CN106429793A - 带滑轮装置的吊装平衡梁 - Google Patents

带滑轮装置的吊装平衡梁 Download PDF

Info

Publication number
CN106429793A
CN106429793A CN201611016477.4A CN201611016477A CN106429793A CN 106429793 A CN106429793 A CN 106429793A CN 201611016477 A CN201611016477 A CN 201611016477A CN 106429793 A CN106429793 A CN 106429793A
Authority
CN
China
Prior art keywords
hoisting
steel strand
fixed pulley
balance beam
strand wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611016477.4A
Other languages
English (en)
Inventor
佘金波
王豪
吕强
魏英杰
冯身强
杨智超
任启富
邓强
王传平
王旭
王涛
陶扬威
唐柏林
左佩文
苟元旭
李波
闵登
杜雨萱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jiangong Industrialization Building Co Ltd
Original Assignee
Chengdu Jiangong Industrialization Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiangong Industrialization Building Co Ltd filed Critical Chengdu Jiangong Industrialization Building Co Ltd
Priority to CN201611016477.4A priority Critical patent/CN106429793A/zh
Publication of CN106429793A publication Critical patent/CN106429793A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开一种带滑轮装置的吊装平衡梁,包括平衡梁主梁、一组定滑轮、定滑轮固定支座、吊环,定滑轮通过定滑轮固定支座安装在平衡梁主梁的下部;钢绞线固定支座安装在平衡梁主梁的下部的两端,钢绞线分别穿过定滑轮和吊环。本发明平衡梁底部设置有多个定滑轮,钢绞线穿过各定滑轮,吊装时可通过定滑轮自行调整吊绳长短,使滑轮两侧各吊绳均处于张紧状态且受力相等,吊装过程中构件各吊点受力均匀,可以有效控制构件的跨中挠度及内部应力,本发明具有受力合理、操作简单、安全可靠、经济等优点,在吊装领域具有很好的实用性和推广价值。

Description

带滑轮装置的吊装平衡梁
技术领域
本发明涉及一种吊装平衡梁装置,特别是一种带滑轮装置的吊装平衡梁。
背景技术
随着我国装配式建筑的推广,叠合板、叠合梁、预制柱及外墙板等预制构件的使用也越来越广泛。各种预制构件的吊装是装配式建筑建设中的关键过程,而现有的各种吊装平衡梁问题比较突出。目前,使用常规平衡梁吊装跨度较大的板类预制构件时,构件中部吊绳常处于松弛状态,仅靠构件两端吊绳受力,易造成构件跨中挠度极大、甚至开裂。因此,有必要研发出使用方便、受力合理的新型吊装平衡梁。
发明内容
为了解决现有吊装平衡梁装置的不足,本发明提供一种带滑轮装置的吊装平衡梁。
本发明解决其技术问题所采用的技术方案是:
带滑轮装置的吊装平衡梁,包括,平衡梁主梁、钢绞线、吊耳,所述的吊耳固定安装在平衡梁主梁上部,还包括,一组定滑轮、定滑轮固定支座、吊环、钢绞线固定支座,所述的定滑轮通过定滑轮固定支座安装在平衡梁主梁的下部;所述的钢绞线固定支座安装在平衡梁主梁的下部的两端,所述的钢绞线分别穿过定滑轮和吊环,钢绞线的两端与平衡梁主梁下部的两端的钢绞线固定支座固定连接。
进一步,所述的定滑轮的数量数量大于1个。相邻的定滑轮之间等距。
所述的钢绞线固定支座和定滑轮固定支座均设置有加劲肋。加强结构整体刚度。
吊装时可通过定滑轮自行调整钢绞线长短,使定滑轮两侧各钢绞线均处于张紧状态且受力相等,进而保证构件所承受的应力在合理范围内。
本发明具有的有益效果是:平衡梁底部设置有多个定滑轮,钢绞线穿过各定滑轮,吊装时可通过定滑轮自行调整吊绳长短,使滑轮两侧各吊绳均处于张紧状态且受力相等,吊装过程中构件各吊点受力均匀,可以有效控制构件的跨中挠度及内部应力,本发明具有受力合理、操作简单、安全可靠、经济等优点,在吊装领域具有很好的实用性和推广价值。
附图说明
图1为本发明的结构示意图;
图2为图1的A-A向剖视图;
图3为本发明的定滑轮固定支座示意图;
图4为本发明的实施示意图;
图5为本发明的实施过程受力示意图。
图中零部件及编号:
1-平衡梁主梁;2-钢绞线;3-定滑轮固定支座;4-吊耳;5-钢绞线固定支座;6-定滑轮;7-吊环。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
如图1~图3所示,带滑轮装置的吊装平衡梁,包括,平衡梁主梁1、钢绞线2、吊耳4,所述的吊耳4固定安装在平衡梁主梁1上部,还包括,一组定滑轮6、定滑轮固定支座3、吊环7、钢绞线固定支座5,所述的定滑轮6通过定滑轮固定支座3安装在平衡梁主梁1的下部;所述的钢绞线固定支座5安装在平衡梁主梁1的下部的两端,所述的钢绞线2分别穿过定滑轮6和吊环7,钢绞线2的两端与平衡梁主梁1下部的两端的钢绞线固定支座5固定连接。
进一步,所述的定滑轮6的数量大于1个。相邻的定滑轮6之间等距。
所述的钢绞线固定支座5和定滑轮固定支座3均设置有加劲肋,加强了结构整体刚度。
实施过程
如图4~图5所示,吊装跨度较大的板类预制构件时,为减小构件产生的应力及跨中挠度,设置了六个吊点,首先根据构件吊点位置确定平衡梁上所需使用的吊环7,将主吊绳穿过吊环7并与吊装构件预埋吊点固定。确定主吊绳及次吊绳连接牢固后,缓慢起吊,待构件吊离地面约500mm后,检查定滑轮6、钢绞线2和主吊绳是否有歪扭或卡死现象,确认构件各吊点受力均匀后可加快起吊速度。
吊装设置三个吊环7和六个次吊点进行吊装时,结合图5对带滑轮装置的吊装平衡梁结构的各吊绳进行受力分析如下:
如图5所示,假设穿过定滑轮6的作为主吊绳的钢绞线2分别受拉力F1、 F2、F3,次吊绳所受拉力分别为F1´、F2´、F3´;主吊绳夹角θ1,次吊绳夹角θ2。由力的平衡及定滑轮6两侧吊绳受拉力相等的原则,有下列等式:
综合上面等式,可得:
因此,带滑轮装置的吊装平衡梁能有效保证主吊绳及次吊绳受力均衡,使被吊预制构件受力更为合理。
本带滑轮装置的吊装平衡梁能有效地避免了采用常规平衡梁吊装较长板类预制构件时,构件中间吊点上的吊绳处于松弛状态的情况;使预制构件各吊点受力均匀,构件的跨中挠度变形控制在合理范围内。同时,该平衡梁具有操作简单、安全可靠等优点,具有良好的实用性和推广价值。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。

Claims (4)

1.一种带滑轮装置的吊装平衡梁,包括,平衡梁主梁(1)、钢绞线(2)、吊耳(4),所述的吊耳(4)固定安装在平衡梁主梁(1)上部,其特征在于,还包括,一组定滑轮(6)、定滑轮固定支座(3)、吊环(7)、钢绞线固定支座(5),所述的定滑轮(6)通过定滑轮固定支座(3)安装在平衡梁主梁(1)的下部;所述的钢绞线固定支座(5)安装在平衡梁主梁(1)的下部的两端,所述的钢绞线(2)分别穿过定滑轮(6)和吊环(7),钢绞线(2)的两端与平衡梁主梁(1)下部的两端的钢绞线固定支座(5)固定连接。
2.根据权利要求1所述的带滑轮装置的吊装平衡梁,其特征在于,所述的定滑轮(6)的数量大于1个。
3.根据权利要求1所述的带滑轮装置的吊装平衡梁,其特征在于,所述的相邻的定滑轮(6)之间等距。
4.根据权利要求1所述的带滑轮装置的吊装平衡梁,其特征在于,所述的钢绞线固定支座(5)和定滑轮固定支座(3)均设置有加劲肋。
CN201611016477.4A 2016-11-18 2016-11-18 带滑轮装置的吊装平衡梁 Pending CN106429793A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611016477.4A CN106429793A (zh) 2016-11-18 2016-11-18 带滑轮装置的吊装平衡梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611016477.4A CN106429793A (zh) 2016-11-18 2016-11-18 带滑轮装置的吊装平衡梁

Publications (1)

Publication Number Publication Date
CN106429793A true CN106429793A (zh) 2017-02-22

Family

ID=58220189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611016477.4A Pending CN106429793A (zh) 2016-11-18 2016-11-18 带滑轮装置的吊装平衡梁

Country Status (1)

Country Link
CN (1) CN106429793A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128794A (zh) * 2017-06-16 2017-09-05 中国二十二冶集团有限公司 预制叠合板吊装方法
CN107140528A (zh) * 2017-06-29 2017-09-08 岳阳远大住宅工业有限公司 起吊装置
CN107161857A (zh) * 2017-07-24 2017-09-15 中国十九冶集团有限公司 适于扁平薄壁构件直立的吊装系统和方法
CN109335952A (zh) * 2018-12-05 2019-02-15 中建科技湖南有限公司 一种预制构件吊具
CN112374346A (zh) * 2020-11-12 2021-02-19 重庆建筑工程职业学院 装配式建筑预制构件吊装装置
CN112607585A (zh) * 2020-12-29 2021-04-06 山东宇航技术有限公司 一种均匀承载装置及火箭吊装和捆绑方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001240363A (ja) * 2000-02-29 2001-09-04 Mitsubishi Heavy Ind Ltd 昇降補助装置
CN203229308U (zh) * 2013-04-27 2013-10-09 江苏工力重机有限公司 一种超长管桩吊具
CN203820281U (zh) * 2014-03-13 2014-09-10 亚泰集团沈阳现代建筑工业有限公司 一种预制建筑构件滑轮组吊具
CN204873418U (zh) * 2015-08-24 2015-12-16 中国化学工程第七建设有限公司 一种大跨度构件吊装装置
CN205036094U (zh) * 2015-09-10 2016-02-17 河北建设集团有限公司 一种装配式叠合板吊装装置
CN205187639U (zh) * 2015-11-24 2016-04-27 杭州华新机电工程有限公司 一种具备双向调平能力的吊具装置
CN206203655U (zh) * 2016-11-18 2017-05-31 成都建工工业化建筑有限公司 带滑轮装置的吊装平衡梁

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001240363A (ja) * 2000-02-29 2001-09-04 Mitsubishi Heavy Ind Ltd 昇降補助装置
CN203229308U (zh) * 2013-04-27 2013-10-09 江苏工力重机有限公司 一种超长管桩吊具
CN203820281U (zh) * 2014-03-13 2014-09-10 亚泰集团沈阳现代建筑工业有限公司 一种预制建筑构件滑轮组吊具
CN204873418U (zh) * 2015-08-24 2015-12-16 中国化学工程第七建设有限公司 一种大跨度构件吊装装置
CN205036094U (zh) * 2015-09-10 2016-02-17 河北建设集团有限公司 一种装配式叠合板吊装装置
CN205187639U (zh) * 2015-11-24 2016-04-27 杭州华新机电工程有限公司 一种具备双向调平能力的吊具装置
CN206203655U (zh) * 2016-11-18 2017-05-31 成都建工工业化建筑有限公司 带滑轮装置的吊装平衡梁

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128794A (zh) * 2017-06-16 2017-09-05 中国二十二冶集团有限公司 预制叠合板吊装方法
CN107140528A (zh) * 2017-06-29 2017-09-08 岳阳远大住宅工业有限公司 起吊装置
CN107140528B (zh) * 2017-06-29 2018-05-11 岳阳远大住宅工业有限公司 起吊装置
CN107161857A (zh) * 2017-07-24 2017-09-15 中国十九冶集团有限公司 适于扁平薄壁构件直立的吊装系统和方法
CN107161857B (zh) * 2017-07-24 2018-11-09 中国十九冶集团有限公司 适于扁平薄壁构件直立的吊装系统和方法
CN109335952A (zh) * 2018-12-05 2019-02-15 中建科技湖南有限公司 一种预制构件吊具
CN112374346A (zh) * 2020-11-12 2021-02-19 重庆建筑工程职业学院 装配式建筑预制构件吊装装置
CN112607585A (zh) * 2020-12-29 2021-04-06 山东宇航技术有限公司 一种均匀承载装置及火箭吊装和捆绑方法

Similar Documents

Publication Publication Date Title
CN106429793A (zh) 带滑轮装置的吊装平衡梁
CN206203655U (zh) 带滑轮装置的吊装平衡梁
CN202090286U (zh) 一种适用于自锚式双索面悬索桥的牵引系统
CN103227431A (zh) 220kV大跨越高塔悬垂绝缘子串带电更换方法
CN202201604U (zh) 一种自平衡绳头组合装置
CN209383241U (zh) 曳引比6:1的重载型电梯结构
CN204588444U (zh) 预制叠合板专用吊具
CN101877460B (zh) 特高压组合式放线滑车
CN203295024U (zh) 多绳自平衡起吊装置
CN103594976B (zh) 用于线路导线紧线的组合紧线工具
CN202226566U (zh) 宽幅主索缆索起重机轻型免支索器天车
CN104192692B (zh) 一种飞机吊装索具
CN206665952U (zh) 一种新型吊装工具
CN205329550U (zh) 悬索桥猫道系统
CN204624958U (zh) 吊排
CN100484859C (zh) 大吨位吊车吊钩平衡滑轮组
CN105565198B (zh) 多点吊装受力均衡装置
CN205616495U (zh) 一种建筑用小型吊装装置
CN209023976U (zh) 一种新型对重反绳轮装置
CN103594974B (zh) 用于架空线路紧线的组合式紧线工具
CN208561398U (zh) 双排联接的电梯对重装置
CN207046637U (zh) 一种适用于无对重背包梯的新型绕绳结构
CN207932896U (zh) 环梁及环轨用整体吊装工具
CN203319500U (zh) 一种钢筋笼对接调整装置
CN202007533U (zh) 滑线安全装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222