 1995-01-13 | 1996-07-17 | Bilfinger + Berger Bauaktiengesellschaft | Tunnel-Längsentwässerungseinrichtung |
KR20100125779A (ko) * | 2009-05-21 | 2010-12-01 | 한국과학기술원 | 초고압 워터젯을 이용한 암반 굴착 모사 시험 장치 |
CN102135491A (zh) * | 2010-12-23 | 2011-07-27 | 西南交通大学 | 泄水式管片衬砌模型孔隙水压试验装置 |
CN203069483U (zh) * | 2013-01-04 | 2013-07-17 | 西南交通大学 | 隧洞裂隙涌水模拟试验设备 |
CN204142710U (zh) * | 2014-10-30 | 2015-02-04 | 中国矿业大学 | 模拟降雨及地下水渗流下隧道围岩塌方的试验装置 |
CN204679292U (zh) * | 2015-06-17 | 2015-09-30 | 西南交通大学 | 施工及运营期隧道渗流场模型试验系统 |
CN105888724A (zh) * | 2016-04-14 | 2016-08-24 | 中国铁路经济规划研究院 | 一种降低隧道底部水压力的逆向排水系统 |
-
2016
- 2016-12-07 CN CN201611113833.4A patent/CN106596278A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0722038A1 (de) * | 1995-01-13 | 1996-07-17 | Bilfinger + Berger Bauaktiengesellschaft | Tunnel-Längsentwässerungseinrichtung |
KR20100125779A (ko) * | 2009-05-21 | 2010-12-01 | 한국과학기술원 | 초고압 워터젯을 이용한 암반 굴착 모사 시험 장치 |
CN102135491A (zh) * | 2010-12-23 | 2011-07-27 | 西南交通大学 | 泄水式管片衬砌模型孔隙水压试验装置 |
CN203069483U (zh) * | 2013-01-04 | 2013-07-17 | 西南交通大学 | 隧洞裂隙涌水模拟试验设备 |
CN204142710U (zh) * | 2014-10-30 | 2015-02-04 | 中国矿业大学 | 模拟降雨及地下水渗流下隧道围岩塌方的试验装置 |
CN204679292U (zh) * | 2015-06-17 | 2015-09-30 | 西南交通大学 | 施工及运营期隧道渗流场模型试验系统 |
CN105888724A (zh) * | 2016-04-14 | 2016-08-24 | 中国铁路经济规划研究院 | 一种降低隧道底部水压力的逆向排水系统 |
Non-Patent Citations (3)
Title |
---|
姚刚: "《土木工程施工技术与组织》", 31 August 2013, 重庆大学出版社 * |
王秀英,谭忠盛: "水下隧道复合式衬砌水压特征研究", 《现代隧道技术》 * |
郭占月: "《高速铁路隧道施工与维护》", 31 January 2012, 成都:西南交通大学出版社 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107036955A (zh) * | 2017-06-09 | 2017-08-11 | 北京工业大学 | 模拟隧道单层衬砌整体防排水系统性能的模型试验装置 |
CN107084832A (zh) * | 2017-06-09 | 2017-08-22 | 北京工业大学 | 模拟隧道单层衬砌局部防排水系统性能的模型试验装置 |
CN107084832B (zh) * | 2017-06-09 | 2019-07-12 | 北京工业大学 | 模拟隧道单层衬砌局部防排水系统性能的模型试验装置 |
CN107036955B (zh) * | 2017-06-09 | 2020-01-10 | 北京工业大学 | 模拟隧道单层衬砌整体防排水系统性能的模型试验装置 |
CN107894384A (zh) * | 2017-11-10 | 2018-04-10 | 石家庄铁道大学 | 富水区裂隙岩体隧道衬砌水压力分布试验模拟系统 |
CN107894384B (zh) * | 2017-11-10 | 2021-04-27 | 石家庄铁道大学 | 富水区裂隙岩体隧道衬砌水压力分布试验模拟系统 |
CN115615903A (zh) * | 2022-10-31 | 2023-01-17 | 华东交通大学 | 一种凹凸排水板受压排水性能试验装置和测试方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shi et al. | Effects of lateral unloading on the mechanical and deformation performance of shield tunnel segment joints | |
Lin et al. | Experimental study on failure behaviour of deep tunnels under high in-situ stresses | |
Ma et al. | Technical progress on researches for the safety of high concrete-faced rockfill dams | |
CN106596278A (zh) | 一种验证富水地区隧道底部排水减压效果的试验装置 | |
Pan et al. | Experimental and numerical study of the water inrush mechanisms of underground tunnels due to the proximity of a water-filled karst cavern | |
Qiu et al. | Structural response of the metro tunnel under local dynamic water environment in loess strata | |
Shi et al. | Effects of overconsolidation ratio on tunnel responses due to overlying basement excavation in clay | |
CN211505504U (zh) | 一种模拟隧道穿越富水断层突涌水的试验装置 | |
CN205317774U (zh) | 模拟盾构隧道纵断面内地层损失扩展的试验系统 | |
Xue et al. | Deformation rule and mechanical characteristic analysis of subsea tunnel crossing weathered trough | |
Zhao et al. | Effects of water inrush from tunnel excavation face on the deformation and mechanical performance of shield tunnel segment joints | |
Zhang et al. | Model test on development characteristics and displacement variation of water and mud inrush on tunnel in fault fracture zone | |
Wang et al. | Failure analysis and dislocation-resistant design parameters of mining tunnel under normal faulting | |
Zhou et al. | Deformation characteristics and failure evolution process of the existing metro station under unilateral deep excavation | |
Meng et al. | Experimental study on seepage characteristics and water inrush of filled karst structure in tunnel | |
Lin et al. | Experimental and numerical investigations into leakage behaviour of a novel prefabricated utility tunnel | |
Wang et al. | Large-scale model test for studying the water inrush during tunnel excavation in fault | |
Yan et al. | Ground fissures geology in Xi’an and failure mitigation measures for utility tunnel system due to geohazard | |
Su | Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill | |
CN207882085U (zh) | 深埋隧洞模型试验装置系统 | |
Chen et al. | Shaking-table tests on seismic behavior of subway station intersecting the ground fissure | |
Jin et al. | Dynamic-response analysis of the branch system of a utility tunnel subjected to near-fault and far-field ground motions in different input mechanisms | |
Tang et al. | Experimental study on pipe strength and field performance of pipe jacking TBM in deep-buried coal mines | |
CN103105308B (zh) | 跨断层埋地管线原位试验方法 | |
CN114152507B (zh) | 一种煤矿地下水库监测模拟试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |
|
RJ01 | Rejection of invention patent application after publication |