CN105334839B - 10kV distribution net equipment management systems - Google Patents
10kV distribution net equipment management systems Download PDFInfo
- Publication number
- CN105334839B CN105334839B CN201510936858.3A CN201510936858A CN105334839B CN 105334839 B CN105334839 B CN 105334839B CN 201510936858 A CN201510936858 A CN 201510936858A CN 105334839 B CN105334839 B CN 105334839B
- Authority
- CN
- China
- Prior art keywords
- module
- management
- control module
- failure
- distribution net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 19
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims abstract description 4
- 239000010931 gold Substances 0.000 claims abstract description 4
- 229910052737 gold Inorganic materials 0.000 claims abstract description 4
- 239000012212 insulator Substances 0.000 claims abstract description 4
- 230000004888 barrier function Effects 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000013139 quantization Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Debugging And Monitoring (AREA)
- Manufacturing & Machinery (AREA)
- Water Supply & Treatment (AREA)
- Automation & Control Theory (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Telephonic Communication Services (AREA)
Abstract
10kV distribution net equipments management system of the present invention, belong to the technical field of equipment management system;The technical problem of solution is:A kind of monitored in real time to equipment fault progress and with the higher distribution net equipment management system of reliability is provided;The technical scheme used for:10kV distribution net equipment management systems, including status information of equipment acquisition module, failure input module, data processing module, main control module and Back Administration Module, the status information of equipment acquisition module and failure input module are connected with data processing module, the data processing module and Back Administration Module are connected with main control module, the main control module includes failure modes module, failure management and control module and failure quantify refinement module, the failure management and control module includes pole guy management and control module, cross-arm gold utensil insulator management module, lead channels management and control module and transformer management and control module;Suitable for power system.
Description
Technical field
10kV distribution net equipments management system of the present invention, belong to the technical field of equipment management system.
Background technology
In face of the numerous tripping operation of 10kV equipment and power-off fault, so write wearing ten four principles Article 4 of bright management:
Most of defects are as caused by system:In most cases, 94% the problem of be the problem of system causes in itself, however,
The problem of people generally being caused in itself by system, is attributed to staff, it is believed that defect is as caused by staff, is one
Individual universal management mistake, and first reaction of the manager for managing accident is self-criticism system responsibility, rather than for employee
Or case is in itself, therefore we need to look for problem from management source, and at present, the distribution of 10kV distributions transmission line of electricity is wide, overhead transmission line
It is long, outdoor operation is chronically at again, is subjected to the influence of surrounding environment and Environmental variations, is often tripped in operation
With power-off fault, the quality and Distribution Network Reliability for having a strong impact on distribution net equipment operation are powered, and production and life to the people are brought
Certain harm.
The content of the invention
The present invention overcomes the shortcomings of the prior art, and technical problem to be solved is:There is provided a kind of to equipment fault
Monitor in real time and with the higher distribution net equipment management system of reliability.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:10kV distribution net equipment management systems, including
Status information of equipment acquisition module, failure input module, data processing module, main control module and Back Administration Module, it is described to set
Standby status information capture module and failure input module are connected with data processing module, and the data processing module and backstage are managed
Reason module is connected with main control module, and the main control module includes failure modes module, failure management and control module and failure and quantified carefully
Change module, the failure management and control module includes pole guy management and control module, cross-arm gold utensil insulator management module, lead channels pipe
Control module and transformer management and control module.
The Back Administration Module is also connected with alarm module, and the alarm module includes SMS alarm, pop-up window report
Alert and log alarming.
The main control module is also connected with data memory module.
The Back Administration Module is connected by third party's interface with other systems.
The present invention has the advantages that compared with prior art:
1st, 10kV distribution net equipments management system of the present invention, status information of equipment acquisition module, failure input module, number are passed through
According to processing module, main control module and Back Administration Module, device fault information enters data processing mould by failure input module
Block, is transferred to main control module after data processing module is handled, and main control module passes through failure modes module, failure management and control module
Quantify that related data information is transferred into Back Administration Module after refinement module is handled with failure, staff can be promoted to work
In place, reduce because of tripping operation, failure, the reason such as reprocess and have a power failure the loss that brings, realize and equipment fault is monitored in real time, tool
There are higher practicality, reliability.
2nd, alarm module of the present invention includes SMS alarm, pop-up window is alarmed and log alarming, staff pass through three kinds
Type of alarm can determine whether the seriousness of failure, facilitate staff to carry out timely processing failure.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings;
Fig. 1 is the structural representation of the present invention;
In figure:1 is status information of equipment acquisition module, and 2 be failure input module, and 3 be data processing module, and 4 be master control
Module, 5 be Back Administration Module, and 6 be failure modes module, and 7 be failure management and control module, and 8 be that failure quantifies refinement module, and 9 are
Alarm module, 10 be data memory module.
Embodiment
As shown in figure 1,10kV distribution net equipment management systems, including status information of equipment acquisition module 1, failure input module
2nd, data processing module 3, main control module 4 and Back Administration Module 5, the status information of equipment acquisition module 1 and failure input
Module 2 is connected with data processing module 3, and the data processing module 3 and Back Administration Module 5 are connected with main control module 4,
The main control module 4 includes failure modes module 6, failure management and control module 7 and failure and quantifies refinement module 8.
The failure management and control module 7 includes pole guy management and control module, cross-arm gold utensil insulator management module, lead channels
Management and control module and transformer management and control module, the result that total failure is analyzed is matched among modules, by system clause and
Administrative provisions match each node of flow, realize the refinement of work, quantization, operableization, executableization.
The Back Administration Module 5 is also connected with alarm module 9, and the alarm module 9 includes SMS alarm, pop-up window
Alarm and log alarming, staff the seriousness of failure is can determine whether by three kinds of type of alarms, facilitate staff carry out and
When handling failure.
The main control module 4 is also connected with data memory module 10, and data memory module 10 can be by the phase of equipment fault
Close data to be stored, facilitate staff to the collecting of data, search.
The Back Administration Module 5 is connected by third party's interface with other systems, by being connected with other systems, makes this
System can monitor the other information in addition to fault message.
Specifically, device fault information enters data processing module 3 by failure input module 2, by data processing mould
Main control module 4 is transferred to after the processing of block 3, main control module 4 quantifies thin by failure modes module 6, failure management and control module 7 and failure
Change after module 8 is handled and related data information be transferred to Back Administration Module 5, can promote staff's work in place, reduce
Because of tripping operation, failure, the reason such as reprocess and have a power failure the loss that brings, realize and equipment fault is monitored in real time, with higher
Practicality, reliability.
10kV distribution net equipments management system of the present invention, pass through status information of equipment acquisition module, failure input module, data
Processing module, main control module and Back Administration Module, equipment fault can be monitored in real time, have prominent substance special
Point and significant progress;Embodiments of the invention are explained in detail above in conjunction with accompanying drawing, but the present invention is not limited to
Embodiment is stated, can also be before present inventive concept not be departed from those of ordinary skill in the art's possessed knowledge
Put that various changes can be made.
Claims (4)
1.10kV distribution net equipment management systems, it is characterised in that:Including status information of equipment acquisition module(1), failure input mould
Block(2), data processing module(3), main control module(4)And Back Administration Module(5), the status information of equipment acquisition module
(1)With failure input module(2)And data processing module(3)It is connected;The data processing module(3)And Back Administration Module
(5)And main control module(4)It is connected;The main control module(4)Including failure modes module(6), failure management and control module(7)And therefore
Barrier quantifies refinement module(8);The failure management and control module(7)Including pole guy management and control module, cross-arm gold utensil insulator management
Module, lead channels management and control module and transformer management and control module.
2. 10kV distribution net equipments management system according to claim 1, it is characterised in that:The Back Administration Module(5)
Also with alarm module(9)It is connected, the alarm module(9)Including SMS alarm, pop-up window alarm and log alarming.
3. 10kV distribution net equipments management system according to claim 1, it is characterised in that:The main control module(4)Also with
Data memory module(10)It is connected.
4. 10kV distribution net equipments management system according to claim 1, it is characterised in that:The Back Administration Module(5)
It is connected by third party's interface with other systems.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510936858.3A CN105334839B (en) | 2015-12-16 | 2015-12-16 | 10kV distribution net equipment management systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510936858.3A CN105334839B (en) | 2015-12-16 | 2015-12-16 | 10kV distribution net equipment management systems |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105334839A CN105334839A (en) | 2016-02-17 |
CN105334839B true CN105334839B (en) | 2018-01-09 |
Family
ID=55285447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510936858.3A Active CN105334839B (en) | 2015-12-16 | 2015-12-16 | 10kV distribution net equipment management systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105334839B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106685075B (en) * | 2016-10-28 | 2019-09-27 | 江西电力职业技术学院 | Power supply trouble monitoring method and device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102570602A (en) * | 2011-12-04 | 2012-07-11 | 江苏省电力公司南京供电公司 | Fault comprehensive processing platform and method of distribution network |
CN102646230A (en) * | 2012-02-27 | 2012-08-22 | 广东电网公司深圳供电局 | Information system for realizing fast power restoration management of power distribution network faults |
CN102737286A (en) * | 2012-04-23 | 2012-10-17 | 中国电力科学研究院 | Online risk analysis system and method for regional power grid |
CN103679556A (en) * | 2013-12-16 | 2014-03-26 | 广东电网公司佛山供电局 | System and method for intelligently diagnosing distribution transform terminal power failure warning |
CN104125094A (en) * | 2014-06-12 | 2014-10-29 | 国家电网公司 | System and method for processing communication network faults of State Grid Corporation of China |
CN104766185A (en) * | 2015-05-06 | 2015-07-08 | 国网山东省电力公司 | Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics |
CN204667452U (en) * | 2015-04-01 | 2015-09-23 | 国家电网公司 | One descends pressure management area control system electrically |
-
2015
- 2015-12-16 CN CN201510936858.3A patent/CN105334839B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102570602A (en) * | 2011-12-04 | 2012-07-11 | 江苏省电力公司南京供电公司 | Fault comprehensive processing platform and method of distribution network |
CN102646230A (en) * | 2012-02-27 | 2012-08-22 | 广东电网公司深圳供电局 | Information system for realizing fast power restoration management of power distribution network faults |
CN102737286A (en) * | 2012-04-23 | 2012-10-17 | 中国电力科学研究院 | Online risk analysis system and method for regional power grid |
CN103679556A (en) * | 2013-12-16 | 2014-03-26 | 广东电网公司佛山供电局 | System and method for intelligently diagnosing distribution transform terminal power failure warning |
CN104125094A (en) * | 2014-06-12 | 2014-10-29 | 国家电网公司 | System and method for processing communication network faults of State Grid Corporation of China |
CN204667452U (en) * | 2015-04-01 | 2015-09-23 | 国家电网公司 | One descends pressure management area control system electrically |
CN104766185A (en) * | 2015-05-06 | 2015-07-08 | 国网山东省电力公司 | Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics |
Also Published As
Publication number | Publication date |
---|---|
CN105334839A (en) | 2016-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202331693U (en) | Online monitoring and sound-light expelling platform of substation security system | |
CN104038373B (en) | information early warning and self-repairing system and method | |
CN208027111U (en) | Intelligent early-warning control system for data center machine room | |
CN107943670A (en) | A kind of ups power equipment monitoring system | |
CN105373055B (en) | A kind of unit fault monitoring method, device and air-conditioning system | |
CN101976889A (en) | Substation video and environment monitoring terminal system | |
CN104317237A (en) | Machine room power environmental monitoring system | |
CN209311894U (en) | A kind of real-time road construction Supervision system based on cloud | |
CN105334839B (en) | 10kV distribution net equipment management systems | |
CN107609788A (en) | A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme | |
CN102201927A (en) | Alarm information processing method and device | |
CN205941681U (en) | ESD's direct current voltage detecting system in field of gas transmission station | |
CN107896002A (en) | 10kV feeder loads monitor active alarm system | |
CN104869012B (en) | System and method are monitored based on dispatching of power netwoks phone comprehensive warning | |
CN104410158B (en) | Load-control tripping circuit monitoring terminal | |
CN103219803A (en) | Switch cabinet monitoring system | |
CN202257805U (en) | Remote acoustooptical alarm system for transformer station | |
CN205581610U (en) | Centralized monitoring system of communication computer lab | |
CN108599366A (en) | Power grid real-time monitoring system | |
CN209015353U (en) | A kind of anti-external force destruction automatic warning device of electric transmission line channel | |
Li et al. | Remote inspection technology of transformer substation based on sensing technology and linkage control | |
CN202455125U (en) | System for polling and monitoring data center distributed power supply equipment | |
CN202197149U (en) | Transformer station safety early warning system | |
CN103312029B (en) | Data center distributed power device inspecting and monitoring system and method | |
CN202363973U (en) | Transformer station secondary equipment intensive management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |