CN109572323A - 矿用自卸车前桥结构 - Google Patents
矿用自卸车前桥结构 Download PDFInfo
- Publication number
- CN109572323A CN109572323A CN201811542596.2A CN201811542596A CN109572323A CN 109572323 A CN109572323 A CN 109572323A CN 201811542596 A CN201811542596 A CN 201811542596A CN 109572323 A CN109572323 A CN 109572323A
- Authority
- CN
- China
- Prior art keywords
- arc
- shaped
- upper plate
- bridge
- lower plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60B—VEHICLE WHEELS; CASTORS; AXLES FOR WHEELS OR CASTORS; INCREASING WHEEL ADHESION
- B60B35/00—Axle units; Parts thereof ; Arrangements for lubrication of axles
- B60B35/02—Dead axles, i.e. not transmitting torque
Abstract
本发明公开了一种矿用自卸车前桥结构,包括桥身焊接主梁,桥身焊接主梁包括:弧形上顶板、弧形下底板、弧形腹板,弧形上顶板、弧形下底板之间通过两块弧形腹板相连接,连接位置连接有焊接垫条;桥身焊接主梁整体呈圆拱形大圆弧平滑过渡,弧形上顶板、弧形下底板在弯曲位置采用弧形过度,弧形腹板的上部和底部为弧形边。本发明使得结构承载能力大幅度的提升,使用寿命大大加长。
Description
技术领域
本发明涉及一种矿用自卸车,具体是,涉及一种矿用自卸车前桥结构。
背景技术
非公路矿用自卸车是大型露天矿山的主要运输设备,其结构复杂、工作环境恶劣。矿用自卸车前桥作为整个矿用车行走系统中的重要组成部分,其结构性能的优劣对矿用自卸车的使用和维护有着重要的影响。
如图1所示,是现有技术中前桥结构示意图;如图2所示,是现有技术中A-A向的剖面示意图。
前桥结构整体呈“凹”形,主要由桥身焊接主梁、悬缸支座、横拉杆支座、纵拉杆支座组成。其中桥身焊接主梁由上顶板1、下底板2、前后两块腹板3及焊接衬板4焊接而成。
上顶板1、下底板2之间通过前后两块腹板3相连接,上顶板1与前后两块腹板3通过焊接衬板4焊接在一起,下底板2与前后两块腹板3通过焊接垫条5焊接在一起。腹板3在拐角过渡处都有开一定长度的槽,通过填焊与焊接衬板4焊接在一起,这些都是为了加强原有结构拐角处的强度,而实际仍无法弥补其自身结构所造成的应力集中现象。
现有矿用自卸车前桥都采用整体方箱型钢板焊接结构,两端呈“Z”型小弯角过渡结构,这种结构在使用中存在小弯角处受力集中,所以结构承载能力不强,容易造成焊缝开裂等现象。而随着非公路矿用自卸车对更大吨位车型的市场需要,使得目前前桥结构强度问题更加凸显,已不能满足车辆安全可靠运行的要求。
发明内容
本发明所解决的技术问题是提供一种矿用自卸车前桥结构,使得结构的承载能力大幅度的提升,使用寿命大大加长。
技术方案如下:
一种矿用自卸车前桥结构,包括桥身焊接主梁,桥身焊接主梁包括:弧形上顶板、弧形下底板、弧形腹板,弧形上顶板、弧形下底板之间通过两块弧形腹板相连接,连接位置连接有焊接垫条;桥身焊接主梁整体呈圆拱形大圆弧平滑过渡,弧形上顶板、弧形下底板在弯曲位置采用弧形过度,弧形腹板的上部和底部为弧形边。
进一步,弧形上顶板、弧形下底板、弧形腹板通过焊接方式形成箱体结构,内部四角采用焊接垫条进行搭接。
进一步,弧形上顶板、弧形下底板通过整块钢板滚压为圆拱形,弧形腹板的上部和底部为弧形边,弧形边与弧形上顶板、弧形下底板的形状相适应。
本发明技术效果包括:
本发明在保证前桥结构自身重量不增加的情况下,通过结构形式的改变及优化,增加前桥受力强度20%以上。去除了原有前桥的结构内部的加强衬板,及其小圆角处加焊的衬板,从而简化了结构,同时使整个前桥受力更加均匀,结构强度大,使用寿命长。
1.本发明将矿用自卸车前桥桥身结构改为为圆拱形,使得结构承载能力大幅度的提升,使用寿命大大加长。
2.本发明跳出以往通过加大加厚材料来加强矿用自卸车前桥强度的惯用思路,并未采用加焊加强筋等方式来增加桥身自身重量,使得结构更加简单的同时,也增加整车的负载能力和车辆运行的燃油经济型。
3.本发明经过结构优化后,精简了不再必要的加强衬板加强筋等,减少了加工工艺工序,因而降低了生产成本。
4.本发明不仅适用于矿用自卸车领域,还可适用于其它重型及工程车辆,使用范围非常广泛。
附图说明
图1是现有技术中前桥结构示意图;
图2是现有技术中A-A向的剖面示意图;
图3是本发明中矿用自卸车前桥结构的示意图;
图4是本发明中矿用自卸车前桥结构B-B向的剖面示意图。
具体实施方式
以下描述充分地示出本发明的具体实施方案,以使本领域的技术人员能够实践和再现。
本发明改变了现有技术中矿用自卸车前桥桥身既有的“凹”形结构,创造性的提出新拱形结构,拱形桥身整体造型平滑,没有受力上的奇异点,使得受力在桥身上均匀分布,大大加强了前桥自身受载能力。同时,更加简化了由于之前强度不够而要加焊的加强衬板等部件,使得结构和加工工序更加简单。
如图3所示,是本发明中矿用自卸车前桥结构的示意图;如图4是本发明中矿用自卸车前桥结构B-B向的剖面示意图;
矿用自卸车前桥结构其桥身焊接主梁的结构包括:弧形上顶板6、弧形下底板7、弧形腹板8,弧形上顶板6、弧形下底板7之间通过两块弧形腹板8相连接。弧形上顶板6、弧形下底板7、弧形腹板8通过焊接方式形成箱体结构,内部四角采用焊接垫条9进行搭接。桥身焊接主梁整体呈圆拱形大圆弧平滑过渡,弧形上顶板6、弧形下底板7在弯曲位置采用弧形过度,弧形腹板8的上部和底部为弧形边,弧形结构使得受力更加分散,解决了现有技术中在各拐角处的应力集中的缺陷,无需腹板3自身开孔及内部加焊衬板。
弧形上顶板6、弧形下底板7通过整块钢板滚压为圆拱形,弧形腹板8的上部和底部为弧形边,弧形边与弧形上顶板6、弧形下底板7的形状相适应。
应当理解的是,以上所述仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应该涵盖在本发明的保护范围之内。因此,本发明的保护范围应以所述权利要求的保护范围为准。
Claims (3)
1.一种矿用自卸车前桥结构,包括桥身焊接主梁,其特征在于,桥身焊接主梁包括:弧形上顶板、弧形下底板、弧形腹板,弧形上顶板、弧形下底板之间通过两块弧形腹板相连接,连接位置连接有焊接垫条;桥身焊接主梁整体呈圆拱形大圆弧平滑过渡,弧形上顶板、弧形下底板在弯曲位置采用弧形过度,弧形腹板的上部和底部为弧形边。
2.如权利要求1所述矿用自卸车前桥结构,其特征在于,弧形上顶板、弧形下底板、弧形腹板通过焊接方式形成箱体结构,内部四角采用焊接垫条进行搭接。
3.如权利要求1所述矿用自卸车前桥结构,其特征在于,弧形上顶板、弧形下底板通过整块钢板滚压为圆拱形,弧形腹板的上部和底部为弧形边,弧形边与弧形上顶板、弧形下底板的形状相适应。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811542596.2A CN109572323A (zh) | 2018-12-17 | 2018-12-17 | 矿用自卸车前桥结构 |
PCT/CN2019/123291 WO2020125425A1 (zh) | 2018-12-17 | 2019-12-05 | 矿用自卸车前桥结构 |
AU2019408142A AU2019408142B2 (en) | 2018-12-17 | 2019-12-05 | Front axle structure of mining dump truck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811542596.2A CN109572323A (zh) | 2018-12-17 | 2018-12-17 | 矿用自卸车前桥结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109572323A true CN109572323A (zh) | 2019-04-05 |
Family
ID=65930472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811542596.2A Pending CN109572323A (zh) | 2018-12-17 | 2018-12-17 | 矿用自卸车前桥结构 |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN109572323A (zh) |
AU (1) | AU2019408142B2 (zh) |
WO (1) | WO2020125425A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020125425A1 (zh) * | 2018-12-17 | 2020-06-25 | 内蒙古北方重型汽车股份有限公司 | 矿用自卸车前桥结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201217449Y (zh) * | 2008-02-02 | 2009-04-08 | 宁波跃进汽车前桥有限公司 | 一种汽车前梁 |
CN203186424U (zh) * | 2013-04-08 | 2013-09-11 | 安徽江淮汽车股份有限公司 | 一种自卸车车架总成 |
CN105014249A (zh) * | 2015-07-23 | 2015-11-04 | 广西柳拖车辆有限公司 | 电动汽车前轴梁的制造方法 |
CN209634184U (zh) * | 2018-12-17 | 2019-11-15 | 内蒙古北方重型汽车股份有限公司 | 矿用自卸车前桥结构 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6585331B2 (en) * | 2001-09-06 | 2003-07-01 | Meritor Heavy Vehicle Technology, Llc | Tubular axle beam |
US20060158023A1 (en) * | 2005-01-14 | 2006-07-20 | The Boler Company | Continuous radius axle and fabricated spindle assembly |
US7862058B2 (en) * | 2008-03-12 | 2011-01-04 | Hendrickson Usa L.L.C. | Fabricated vehicle axle |
CN201660021U (zh) * | 2010-04-09 | 2010-12-01 | 风润新能源设备有限公司 | 一种新型矿用车前桥焊接梁 |
CN203511165U (zh) * | 2013-10-12 | 2014-04-02 | 广东富华工程机械制造有限公司 | 一种新型农用货运挂车车轴 |
US11014404B2 (en) * | 2015-05-29 | 2021-05-25 | Hendrickson Usa, L.L.C. | Fabricated axle with removable king pin |
CN109572323A (zh) * | 2018-12-17 | 2019-04-05 | 内蒙古北方重型汽车股份有限公司 | 矿用自卸车前桥结构 |
-
2018
- 2018-12-17 CN CN201811542596.2A patent/CN109572323A/zh active Pending
-
2019
- 2019-12-05 AU AU2019408142A patent/AU2019408142B2/en active Active
- 2019-12-05 WO PCT/CN2019/123291 patent/WO2020125425A1/zh active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201217449Y (zh) * | 2008-02-02 | 2009-04-08 | 宁波跃进汽车前桥有限公司 | 一种汽车前梁 |
CN203186424U (zh) * | 2013-04-08 | 2013-09-11 | 安徽江淮汽车股份有限公司 | 一种自卸车车架总成 |
CN105014249A (zh) * | 2015-07-23 | 2015-11-04 | 广西柳拖车辆有限公司 | 电动汽车前轴梁的制造方法 |
CN209634184U (zh) * | 2018-12-17 | 2019-11-15 | 内蒙古北方重型汽车股份有限公司 | 矿用自卸车前桥结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020125425A1 (zh) * | 2018-12-17 | 2020-06-25 | 内蒙古北方重型汽车股份有限公司 | 矿用自卸车前桥结构 |
Also Published As
Publication number | Publication date |
---|---|
WO2020125425A1 (zh) | 2020-06-25 |
AU2019408142B2 (en) | 2022-01-06 |
AU2019408142A1 (en) | 2020-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209634184U (zh) | 矿用自卸车前桥结构 | |
CN109572323A (zh) | 矿用自卸车前桥结构 | |
CN102328615B (zh) | 一种混凝土搅拌车 | |
CN203698064U (zh) | 一种矿用自卸车车厢 | |
CN205185941U (zh) | 一种矿用自卸车及其车厢 | |
CN108146316A (zh) | 举升支架及其设置有举升支架的矿用自卸车车厢 | |
CN106677062B (zh) | 一种双主梁密横梁正交异性桥面系结构 | |
RU2739404C1 (ru) | Шкворневой узел рамы грузового вагона | |
CN109353259A (zh) | 一种大吨位电动轮自卸车用车厢 | |
RU175299U1 (ru) | Кузов полувагона | |
CN109252453A (zh) | 提高整体运输性能的组合式运梁车及其施工工法 | |
CN203766786U (zh) | 一种铁路货车车体整体端墙板 | |
CN103121470A (zh) | 全承载商用车平台及其模块化应用 | |
CN102745241B (zh) | 一种矿用自卸车车架结构及包括该结构的自卸车 | |
CN209037667U (zh) | 车架及宽体自卸车 | |
CN106836327A (zh) | 耳板结构及装载机 | |
CN201784689U (zh) | 一种矿用自卸车圈梁结构 | |
CN209852428U (zh) | 一种自卸车带有加强梁的车身结构 | |
CN202954393U (zh) | 一种多功能装载机车架结构 | |
WO2015045152A1 (ja) | ダンプトラックの荷台構造 | |
CN202115401U (zh) | 新型自卸车油缸支座梁总成 | |
CN201834020U (zh) | 自卸车下架抗扭横梁结构 | |
CN201240424Y (zh) | 自卸车用副梁 | |
CN201694246U (zh) | 一种自卸车用无副车架举升结构 | |
CN202882005U (zh) | 一种改进型的装载机前车架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |