CN209311894U - A kind of real-time road construction Supervision system based on cloud - Google Patents

A kind of real-time road construction Supervision system based on cloud Download PDF

Info

Publication number
CN209311894U
CN209311894U CN201822045171.2U CN201822045171U CN209311894U CN 209311894 U CN209311894 U CN 209311894U CN 201822045171 U CN201822045171 U CN 201822045171U CN 209311894 U CN209311894 U CN 209311894U
Authority
CN
China
Prior art keywords
alarm
real
cloud
sensor
electrically connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822045171.2U
Other languages
Chinese (zh)
Inventor
施建波
马晶
肖海榕
王纯国
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Branch Construction Project Management Co Ltd
Original Assignee
Jiangsu Branch Construction Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Branch Construction Project Management Co Ltd filed Critical Jiangsu Branch Construction Project Management Co Ltd
Priority to CN201822045171.2U priority Critical patent/CN209311894U/en
Application granted granted Critical
Publication of CN209311894U publication Critical patent/CN209311894U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The real-time road construction Supervision system based on cloud that the utility model discloses a kind of, its structure includes automatic dialing system and equipment monitoring system, a kind of real-time road construction Supervision system based on cloud of the utility model, its advantages are, to solve not carrying out being rapidly performed by alarm when there is accident, the problem of leading to the time for influencing to rescue, by being provided with automatic dialing system, when there is fire behavior in alarm monitor detection construction site, when the events such as flood, alarm monitor is sent to inside wireless communication module by wireless signal, wireless communication module transfers data to inside cloud processing terminal, cloud processing terminal handles data, it is alarmed by one key alarm module of wireless controller, positioning system obtains electric position to accident simultaneously, then fire alarm is dialed by automatic dialing system and first-aid centre carries out Alarm, having reached can carry out being rapidly performed by alarm when there is accident, increase the beneficial effect of the time of rescue.

Description

A kind of real-time road construction Supervision system based on cloud
Technical field
The utility model relates to tele-control system technical fields, and in particular to a kind of real-time road construction based on cloud Supervision system.
Background technique
With the fast development and Organic Renewal of urban construction and public infrastructure development, the scale of construction industry is not yet Disconnected to expand, the importance of safety in production is more prominent, and construction site is the multiple place of a safety accident, each building constructor Either developer usually can have many construction sites in an area or the whole nation, and the scattered distribution in these building sites is difficult to have Enough manpowers and energy frequently go to site supervision and inspection, thus management is upper highly difficult, eventually leads to projects safety Quality cannot effectively ensure that further, the article for being stored in construction site for a long time is more, and the personnel's situation for entering and leaving building site is multiple It is miscellaneous, the phenomenon that material is stolen frequent occurrence, finished product/semi-finished product are destroyed, loss is brought to enterprise, also, due to technically Management is insufficient, and concrete mixer truck overload, overspeed violation operation phenomenon are serious, and operational safety accident frequently occurs, engineering construction Scale constantly expands, process flow numerous and complicated, how to carry out field management, the control accident occurrence frequency in construction site, and one Directly construction enterprises, government administration section focus of attention, currently, some construction sites using monitoring system to condition of construction into Row monitoring, so that more convenient and quicker learns field condition, still, existing building site monitoring means are single, only there is scene to draw Face monitoring function, and comprehensive security monitoring and alarm can not be carried out, it can not also carry out remotely controlling alarm and emergency shutdown Processing, existing monitoring device also can not carry out remote supervisory to worker's attendance and construction speed, and therefore, effect has Limit, with the rapid development of science and technology, the real-time road construction Supervision system based on cloud has also obtained technological improvement, still The prior art can not carry out being rapidly performed by alarm when there is accident, lead to the time for influencing to rescue, cannot be to construction equipment Working condition detected in real time, cause cannot timely construction equipment repair and the generation that causes the accident.
Utility model content
(1) technical problems to be solved
In order to overcome the shortage of prior art, it is proposed that a kind of real-time road construction Supervision system based on cloud, to solve The prior art can not carry out being rapidly performed by alarm when there is accident, lead to the time for influencing to rescue, cannot be to construction equipment Working condition detected in real time, cause cannot timely construction equipment repairs and the generation that causes the accident is asked Topic, having reached can carry out being rapidly performed by alarm when there is accident, increase the time of rescue, can be to the work of construction equipment Make situation to be detected in real time, so that timely construction equipment repairs and reduce the beneficial effect of the generation of accident.
(2) technical solution
The utility model is achieved through the following technical solutions: the utility model proposes a kind of real-time road based on cloud Construction Supervision system, including safety monitoring system, real-time monitoring system, alarm control system, positioning system, cloud processing terminal, Wireless communication module, internet cloud platform, data-storage system, data query system, a key alarm module, alarm monitor, Stop controller, real-time road construction site equipment, automatic dialing system and equipment monitoring system, the safety monitoring system, institute It states safety monitoring system to be electrically connected with cloud processing terminal, the cloud processing terminal is wirelessly connected with wireless communication module It connects, the cloud processing terminal is wirelessly connected with wireless communication module, and the real-time monitoring system and cloud processing terminal carry out Electrical connection, the wireless communication module are wirelessly connected with internet cloud platform, and the equipment monitoring system and cloud processing are eventually End is electrically connected, and the internet cloud platform is wirelessly connected with data-storage system, the data query system and mutually Networking cloud platform is wirelessly connected, and the alarm control system is electrically connected with alarm monitor, the alarm monitor It is electrically connected with wireless communication module, the wireless communication module is wirelessly connected with cloud processing terminal, the cloud processing Terminal is wirelessly connected with a key alarm module, and the key alarm module is wirelessly connected with positioning system, described fixed Position system is wirelessly connected with automatic dialing system, and the cloud processing terminal is electrically connected with stop controller, described to stop Machine controller is electrically connected with real-time road construction site equipment.
Further, the safety monitoring system includes smoke sensor device, liquid level sensor, sensor noise, wind-force biography Sensor, temperature sensor and humidity sensor, and smoke sensor device, liquid level sensor, sensor noise, wind sensor, Temperature sensor and humidity sensor are electrically connected with safety monitoring system output end, be conducive to smog, liquid level, noise, Wind-force, temperature, humidity are detected.
Further, the real-time monitoring system includes that holographic real-time scape information capture subsystem, monitor and face are beaten Card system, and monitor and face punch card system pass through holographic real-time scape information capture subsystem and real-time monitoring system is defeated Outlet is electrically connected, and is monitored in real time conducive to road construction.
Further, the alarm control system includes smoke alarm, water level alarm, noise alarm, strong wind report Alert device, high temperature alarm and high humidity alarm, and smoke alarm, water level alarm, noise alarm, gale alarm, High temperature alarm and high humidity alarm are electrically connected with alarm control system output end, are conducive to issue staff and be warned Report, handles staff timely.
Further, the positioning system includes Beidou positioning module and GPS positioning module, and Beidou positioning module and GPS positioning module is electrically connected with positioning system output end, conducive to being positioned, enables maintenance personnel quickly to out Thing place is positioned.
Further, the equipment monitoring system includes current sensor and voltage sensor, and current sensor and Voltage sensor is electrically connected with equipment monitoring system, is detected conducive to the working condition to construction equipment.
Further, the current sensor is ADF100 series, and inductive effects are excellent, and long service life.
Further, the voltage sensor is CV3 series, and detection effect is excellent.
Further, the smoke sensor device is JTY-GD-CA2001 series, is consumed energy low.
Three) beneficial effect
The utility model compared with the existing technology, has the advantages that
1), to solve the problem of that can not carry out being rapidly performed by alarm when there is accident leads to the time for influencing to rescue, By being provided with automatic dialing system, when there are the events such as fire behavior, flood in alarm monitor detection construction site, alarm monitor It is sent to inside wireless communication module by wireless signal, wireless communication module transfers data to inside cloud processing terminal, cloud Processing terminal handles data, is alarmed by one key alarm module of wireless controller, while positioning system is to accident It electric must be positioned, fire alarm is then dialed by automatic dialing system and first-aid centre alarms, having reached can occur It carries out being rapidly performed by alarm when accident, increases the beneficial effect of the time of rescue.
2), the working condition of construction equipment must not be detected in real time for solution, causing timely to construct sets It the problem of standby generation for repairing and causing the accident, by being provided with equipment monitoring system, is installed on construction equipment first Upper current sensor and voltage sensor, current sensor can experience the information of tested electric current, and can will test and experience Information is for conversion into the information output of the electric signal or other required forms that meet certain standard needs, voltage according to certain rules Sensor can make tracking acquisition to the AC and DC voltage signal of high speed variation, make frequency spectrum for more complicated voltage waveform Analysis, the data next acquired carry out data processing by cloud processing terminal and compare to normal value, thus to construction Equipment is detected, reached can the working condition to construction equipment detected in real time, thus timely construction equipment Repair and reduce the beneficial effect of the generation of accident.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the real-time road construction Supervision system arrangement schematic diagram based on cloud of the utility model.
In figure: safety monitoring system -1, real-time monitoring system -2, alarm control system -3, positioning system -4, automatic dialing System -5, equipment monitoring system -6, cloud processing terminal -7, wireless communication module -8, internet cloud platform -9, data storage system System -10, data query system -11, a key alarm module -12, alarm monitor -13, stop controller -14, the construction of real-time road Field device -15.
Specific embodiment
In the technical program:
Automatic dialing system 5 and equipment monitoring system 6 are that the utility model contains the innovative component of essence.
It is safety monitoring system 1, real-time monitoring system 2, alarm control system 3, positioning system 4, cloud processing terminal 7, wireless Communication module 8, internet cloud platform 9, data-storage system 10, data query system 11, a key alarm module 12, alarm monitoring Device 13, stop controller 14 and real-time road construction site equipment 15 are the realization essential connection of technical solutions of the utility model Property component.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Fig. 1 and Fig. 2 are please referred to, the utility model provides a kind of real-time road construction Supervision system based on cloud: including Safety monitoring system 1, real-time monitoring system 2, alarm control system 3, positioning system 4, cloud processing terminal 7, wireless communication module 8, internet cloud platform 9, data-storage system 10, data query system 11, a key alarm module 12, alarm monitor 13, stop Machine controller 14, real-time road construction site equipment 15, automatic dialing system 5 and equipment monitoring system 6, safety monitoring system 1, peace Full monitoring system 1 is electrically connected with cloud processing terminal 7, and cloud processing terminal 7 is wirelessly connected with wireless communication module 8, cloud Processing terminal 7 is wirelessly connected with wireless communication module 8, and real-time monitoring system 2 is electrically connected with cloud processing terminal 7, nothing Line communication module 8 is wirelessly connected with internet cloud platform 9, and equipment monitoring system 6 is electrically connected with cloud processing terminal 7, Internet cloud platform 9 is wirelessly connected with data-storage system 10, and data query system 11 and internet cloud platform 9 carry out nothing Line connection, alarm control system 3 are electrically connected with alarm monitor 13, and alarm monitor 13 and wireless communication module 8 carry out Electrical connection, wireless communication module 8 are wirelessly connected with cloud processing terminal 7, and cloud processing terminal 7 and a key alarm module 12 carry out It is wirelessly connected, a key alarm module 12 is wirelessly connected with positioning system 4, and positioning system 4 and automatic dialing system 5 carry out nothing Line connection, cloud processing terminal 7 are electrically connected with stop controller 14, stop controller 14 and real-time road construction site equipment 15 It is electrically connected.
Wherein, the safety monitoring system 1 includes smoke sensor device, liquid level sensor, sensor noise, wind-force sensing Device, temperature sensor and humidity sensor, and smoke sensor device, liquid level sensor, sensor noise, wind sensor, temperature Degree sensor and humidity sensor are electrically connected with 1 output end of safety monitoring system, are conducive to smog, liquid level, noise, wind Power, temperature, humidity are detected.
Wherein, the real-time monitoring system 2 includes that holographic real-time scape information capture subsystem, monitor and face check card and be System, and monitor and face punch card system pass through holographic real-time scape information capture subsystem and real-time monitoring system 2 exports End is electrically connected, and is monitored in real time conducive to road construction.
Wherein, the alarm control system 3 includes smoke alarm, water level alarm, noise alarm, strong wind alarming Device, high temperature alarm and high humidity alarm, and smoke alarm, water level alarm, noise alarm, gale alarm, height Warm alarm and high humidity alarm are electrically connected with 3 output end of alarm control system, are sounded an alarm conducive to staff, Handle staff timely.
Wherein, the positioning system 4 includes Beidou positioning module and GPS positioning module, and Beidou positioning module and GPS Locating module is electrically connected with 4 output end of positioning system, conducive to being positioned, enables maintenance personnel quickly to meeting accident Place is positioned.
Wherein, the equipment monitoring system 6 includes current sensor and voltage sensor, and current sensor and voltage Sensor is electrically connected with equipment monitoring system 6, is detected conducive to the working condition to construction equipment.
Wherein, the current sensor is ADF100 series, and inductive effects are excellent, and long service life.
Wherein, the voltage sensor is CV3 series, and detection effect is excellent.
Wherein, the smoke sensor device is JTY-GD-CA2001 series, is consumed energy low.
Wireless communication module 8 described in this patent be widely used in vehicle monitoring, remote control, telemetering, small wireless network, Radio meter register, access control system, cell call, industrial data acquisition system, wireless tag, identification, non-contact RF smart card, Micro radio data terminal, fire safety system, wireless remote-control system, biological signal collecting, hydrometeorology monitoring, robot control In the fields such as system, wireless 232 data communication, wireless 485/422 data communication, digital audio, Digital Image Transmission.
Working principle: safety monitoring system 1 is electrically connected with smoke alarm, water level alarm, noise alarm, strong wind report Alert device, high temperature alarm and high humidity alarm, the data that safety monitoring system 1 detects are carried out at data by cloud processing terminal 7 After reason, module 8 is sent on internet cloud platform 9 following cloud processing terminal 7 by wireless communication;Meanwhile working as alarm monitoring When there are the events such as fire behavior, flood in the detection of device 13 construction site, alarm monitor 13 is sent to radio communication mold by wireless signal Inside block 8, wireless communication module 8 is transferred data to inside cloud processing terminal 7, and cloud processing terminal 7 handles data, is led to One key alarm module 12 of wireless controller is crossed to alarm, at the same positioning system 4 to accident obtain it is electric position, then by from It is dynamic to dial that system 5 dials Fire alarm 119 and first-aid centre 120 alarms, reached can be carried out when there is accident it is quick It alarms, increases the beneficial effect of the time of rescue;Real-time monitoring system 2 include holographic real-time scape information capture subsystem, Monitor and face punch card system, the output end of construction speed monitor and the output end of face punch card system are electrically connected to nothing Line communication module 8, the camera of real-time monitoring system 2 can be monitored the construction speed of construction site, feelings of turning out for work to worker Condition is recorded, and this two item data is transferred to construction speed monitor and face punch card system, the output of monitor respectively End and face punch card system are finally transferred to cloud processing terminal 7, realize the remote supervisory of progress monitoring and worker's attendance;Exist first Current sensor and voltage sensor are installed on construction equipment, current sensor can experience the information of tested electric current, and energy It will test the information experienced, be for conversion into the electric signal or other required forms for meeting certain standard needs according to certain rules Information output, voltage sensor can make tracking acquisition to the AC and DC voltage signal of high speed variation, for more complicated electricity Corrugating makees spectrum analysis, and the data next acquired carry out data processing by cloud processing terminal 7 and carry out pair to normal value Than, to be detected to construction equipment, reached can the working condition to construction equipment detected in real time, thus and When construction equipment repair and reduce the beneficial effect of the generation of accident;The data that last internet cloud platform 9 will summarize It is delivered to inside data-storage system 10 and data query system 11, is inquired for operator.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. a kind of real-time road construction Supervision system based on cloud, including safety monitoring system (1), real-time monitoring system (2), Alarm control system (3), positioning system (4), cloud processing terminal (7), wireless communication module (8), internet cloud platform (9), number According to storage system (10), data query system (11), a key alarm module (12), alarm monitor (13), stop controller (14) and real-time road construction site equipment (15), it is characterised in that: further include automatic dialing system (5) and equipment monitoring system (6), the safety monitoring system (1), the safety monitoring system (1) is electrically connected with cloud processing terminal (7), at the cloud Reason terminal (7) is wirelessly connected with wireless communication module (8), and the cloud processing terminal (7) and wireless communication module (8) carry out Be wirelessly connected, the real-time monitoring system (2) is electrically connected with cloud processing terminal (7), the wireless communication module (8) with it is mutual Networking cloud platform (9) is wirelessly connected, and the equipment monitoring system (6) is electrically connected with cloud processing terminal (7), described mutual Networking cloud platform (9) is wirelessly connected with data-storage system (10), and the data query system (11) and internet cloud are flat Platform (9) is wirelessly connected, and the alarm control system (3) is electrically connected with alarm monitor (13), the alarm monitoring Device (13) is electrically connected with wireless communication module (8), and the wireless communication module (8) and cloud processing terminal (7) carry out wirelessly Connection, the cloud processing terminal (7) is wirelessly connected with a key alarm module (12), the key alarm module (12) with calmly Position system (4) is wirelessly connected, and the positioning system (4) is wirelessly connected with automatic dialing system (5), the cloud processing Terminal (7) is electrically connected with stop controller (14), the stop controller (14) and real-time road construction site equipment (15) It is electrically connected.
2. a kind of real-time road construction Supervision system based on cloud according to claim 1, it is characterised in that: the peace Full monitoring system (1) includes smoke sensor device, liquid level sensor, sensor noise, wind sensor, temperature sensor and humidity Sensor, and smoke sensor device, liquid level sensor, sensor noise, wind sensor, temperature sensor and humidity sensor It is electrically connected with safety monitoring system (1) output end.
3. a kind of real-time road construction Supervision system based on cloud according to claim 1, it is characterised in that: the reality When monitoring system (2) include holographic real-time scape information capture subsystem, monitor and face punch card system, and monitor and people Face punch card system passes through holographic real-time scape information capture subsystem and is electrically connected with real-time monitoring system (2) output end.
4. a kind of real-time road construction Supervision system based on cloud according to claim 1, it is characterised in that: the report Alert control system (3) include smoke alarm, water level alarm, noise alarm, gale alarm, high temperature alarm and high humidity Alarm, and smoke alarm, water level alarm, noise alarm, gale alarm, high temperature alarm and high humidity alarm It is electrically connected with alarm control system (3) output end.
5. a kind of real-time road construction Supervision system based on cloud according to claim 1, it is characterised in that: described fixed Position system (4) includes Beidou positioning module and GPS positioning module, and Beidou positioning module and GPS positioning module with positioning System (4) output end is electrically connected.
6. a kind of real-time road construction Supervision system based on cloud according to claim 1, it is characterised in that: described to set Standby monitoring system (6) include current sensor and voltage sensor, and current sensor and voltage sensor are and Supervision Examining system (6) is electrically connected.
CN201822045171.2U 2018-12-06 2018-12-06 A kind of real-time road construction Supervision system based on cloud Active CN209311894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822045171.2U CN209311894U (en) 2018-12-06 2018-12-06 A kind of real-time road construction Supervision system based on cloud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822045171.2U CN209311894U (en) 2018-12-06 2018-12-06 A kind of real-time road construction Supervision system based on cloud

Publications (1)

Publication Number Publication Date
CN209311894U true CN209311894U (en) 2019-08-27

Family

ID=67675956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822045171.2U Active CN209311894U (en) 2018-12-06 2018-12-06 A kind of real-time road construction Supervision system based on cloud

Country Status (1)

Country Link
CN (1) CN209311894U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112367371A (en) * 2020-10-27 2021-02-12 武汉聚信同创科技有限公司 Automation equipment monitoring system based on mobile phone control
CN113858194A (en) * 2021-09-18 2021-12-31 中铁建设集团有限公司 A other robot that stands for job site auxiliary management
CN115424408A (en) * 2022-09-05 2022-12-02 广东电网有限责任公司 Site operation safety control early warning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112367371A (en) * 2020-10-27 2021-02-12 武汉聚信同创科技有限公司 Automation equipment monitoring system based on mobile phone control
CN113858194A (en) * 2021-09-18 2021-12-31 中铁建设集团有限公司 A other robot that stands for job site auxiliary management
CN115424408A (en) * 2022-09-05 2022-12-02 广东电网有限责任公司 Site operation safety control early warning device

Similar Documents

Publication Publication Date Title
CN103823433B (en) Method for realizing relay protection equipment on-line monitoring by use of communication process analysis
CN107831712A (en) Transformer station's remote supervision system
CN209311894U (en) A kind of real-time road construction Supervision system based on cloud
CN103970098B (en) Intelligent substation auxiliary system comprehensive monitoring platform
CN104502753A (en) Networked on-line real-time analysis system for electric power fault recording device and application of system
CN108470386A (en) A kind of cable run intelligent inspection system based on GPS and cloud platform
CN110535238A (en) A kind of transformer equipment intelligent monitor system and method
CN105376534A (en) Integrated electric power information communication monitoring platform based on wireless transmission technology
CN103376784A (en) Intelligent remote transformer substation monitoring system
CN106781594A (en) Data signal acquisition and processing system
CN103560590B (en) Electric network intelligent scheduling framework and its implementation
CN105898898A (en) Information monitoring system based on wireless sensor network
CN107918366A (en) A kind of method for safety monitoring and system based on Internet of Things
CN105785946A (en) Machine room environment control integrated monitoring platform
CN103592929A (en) Internet of Things system for monitoring and managing fire water supply
CN205846861U (en) A kind of 500 kv substation communication equipment intelligence regular visit systems
CN206363539U (en) Traffic signal light fault early warning system
CN205427566U (en) Long -range basic station monitor system based on internet
CN107340747A (en) A kind of concrete mixer intelligent remote monitoring system
CN103048976A (en) Security management and control command system
CN111131519A (en) Intelligent operation and maintenance cloud platform for transformer substation
CN109341757A (en) A kind of the intelligent detecting prewarning system and its application method of information system operation data
CN205622325U (en) Remote intelligent power dispatching automation equipment examine monitoring system
CN205983124U (en) Comprehensive supervision system
CN205179109U (en) Shield tunnel construction numeral management platform that becomes more meticulous based on thing networking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant