CN103490520B - Power distribution network fault treatment method - Google Patents

Power distribution network fault treatment method Download PDF

Info

Publication number
CN103490520B
CN103490520B CN201310489560.3A CN201310489560A CN103490520B CN 103490520 B CN103490520 B CN 103490520B CN 201310489560 A CN201310489560 A CN 201310489560A CN 103490520 B CN103490520 B CN 103490520B
Authority
CN
China
Prior art keywords
fault
information
module
message
fault message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310489560.3A
Other languages
Chinese (zh)
Other versions
CN103490520A (en
Inventor
王春宁
徐荆州
韦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN HIGH-TECH Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical JIANGSU SUYUAN HIGH-TECH Co Ltd
Priority to CN201310489560.3A priority Critical patent/CN103490520B/en
Publication of CN103490520A publication Critical patent/CN103490520A/en
Application granted granted Critical
Publication of CN103490520B publication Critical patent/CN103490520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a power distribution network fault treatment method and belongs to the technical field of power network management. A platform comprises a fault information acquisition system, a fault information study and judgment system and a fault clearing and power failure/supply information push system. The method is characterized by acquiring information of faults requested to be cleared, line faults and consumption acquisition faults in an existing 95598 system, a distribution automation management system and a power consumption information acquisition system, after receiving and verifying the information, carrying out equipment locating, fault information screening, line topology analysis, equipment operation information analysis and line switch analysis to determine and display the fault types, places and areas of influence in an existing GIS (geographic information system), guiding fault clearing according to the determined fault results and simultaneously pushing the power failure information and power restoration information to users. The platform and the method can be used for achieving centralized acquisition and advanced automatic study and judgment of existing various fault information, can be used for actively pushing the power failure and power restoration information to the users and can interact with the users.

Description

Power distribution network fault treatment method
The application is denomination of invention: power distribution network fault integrated treatment platform and processing method, and application number is: 201110396709.4, and the applying date is: the division of the application for a patent for invention on December 4th, 2011.
Technical field
The present invention relates to one and gather electric network fault information by all kinds of means, automatic anticipation is carried out to fault message, and anticipation result is pushed to repairing and user, and with the processing platform of user interaction and processing method, belong to technical field of power grid management.
Background technology
Existing electrical network automated management system does not form integrated treatment to electric network fault, to the collection of fault message, the process that judges, notify each links such as user and commander's breakdown repair is all isolated, lack contact each other, and result can not form interaction with user.Concrete manifestation is as follows:
1, the collection of fault message is single isolated
Existing electric network fault information gathering has existing 95598 systems to report for repairment to report, user's intelligent electric meter fault reports, distribution transforming acquisition terminal fault reports, circuit On line switch fault reports, the mode of the channel acquisitions such as transformer station's outlet switch fault reports, but the fault message that these channels obtain is all be stored in separately in respective operation system, the fault message reported for repairment as existing 95598 systems is stored in existing 95598 systems, for another example the failed storage that reports of user's intelligent electric meter is in power information acquisition system (CSM), the fault message that and for example circuit On line switch and transformer station's outlet switch report is stored in power distribution automation management system (DMS).As can be seen here, the channel that existing various electrical network operation system gathers fault message is isolated (being battalion separately), the information of various channel collection lacks unified access road, not contact between the fault message that various channel gathers, therefore existing electrical network various automation operation system can not share the fault message that various channel gathers simultaneously, thus can not meet the requirement comprehensively analyzed electric network fault information and utilize.
2, early stage anticipation is automatically lacked for fault message
For a long time, when power matching network breaks down, enter scene rush to repair after fault reports before, can not analyze for fault message and accurate localizing faults source and relevant device information, the confirmation after the description of user and repair personnel to scene can only be depended on, namely can not accurately judge in time the type of fault, the scope etc. of impact.Bring thus, during power failure repairing, accurate localizing faults source and relevant device information, Obtaining Accurate fault type and coverage exist delayed, depend on the confirmation after repair personnel to scene, thus the scheduling of the progress of impact repairing and repairing resource.
3, fault message and repairing recovery situation cannot push to user side
For a long time, user can only pass through TV, newpapers and periodicals and Network Capture outage information, but the limitation of traditional media making client often cannot grasp outage information in time because ignoring, more can not grasp electric network fault outage information and expectation in real time and to restore electricity temporal information.Although existing 95598 systems of existing electrical network itself possess inquiry and the issuing function of fault outage information, but the contact staff of existing 95598 systems does not normally initiatively issue fault outage information to user, just just inform user when user condescends to inquire, existing 95598 systems can not inform that user malfunction power failure repairing progress and expectation restore electricity temporal information.In addition during scene rush to repair, repair personnel at the scene can not with breakdown repair system real-time, interactive, repairing work can not effectively be supervised.
Summary of the invention
The first technical problem that the present invention will solve is: the full-automatic integrated treatment platform and the processing method that propose a kind of current collection net fault information acquisition, study and judge, push integration.
The second technical problem that the present invention will solve is: on the basis solving above-mentioned first technical problem, proposes a kind ofly to carry out the interactive full-automatic integrated treatment platform of adapted electrical network and method with user.
In order to solve above-mentioned first technical problem, one of technical scheme that the present invention proposes is: a kind of power distribution network fault integrated treatment platform, comprise fault information acquisition system, fault message studies and judges system and breakdown repair stops information transmission system of powering, described fault information acquisition system comprises and is arranged at existing 95598 and intrasystemly reports fault message pushing module for repairment, be arranged at the line fault info push module in existing power distribution automation management system, be arranged in existing power information acquisition system with adopting fault message pushing module, fault message receiver module, faulted-phase judgment module and fault message sending module, described fault message is studied and judged system and is comprised faulty equipment locating module, fault message screening module, line topological analysis module, equipment operation information analysis module, line switching analysis module, failure analysis module and fault display module, described breakdown repair stops power supply information transmission system and comprises breakdown repair allocation schedule module, scene rush to repair administration module, repairing info push module and stop info push module of powering,
The described fault message pushing module that reports for repairment is in order to be pushed to described fault message receiver module by being reported to the user of existing 95598 systems to report fault message for repairment;
Described line fault info push module is in order to being reported to the switch changed position fault message of power distribution automation management system (DMS) to be pushed to described fault message receiver module;
Described with adopting fault message pushing module in order to the distribution transforming of power information acquisition system (CSM) and user malfunction information pushing will be reported to described fault message receiver module;
Described fault message receiver module is in order to receive and to verify from reporting fault message pushing module, line fault info push module for repairment and pushing with adopting fault message pushing module the fault message of coming;
Described faulted-phase judgment module stores in order to the fault message received by described fault message receiver module, according to power network line topological structure from low-voltage customer to high-tension apparatus, carries out analytical integration with unified data model;
Described fault message sending module, in order to the fault message by faulted-phase judgment resume module, is sent to described faulty equipment locating module by information outgoing passage;
The fault message that described faulty equipment locating module sends for receiving described fault message sending module, and the actual geographic position and the account information that are obtained the source device relevant to fault message by existing power distribution management system (PMS);
Described fault message screening module is used for the fault message after to equipment location and screens, and gets rid of the scheduled outage fault message and confirmed fault message that have generated;
Described line topological analysis module is used for carrying out topological analysis to the adapted electric line belonging to the fault message filtered out, and obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
What described equipment operation information analysis module was used for the circuit charging equipment in the list of circuit charging equipment to carry out step by step equipment operation information calls cls analysis together, and judges whether circuit charging equipment exists fault;
Described line switching analysis module for detecting the switch folding information of On line switch in adapted electric line and outlet switch, and judges whether adapted electric line exists line fault;
Described failure analysis module is used for according to equipment operation information, switch folding information and topological structure determination fault type, the position of fault and fault effects region, fault type, the position of fault and fault effects region are pushed to breakdown repair allocation schedule module, according to fault type, the position of fault and fault effects Area generation fault outage information and push to stop power info push module;
Described breakdown repair allocation schedule module is used for repairing teams and groups and the scheduling recovery vehicle of determining fault according to fault type, the position of fault and fault effects region;
Described scene rush to repair administration module is for monitoring and gathering the repairing procedural information of repair personnel and the information that restores electricity;
Described repairing info push module is used for repairing procedural information to push to fault display module, and the information pushing that will restore electricity is to stopping info push module of powering;
Described fault display module is used for there is the circuit charging equipment of fault and account information thereof, the influence area of adapted electric line and repairing procedural information by existing adapted power grid GIS system demonstration;
The described power supply info push module that stops pushes for fault outage information and the information that restores electricity being affected user to power failure by existing 95598 systems, short message service passage and optic fibre data channel.
In order to solve above-mentioned first technical problem, two of the technical scheme that the present invention proposes is: a kind of power distribution network fault treatment method, adopts above-mentioned power distribution network fault integrated treatment platform, and perform following steps:
1) in existing 95598 systems, fault message pushing module is reported in setting for repairment, sets up existing 95598 systems and the Web service data-transmission channel reporting fault message pushing module for repairment;
Line fault info push module is set in existing power distribution automation management system, sets up GPRS message information Transfer pipe or the IEB bus service data Transfer pipe of power distribution automation management system and line fault info push module;
Arrange with adopting fault message pushing module in existing power information acquisition system, set up power information acquisition system with the Web service data-transmission channel adopting fault message pushing module;
2) report fault message pushing module for repairment and be pushed to fault message receiver module by being reported to the user of existing 95598 systems to report fault message for repairment;
Line fault info push module is pushed to fault message receiver module by being reported to the switch changed position fault message of existing power distribution automation management system;
To the distribution transforming of existing power information acquisition system and user malfunction information pushing be reported to fault message receiver module with adopting fault message pushing module;
3) fault message receiver module receives and verifies from reporting fault message pushing module, line fault info push module for repairment and pushing with adopting fault message pushing module the fault message of coming;
4) fault message receiving through fault message receiver module and verify stores by faulted-phase judgment module, according to power network line topological structure from low-voltage customer to high-tension apparatus, carries out analytical integration with unified data model;
5) fault message through faulted-phase judgment resume module is sent to faulty equipment locating module by information outgoing passage by fault message sending module;
6) faulty equipment locating module receives the fault message that fault message sending module sends, and obtains actual geographic position and the account information of the source device relevant to fault message by existing power distribution management system;
7) fault message screening module is screened the fault message behind source device location, judge whether the fault message behind source device location belongs to the scheduled outage fault message and confirmed fault message that have generated, then getting rid of in this way, if not being, carrying out next step;
8) line topological analysis module is reviewed by power supply point and is carried out topological analysis to the adapted electric line belonging to the fault message filtered out, and obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
9) the circuit charging equipment in the list of circuit charging equipment is carried out equipment operation information and calls cls analysis together by equipment operation information analysis module step by step, judge whether circuit charging equipment exists fault according to the equipment operation information analyzed, then carry out next step in this way, if not being, failure judgement information is user's internal fault information, terminates to study and judge;
10) On line switch in line switching analysis module detection adapted electric line and the switch folding information of outlet switch, judge whether adapted electric line exists line fault;
11) failure analysis module is according to described equipment operation information and switch folding information determination fault type, the position of fault and fault effects region is determined according to described topological structure, fault type, the position of fault and fault effects region are pushed to breakdown repair allocation schedule module, according to fault type, the position of fault and fault effects Area generation fault outage information and push to stop power info push module;
12) breakdown repair allocation schedule module determines repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects region;
13) scene rush to repair administration module is monitored and is gathered the repairing procedural information of repair personnel and the information that restores electricity;
14) rush to repair info push module and repairing procedural information is pushed to fault display module, and the information pushing that will restore electricity is to stopping info push module of powering;
15) there is the circuit charging equipment of fault and account information thereof, the influence area of adapted electric line and repairing procedural information by existing adapted power grid GIS system demonstration in fault display module;
16) stop power supply info push module, by existing 95598 systems, short message service passage and optic fibre data channel, fault outage information and the information that restores electricity are affected user's propelling movement to power failure.
In order to solve above-mentioned second technical problem, the improvement of the present invention to one of technique scheme is: also comprise for carrying out interactive interactive module by short message service passage and optic fibre data channel and user, described interaction is that user sends code and user number inquiry stops power transmission information, is stopped power transmission information and send to inform user according to user number inquiring user region by interactive module.
In order to solve above-mentioned second technical problem, the improvement of the present invention to technique scheme two is: adopt the technical scheme improved to increase execution the 17th in the lump) step: interactive module carries out interaction by short message service passage and optic fibre data channel and user; Described interaction be user send code and user number inquiry stop power transmission information, by interactive module according to user number inquiring user region outage information and restore electricity information and send inform user.
One of technique scheme perfect: described in report fault message pushing module for repairment and linked by Web service data-transmission channel with existing 95598 systems, described line fault info push module is linked by GPRS message information Transfer pipe or IEB bus service data Transfer pipe with existing power distribution automation management system, describedly to be linked by Web service data-transmission channel with existing power information acquisition system with adopting fault message pushing module, described GPRS message information Transfer pipe utilizes the SIM card being arranged on the remote signalling displacement device of switch to form, described information outgoing passage is LAN.
One of technique scheme perfect: described storage is stored in the fault message table of respective type by the classification of the fault message of the separate sources received; Described analytical integration arranges according to the wire topologies of mesolow is top-down, comprise and analyzing from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station outlet switch information, and set up the relation can inquired about each other, the result analyzed is stored in analysis result table.
One of technique scheme perfect: described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and defect content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
One of technique scheme perfect: described fault message comprises the user's repairing information being reported to existing 95598 systems, existing power information acquisition system (CSM) reporting fault information and existing power distribution automation management system (DMS) reporting fault information; Described fault type comprises low-voltage platform area fault, distribution transforming fault, middle pressure client internal fault, part line fault and circuit fault completely.
One of technique scheme perfect: when described fault message is when being reported to the user of existing 95598 systems to report fault message for repairment, described source device obtains by existing power distribution management system the low pressure ammeter box equipment or load-control equipment that user is associated according to the Customs Assigned Number that reports for repairment, and described source device actual geographic coordinate information and account information are obtained by existing power distribution management system queries according to the unique encodings of low pressure ammeter box equipment or load-control equipment; When described fault message be existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information time, described source device be obtained by existing power distribution management system according to asset of equipments numbering distribution transforming, switch and load-control equipment; Described source device actual geographic coordinate information and account information are obtained by existing power distribution management system queries according to the unique encodings of source distribution transforming, switch and load-control equipment.
One of technique scheme perfect: described controller switching equipment comprises circuit, switch, distribution transformer and Middle Voltage, and described power failure affects equipment and comprises low-voltage meter box and Middle Voltage.
Technique scheme two perfect: the 3rd) in step, if the fault message of verification is abnormal data, feed back to fault message propelling movement side for different fault messages source; If the fault message of verification is normal data, push to faulted-phase judgment module;
Technique scheme two perfect: the 4th) in step, described storage is stored in the fault message table of respective type by the classification of the fault message of the separate sources received; Described analytical integration arranges according to the wire topologies of mesolow is top-down, comprise and analyzing from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station outlet switch information, and set up the relation can inquired about each other, the result analyzed is stored in analysis result table.
Technique scheme two perfect: described GPRS message information Transfer pipe utilizes the SIM card being arranged on the remote signalling displacement device of switch to form; Described information outgoing passage is LAN; Described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and defect content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
Improving of technique scheme two one is: the described 6th) in step, when described fault message is when being reported to the user of existing 95598 systems to report fault message for repairment, according to the Customs Assigned Number reported for repairment, obtain low pressure ammeter box equipment or load-control equipment that user is associated as source device by existing power distribution management system (PMS), and inquire source device actual geographic coordinate information and account information by the unique encodings of low pressure ammeter box equipment or load-control equipment.
Improving of technique scheme two two is: the described 6th) in step, when described fault message be existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information time, obtain distribution transforming, switch and load-control equipment as source device according to asset of equipments numbering by existing power distribution management system, and inquire source device actual geographic coordinate information and account information by the unique encodings of distribution transforming, switch and load-control equipment.
Technique scheme two perfect: the described 7th) in step, whether fault message screening module first failure judgement information is the scheduled outage fault message generated, then get rid of this fault message in this way not study and judge, and informed by existing 95598 systems and report user for repairment; If be not scheduled outage then failure judgement information whether be confirmed fault message, then get rid of this fault message in this way and do not study and judge, and inform that user has confirmed the repairing situation of fault by existing 95598 systems; As neither scheduled outage fault message neither confirm fault message, then carry out next step.
Technique scheme two perfect: the described 8th) in step, it is carry out power supply point according to the actual geographic position of source device to review and formed and review path that described power supply point is reviewed, then collection power supply point reviews the circuit charging equipment on path, circuit charging equipment equipment is carried out classifying, combining, forms the list of circuit charging equipment.
Technique scheme two perfect: the described 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, load-control equipment and low pressure ammeter box.
Technique scheme two perfect: the described 10th) in step, describedly judge whether adapted electric line exists line fault and comprise:
If 1. outlet switch closes, then judge it is part line failure;
If 2. outlet switch disconnects, then judge it is whole piece line failure;
If 3. outlet switch and On line switch are all in closure state, then judge it is that circuit does not break down but device fails.
Technique scheme two perfect: the described 11st) in step, describedly determine that fault type comprises:
A. as user transformers fault-free reports, then determine that fault type is low-voltage platform area fault;
B. as user transformers has fault to report, but report without On line switch and outlet switch fault, then determine that fault type is distribution transforming fault;
C. as user transformers has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
D. as user transformers has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely;
E. as user's load-control equipment fault-free reports, then determine that fault type is middle pressure client internal fault;
F. as user's load-control equipment has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
G. as user's load-control equipment has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely.
Technique scheme two perfect: the described 7th) in step, whether fault message screening module first failure judgement information is the scheduled outage fault message generated, then get rid of this fault message in this way not study and judge, and informed by existing 95598 systems and report user for repairment; If be not scheduled outage then failure judgement information whether be confirmed fault message, then get rid of this fault message in this way and do not study and judge, and inform that user has confirmed the repairing situation of fault by existing 95598 systems; As neither scheduled outage fault message neither confirm fault message, then carry out next step;
The described 8th) in step, it is carry out power supply point according to the actual geographic position of source device to review and formed and review path that described power supply point is reviewed, then collection power supply point reviews the circuit charging equipment on path, circuit charging equipment equipment is carried out classifying, combining, forms the list of circuit charging equipment;
The described 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, load-control equipment and low pressure ammeter box;
The described 10th) in step, if outlet switch closes, then judge it is part line failure; If outlet switch disconnects, then judge it is whole piece line failure; If outlet switch and On line switch are all in closure state, then judge it is that circuit does not break down but device fails;
The described 11st) in step, describedly determine that fault type comprises:
A. as user transformers fault-free reports, then determine that fault type is low-voltage platform area fault;
B. as user transformers has fault to report, but report without On line switch and outlet switch fault, then determine that fault type is distribution transforming fault;
C. as user transformers has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
D. as user transformers has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely;
E. as user's load-control equipment fault-free reports, then determine that fault type is middle pressure client internal fault;
F. as user's load-control equipment has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
G. as user's load-control equipment has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely.
The invention has the beneficial effects as follows: 1) reporting fault message pushing module, line fault info push module and with adopting fault message pushing module for repairment owing to arranging respectively in existing 95598 systems, power distribution automation management system and power information acquisition system, initiatively sending fault message receiver module to by being reported to the fault message of existing 95598 systems, power distribution automation management system and power information acquisition system; Therefore realize gathering the electric network fault information of existing various electrical network operation system channel collection and initiatively transmitting; 2) fault message is studied and judged system and can the very first time after receiving reporting fault information be carried out automatically studying and judging in advance, and obtain fault type, the position of fault and fault effects region accurately, thus provide strong foundation for breakdown repair and management, and then improve the efficiency of breakdown repair and administration of power networks; 3) breakdown repair stops power supply information transmission system initiatively directly can affect user's propelling movement to power failure by outage information and the information that restores electricity, and user is known the very first time and stops power transmission information, be convenient to user and carry out corresponding measure; 4) client can short message service passage and optic fibre data channel inquiry outage information and to restore electricity information, is convenient to carry out alternately with client.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, power distribution network fault integrated treatment platform of the present invention and method are described further.
Fig. 1 is the module rack composition of embodiment one power distribution network fault integrated treatment platform.
Fig. 2 is the flow chart of embodiment one power distribution network fault treatment method.
Fig. 3 is the module rack composition of embodiment two power distribution network fault integrated treatment platform.
Fig. 4 is the flow chart of embodiment two power distribution network fault treatment method.
Embodiment
Embodiment one
The present embodiment power distribution network fault integrated treatment platform comprises fault information acquisition system A, fault message studies and judges system B and breakdown repair stops power supply information transmission system C.
Fault information acquisition system A comprise be arranged at existing 95598 intrasystemly report fault message pushing module 1 for repairment, the line fault info push module 2 be arranged in existing power distribution automation management system, be arranged in existing power information acquisition system with adopting fault message pushing module 3, fault message receiver module 4, faulted-phase judgment module 5 and fault message sending module 6.
Fault message is studied and judged system B and is comprised faulty equipment locating module 7, fault message screening module 8, line topological analysis module 9, equipment operation information analysis module 10, line switching analysis module 11, failure analysis module 12 and fault display module 13.
Breakdown repair stops power supply information transmission system C and comprises breakdown repair allocation schedule module 14, scene rush to repair administration module 15, repairing info push module 16 and stop info push module 17 of powering.
Report fault message pushing module 1 for repairment in order to be pushed to fault message receiver module 4 by being reported to the user of existing 95598 systems to report fault message for repairment;
Line fault info push module 2 is in order to being reported to the switch changed position fault message of power distribution automation management system (DMS) to be pushed to fault message receiver module 4;
With adopting fault message pushing module 3 in order to the distribution transforming of power information acquisition system (CSM) and user malfunction information pushing will be reported to fault message receiver module 4;
Fault message receiver module 4 is in order to receive and to verify from reporting fault message pushing module 1, line fault info push module 2 for repairment and pushing with adopting fault message pushing module 3 the fault message of coming;
Faulted-phase judgment module 5 stores in order to the fault message received by fault message receiver module 4, according to power network line topological structure from low-voltage customer to high-tension apparatus, carry out analytical integration with unified data model, then push to fault message sending module 6;
The fault message of fault message sending module 6 in order to faulted-phase judgment module 5 to be processed, is sent to described faulty equipment locating module by information outgoing passage, and information outgoing passage is generally LAN;
The fault message that faulty equipment locating module 7 sends for receiving fault message sending module 6, and the actual geographic position and the account information that are obtained the source device relevant to fault message by existing power distribution management system (PMS);
Fault message screening module 8, for screening the fault message behind equipment location, gets rid of the scheduled outage fault message and confirmed fault message that have generated;
Line topological analysis module 9, for carrying out topological analysis to the adapted electric line belonging to the fault message filtered out, obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
Equipment operation information is analyzed 10 modules for what the circuit charging equipment in the list of circuit charging equipment is carried out step by step equipment operation information and is called cls analysis together, and judges whether circuit charging equipment exists fault;
Line switching analysis module 11 for detecting the switch folding information of On line switch in adapted electric line and outlet switch, and judges whether adapted electric line exists line fault;
Failure analysis module 12 is for according to equipment operation information, switch folding information and topological structure determination fault type, the position of fault and fault effects region, fault type, the position of fault and fault effects region are pushed to breakdown repair allocation schedule module 14, according to fault type, the position of fault and fault effects Area generation fault outage information and push to stop power info push module 17;
Breakdown repair allocation schedule module 14 is for determining repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects region;
Scene rush to repair administration module 15 is for monitoring and gathering the repairing procedural information of repair personnel and the information that restores electricity;
Repairing info push module 16 is for pushing to fault display module 13 by repairing procedural information, and the information pushing that will restore electricity is to stopping info push module 17 of powering;
For there is the circuit charging equipment of fault and account information thereof, the influence area of adapted electric line and repairing procedural information by existing adapted power grid GIS system demonstration in fault display module 13;
Stop power supply info push module 17 to push for fault outage information and the information that restores electricity being affected user to power failure by existing 95598 systems, short message service passage and optic fibre data channel.
The power distribution network fault treatment method of the present embodiment, adopts above-mentioned power distribution network fault integrated treatment platform, and performs following steps:
1) in existing 95598 systems, fault message pushing module 1 is reported in setting for repairment, set up existing 95598 systems and the Web service data-transmission channel reporting fault message pushing module 1 for repairment, the concrete user pushed reports fault message for repairment and comprises: Customs Assigned Number, user's name, station address, contact method, defect content etc.
Line fault info push module 2 is set in existing power distribution automation management system, sets up the GPRS message information Transfer pipe (specifically utilizing the SIM card of the remote signalling displacement device being arranged on switch to form GPRS message information Transfer pipe) of power distribution automation management system and line fault info push module 2; The fault message transmitted is mainly the displacement information that outlet switch is operated a switch and On line switch is isolated, and the concrete switching information transmitted comprises: the message such as switch number, on off state, circuit number, affiliated plant stand, three-phase current, three-phase voltage.
Arrange with adopting fault message pushing module 3 in existing power information acquisition system, set up power information acquisition system with the Web service data-transmission channel adopting fault message pushing module 3; The distribution transforming transmitted and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time etc.
2) report fault message pushing module 1 for repairment and be pushed to fault message receiver module 4 by being reported to the user of existing 95598 systems to report fault message for repairment;
Line fault info push module 2 is pushed to fault message receiver module 4 by being reported to the switch changed position fault message of existing power distribution automation management system (DMS);
The distribution transforming of existing power information acquisition system (CSM) and user malfunction information pushing will be reported to fault message receiver module 4 with adopting fault message pushing module 3.
3) fault message receiver module 4 receives and verifies from reporting fault message pushing module 1, line fault info push module 2 for repairment and pushing with adopting fault message pushing module 3 the fault message of coming; Fault message receiver module 4 is when receiving fault information data, need verify the fault information data of separate sources, if the fault message of verification is abnormal data, feed back to fault information data propelling movement side (respective operation system) for different fault information data source; If the fault message of verification is normal data, then push to faulted-phase judgment module 5.
4) fault message receiving through fault message receiver module 4 and verify stores by faulted-phase judgment module 5, according to power network line topological structure from low-voltage customer to high-tension apparatus, carry out analytical integration with unified data model, then push to faulty equipment locating module 6;
Data storage is: need classification to be stored in the fault message table of respective type to the fault message of the separate sources received;
Analytical integration is: when carrying out analytical integration to data, arrange according to the wire topologies of mesolow is top-down, as: analyze from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station outlet switch information, and set up the relation (such as by user malfunction information inquiry distribution transforming fault message) can inquired about each other, the result analyzed is stored in analysis result table.
5) fault message processed through faulted-phase judgment module 5 is sent to faulty equipment locating module by information outgoing passage by fault message sending module 6, and information outgoing passage generally adopts LAN.
6) faulty equipment locating module 7 receives the fault message that fault message sending module 6 sends, and obtains actual geographic position and the account information of the source device relevant to fault message by existing power distribution management system.
Concrete steps are: when described fault message is when being reported to existing 95598 system users to report fault message for repairment, according to the Customs Assigned Number reported for repairment, obtain low pressure ammeter box equipment or load-control equipment that user is associated as source device by existing power distribution management system (PMS), and inquire source device actual geographic coordinate information and account information by the unique encodings of low pressure ammeter box equipment or load-control equipment.When described fault message be existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information time, the distribution transforming obtained by existing power distribution management system according to asset of equipments numbering, switch and load-control equipment as source device, and inquire source device actual geographic coordinate information and account information by the unique encodings of distribution transforming, switch and load-control equipment.
7) fault message behind fault message screening module 8 pairs of source devices location screens, judge source device locate after fault message whether belong to the scheduled outage fault message that generated and confirmed fault message, then getting rid of in this way, if not being, carrying out next step.
Concrete screening step is: whether fault message screening module first failure judgement information is the scheduled outage fault message generated, and scheduled outage fault message is then got rid of this fault message and do not studied and judged in this way, and is informed by existing 95598 systems and report user for repairment; If be not scheduled outage fault message then failure judgement information whether be confirmed fault message, confirmed fault message is then got rid of this fault message and is not studied and judged in this way, and informs that user has confirmed the repairing situation of fault by existing 95598 systems; As neither scheduled outage fault message neither confirm fault message, then carry out next step.
8) line topological analysis module 9 is reviewed by power supply point and is carried out topological analysis to the adapted electric line belonging to the fault message filtered out, and obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure.
Concrete analysis step is: first carry out power supply point according to the actual geographic position of source device and review, and is formed and reviews path (obtaining the topological structure of this adapted electric line); Then collection power supply point reviews the circuit charging equipment on path, is carried out classifying, combining by circuit charging equipment equipment, forms the list of circuit charging equipment.
9) the circuit charging equipment in the list of circuit charging equipment is carried out operation information and calls cls analysis together by equipment operation information analysis module 10 step by step, judge whether circuit charging equipment exists fault according to the equipment operation information analyzed, then carry out next step in this way, if not being, failure judgement information is user's internal fault information, terminates to study and judge.
Concrete analysis step is: the outlet switch in the list of circuit charging equipment, On line switch, distribution transforming, load-control equipment, low pressure ammeter box (circuit charging equipment) are carried out to operation information step by step and call survey together.If all normal operation in the said equipment, then illustrate the fault repairing information reported because client's self reason causes inside to break down.
10) line switching analysis module 11 detects the switch folding information of On line switch in adapted electric line and outlet switch, judges whether adapted electric line exists line fault.
The concrete step judging whether adapted electric line exists line fault comprises:
If 1. outlet switch closes, then judge it is part line failure;
If 2. outlet switch disconnects, then judge it is whole piece line failure;
If 3. outlet switch and On line switch are all in closure state, then judge it is that circuit does not break down but device fails.
11) failure analysis module 11 is according to equipment operation information and switch folding information determination fault type, the position of fault and fault effects region is determined according to topological structure, fault type, the position of fault and fault effects region are pushed to breakdown repair allocation schedule module 14, according to fault type, the position of fault and fault effects Area generation fault outage information and push to stop power info push module 17.
Concrete steps are:
First, according to the failure condition that the analysis result of the said equipment operating analysis and switch folding information is determined, determine the particular type (fault type comprises low-voltage platform area fault, distribution transforming fault, middle pressure client internal fault, part line fault and circuit fault completely) of fault further; Determine that the detailed process of fault type comprises:
A. as user transformers fault-free reports, then determine that fault type is low-voltage platform area fault;
B. as user transformers has fault to report, but report without On line switch and outlet switch fault, then determine that fault type is distribution transforming fault;
C. as user transformers has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
D. as user transformers has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely;
E. as user's load-control equipment fault-free reports, then determine that fault type is middle pressure client internal fault;
F. as user's load-control equipment has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
G. as user's load-control equipment has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely.
12) breakdown repair allocation schedule module 12, determines repairing teams and groups and scheduling recovery vehicle according to fault type, the position of fault and fault effects region.
13) scene rush to repair administration module 13 is monitored and is gathered the repairing procedural information of repair personnel and the information that restores electricity.
14) rush to repair info push module 14, repairing procedural information pushes to fault display module 12, and the information pushing that will restore electricity is to stopping info push module 17 of powering.
15) there is the circuit charging equipment of fault and account information thereof, the influence area of adapted electric line and repairing procedural information by existing adapted power grid GIS system demonstration in fault display module 12;
16) stop power supply info push module 17, by existing 95598 systems, short message service passage and optic fibre data channel, fault outage information and the information that restores electricity are affected user's propelling movement to power failure.
Embodiment two
The power distribution network fault integrated treatment platform of the present embodiment is substantially identical with embodiment one, and difference is: also comprise for carrying out interactive interactive module 18 by short message service passage and optic fibre data channel and user; Interaction refers to that user sends code and user number inquiry stops power transmission information. when code is for having a power failure, interactive module 18 is inquired about client region outage information according to user number and is informed client; When code is for restoring electricity, interactive module 4 to restore electricity information inform user according to user number inquiry client region.
The power distribution network fault treatment method of the present embodiment is substantially identical with embodiment one, and difference is:
1. increase and perform step 17): interactive module 18 carries out interaction by short message channel and optical-fibre channel and user; Interaction is that user sends code and user number inquiry stops power transmission information, and interactive module 4 also sends according to user number inquiring user region outage information and the information that restores electricity and informs user.
2. the 1st) in step, replace GPRS message information Transfer pipe by setting up IEB bus service data Transfer pipe between power distribution automation management system and line fault info push module 2.
3. the 7th) in step, scheduled outage information and confirmed fault message, do not need and informed by existing 95598 systems to report user for repairment.
The present invention is not limited to above-described embodiment, and all employings are equal to replacement technical scheme with the invention described above technical scheme all drops within protection scope of the present invention.

Claims (10)

1. a power distribution network fault treatment method, performs following steps:
1) in existing 95598 systems, fault message pushing module is reported in setting for repairment, sets up existing 95598 systems and the Web service data-transmission channel reporting fault message pushing module for repairment;
Line fault info push module is set in existing power distribution automation management system, sets up GPRS message information Transfer pipe or the IEB bus service data Transfer pipe of power distribution automation management system and line fault info push module;
Arrange with adopting fault message pushing module in existing power information acquisition system, set up power information acquisition system with the Web service data-transmission channel adopting fault message pushing module;
2) report fault message pushing module for repairment and be pushed to fault message receiver module by being reported to the user of existing 95598 systems to report fault message for repairment;
Line fault info push module is pushed to fault message receiver module by being reported to the switch changed position fault message of existing power distribution automation management system;
To the distribution transforming of existing power information acquisition system and user malfunction information pushing be reported to fault message receiver module with adopting fault message pushing module;
3) fault message receiver module receives and verifies from reporting fault message pushing module, line fault info push module for repairment and pushing with adopting fault message pushing module the fault message of coming;
4) fault message receiving through fault message receiver module and verify stores by faulted-phase judgment module, according to power network line topological structure from low-voltage customer to high-tension apparatus, carries out analytical integration with unified data model;
5) fault message through faulted-phase judgment resume module is sent to faulty equipment locating module by information outgoing passage by fault message sending module;
6) faulty equipment locating module receives the fault message that fault message sending module sends, and obtains actual geographic position and the account information of the source device relevant to fault message by existing power distribution management system;
7) fault message screening module is screened the fault message behind source device location, judge whether the fault message behind source device location belongs to the scheduled outage fault message and confirmed fault message that have generated, then getting rid of in this way, if not being, carrying out next step;
8) line topological analysis module is reviewed by power supply point and is carried out topological analysis to the adapted electric line belonging to the fault message filtered out, and obtains the topological structure of this adapted electric line and the circuit charging equipment list of associated topologies structure;
9) the circuit charging equipment in the list of circuit charging equipment is carried out equipment operation information and calls cls analysis together by equipment operation information analysis module step by step, judge whether circuit charging equipment exists fault according to the equipment operation information analyzed, then carry out next step in this way, if not being, failure judgement information is user's internal fault information, terminates to study and judge;
10) On line switch in line switching analysis module detection adapted electric line and the switch folding information of outlet switch, judge whether adapted electric line exists line fault;
11) failure analysis module is according to described equipment operation information and switch folding information determination fault type, the position of fault and fault effects region is determined according to the topological structure of adapted electric line, fault type, the position of fault and fault effects region are pushed to breakdown repair allocation schedule module, according to fault type, the position of fault and fault effects Area generation fault outage information and push to stop power info push module;
12) breakdown repair allocation schedule module determines repairing teams and groups and the scheduling recovery vehicle of fault according to fault type, the position of fault and fault effects region;
13) scene rush to repair administration module is monitored and is gathered the repairing procedural information of repair personnel and the information that restores electricity;
14) rush to repair info push module and repairing procedural information is pushed to fault display module, and the information pushing that will restore electricity is to stopping info push module of powering;
15) there is the circuit charging equipment of fault and account information thereof, the influence area of adapted electric line and repairing procedural information by existing adapted power grid GIS system demonstration in fault display module;
16) stop power supply info push module, by existing 95598 systems, short message service passage and optic fibre data channel, fault outage information and the information that restores electricity are affected user's propelling movement to power failure;
17) interactive module carries out interaction by short message service passage and optic fibre data channel and user, described interaction is that user sends code and user number inquiry stops power transmission information, is stopped power transmission information and send to inform user according to user number inquiring user region by interactive module;
The 3rd) in step, if the fault message of verification is abnormal data, feed back to fault message propelling movement side for different fault messages source; If the fault message of verification is normal data, then push to faulted-phase judgment module;
The described 6th) in step, when described fault message be existing power information acquisition system reporting fault information or existing power distribution automation management system reporting fault information time, obtain distribution transforming, switch and load-control equipment as source device according to asset of equipments numbering by existing power distribution management system, and inquire source device actual geographic information and account information by the unique encodings of distribution transforming, switch and load-control equipment.
2. power distribution network fault treatment method according to claim 1, is characterized in that: the 4th) in step, described storage is stored in the fault message table of respective type by the classification of the fault message of the separate sources received; Described analytical integration arranges according to the wire topologies of mesolow is top-down, comprise and analyzing from user profile-> ammeter information-> distribution transforming information-> On line switch information-> transformer station outlet switch information, and set up the relation can inquired about each other, the result analyzed is stored in analysis result table.
3. power distribution network fault treatment method according to claim 1, is characterized in that: described GPRS message information Transfer pipe utilizes the SIM card being arranged on the remote signalling displacement device of switch to form; Described information outgoing passage is LAN; Described user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and defect content; Described switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated plant stand, three-phase current and three-phase voltage; Described distribution transforming and user malfunction information comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering and acquisition time.
4. power distribution network fault treatment method according to claim 1, it is characterized in that: the described 6th) in step, when described fault message is when being reported to the user of existing 95598 systems to report fault message for repairment, obtain low pressure ammeter box equipment or load-control equipment that user is associated as source device according to the Customs Assigned Number reported for repairment by existing power distribution management system, and inquire source device actual geographic information and account information by the unique encodings of low pressure ammeter box equipment or load-control equipment.
5. power distribution network fault treatment method according to claim 1, it is characterized in that: the described 7th) in step, whether fault message screening module first failure judgement information is the scheduled outage fault message generated, then get rid of this fault message in this way not study and judge, and informed by existing 95598 systems and report user for repairment, if not being, whether failure judgement information is confirmed fault message, then get rid of this fault message in this way not study and judge, and inform that user has confirmed the repairing situation of fault by existing 95598 systems; As neither scheduled outage fault message neither confirmed fault message, then carry out next step.
6. power distribution network fault treatment method according to claim 1, it is characterized in that: the described 8th) in step, it is carry out power supply point according to the actual geographic position of source device to review and formed and review path that described power supply point is reviewed, then collection power supply point reviews the circuit charging equipment on path, circuit charging equipment is carried out classify, combine, form the list of circuit charging equipment.
7. power distribution network fault treatment method according to claim 1, is characterized in that: the described 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, load-control equipment and low pressure ammeter box.
8. power distribution network fault treatment method according to claim 1, is characterized in that: the described 10th) in step, describedly judge whether adapted electric line exists line fault and comprise:
If 1. outlet switch closes, then judge it is part line failure;
If 2. outlet switch disconnects, then judge it is whole piece line failure;
If 3. outlet switch and On line switch are all in closure state, then judge it is that circuit does not break down but device fails.
9. power distribution network fault treatment method according to claim 1, is characterized in that: the described 11st) in step, describedly determine that fault type comprises:
A. as user transformers fault-free reports, then determine that fault type is low-voltage platform area fault;
B. as user transformers has fault to report, but report without On line switch and outlet switch fault, then determine that fault type is distribution transforming fault;
C. as user transformers has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
D. as user transformers has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely;
E. as load-control equipment fault-free reports, then determine that fault type is middle pressure client internal fault;
F. as load-control equipment has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
G. as load-control equipment has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely.
10. power distribution network fault treatment method according to claim 1, it is characterized in that: the described 7th) in step, whether fault message screening module first failure judgement information is the scheduled outage fault message generated, then get rid of this fault message in this way not study and judge, and informed by existing 95598 systems and report user for repairment; If be not scheduled outage fault message then failure judgement information whether be confirmed fault message, then get rid of this fault message in this way and do not study and judge, and inform that user has confirmed the repairing situation of fault by existing 95598 systems; As neither scheduled outage fault message neither confirm fault message, then carry out next step;
The described 8th) in step, it is carry out power supply point according to the actual geographic position of source device to review and formed and review path that described power supply point is reviewed, then collection power supply point reviews the circuit charging equipment on path, is carried out by circuit charging equipment classifying, combining, and forms the list of circuit charging equipment;
The described 9th) in step, described circuit charging equipment is outlet switch, On line switch, distribution transforming, load-control equipment and low pressure ammeter box;
The described 10th) in step, if outlet switch closes, then judge it is part line failure; If outlet switch disconnects, then judge it is whole piece line failure; If outlet switch and On line switch are all in closure state, then judge it is that circuit does not break down but device fails;
The described 11st) in step, describedly determine that fault type comprises:
A. as user transformers fault-free reports, then determine that fault type is low-voltage platform area fault;
B. as user transformers has fault to report, but report without On line switch and outlet switch fault, then determine that fault type is distribution transforming fault;
C. as user transformers has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
D. as user transformers has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely;
E. as load-control equipment fault-free reports, then determine that fault type is middle pressure client internal fault;
F. as load-control equipment has fault to report, and wired upper switch fault reports, then determine that fault type is part line fault;
G. as load-control equipment has fault to report, and there is outlet switch fault to report, then determine that fault type is circuit fault completely.
CN201310489560.3A 2011-12-04 2011-12-04 Power distribution network fault treatment method Active CN103490520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310489560.3A CN103490520B (en) 2011-12-04 2011-12-04 Power distribution network fault treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310489560.3A CN103490520B (en) 2011-12-04 2011-12-04 Power distribution network fault treatment method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN2011103967094A Division CN102570602B (en) 2011-12-04 2011-12-04 Fault comprehensive processing platform and method of distribution network

Publications (2)

Publication Number Publication Date
CN103490520A CN103490520A (en) 2014-01-01
CN103490520B true CN103490520B (en) 2015-05-13

Family

ID=49830545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310489560.3A Active CN103490520B (en) 2011-12-04 2011-12-04 Power distribution network fault treatment method

Country Status (1)

Country Link
CN (1) CN103490520B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103501050B (en) * 2011-12-04 2016-01-27 江苏省电力公司南京供电公司 Power distribution network fault integrated treatment platform
CN103501052A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling method for power distribution and consumption network
CN103490522A (en) * 2011-12-04 2014-01-01 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment method
CN103501054A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Fault handling method for power distribution network
CN103915827B (en) * 2014-03-14 2016-08-24 国网山东省电力公司青岛供电公司 Power distribution network fault analysis method and study and judge system
CN104155581A (en) * 2014-08-20 2014-11-19 国家电网公司 Distribution network power fault judgment method
CN104360208A (en) * 2014-12-05 2015-02-18 国家电网公司 Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN104678258B (en) * 2015-02-27 2017-08-01 国家电网公司 It is a kind of specially to become the method that information to distribution network failure actively study and judge based on public
CN104766185B (en) * 2015-05-06 2018-03-02 国网山东省电力公司 Area power grid outage information based on grid power blackout characteristic studies and judges system and method
CN104899700A (en) * 2015-06-23 2015-09-09 国网天津市电力公司 Intelligent terminal operation and maintenance emanagement system
CN105277851A (en) * 2015-10-16 2016-01-27 国网甘肃省电力公司天水供电公司 Distribution network fault judgment searching and positioning system
CN107276041A (en) * 2017-05-16 2017-10-20 国网山东省电力公司临清市供电公司 Power distribution network rushes to repair maneuvering platform
CN108875975A (en) * 2018-06-27 2018-11-23 国网甘肃省电力公司金昌供电公司 A kind of excellent dress system of wisdom precisely informed based on client's outage information
CN111582550A (en) * 2020-04-14 2020-08-25 广东卓维网络有限公司 Power station fault first-aid repair quick response system based on GIS
CN114283563A (en) * 2021-12-24 2022-04-05 深圳供电局有限公司 Fire-fighting type response system, method and device for power grid line fault

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101207527A (en) * 2007-08-01 2008-06-25 许之端 Network collocating management system based on network collocating platform area test control network
CN101715027A (en) * 2009-10-26 2010-05-26 浙江省电力公司 Customer service system and method for power system
CN201774545U (en) * 2010-07-13 2011-03-23 华东电网有限公司 Streaming media server for electric power system
CN102110277A (en) * 2009-12-28 2011-06-29 河南省电力公司商丘供电公司 Early-warning and processing method for accident of power-supply system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101207527A (en) * 2007-08-01 2008-06-25 许之端 Network collocating management system based on network collocating platform area test control network
CN101715027A (en) * 2009-10-26 2010-05-26 浙江省电力公司 Customer service system and method for power system
CN102110277A (en) * 2009-12-28 2011-06-29 河南省电力公司商丘供电公司 Early-warning and processing method for accident of power-supply system
CN201774545U (en) * 2010-07-13 2011-03-23 华东电网有限公司 Streaming media server for electric power system

Also Published As

Publication number Publication date
CN103490520A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103516054B (en) Power distribution network fault automatic processing method
CN103490520B (en) Power distribution network fault treatment method
CN103490523B (en) Intelligent power distribution network fault treatment system
CN103501053B (en) Comprehensive fault handling system for power distribution and consumption network
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN103490522A (en) Intelligent power distribution network fault treatment method
CN103501054A (en) Fault handling method for power distribution network
CN103501052A (en) Comprehensive fault handling method for power distribution and consumption network
CN102565572B (en) Platform and method for judging fault of match power grid
CN109995145B (en) Low-voltage distribution network fault active study and judgment method based on intelligent distribution transformer terminal
CN106990328B (en) Distribution network emergency repair abnormal data analysis and fault positioning system and method
CN106646104B (en) Fault Diagnosis Method for Distribution Networks
CN105785201B (en) A kind of power distribution network fault analysis method and study and judge system
CN110658415B (en) Low-voltage distribution line fault detection method and system
CN109459664A (en) A kind of detection of distribution network failure and positioning analysis system
CN109472476B (en) Power failure identification analysis method and system
CN102497017B (en) Power grid failure information comprehensive collection platform and collection method
CN109447284B (en) Distribution network fault information sending method and system for power supply service command platform
CN101826756A (en) System and method for realizing fault positioning of power distributing substation equipment
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
KR101589736B1 (en) Train electrical device technical support system
CN105429301A (en) Node analysis method-based self-healing control method for intelligent power distribution network
CN103997126B (en) A kind of fault diagnosis stage division based on on-off state and system
CN109193946B (en) Urgent repair information release system for power consumer
CN110018378A (en) Report the failure analysis method that work order is distributed same overhead transmission line difference transformer for repairment more

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Chunning

Inventor after: Xu Jingzhou

Inventor after: Wei Lei

Inventor before: Wang Hailin

Inventor before: Xu Haiqing

Inventor before: Chen Kai

Inventor before: Xu Aihua

Inventor before: Zhang Wenjun

Inventor before: Zhu Hong

Inventor before: Wu Wenshu

Inventor before: Wei Lei

CB03 Change of inventor or designer information
COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GE CHANGXIN PEI YUJIE ZHANG GUANGXIN XU JIANGUO WANG MINZHEN DONG JUN ZHANG HAO YU HONGREN TO: HU YAQING LIU HONGSHENG YU HONGREN

C14 Grant of patent or utility model
GR01 Patent grant