CN103490521A - Intelligent power distribution network fault treatment platform - Google Patents

Intelligent power distribution network fault treatment platform Download PDF

Info

Publication number
CN103490521A
CN103490521A CN201310489657.4A CN201310489657A CN103490521A CN 103490521 A CN103490521 A CN 103490521A CN 201310489657 A CN201310489657 A CN 201310489657A CN 103490521 A CN103490521 A CN 103490521A
Authority
CN
China
Prior art keywords
fault
information
module
fault message
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310489657.4A
Other languages
Chinese (zh)
Other versions
CN103490521B (en
Inventor
王海林
许海清
陈楷
徐爱华
张文俊
朱红
吴文书
韦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN HIGH-TECH Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical JIANGSU SUYUAN HIGH-TECH Co Ltd
Priority to CN201310489657.4A priority Critical patent/CN103490521B/en
Publication of CN103490521A publication Critical patent/CN103490521A/en
Application granted granted Critical
Publication of CN103490521B publication Critical patent/CN103490521B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Abstract

The invention relates to an intelligent power distribution network fault treatment platform and belongs to the technical field of power network management. The platform comprises a fault information acquisition system, a fault information study and judgment system and a fault clearing and power failure/supply information push system. A method is characterized by acquiring information of faults requested to be cleared, line faults and consumption acquisition faults in an existing 95598 system, a distribution automation management system and a power consumption information acquisition system, after receiving and verifying the information, carrying out equipment locating, fault information screening, line topology analysis, equipment operation information analysis and line switch analysis to determine and display the fault types, places and areas of influence in an existing GIS (geographic information system), guiding fault clearing according to the determined fault results and simultaneously pushing the power failure information and power restoration information to users. The platform and the method can be used for achieving centralized acquisition and advanced automatic study and judgment of existing various fault information, can be used for actively pushing the power failure and power restoration information to the users and can interact with the users.

Description

Adapted electric network fault Intelligent Processing Platform
The application is that denomination of invention is: adapted electric network fault integrated treatment platform and processing method, and application number is: 201110396709.4, the applying date is: the division of the application for a patent for invention on December 4th, 2011.
Technical field
The present invention relates to a kind of electric network fault information that gathers by all kinds of means, fault message carried out to automatic anticipation, and the anticipation result is pushed to repairing and user, and with processing platform and the processing method of user interaction, belong to the administration of power networks technical field.
Background technology
Existing electrical network automated management system does not form integrated treatment to electric network fault, to the collection of fault message, judge, notify the processing of each links such as user and commander's breakdown repair all to isolate, lack each other contact, and result can not form interaction with the user.Concrete manifestation is as follows:
1, the collection of fault message is single isolated
Existing electric network fault information gathering has existing 95598 systems to report for repairment to report, user's intelligent electric meter fault reports, distribution transforming acquisition terminal fault reports, circuit On line switch fault reports, the mode that transformer station's outlet switch fault such as reports to obtain at the channel, but the fault message that these channels obtain is all to be stored in separately separately in operation system, the fault message reported for repairment as existing 95598 systems is stored in existing 95598 systems, the failed storage that user's intelligent electric meter reports for another example is in power information acquisition system (CSM), the fault message that and for example circuit On line switch and transformer station's outlet switch report is stored in power distribution automation management system (DMS).As can be seen here, the channel that existing various electrical network operation systems gather fault message is (battalion of respectively doing for oneself) isolated, the information of various channel collections lacks unified access road, not contact between the fault message that various channels gather, therefore the various automation operation systems of existing electrical network can not be shared the fault message that various channels gather simultaneously, thereby can not meet the requirement of electric network fault information being carried out to analysis-by-synthesis and utilization.
2, lack early stage anticipation automatically for fault message
For a long time, when power matching network breaks down, enter scene rush to repair after fault reports before, can not analyze and accurately locate the source of trouble and relevant device information for fault message, can only depend on user's description and repair personnel to the confirmation behind scene, can not accurately judge in time the type of fault, the scope of impact etc.Bring thus, power failure when repairing accurately the location source of trouble and relevant device information, Obtaining Accurate fault type and coverage exist and lag behind, depend on the repair personnel to the confirmation behind scene, thus the scheduling of the progress of impact repairing and repairing resource.
3, fault message and repairing recovery situation can't push to user side
For a long time, the user can only pass through TV, newpapers and periodicals and Network Capture power failure information, but the limitation of traditional media makes the client often because ignoring, can't grasp in time power failure information, more can not grasp in real time electric network fault power failure information and the expectation temporal information that restores electricity.Although existing 95598 systems of existing electrical network itself possess inquiry and the issuing function of fault outage information, but the contact staff of existing 95598 systems does not normally initiatively issue fault outage information to the user, just when the user condescends to inquire, just inform the user, existing 95598 systems can not be informed user malfunction power failure repairing progress and the expectation temporal information that restores electricity.In addition during scene rush to repair, the repair personnel at the scene can not with breakdown repair system real-time, interactive, repairing work can not effectively be supervised.
Summary of the invention
The first technical problem that the present invention will solve is: propose a kind of current collection net fault information acquisition, study and judge, push integrated fully-automatic intelligent processing platform and processing method.
The second technical problem that the present invention will solve is: solving on the basis of above-mentioned the first technical problem, proposing a kind ofly can carry out interactive adapted electrical network fully-automatic intelligent processing platform and method with the user.
In order to solve above-mentioned the first technical problem, one of technical scheme that the present invention proposes is: a kind of adapted electric network fault Intelligent Processing Platform, comprise the fault information acquisition system, fault message studies and judges system and breakdown repair stops the information transmission system of powering, described fault information acquisition system comprises and is arranged at the existing 95598 intrasystem fault message pushing modules that report for repairment, be arranged at the line fault information pushing module in existing power distribution automation management system, the use be arranged in existing power information acquisition system is adopted the fault message pushing module, the fault message receiver module, fault message processing module and fault message sending module, described fault message is studied and judged system and is comprised the faulty equipment locating module, fault message screening module, line topological analysis module, equipment operation information analysis module, line switching analysis module, failure analysis module and fault display module, the described breakdown repair information transmission system that stops powering comprises breakdown repair allocation schedule module, scene rush to repair administration module, repairing information pushing module and the information pushing module of stopping powering,
The described fault message pushing module that reports for repairment reports fault message for repairment in order to the user that will be reported to existing 95598 systems and is pushed to described fault message receiver module;
Described line fault information pushing module is pushed to described fault message receiver module in order to the switch changed position fault message that will be reported to power distribution automation management system (DMS);
Described use adopt the fault message pushing module in order to the distribution transforming that will be reported to power information acquisition system (CSM) and user malfunction information pushing to described fault message receiver module;
Described fault message receiver module in order to receive and verification from reporting fault message pushing module, line fault information pushing module for repairment and with the fault message of adopting the propelling movement of fault message pushing module;
Described fault message processing module is stored in order to the fault message that described fault message receiver module is received, and according to the power network line topological structure, from the low-voltage customer to the high-tension apparatus, with unified data model, carries out analytical integration;
The fault message of described fault message sending module in order to the fault message processing module is processed, send out passage outward by information and be sent to described faulty equipment locating module;
Described faulty equipment locating module is used for receiving the fault message that described fault message sending module sends, and obtains actual geographic position and the account information of the source device relevant to fault message by existing power distribution management system (PMS);
Described fault message screening module is screened for the fault message to behind the equipment location, gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Described line topological analysis module, for the adapted electric line under the fault message filtered out is carried out to topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
Described equipment operation information analysis module is used for the circuit charging equipment of circuit charging equipment list is carried out to the cls analysis of calling together of equipment operation information step by step, and judges whether the circuit charging equipment exists fault;
Described line switching analysis module is for detection of the switch folding information of the On line switch on the adapted electric line and outlet switch, and judges whether the adapted electric line exists line fault;
Described failure analysis module is for determining fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure, fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop powering the information pushing module;
Described breakdown repair allocation schedule module is for determining repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects zone;
Described scene rush to repair administration module is for the repairing procedural information of monitoring and gather the repair personnel and the information that restores electricity;
Described repairing information pushing module pushes to the fault display module for rushing to repair procedural information, and the information pushing that will restore electricity is to the information pushing module of stopping powering;
Described fault display module is for influence area and the repairing procedural information of the circuit charging equipment that has fault by existing adapted power grid GIS system demonstration and account information thereof, adapted electric line;
The described information pushing module of stopping powering is for affecting user's propelling movement by existing 95598 systems, short message service passage and optic fibre data channel by fault outage information and the information that restores electricity to having a power failure.
In order to solve above-mentioned the first technical problem, two of the technical scheme that the present invention proposes is: a kind of adapted electric network fault intelligent processing method adopts above-mentioned adapted electric network fault Intelligent Processing Platform, and carries out following steps:
1) arrange and report the fault message pushing module for repairment in existing 95598 systems, set up existing 95598 systems and the Web service data-transmission channel that reports the fault message pushing module for repairment;
In existing power distribution automation management system, line fault information pushing module is set, sets up GPRS message information Transfer pipe or the IEB bus service data Transfer pipe of power distribution automation management system and line fault information pushing module;
Arrange with adopting the fault message pushing module in existing power information acquisition system, set up the power information acquisition system and use the Web service data-transmission channel of adopting the fault message pushing module;
2) reporting the fault message pushing module for repairment will be reported to the user of existing 95598 systems to report fault message for repairment to be pushed to the fault message receiver module;
Line fault information pushing module will be reported to the switch changed position fault message of existing power distribution automation management system to be pushed to the fault message receiver module;
With adopting the fault message pushing module, will be reported to the distribution transforming of existing power information acquisition system and user malfunction information pushing to the fault message receiver module;
3) reception of fault message receiver module and verification are from reporting fault message pushing module, line fault information pushing module for repairment and pushing with adopting the fault message pushing module the fault message of coming;
4) the fault message processing module will be stored through the fault message of the reception of fault message receiver module and verification, according to the power network line topological structure, from the low-voltage customer to the high-tension apparatus, with unified data model, carry out analytical integration;
5) fault message that the fault message sending module will be processed through the fault message processing module is sent out passage outside by information and is sent to the faulty equipment locating module;
6) the faulty equipment locating module receives the fault message that the fault message sending module sends, and by having actual geographic position and the account information of the source device that the power distribution management system acquisition is relevant to fault message now;
7) fault message that fault message screens after module is located source device is screened, judge whether the fault message behind the source device location belongs to scheduled outage fault message and the confirmed fault message generated, get rid of in this way, if not being carries out next step;
8) the adapted electric line that the line topological analysis module is reviewed under the fault message to filtering out by power supply point is carried out topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
9) equipment operation information analysis module carries out step by step the equipment operation information by the circuit charging equipment in the list of circuit charging equipment and calls cls analysis together, judge according to the equipment operation information analyzed whether the circuit charging equipment exists fault, carry out in this way next step, if be not that failure judgement information is user's internal fault information, finish to study and judge;
10) On line switch on line switching analysis module detection adapted electric line and the switch folding information of outlet switch, judge whether the adapted electric line exists line fault;
11) failure analysis module is determined fault type according to described equipment operation information and switch folding information, determine the position of fault and fault effects zone according to described topological structure, fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop powering the information pushing module;
12) breakdown repair allocation schedule module is determined repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects zone;
13) repair personnel's repairing procedural information and the information that restores electricity are monitored and gathered to the scene rush to repair administration module;
14) repairing information pushing module will be rushed to repair procedural information and be pushed to the fault display module, and the information pushing that will restore electricity is to the information pushing module of stopping powering;
15) the fault display module exists influence area and the repairing procedural information of the circuit charging equipment of fault and account information thereof, adapted electric line by existing adapted power grid GIS system demonstration;
16) the information pushing module of stopping powering affect user's propelling movement by existing 95598 systems, short message service passage and optic fibre data channel by fault outage information and the information that restores electricity to having a power failure.
In order to solve above-mentioned the second technical problem, the present invention to the improvement of one of technique scheme is: also comprise for by short message service passage and optic fibre data channel and user, carrying out interactive interactive module, described interaction is that the user sends code and the user number inquiry stops power transmission information, by interactive module, according to user number inquiring user region, is stopped power transmission information and send to inform the user.
In order to solve above-mentioned the second technical problem, the present invention to two improvement of technique scheme is: adopt improved technical scheme to increase in the lump and carry out the 17th) step: interactive module is carried out interaction by short message service passage and optic fibre data channel and user; Described interaction is that the user sends code and the user number inquiry stops power transmission information, by interactive module, according to user number inquiring user region power failure information and the information that restores electricity, is also sent and informs the user.
One of technique scheme perfect: the described fault message pushing module that reports for repairment links by the Web service data-transmission channel with existing 95598 systems, described line fault information pushing module links by GPRS message information Transfer pipe or IEB bus service data Transfer pipe with existing power distribution automation management system, described use is adopted the fault message pushing module and is linked by the Web service data-transmission channel with existing power information acquisition system, described GPRS message information Transfer pipe is to utilize the SIM card of the remote signalling displacement device that is arranged on switch to form, it is LAN that described information is sent out passage outward.
One of technique scheme perfect: described storage is that the fault message classification of the separate sources that will receive is stored in the fault message table of type separately; Described analytical integration is top-down arrangement of line topological structure according to mesolow, comprise from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station's outlet switch information and being analyzed, and set up the relation can inquire about each other, by the result store that analyzes in the analysis result table.
One of technique scheme perfect: described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
One of technique scheme perfect: described fault message comprises the user's repairing information that is reported to existing 95598 systems, existing power information acquisition system (CSM) reporting fault information and existing power distribution automation management system (DMS) reporting fault information; Described fault type comprises low-voltage platform area fault, distribution transforming fault, middle pressure client's internal fault, part line fault and circuit fault completely.
One of technique scheme perfect: when described fault message is while being reported to the user of existing 95598 systems to report fault message for repairment, described source device is to obtain by existing power distribution management system low pressure ammeter box equipment or the negative control device that the user is associated according to the Customs Assigned Number reported for repairment, and described source device actual geographic coordinate information and account information are to obtain by existing power distribution management system queries according to unique coding of low pressure ammeter box equipment or negative control device; When described fault message is existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information, described source device is distribution transforming, switch and the negative control device obtained by existing power distribution management system according to the asset of equipments numbering; Described source device actual geographic coordinate information and account information are to obtain by existing power distribution management system queries according to unique coding of source distribution transforming, switch and negative control device.
One of technique scheme perfect: described controller switching equipment comprises circuit, switch, distribution transformer and Middle Voltage, and described power failure affects equipment and comprises low-voltage meter box and Middle Voltage.
Technique scheme two perfect: the 3rd) in step, if the fault message of verification is abnormal data, for different fault message sources, to fault message propelling movement side, fed back; If the fault message of verification is normal data pushes to the fault message processing module;
Technique scheme two perfect: the 4th) in step, described storage is that the fault message classification of the separate sources that will receive is stored in the fault message table of type separately; Described analytical integration is top-down arrangement of line topological structure according to mesolow, comprise from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station's outlet switch information and being analyzed, and set up the relation can inquire about each other, by the result store that analyzes in the analysis result table.
Technique scheme two perfect: described GPRS message information Transfer pipe is to utilize the SIM card of the remote signalling displacement device be arranged on switch to form; It is LAN that described information is sent out passage outward; Described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
Two improve and one be of technique scheme: the described the 6th) in step, when described fault message is while being reported to the user of existing 95598 systems to report fault message for repairment, according to the Customs Assigned Number reported for repairment, obtain low pressure ammeter box equipment that the user is associated or negative control device as source device by existing power distribution management system (PMS), and the unique coded query by low pressure ammeter box equipment or negative control device is to source device actual geographic coordinate information and account information.
Two improve and two be of technique scheme: the described the 6th) in step, when described fault message is existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information, obtain distribution transforming, switch and negative control device as source device according to asset of equipments numbering by existing power distribution management system, and by distribution transforming, switch and the negative unique coded query of device of controlling to source device actual geographic coordinate information and account information.
Technique scheme two perfect: the described the 7th) in step, whether fault message screening module at first failure judgement information is the scheduled outage fault message generated, get rid of in this way this fault message and do not studied and judged, and inform and report the user for repairment by existing 95598 systems; If be not scheduled outage failure judgement information whether be confirmed fault message, get rid of in this way this fault message and do not studied and judged, and inform that by existing 95598 systems the user has confirmed the repairing situation of fault; As neither the scheduled outage fault message neither be confirmed fault message, carry out next step.
Technique scheme two perfect: the described the 8th) in step, it is to carry out power supply point according to the actual geographic position of source device to review and form and review path that described power supply point is reviewed, then collect power supply point and review the circuit charging equipment on path, circuit charging equipment equipment is classified, combined, formed the list of circuit charging equipment.
Technique scheme two perfect: the described the 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, negative control device and low pressure ammeter box.
Technique scheme two perfect: the described the 10th) in step, describedly judge whether the adapted electric line exists line fault to comprise:
If 1. the outlet switch closure, judge it is the part line failure;
If 2. outlet switch disconnects, judgement is the whole piece line failure;
If 3. outlet switch and On line switch are all in closure state, judgement is that circuit does not break down but device fails.
Technique scheme two perfect: the described the 11st) in step, described definite fault type comprises:
A. report as the user transformers fault-free, determine that fault type is the low-voltage platform area fault;
B. report as user transformers has fault, but wireless upper switch and outlet switch fault report, determine that fault type is the distribution transforming fault;
C. report as user transformers has fault, and wired upper switch fault reports, determine that fault type is part line fault;
D. report as user transformers has fault, and have the outlet switch fault to report, determine that fault type is circuit fault completely;
E. report as the negative control of user device fault-free, determine that fault type is middle pressure client internal fault;
F. control device as negative as the user has fault to report, and wired upper switch fault reports, and determines that fault type is part line fault;
G. as the negative control of user device, there is fault to report, and have the outlet switch fault to report, determine that fault type is circuit fault completely.
Technique scheme two perfect: the described the 7th) in step, whether fault message screening module at first failure judgement information is the scheduled outage fault message generated, get rid of in this way this fault message and do not studied and judged, and inform and report the user for repairment by existing 95598 systems; If be not scheduled outage failure judgement information whether be confirmed fault message, get rid of in this way this fault message and do not studied and judged, and inform that by existing 95598 systems the user has confirmed the repairing situation of fault; As neither the scheduled outage fault message neither be confirmed fault message, carry out next step;
The described the 8th) in step, it is to carry out power supply point according to the actual geographic position of source device to review and form and review path that described power supply point is reviewed, then collect power supply point and review the circuit charging equipment on path, circuit charging equipment equipment is classified, combined, formed the list of circuit charging equipment;
The described the 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, negative control device and low pressure ammeter box;
The described the 10th) in step, if the outlet switch closure, judgement is the part line failure; If outlet switch disconnects, judgement is the whole piece line failure; If outlet switch and On line switch are all in closure state, judgement is that circuit does not break down but device fails;
The described the 11st) in step, described definite fault type comprises:
A. report as the user transformers fault-free, determine that fault type is the low-voltage platform area fault;
B. report as user transformers has fault, but wireless upper switch and outlet switch fault report, determine that fault type is the distribution transforming fault;
C. report as user transformers has fault, and wired upper switch fault reports, determine that fault type is part line fault;
D. report as user transformers has fault, and have the outlet switch fault to report, determine that fault type is circuit fault completely;
E. report as the negative control of user device fault-free, determine that fault type is middle pressure client internal fault;
F. control device as negative as the user has fault to report, and wired upper switch fault reports, and determines that fault type is part line fault;
G. as the negative control of user device, there is fault to report, and have the outlet switch fault to report, determine that fault type is circuit fault completely.
The invention has the beneficial effects as follows: 1) owing to arranging respectively in existing 95598 systems, power distribution automation management system and power information acquisition system, report fault message pushing module, line fault information pushing module for repairment and, with adopting the fault message pushing module, will be reported to the fault message that has 95598 systems, power distribution automation management system and power information acquisition system now initiatively to send the fault message receiver module to; Therefore realize the electric network fault information of existing various electrical network operation system channel collection is gathered and initiatively transmits; 2) fault message is studied and judged system and can be shifted to an earlier date automatically the very first time after receiving reporting fault information and study and judge, and obtain fault type, the position of fault and fault effects zone accurately, thereby for breakdown repair and management provide strong foundation, and then improve the efficiency of breakdown repair and administration of power networks; 3) the breakdown repair information transmission system that stops powering can initiatively directly affect user's propelling movement by power failure information and the information that restores electricity to having a power failure, and the user is known the very first time and stop power transmission information, is convenient to the user and carries out corresponding measure; 4) client can the short message service passage and optic fibre data channel inquiry power failure information and the information that restores electricity, and is convenient to carry out alternately with the client.
The accompanying drawing explanation
Below in conjunction with accompanying drawing, adapted electric network fault Intelligent Processing Platform of the present invention and method are described further.
Fig. 1 is the module rack composition of embodiment mono-adapted electric network fault Intelligent Processing Platform.
Fig. 2 is the flow chart of embodiment mono-adapted electric network fault intelligent processing method.
Fig. 3 is the module rack composition of embodiment bis-adapted electric network fault Intelligent Processing Platform.
Fig. 4 is the flow chart of embodiment bis-adapted electric network fault intelligent processing methods.
Embodiment
Embodiment mono-
The adapted electric network fault Intelligent Processing Platform of the present embodiment comprises that fault information acquisition system A, fault message study and judge system B and the breakdown repair information transmission system C that stops powering.
Fault information acquisition system A comprise be arranged at existing 95598 intrasystemly report fault message pushing module 1 for repairment, be arranged at the line fault information pushing module 2 in existing power distribution automation management system, the use be arranged in existing power information acquisition system is adopted fault message pushing module 3, fault message receiver module 4, fault message processing module 5 and fault message sending module 6.
Fault message is studied and judged system B and is comprised faulty equipment locating module 7, fault message screening module 8, line topological analysis module 9, equipment operation information analysis module 10, line switching analysis module 11, failure analysis module 12 and fault display module 13.
The breakdown repair information transmission system C that stops powering comprises breakdown repair allocation schedule module 14, scene rush to repair administration module 15, repairing information pushing module 16 and the information pushing module 17 of stopping powering.
Reporting fault message pushing module 1 for repairment reports fault message for repairment in order to the user that will be reported to existing 95598 systems and is pushed to fault message receiver module 4;
Line fault information pushing module 2 is pushed to fault message receiver module 4 in order to the switch changed position fault message that will be reported to power distribution automation management system (DMS);
With adopt fault message pushing module 3 in order to the distribution transforming that will be reported to power information acquisition system (CSM) and user malfunction information pushing to fault message receiver module 4;
Fault message receiver module 4 in order to receive and verification from reporting fault message pushing module 1, line fault information pushing module 2 for repairment and with the fault message of adopting 3 propelling movements of fault message pushing module;
Fault message processing module 5 is stored in order to the fault message that fault message receiver module 4 is received, according to the power network line topological structure from the low-voltage customer to the high-tension apparatus, carry out analytical integration with unified data model, then push to fault message sending module 6;
The fault message of fault message sending module 6 in order to fault message processing module 5 is processed, send out passage outward by information and be sent to described faulty equipment locating module, and it is generally LAN that information is sent out passage outward;
The fault message that faulty equipment locating module 7 sends for receiving fault message sending module 6, and obtain actual geographic position and the account information of the source device relevant to fault message by having power distribution management system (PMS) now;
Fault message screening module 8 is screened for the fault message to behind the equipment location, gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Line topological analysis module 9 carries out topological analysis for the adapted electric line under the fault message to filtering out, and obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
The equipment operation information is analyzed 10 modules and is carried out step by step the cls analysis of calling together of equipment operation information for the circuit charging equipment by the list of circuit charging equipment, and judges whether the circuit charging equipment exists fault;
Line switching analysis module 11 is for detection of the switch folding information of the On line switch on the adapted electric line and outlet switch, and judges whether the adapted electric line exists line fault;
Failure analysis module 12 is for determining fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure, fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module 14, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop powering information pushing module 17;
Breakdown repair allocation schedule module 14 is for determining repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects zone;
Scene rush to repair administration module 15 is for the repairing procedural information of monitoring and gather the repair personnel and the information that restores electricity;
Repairing information pushing module 16 pushes to fault display module 13 for rushing to repair procedural information, and the information pushing that will restore electricity is to the information pushing module 17 of stopping powering;
Fault display module 13 is for influence area and the repairing procedural information of the circuit charging equipment that has fault by existing adapted power grid GIS system demonstration and account information thereof, adapted electric line;
Stop powering information pushing module 17 for by existing 95598 systems, short message service passage and optic fibre data channel, fault outage information and the information that restores electricity being affected to user's propelling movement to having a power failure.
The adapted electric network fault intelligent processing method of the present embodiment, adopt above-mentioned adapted electric network fault Intelligent Processing Platform, and carry out following steps:
1) arrange and report fault message pushing module 1 for repairment in existing 95598 systems, set up existing 95598 systems and the Web service data-transmission channel that reports fault message pushing module 1 for repairment, the concrete user who pushes reports fault message for repairment and comprises: Customs Assigned Number, user's name, station address, contact method, fault content etc.
In existing power distribution automation management system, line fault information pushing module 2 is set, sets up the GPRS message information Transfer pipe (specifically utilizing the SIM card of the remote signalling displacement device that is arranged on switch to form GPRS message information Transfer pipe) of power distribution automation management system and line fault information pushing module 2; The fault message transmitted is mainly the displacement information that outlet switch is operated a switch and On line switch is isolated, and the concrete switching information transmitted comprises: the messages such as switch number, on off state, circuit number, affiliated plant stand, three-phase current, three-phase voltage.
Arrange with adopting fault message pushing module 3 in existing power information acquisition system, set up the power information acquisition system and use the Web service data-transmission channel of adopting fault message pushing module 3; The distribution transforming transmitted and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time etc.
2) reporting fault message pushing module 1 for repairment will be reported to the user of existing 95598 systems to report fault message for repairment to be pushed to fault message receiver module 4;
Line fault information pushing module 2 will be reported to the switch changed position fault message of existing power distribution automation management system (DMS) to be pushed to fault message receiver module 4;
With adopting fault message pushing module 3, will be reported to the distribution transforming of existing power information acquisition system (CSM) and user malfunction information pushing to fault message receiver module 4.
3) 4 receptions of fault message receiver module and verification are from reporting fault message pushing module 1, line fault information pushing module 2 for repairment and pushing with adopting fault message pushing module 3 the fault message of coming; Fault message receiver module 4 is when receiving fault information data, need carry out verification to the fault information data of separate sources, if the fault message of verification is abnormal data, for different fault information data source to fault information data propelling movement side (operation system separately) fed back; If the fault message of verification is normal data, to fault message processing module 5, push.
4) fault message processing module 5 will be stored through the fault message of 4 receptions of fault message receiver module and verification, according to the power network line topological structure from the low-voltage customer to the high-tension apparatus, carry out analytical integration with unified data model, then push to faulty equipment locating module 6;
Data storages is: to the fault message of the separate sources that receives, need to classify and be stored in the fault message table of type separately;
Analytical integration is: when data are carried out to analytical integration, the top-down arrangement of line topological structure according to mesolow, as: from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station's outlet switch information, analyzed, and set up the relation (for example can pass through user malfunction information inquiry distribution transforming fault message) can inquire about each other, by the result store that analyzes in the analysis result table.
5) fault message that fault message sending module 6 will be processed through fault message processing module 5 is sent out passage outside by information and is sent to the faulty equipment locating module, and information is sent out passage outward and generally adopted LAN.
6) faulty equipment locating module 7 receives the fault message that fault message sending module 6 sends, and by having actual geographic position and the account information of the source device that the power distribution management system acquisition is relevant to fault message now.
Concrete steps are: when described fault message is while being reported to existing 95598 system users to report fault message for repairment, according to the Customs Assigned Number reported for repairment, obtain low pressure ammeter box equipment that the user is associated or negative control device as source device by existing power distribution management system (PMS), and the unique coded query by low pressure ammeter box equipment or negative control device is to source device actual geographic coordinate information and account information.When described fault message is existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information, the distribution transforming obtained by existing power distribution management system according to asset of equipments numbering, switch and negative control device be as source device, and by distribution transforming, switch and the negative unique coded query of device of controlling to source device actual geographic coordinate information and account information.
7) fault message behind 8 pairs of source device location of fault message screening module is screened, and judges whether the fault message behind the source device location belongs to the scheduled outage fault message generated and confirmed fault message, gets rid of in this way, if not being carries out next step.
Concrete screening step is: whether fault message screening module at first failure judgement information is the scheduled outage fault message generated, and the scheduled outage fault message is got rid of this fault message and do not studied and judged in this way, and informs and report the user for repairment by existing 95598 systems; If be not the scheduled outage fault message failure judgement information whether be confirmed fault message, confirmed fault message is got rid of this fault message and is not is not studied and judged in this way, and informs that by existing 95598 systems the user has confirmed the repairing situation of fault; As neither the scheduled outage fault message neither be confirmed fault message, carry out next step.
8) the adapted electric line that line topological analysis module 9 is reviewed under the fault message to filtering out by power supply point is carried out topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure.
The concrete analysis step is: at first according to the actual geographic position of source device, carry out power supply point and review, form and review path (obtaining the topological structure of this adapted electric line); Then collect power supply point and review the circuit charging equipment on path, circuit charging equipment equipment is classified, combined, form the list of circuit charging equipment.
9) equipment operation information analysis module 10 carries out step by step operation information by the circuit charging equipment in the list of circuit charging equipment and calls cls analysis together, judge according to the equipment operation information analyzed whether the circuit charging equipment exists fault, carry out in this way next step, if be not that failure judgement information is user's internal fault information, finish to study and judge.
The concrete analysis step is: the outlet switch in the list of circuit charging equipment, On line switch, distribution transforming, negative control device, low pressure ammeter box (circuit charging equipment) are carried out step by step operation information and call survey together.If normal operation all in the said equipment, illustrate the fault repairing information that causes inside to break down to report due to client's self reason.
10) On line switch on line switching analysis module 11 detection adapted electric line and the switch folding information of outlet switch, judge whether the adapted electric line exists line fault.
Specifically judge whether the adapted electric line exists the step of line fault to comprise:
If 1. the outlet switch closure, judge it is the part line failure;
If 2. outlet switch disconnects, judgement is the whole piece line failure;
If 3. outlet switch and On line switch are all in closure state, judgement is that circuit does not break down but device fails.
11) failure analysis module 11 is determined fault type according to equipment operation information and switch folding information, determine the position of fault and fault effects zone according to topological structure, fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module 14, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop powering information pushing module 17.
Concrete steps are:
At first, according to the definite failure condition of analysis result of the said equipment operating analysis and switch folding information, further determine the particular type (fault type comprises low-voltage platform area fault, distribution transforming fault, middle pressure client's internal fault, part line fault and circuit fault completely) of fault; The detailed process of determining fault type comprises:
A. report as the user transformers fault-free, determine that fault type is the low-voltage platform area fault;
B. report as user transformers has fault, but wireless upper switch and outlet switch fault report, determine that fault type is the distribution transforming fault;
C. report as user transformers has fault, and wired upper switch fault reports, determine that fault type is part line fault;
D. report as user transformers has fault, and have the outlet switch fault to report, determine that fault type is circuit fault completely;
E. report as the negative control of user device fault-free, determine that fault type is middle pressure client internal fault;
F. control device as negative as the user has fault to report, and wired upper switch fault reports, and determines that fault type is part line fault;
G. as the negative control of user device, there is fault to report, and have the outlet switch fault to report, determine that fault type is circuit fault completely.
12) breakdown repair allocation schedule module 12, determine repairing teams and groups and scheduling recovery vehicle according to fault type, the position of fault and fault effects zone.
13) repair personnel's repairing procedural information and the information that restores electricity are monitored and gathered to scene rush to repair administration module 13.
14) repairing information pushing module 14, the repairing procedural information pushes to fault display module 12, and the information pushing that will restore electricity is to the information pushing module 17 of stopping powering.
15) fault display module 12 exists influence area and the repairing procedural information of the circuit charging equipment of fault and account information thereof, adapted electric line by existing adapted power grid GIS system demonstration;
16) the information pushing module 17 of stopping powering affect user's propelling movement by existing 95598 systems, short message service passage and optic fibre data channel by fault outage information and the information that restores electricity to having a power failure.
Embodiment bis-
Adapted electric network fault Intelligent Processing Platform and the embodiment mono-of the present embodiment are basic identical, and difference is: also comprise for by short message service passage and optic fibre data channel and user, carrying out interactive interactive module 18; Interaction refers to that the user sends code and the user number inquiry stops power transmission information. when code is power failure, interactive module 18 is according to user number inquiry client region power failure information and inform the client; When code, when restoring electricity, interactive module 4 is according to restore electricity information inform the user of user number inquiry client region.
Adapted electric network fault intelligent processing method and the embodiment mono-of the present embodiment are basic identical, and difference is:
1. increase execution step 17): interactive module 18 is carried out interaction by short message channel and optical-fibre channel and user; Interaction is that the user sends code and the user number inquiry stops power transmission information, and interactive module 4 also sends and informs the user according to user number inquiring user region power failure information and the information that restores electricity.
2. the 1st) in step, by set up IEB bus service data Transfer pipe between power distribution automation management system and line fault information pushing module 2, replace GPRS message information Transfer pipe.
3. the 7th) in step, scheduled outage information and confirmed fault message, do not need and inform and report the user for repairment by existing 95598 systems.
The present invention is not limited to above-described embodiment, within the technical scheme that all employings and the invention described above technical scheme are equal to replacement all drops on protection scope of the present invention.

Claims (5)

1. an adapted electric network fault Intelligent Processing Platform, it is characterized in that: comprise that fault information acquisition system, fault message are studied and judged system and breakdown repair stops the information transmission system of powering, described fault information acquisition system comprise be arranged at existing 95598 intrasystemly report the fault message pushing module for repairment, be arranged at the line fault information pushing module in existing power distribution automation management system, the use be arranged in existing power information acquisition system is adopted fault message pushing module, fault message receiver module, fault message processing module and fault message sending module; Described fault message is studied and judged system and is comprised faulty equipment locating module, fault message screening module, line topological analysis module, equipment operation information analysis module, line switching analysis module, failure analysis module and fault display module; The described breakdown repair information transmission system that stops powering comprises breakdown repair allocation schedule module, scene rush to repair administration module, repairing information pushing module and the information pushing module of stopping powering;
The described fault message pushing module that reports for repairment reports fault message for repairment in order to the user that will be reported to existing 95598 systems and is pushed to described fault message receiver module;
Described line fault information pushing module is pushed to described fault message receiver module in order to the switch changed position fault message that will be reported to the power distribution automation management system;
Described use adopt the fault message pushing module in order to the distribution transforming that will be reported to the power information acquisition system and user malfunction information pushing to described fault message receiver module;
Described fault message receiver module in order to receive and verification from reporting fault message pushing module, line fault information pushing module for repairment and with the fault message of adopting the propelling movement of fault message pushing module;
Described fault message processing module is stored in order to the fault message that described fault message receiver module is received, and according to the power network line topological structure, from the low-voltage customer to the high-tension apparatus, with unified data model, carries out analytical integration;
The fault message of described fault message sending module in order to the fault message processing module is processed, send out passage outward by information and be sent to described faulty equipment locating module;
The fault message that described faulty equipment locating module sends for receiving described fault message sending module, and by having actual geographic position and the account information of the source device that the power distribution management system acquisition is relevant to fault message now;
Described fault message screening module is screened for the fault message to behind the equipment location, gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Described line topological analysis module, for the adapted electric line under the fault message filtered out is carried out to topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
Described equipment operation information analysis module is used for the circuit charging equipment of circuit charging equipment list is carried out to the cls analysis of calling together of equipment operation information step by step, and judges whether the circuit charging equipment exists fault;
Described line switching analysis module is for detection of the switch folding information of the On line switch on the adapted electric line and outlet switch, and judges whether the adapted electric line exists line fault;
Described failure analysis module is for determining fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure, fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop powering the information pushing module;
Described breakdown repair allocation schedule module is for determining repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects zone;
Described scene rush to repair administration module is for the repairing procedural information of monitoring and gather the repair personnel and the information that restores electricity;
Described repairing information pushing module pushes to described fault display module for rushing to repair procedural information, and the information pushing that will restore electricity is to the information pushing module of stopping powering;
Described fault display module is for influence area and the repairing procedural information of the circuit charging equipment that has fault by existing adapted power grid GIS system demonstration and account information thereof, adapted electric line;
The described information pushing module of stopping powering is for affecting user's propelling movement by existing 95598 systems, short message service passage and optic fibre data channel by fault outage information and the information that restores electricity to having a power failure;
The described fault message pushing module that reports for repairment links by the Web service data-transmission channel with existing 95598 systems, described line fault information pushing module links by GPRS message information Transfer pipe or IEB bus service data Transfer pipe with existing power distribution automation management system, described use is adopted the fault message pushing module and is linked by the Web service data-transmission channel with existing power information acquisition system, described GPRS message information Transfer pipe is to utilize the SIM card of the remote signalling displacement device that is arranged on switch to form, and it is LAN that described information is sent out passage outward;
Described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering and acquisition time.
2. adapted electric network fault Intelligent Processing Platform according to claim 1 is characterized in that: also comprise for by short message service passage and optic fibre data channel and user, carrying out interactive interactive module; Described interaction is that the user sends code and the user number inquiry stops power transmission information, by interactive module, according to user number inquiring user region, is stopped power transmission information and send to inform the user.
3. according to the described adapted electric network fault of claim 1 or 2 Intelligent Processing Platform, it is characterized in that: described storage is that the fault message classification of the separate sources that will receive is stored in the fault message table of type separately; Described analytical integration is top-down arrangement of line topological structure according to mesolow, comprise from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station's outlet switch information and being analyzed, and set up the relation can inquire about each other, by the result store that analyzes in the analysis result table.
4. adapted electric network fault Intelligent Processing Platform according to claim 3, it is characterized in that: described fault message comprises the user's repairing information that is reported to existing 95598 systems, existing power information acquisition system reporting fault information and existing power distribution automation management system reporting fault information; Described fault type comprises low-voltage platform area fault, distribution transforming fault, middle pressure client's internal fault, part line fault and circuit fault completely.
5. adapted electric network fault Intelligent Processing Platform according to claim 4, it is characterized in that: when described fault message is while being reported to the user of existing 95598 systems to report fault message for repairment, described source device is to obtain by existing power distribution management system low pressure ammeter box equipment or the negative control device that the user is associated according to the Customs Assigned Number reported for repairment, and the actual geographic position of described source device and account information are to obtain by existing power distribution management system queries according to unique coding of low pressure ammeter box equipment or negative control device; When described fault message is existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information, described source device is distribution transforming, switch and the negative control device obtained by existing power distribution management system according to the asset of equipments numbering; The actual geographic position of described source device and account information are to obtain by existing power distribution management system queries according to unique coding of distribution transforming, switch and negative control device.
CN201310489657.4A 2011-12-04 2011-12-04 Intelligent power distribution network fault treatment platform Active CN103490521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310489657.4A CN103490521B (en) 2011-12-04 2011-12-04 Intelligent power distribution network fault treatment platform

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310489657.4A CN103490521B (en) 2011-12-04 2011-12-04 Intelligent power distribution network fault treatment platform
CN2011103967094A CN102570602B (en) 2011-12-04 2011-12-04 Fault comprehensive processing platform and method of distribution network

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN2011103967094A Division CN102570602B (en) 2011-12-04 2011-12-04 Fault comprehensive processing platform and method of distribution network

Publications (2)

Publication Number Publication Date
CN103490521A true CN103490521A (en) 2014-01-01
CN103490521B CN103490521B (en) 2015-09-30

Family

ID=46415309

Family Applications (5)

Application Number Title Priority Date Filing Date
CN2011103967094A Active CN102570602B (en) 2011-12-04 2011-12-04 Fault comprehensive processing platform and method of distribution network
CN201310489872.4A Active CN103516054B (en) 2011-12-04 2011-12-04 Power distribution network fault automatic processing method
CN201310489744.XA Active CN103501050B (en) 2011-12-04 2011-12-04 Power distribution network fault integrated treatment platform
CN201310489657.4A Active CN103490521B (en) 2011-12-04 2011-12-04 Intelligent power distribution network fault treatment platform
CN201310489820.7A Active CN103501051B (en) 2011-12-04 2011-12-04 Power distribution network fault processing platform

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN2011103967094A Active CN102570602B (en) 2011-12-04 2011-12-04 Fault comprehensive processing platform and method of distribution network
CN201310489872.4A Active CN103516054B (en) 2011-12-04 2011-12-04 Power distribution network fault automatic processing method
CN201310489744.XA Active CN103501050B (en) 2011-12-04 2011-12-04 Power distribution network fault integrated treatment platform

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201310489820.7A Active CN103501051B (en) 2011-12-04 2011-12-04 Power distribution network fault processing platform

Country Status (1)

Country Link
CN (5) CN102570602B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103501051A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling platform for power distribution and consumption network
CN103837796A (en) * 2014-03-12 2014-06-04 国家电网公司 Transmission line malfunction visualized report method and system based on Web and GIS
CN103915827A (en) * 2014-03-14 2014-07-09 国网山东省电力公司青岛供电公司 Power distribution network fault studying and judging method and system
CN104317821A (en) * 2014-09-29 2015-01-28 国家电网公司 Method for checking power failure information by using image technology
CN104933502A (en) * 2014-11-27 2015-09-23 国网山东省电力公司应急管理中心 Emergency intelligent unified communication scheduling system based on power grid GIS and scheduling method thereof
CN105259896A (en) * 2015-11-11 2016-01-20 国网山西省电力公司大同供电公司 Fault diagnosis method based on power scheduling data network
CN107766949A (en) * 2017-09-19 2018-03-06 河海大学 Failure rapid rush-repair commander's business information exchange method based on meta-model
CN109871965A (en) * 2019-01-21 2019-06-11 长沙理工大学 A kind of breakdown repair App platform of combination GIS and power customer fault location information
CN109934273A (en) * 2019-03-01 2019-06-25 长沙理工大学 It is a kind of based on the fault characteristic of DML-KNN algorithm and active damage repair technology draw a portrait new method
CN110738329A (en) * 2019-09-06 2020-01-31 国网浙江桐乡市供电有限公司 first-aid repair informing method based on cloud platform
CN111181245A (en) * 2020-01-07 2020-05-19 广东卓维网络有限公司 Intelligent power consumption management system

Families Citing this family (79)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490523B (en) * 2011-12-04 2015-05-13 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment system
CN103501053B (en) * 2011-12-04 2015-05-13 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network
CN103501052A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling method for power distribution and consumption network
CN103501054A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling method for power distribution network
CN104182815B (en) * 2012-10-22 2017-04-05 国网山东省电力公司青岛供电公司 A kind of power supply reliability acquisition methods and system
CN103869217A (en) * 2012-12-07 2014-06-18 国家电网公司 Method and device for power grid fault matching and analysis
CN103903184A (en) * 2012-12-24 2014-07-02 天津市电力公司 Method for processing information between power distribution network first-aid repair command platform and mobile terminal
CN103149548B (en) * 2013-01-31 2015-11-18 重庆市电力公司电力科学研究院 A kind of method for information display based on electric power meter and device
CN103268571B (en) * 2013-04-28 2016-08-24 北京臻迪科技股份有限公司 Status of electric power display packing and system
CN104219070B (en) * 2013-05-31 2017-11-17 华为技术有限公司 The method and Network Fault Detecting system of Network Fault Detecting
CN103279841B (en) * 2013-06-09 2016-12-28 广东电网公司佛山供电局 The method for pushing of a kind of power information and system
CN103427417B (en) * 2013-07-31 2015-10-14 国家电网公司 Based on the distribution network failure processing method of Multi-source Information Fusion
CN104091202A (en) * 2014-07-11 2014-10-08 国家电网公司 Power distribution network power supply capacity risk assessment method
CN104079075B (en) * 2014-07-24 2016-06-01 国网黑龙江省电力有限公司双鸭山供电公司 Dispatching automation novel maintenance terminal and its implementation
CN104218485A (en) * 2014-09-23 2014-12-17 国网河南省电力公司周口供电公司 Power grid quick rush-repair control system and using method thereof
CN104281979B (en) * 2014-09-26 2018-05-04 广东电网有限责任公司电力科学研究院 Distribution transformer platform area low voltage failure type detection method and system
CN104269926A (en) * 2014-09-30 2015-01-07 国家电网公司 Power utilization information comprehensive acquisition system for power supply guaranteeing platform
CN104362738B (en) * 2014-10-14 2016-12-07 深圳市三江电气有限公司 A kind of intelligence equipment for power transmission and distribution
CN104394020A (en) * 2014-12-04 2015-03-04 国家电网公司 Automatic fault processing and safety control system and method for power information collection device
CN104504513A (en) * 2014-12-17 2015-04-08 昆明能讯科技有限责任公司 Quick collection method for power grid line equipment based on configuration library
CN104678258B (en) * 2015-02-27 2017-08-01 国家电网公司 It is a kind of specially to become the method that information to distribution network failure actively study and judge based on public
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN104751305A (en) * 2015-04-28 2015-07-01 国网上海市电力公司 Trouble analysis and repair-based intelligent interaction system and control method thereof
CN105049223B (en) * 2015-05-29 2018-06-15 国家电网公司 A kind of power telecom network defect troubleshooting decision assistant analysis method
CN105025107A (en) * 2015-07-28 2015-11-04 国网北京市电力公司 Power failure information processing method, client and server
CN105207121A (en) * 2015-09-23 2015-12-30 国家电网公司 Power distribution network fault emergency maintenance method based on topology analysis
CN105048630A (en) * 2015-09-24 2015-11-11 国网天津武清供电有限公司 Intelligent scheduling control system and method based on data automatic analysis system
CN105277851A (en) * 2015-10-16 2016-01-27 国网甘肃省电力公司天水供电公司 Distribution network fault judgment searching and positioning system
CN105320113B (en) * 2015-10-19 2018-04-10 国家电网公司 The information interacting method of power network spatial Information Service platform and electrical power distribution automatization system
CN105303316A (en) * 2015-11-01 2016-02-03 国网山东省电力公司聊城供电公司 National power grid distribution network fault processing system
CN105509728A (en) * 2015-11-02 2016-04-20 湖南红太阳新能源科技有限公司 Photovoltaic power station failure equipment navigation method and system
CN105334839B (en) * 2015-12-16 2018-01-09 国家电网公司 10kV distribution net equipment management systems
CN105429144A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Information processing method and information processing device for emergency repairing of distribution network
CN105699760B (en) * 2016-01-22 2018-09-18 国网冀北电力有限公司电力科学研究院 The operating condition analysis method of electric energy measuring equipment and power information collecting device
CN105809373A (en) * 2016-04-27 2016-07-27 国网山东省电力公司济南市长清区供电公司 Distribution network fault information comprehensive collection and management platform
CN105700506B (en) * 2016-04-29 2018-02-06 南京信息职业技术学院 A kind of long-range transformer station temperature and humidity control system
CN105967063B (en) * 2016-05-16 2018-08-14 上海振华重工电气有限公司 Maintenance platform fault analysis process system and method
CN107516891B (en) * 2016-06-17 2022-06-03 中兴通讯股份有限公司 Power utilization control method, device and equipment for communication power supply
CN106302113A (en) * 2016-08-05 2017-01-04 海南电保姆科技有限公司 Feedback information treating method and apparatus
CN106291245A (en) * 2016-08-25 2017-01-04 国网山东省电力公司青岛供电公司 A kind of distribution network failure actively generates and sends repaiies method and apparatus
CN106230120B (en) * 2016-09-09 2017-10-13 国家电网公司 A kind of method of supplying power to
CN106355357B (en) * 2016-10-12 2021-04-30 深圳供电局有限公司 Power distribution network fault processing method and information processing system
CN106841908A (en) * 2016-12-19 2017-06-13 国电南瑞科技股份有限公司 The visual presentation method of the distribution network failure positioning based on power grid GIS
CN106815373B (en) * 2017-02-10 2020-04-03 国网山东省电力公司 Distribution network first-aid repair big data display method and system based on BI analysis
CN106814286B (en) * 2017-02-10 2019-12-31 国网山东省电力公司 Power distribution network fault positioning system, method and server based on multi-element fault acquisition
CN106872856B (en) * 2017-03-01 2019-12-24 国网山东省电力公司 Power distribution network fault active first-aid repair system and method based on multi-element fault collection
CN106960283A (en) * 2017-03-27 2017-07-18 国网山东省电力公司夏津县供电公司 Special transformer acquisition terminal fault handling method, device and system
CN107171436B (en) * 2017-05-08 2020-02-28 国网山东省电力公司烟台供电公司 Monitoring device capable of automatically screening information and analyzing accidents and monitoring method thereof
CN106980071B (en) * 2017-05-16 2019-12-06 国网山东省电力公司 Visual first-aid repair system based on power grid GIS and working method thereof
CN106990328B (en) * 2017-05-16 2019-12-31 国网山东省电力公司 Distribution network emergency repair abnormal data analysis and fault positioning system and method
CN107167704B (en) * 2017-05-16 2019-12-31 国网山东省电力公司 Power distribution network fault diagnosis system and method based on CIM model
CN107147215A (en) * 2017-05-16 2017-09-08 国网山东省电力公司 The Distribution Fault Location System and method of combined circuit overload data analysis
CN107730397A (en) * 2017-09-20 2018-02-23 国网天津市电力公司 A kind of energy coordination approach for ensureing the low-voltage region quality of power supply
CN107765123B (en) * 2017-10-19 2019-10-25 中领世能(天津)科技有限公司 Detected rule update method and Electrical Safety monitor system
CN108107318B (en) * 2017-11-03 2020-08-11 国网北京市电力公司 User fault positioning method and device
CN108460468A (en) * 2018-01-23 2018-08-28 国网江西省电力有限公司电力科学研究院 It is a kind of public to become failure event management method and device
CN108512223B (en) * 2018-04-11 2020-07-03 江苏电力信息技术有限公司 Intelligent auxiliary studying and judging method for switching tripping of substation in power transmission and transformation operation and detection control platform
CN108734381A (en) * 2018-04-11 2018-11-02 国网山东省电力公司 A kind of outage information collaborative management method, apparatus and system
CN108539736B (en) * 2018-04-26 2021-07-16 广东电网有限责任公司广州供电局 Power failure event analysis method and system based on multi-source data and computer equipment
CN108539856A (en) * 2018-04-28 2018-09-14 国网河南省电力公司周口供电公司 Power distribution network complete perception operation monitoring power distribution rush-repair system
CN108875975A (en) * 2018-06-27 2018-11-23 国网甘肃省电力公司金昌供电公司 A kind of excellent dress system of wisdom precisely informed based on client's outage information
CN109460833B (en) * 2018-10-22 2021-11-09 国家电网有限公司 Method and system for processing equipment data and repair work order data of distribution network fault
CN109193946B (en) * 2018-10-22 2022-04-22 国家电网有限公司 Urgent repair information release system for power consumer
CN109447284B (en) * 2018-10-22 2021-11-12 国家电网有限公司 Distribution network fault information sending method and system for power supply service command platform
CN109523038A (en) * 2018-10-30 2019-03-26 深圳供电局有限公司 A kind of gridding outage analysis method and system
CN109814000A (en) * 2019-01-30 2019-05-28 国家电网有限公司 A kind of control system and its application method for power grid rapid rush-repair
CN111931511A (en) * 2019-04-26 2020-11-13 中国电力科学研究院有限公司 Semantic analysis method and system based on wide-area distributed architecture
CN110441655B (en) * 2019-08-08 2022-08-12 中广核玉溪元江风力发电有限公司 Lightning grounding fault monitoring system for wind power plant current collecting line
CN110648482B (en) * 2019-09-30 2021-07-06 武汉理工光科股份有限公司 Distributed vibration optical cable positioning method and system based on long-distance oil and gas pipeline GIS
CN111262344A (en) * 2020-03-30 2020-06-09 佛山科学技术学院 Power grid monitoring emergency system
CN111579917A (en) * 2020-04-08 2020-08-25 广西电网有限责任公司北海供电局 Low-voltage distribution network fault positioning system and method
CN112070243A (en) * 2020-07-08 2020-12-11 国网浙江杭州市富阳区供电有限公司 Multi-channel automatic pushing method for power grid fault information
CN112101707A (en) * 2020-07-31 2020-12-18 广东卓维网络有限公司 Power utilization emergency management system
CN112769231B (en) * 2020-12-24 2022-10-11 深圳供电局有限公司 Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN113447882B (en) * 2021-06-01 2022-09-09 国网河北省电力有限公司营销服务中心 Fault processing method based on electric energy meter, server and terminal
CN114021999A (en) * 2021-11-09 2022-02-08 国网山东省电力公司信息通信公司 Full scene power grid dispatching exchange network management and control system and method
CN114336551A (en) * 2022-01-14 2022-04-12 贵州大学 Flexible direct current transmission system fault protection system based on MMC
CN115575765B (en) * 2022-10-31 2023-06-30 国网浙江省电力有限公司金华供电公司 Ground fault section selection analysis system based on distribution automation four-region data
CN116111591B (en) * 2023-04-12 2023-07-04 广东电网有限责任公司佛山供电局 Distribution network line rapid power restoration capability analysis method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
EP2388883A1 (en) * 2009-01-13 2011-11-23 Hitachi, Ltd. Power demand-supply management server and power demand-supply management system
CN102570602A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Fault comprehensive processing platform and method of distribution network
CN103490523A (en) * 2011-12-04 2014-01-01 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment system
CN103501053A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951027B (en) * 2010-09-01 2014-01-15 中国电力科学研究院 Uniform data acquisition and monitoring system of low-medium voltage power distribution network
CN103490522A (en) * 2011-12-04 2014-01-01 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment method
CN103501052A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling method for power distribution and consumption network
CN202475009U (en) * 2011-12-04 2012-10-03 江苏省电力公司南京供电公司 Comprehensive processing system of failure of power distribution and supply grid
CN103490520B (en) * 2011-12-04 2015-05-13 江苏省电力公司南京供电公司 Power distribution network fault treatment method
CN103501054A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling method for power distribution network

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2388883A1 (en) * 2009-01-13 2011-11-23 Hitachi, Ltd. Power demand-supply management server and power demand-supply management system
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN102570602A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Fault comprehensive processing platform and method of distribution network
CN103490523A (en) * 2011-12-04 2014-01-01 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment system
CN103501050A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling platform for power distribution and consumption network
CN103501051A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling platform for power distribution and consumption network
CN103501053A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103501050B (en) * 2011-12-04 2016-01-27 江苏省电力公司南京供电公司 Power distribution network fault integrated treatment platform
CN103501050A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling platform for power distribution and consumption network
CN103501051A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling platform for power distribution and consumption network
CN103501051B (en) * 2011-12-04 2015-09-16 江苏省电力公司南京供电公司 Power distribution network fault processing platform
CN103837796A (en) * 2014-03-12 2014-06-04 国家电网公司 Transmission line malfunction visualized report method and system based on Web and GIS
CN103837796B (en) * 2014-03-12 2016-09-07 国家电网公司 The transmission line malfunction visualization report method of a kind of sing on web and GIS and system
CN103915827A (en) * 2014-03-14 2014-07-09 国网山东省电力公司青岛供电公司 Power distribution network fault studying and judging method and system
CN103915827B (en) * 2014-03-14 2016-08-24 国网山东省电力公司青岛供电公司 Power distribution network fault analysis method and study and judge system
CN104317821A (en) * 2014-09-29 2015-01-28 国家电网公司 Method for checking power failure information by using image technology
CN104933502A (en) * 2014-11-27 2015-09-23 国网山东省电力公司应急管理中心 Emergency intelligent unified communication scheduling system based on power grid GIS and scheduling method thereof
CN105259896A (en) * 2015-11-11 2016-01-20 国网山西省电力公司大同供电公司 Fault diagnosis method based on power scheduling data network
CN105259896B (en) * 2015-11-11 2018-03-20 国网山西省电力公司大同供电公司 A kind of method for diagnosing faults based on power dispatch data network
CN107766949A (en) * 2017-09-19 2018-03-06 河海大学 Failure rapid rush-repair commander's business information exchange method based on meta-model
CN109871965A (en) * 2019-01-21 2019-06-11 长沙理工大学 A kind of breakdown repair App platform of combination GIS and power customer fault location information
CN109934273A (en) * 2019-03-01 2019-06-25 长沙理工大学 It is a kind of based on the fault characteristic of DML-KNN algorithm and active damage repair technology draw a portrait new method
CN110738329A (en) * 2019-09-06 2020-01-31 国网浙江桐乡市供电有限公司 first-aid repair informing method based on cloud platform
CN111181245A (en) * 2020-01-07 2020-05-19 广东卓维网络有限公司 Intelligent power consumption management system

Also Published As

Publication number Publication date
CN103516054B (en) 2015-09-16
CN103501050B (en) 2016-01-27
CN103501051B (en) 2015-09-16
CN103490521B (en) 2015-09-30
CN102570602A (en) 2012-07-11
CN103501050A (en) 2014-01-08
CN102570602B (en) 2013-10-30
CN103501051A (en) 2014-01-08
CN103516054A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN102570602B (en) Fault comprehensive processing platform and method of distribution network
CN103490520B (en) Power distribution network fault treatment method
CN103490523B (en) Intelligent power distribution network fault treatment system
CN103490522A (en) Intelligent power distribution network fault treatment method
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN103501054A (en) Fault handling method for power distribution network
CN103501052A (en) Comprehensive fault handling method for power distribution and consumption network
CN103501053B (en) Comprehensive fault handling system for power distribution and consumption network
CN109995145B (en) Low-voltage distribution network fault active study and judgment method based on intelligent distribution transformer terminal
CN102565572B (en) Platform and method for judging fault of match power grid
CN106990328B (en) Distribution network emergency repair abnormal data analysis and fault positioning system and method
CN103679556B (en) The intelligent diagnosing method of distribution transformer terminals power failure alarm
CN109460833B (en) Method and system for processing equipment data and repair work order data of distribution network fault
CN109459664A (en) A kind of detection of distribution network failure and positioning analysis system
CN104091231A (en) Distribution network fault repairing commanding and processing system and method
CN110658415B (en) Low-voltage distribution line fault detection method and system
CN107767067A (en) Power distribution network management and running evaluation index system construction method based on big data
CN102407867A (en) Urban rail transit signal maintenance supporting system
CN110609209A (en) Active sensing method for power loss of distribution room based on Internet of things
CN109447284B (en) Distribution network fault information sending method and system for power supply service command platform
CN102497017B (en) Power grid failure information comprehensive collection platform and collection method
CN101826756A (en) System and method for realizing fault positioning of power distributing substation equipment
CN110568275B (en) Open-phase fault studying and judging method and system based on public and private power distribution network variable data
CN109472476A (en) A kind of power failure identifying and analyzing method and system
CN103325019A (en) Event-driven power grid fault information judgment method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Kai

Inventor after: Zhu Hong

Inventor after: Zhang Wenjun

Inventor before: Wang Hailin

Inventor before: Xu Haiqing

Inventor before: Chen Kai

Inventor before: Xu Aihua

Inventor before: Zhang Wenjun

Inventor before: Zhu Hong

Inventor before: Wu Wenshu

Inventor before: Wei Lei

CB03 Change of inventor or designer information
COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG HAILIN XU HAIQING CHEN KAI XU AIHUA ZHANG WENJUN ZHU HONG WU WENSHU WEI LEI TO: CHEN KAI ZHU HONG ZHANG WENJUN

C14 Grant of patent or utility model
GR01 Patent grant