CN110055902B - 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 - Google Patents
一种大吨位箱梁正位提梁上桥施工方法及其架设方法 Download PDFInfo
- Publication number
- CN110055902B CN110055902B CN201910438594.7A CN201910438594A CN110055902B CN 110055902 B CN110055902 B CN 110055902B CN 201910438594 A CN201910438594 A CN 201910438594A CN 110055902 B CN110055902 B CN 110055902B
- Authority
- CN
- China
- Prior art keywords
- girder
- bridge
- erected
- box
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910438594.7A CN110055902B (zh) | 2019-05-23 | 2019-05-23 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
US17/613,060 US11391004B1 (en) | 2019-05-23 | 2020-05-15 | Construction method for upright lifting of large-tonnage box girder to bridge, and erection method for large-tonnage box girder |
JP2021536362A JP6986656B1 (ja) | 2019-05-23 | 2020-05-15 | 大トン数箱桁の橋への直上吊り上げ施工方法及びその架設方法 |
PCT/CN2020/090405 WO2020233501A1 (zh) | 2019-05-23 | 2020-05-15 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910438594.7A CN110055902B (zh) | 2019-05-23 | 2019-05-23 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110055902A CN110055902A (zh) | 2019-07-26 |
CN110055902B true CN110055902B (zh) | 2020-12-22 |
Family
ID=67324361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910438594.7A Active CN110055902B (zh) | 2019-05-23 | 2019-05-23 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US11391004B1 (zh) |
JP (1) | JP6986656B1 (zh) |
CN (1) | CN110055902B (zh) |
WO (1) | WO2020233501A1 (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055902B (zh) | 2019-05-23 | 2020-12-22 | 中铁二局集团有限公司 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
CN114908689B (zh) * | 2021-02-10 | 2024-07-23 | 南通振华重型装备制造有限公司 | 一种大跨径钢桥工厂整体卸载方法 |
CN113279331A (zh) * | 2021-04-25 | 2021-08-20 | 河南五建建设集团有限公司 | 一种桥段吊取箱梁的方法 |
CN113756190B (zh) * | 2021-08-04 | 2023-01-24 | 中铁上海工程局集团有限公司 | 一种小间距多桥并行段箱梁同步运架施工方法 |
CN113832827A (zh) * | 2021-09-22 | 2021-12-24 | 中交路桥华南工程有限公司 | 钢箱梁顶推施工用导梁 |
CN114481835B (zh) * | 2021-12-13 | 2023-04-07 | 中铁第五勘察设计院集团有限公司 | 架桥机吊点无级变跨装置及方法 |
CN114635360A (zh) * | 2022-03-11 | 2022-06-17 | 中铁第五勘察设计院集团有限公司 | 架设桥梁梁体的方法 |
CN114808708B (zh) * | 2022-03-29 | 2023-09-26 | 中国铁建港航局集团有限公司 | 小箱梁高低吊法安装施工方法 |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5940916A (en) * | 1997-09-03 | 1999-08-24 | J. Muller International | Bridge span-by-span construction apparatus and method |
KR20030093680A (ko) * | 2002-06-05 | 2003-12-11 | 브이에스엘코리아 주식회사 | 하부지지형 이동식 비계공법에 의한 더블-티 교량의시공방법 |
CA2634458C (en) * | 2005-12-20 | 2013-06-18 | Flatiron Constructors, Inc. | Method and apparatus for bridge construction |
JP4937838B2 (ja) * | 2007-05-30 | 2012-05-23 | 三井住友建設株式会社 | 橋梁の架設方法 |
CN100543235C (zh) * | 2007-10-16 | 2009-09-23 | 中铁大桥局集团第四工程有限公司 | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 |
CN101818480B (zh) * | 2010-04-15 | 2012-08-01 | 中铁科工集团有限公司 | 一种箱梁转运平台及其移梁和装梁工序 |
CN102071646A (zh) * | 2010-12-31 | 2011-05-25 | 中铁大桥局集团第四工程有限公司 | 大吨位箱梁下海系统及施工方法 |
CN102182147B (zh) * | 2011-03-31 | 2012-12-05 | 中铁港航局集团第二工程有限公司 | 一种钢箱梁架设方法 |
CN102493352B (zh) * | 2011-12-26 | 2014-02-12 | 中铁九局集团有限公司 | 利用轮胎式搬运机跨桥施工的方法 |
JP5945418B2 (ja) * | 2012-01-10 | 2016-07-05 | 三井住友建設株式会社 | 箱桁橋の構築方法 |
JP6081117B2 (ja) * | 2012-09-24 | 2017-02-15 | 株式会社ネクスコ東日本エンジニアリング | 既設橋梁の撤去方法および既設橋梁の更新方法 |
CN103132459B (zh) * | 2013-03-01 | 2015-03-11 | 中铁十七局集团第三工程有限公司 | 一种铁路架桥吊运梁机取梁方法 |
US8671490B1 (en) * | 2013-03-06 | 2014-03-18 | Mark Carney | Bridge span replacement system |
CN104400309A (zh) * | 2014-09-19 | 2015-03-11 | 庄景阳 | 一种发动机动力提升的操作工具的使用方法 |
CN104532755B (zh) * | 2015-01-04 | 2017-03-29 | 河北工业大学 | 一种推进式运梁车 |
CN104631335B (zh) * | 2015-02-05 | 2016-06-29 | 郑州新大方重工科技有限公司 | 大吨位架桥机及其施工方法 |
CN106087774B (zh) * | 2016-06-17 | 2018-02-06 | 中铁十七局集团第三工程有限公司 | 一种利用900吨移梁机给桥面运梁车装梁的架桥施工方法 |
CN106567342A (zh) * | 2016-11-10 | 2017-04-19 | 上海市基础工程集团有限公司 | 局促空间超宽桥面高低腿门吊架设预制梁方法 |
US10214395B2 (en) * | 2017-07-12 | 2019-02-26 | Da Pan | Gantry assembly and a system for replacing single or double railway bridges |
CN207143706U (zh) * | 2017-09-05 | 2018-03-27 | 山西省交通科学研究院 | 一种钢箱梁桥一次落架系统 |
CN208884372U (zh) * | 2018-09-17 | 2019-05-21 | 中铁二局集团有限公司 | 一种用于小半径曲线铁路整孔箱梁施工的大吨位架桥机 |
CN110055902B (zh) * | 2019-05-23 | 2020-12-22 | 中铁二局集团有限公司 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
-
2019
- 2019-05-23 CN CN201910438594.7A patent/CN110055902B/zh active Active
-
2020
- 2020-05-15 US US17/613,060 patent/US11391004B1/en active Active
- 2020-05-15 JP JP2021536362A patent/JP6986656B1/ja active Active
- 2020-05-15 WO PCT/CN2020/090405 patent/WO2020233501A1/zh active Application Filing
Also Published As
Publication number | Publication date |
---|---|
US11391004B1 (en) | 2022-07-19 |
US20220220678A1 (en) | 2022-07-14 |
JP6986656B1 (ja) | 2021-12-22 |
JP2022511986A (ja) | 2022-02-01 |
WO2020233501A1 (zh) | 2020-11-26 |
CN110055902A (zh) | 2019-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110055902B (zh) | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 | |
CN110847062A (zh) | 80米跨宽幅钢箱梁厂内整孔拼装双幅架设施工方法 | |
CN111852521B (zh) | 大断面盾构隧道内部结构施工用口字件拼装台车及同步施工方法 | |
CN108999044A (zh) | 一种模块化路基箱、钢栈道平台结构及其施工方法 | |
CN217378620U (zh) | 一种智能架桥系统 | |
CN110158486B (zh) | 一种架设拼宽梁的架桥机及施工方法 | |
CN112342915B (zh) | 架空轨道龙门吊运梁施工方法 | |
CN208884294U (zh) | 一种模块化路基箱及钢栈道平台结构 | |
CN210140774U (zh) | 一种可实现大吨位箱梁正位提梁上桥的提梁装置 | |
CN201891087U (zh) | 辅助运架一体机的喂梁平台 | |
CN212561214U (zh) | 一种轨道交通高架桥架梁施工结构 | |
CN113356063A (zh) | 一种预制箱梁垂直运输体系及运输方法 | |
CN210315235U (zh) | 可实现纵横向拼装的三工作面架桥机 | |
CN113931068A (zh) | 钢与混凝土叠合梁安装的桥面吊机及其架梁方法 | |
CN110552294B (zh) | 架桥机逆向架梁施工平台及其施工方法 | |
JP2018204364A (ja) | 撤去部材搬出方法、及び部材更新方法 | |
CN113482047A (zh) | 管廊安装方法 | |
CN210561772U (zh) | 一种拼宽梁架桥机 | |
CN216006632U (zh) | 一种预制箱梁垂直运输体系 | |
CN215290260U (zh) | 装配式地铁车站自行走顶板张拉工作台架 | |
CN215801070U (zh) | 一种开启桥吊装轨道平台 | |
CN214939385U (zh) | 一种安装架设桥墩及其盖梁下行式架墩机 | |
CN219099820U (zh) | 一种跨航道钢混结合梁桥面板的提升装置 | |
CN107386661A (zh) | 一种超大平面结构施工物料运输系统及其操作方法 | |
CN114635360A (zh) | 架设桥梁梁体的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Ye Yusen Inventor after: Chen Jianjun Inventor after: Li Da Inventor after: Tang Haoxian Inventor after: Chen Jiannan Inventor after: Fan Xiaotao Inventor after: Pan Chuanwei Inventor after: Lin Guohui Inventor after: Chen Mengqiang Inventor after: Li Shilong Inventor after: Li Chao Inventor after: Wang Qiang Inventor before: Ye Yusen Inventor before: Li Da Inventor before: Tang Haoxian Inventor before: Chen Jiannan Inventor before: Pan Chuanwei Inventor before: Lin Guohui Inventor before: Chen Mengqiang Inventor before: Li Shilong Inventor before: Li Chao Inventor before: Wang Qiang Inventor before: Chen Jianjun |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |