CN202475009U - Comprehensive processing system of failure of power distribution and supply grid - Google Patents

Comprehensive processing system of failure of power distribution and supply grid Download PDF

Info

Publication number
CN202475009U
CN202475009U CN 201120496869 CN201120496869U CN202475009U CN 202475009 U CN202475009 U CN 202475009U CN 201120496869 CN201120496869 CN 201120496869 CN 201120496869 U CN201120496869 U CN 201120496869U CN 202475009 U CN202475009 U CN 202475009U
Authority
CN
China
Prior art keywords
fault
module
information
fault message
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120496869
Other languages
Chinese (zh)
Inventor
王海林
许海清
陈楷
徐爱华
张文俊
朱红
吴文书
韦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGSU SUYUAN HIGH-TECH Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN HIGH-TECH Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical JIANGSU SUYUAN HIGH-TECH Co Ltd
Priority to CN 201120496869 priority Critical patent/CN202475009U/en
Application granted granted Critical
Publication of CN202475009U publication Critical patent/CN202475009U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to a comprehensive processing system of failures of a power distribution and supply grid and belongs to the technical field of power grid management. The comprehensive processing system of the failures of the power distribution and supply grid includes a failure information collecting device, a failure information researching and judging device and a failure urgent repair power cut/supply information push device. The failure information collecting device includes a failure report information push module, a line failure information push module, a power utilization and collection failure information push module, a failure information receiving module, a failure information processing module and a failure information sending module. The failure information researching and judging device includes a failure device positioning module, a failure information screening module, a line topological analysis module, a device operation information analyzing module, a line switch analyzing module, a failure analyzing module and a failure display module. The failure urgent repair power cut/supply information push device includes a failure urgent repair allocation and scheduling module, an onsite urgent repair management module, an urgent repair information push module and a power cut/supply information push module. The comprehensive processing system of the failures of the power distribution and supply grid realizes integrated collection of failure information and automatic research and judgment of the failure information in advance, and pushes power cut/supply information to users for interaction.

Description

Adapted electric network fault total system
Technical field
The utility model relates to a kind of electric network fault information of gathering by all kinds of means, and fault message is carried out automatic anticipation, and the anticipation result is pushed to repairing and user, and with the treatment system of user interaction, belong to the administration of power networks technical field.
Background technology
Existing electrical network automated management system does not form integrated treatment to electric network fault; To the collection of fault message, judge, notify the processing of each link such as user and commander's breakdown repair all to isolate; Lack contact each other, and result can not form interaction with the user.Concrete manifestation is following:
1, the collection of fault message is single isolated
Existing electric network fault information gathering has 95598 to report the mode that channel such as reports, user's intelligent electric meter fault reports, distribution transforming acquisition terminal fault reports, circuit On line switch fault reports, transformer station's outlet switch fault reports to obtain for repairment; But the fault message that these channels obtain all is to be stored in separately separately in the operation system; Be stored in 95598 customer service systems like 95598 fault messages that report for repairment; The failed storage that reports of user's intelligent electric meter is in power information acquisition system (CSM) for another example, and and for example circuit On line switch and transformer station go out the fault message that wiretap reports and be stored in the power distribution automation management system (DMS).This shows; The channel that existing various electrical network operation systems are gathered fault message is (battalion of respectively doing for oneself) that isolates; The information of various channel collections lacks unified access road; Not contact between the fault message that various channels are gathered, therefore the various automation operation systems of existing electrical network can not be shared the fault message that various channels are gathered simultaneously, thereby can not satisfy the requirement of electric network fault information being carried out analysis-by-synthesis and utilization.
2, lack early stage anticipation automatically for fault message
For a long time; When power matching network breaks down; Before fault reports back entering scene rush to repair; Can not analyze and accurately fault location source and relevant device information for fault message, the affirmation of description and the repairing personnel that can only depend on the user behind the scene promptly can not in time accurately be judged the type of fault, the scope of influence etc.What bring thus is, accurate fault location source and relevant device information during the power failure repairing, accurately obtains fault type and coverage and exists and lag behind, and depends on the affirmation of repairing personnel behind the scene, thus the scheduling of the progress of influence repairing and repairing resource.
3, fault message and repairing recovery situation can't push for a long time to user side; The user can only obtain power failure information through TV, newpapers and periodicals and network; But the limitation of traditional media makes the client often can't grasp power failure information in time because of ignoring, and more can not grasp electric network fault power failure information and the expectation temporal information that restores electricity in real time.Though existing electrical network 95598 customer service systems itself possess the inquiry and the issuing function of fault outage information; But 95598 contact staff normally initiatively do not issue fault outage information to the user; Just when the user condescends to inquire, just inform the user, 95598 can not inform user's fault outage repairing progress and the expectation temporal information that restores electricity.In addition during scene rush to repair, the repairing personnel at the scene can not with breakdown repair system real-time, interactive, repairing work can not effectively be supervised.
The utility model content
First technical problem that the utility model will solve is: propose a kind of current collection net fault information acquisition, study and judge, push incorporate full-automatic total system.
Second technical problem that the utility model will solve is: on the basis that solves above-mentioned first technical problem, propose a kind of full-automatic total system of adapted electrical network that can carry out interaction with the user.
The utility model is that the technical scheme that solves the problems of the technologies described above proposition is: a kind of adapted electric network fault total system; Comprise that fault information acquisition device, fault message are studied and judged device and breakdown repair stops the information push-delivery apparatus of supplying power, said fault information acquisition device comprises being arranged at and existing 95598 intrasystemly reports that fault message pushes module, the line fault information in the existing power distribution automation management system of being arranged at pushes module for repairment, is arranged at usefulness in the existing power information acquisition system and adopts fault message and push module, fault message receiver module, fault message processing module and fault message sending module; Said fault message is studied and judged device and is comprised faulty equipment locating module, fault message screening module, line topological analysis module, equipment operation information analysis module, line switching analysis module, failure analysis module and fault display module; The said breakdown repair information push-delivery apparatus that stops supplying power comprises that breakdown repair allocation schedule module, scene rush to repair administration module, repairing information push module and stop power supply information and pushes module;
The said fault message that reports for repairment pushes module and reports fault message for repairment in order to the user that will be reported to 95598 systems and be pushed to said fault message receiver module;
Said line fault information pushes module and is pushed to said fault message receiver module in order to the switch changed position fault message that will be reported to the power distribution automation management system;
Said usefulness is adopted fault message propelling movement module and is pushed to said fault message receiver module in order to distribution transforming and user's fault message that will be reported to the power information acquisition system;
Fault message pushes module to said fault message receiver module, line fault information pushes module and pushes the next fault message of module propelling movement with adopting fault message from reporting for repairment with verification in order to receive;
Said fault message processing module is stored in order to the fault message that said fault message receiver module is received, and from the low-voltage customer to the high-tension apparatus, carries out analytical integration with uniform data model according to the power network line topological structure;
The fault message of said fault message sending module in order to the fault message processing module is handled sent out passage outward through information and is sent to said faulty equipment locating module;
Said faulty equipment locating module is used to receive the fault message that said fault message sending module sends, and obtains the actual geographical position and the account information of the source device relevant with fault message through existing power distribution management system;
Said fault message screening module is used for the fault message behind the equipment location is screened, and gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Said line topological analysis module is used for the adapted electric line under the fault message that filters out is carried out topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment tabulation of associated topologies structure;
Said equipment operation information analysis module is used for the circuit charging equipment of circuit charging equipment tabulation is carried out the cls analysis of calling together of equipment operation information step by step, and judges whether the circuit charging equipment exists fault;
Said line switching analysis module is used to the switch folding information that detects the On line switch on the adapted electric line and go out wiretap, and judges whether the adapted electric line exists line fault;
Said failure analysis module is used for confirming fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure; Fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop power supply information propelling movement module;
Said breakdown repair allocation schedule module is used for confirming according to fault type, the position of fault and fault effects zone the repairing teams and groups and the scheduling recovery vehicle of fault;
Said scene rush to repair administration module is used to monitor and gather repairing personnel's the repairing procedural information and the information that restores electricity;
Said repairing information pushes module and is used for repairing procedural information is pushed to the fault display module, and will the information of restoring electricity be pushed to and stops power supply information propelling movement module;
Said fault display module is used for having circuit charging equipment and the account information thereof of fault, the influence area and the repairing procedural information of adapted electric line through existing adapted power grid GIS system demonstration;
The said power supply information propelling movement module of stopping is used for through existing 95598 customer service systems, short message service passage and fiber data passage the fault outage information and the information that restores electricity being influenced user's propelling movement to having a power failure.
In order to solve above-mentioned second technical problem; The present invention to the improvement of technique scheme is: also comprise being used for carrying out interactive interactive module through short message service passage and fiber data passage and user; Said interaction is that the user sends code and the user number inquiry stops sending electrical information, stops sending electrical information and transmission to inform the user by interactive module according to user number inquiring user region.
The perfect of technique scheme is: the said fault message propelling movement module of reporting for repairment links through the Web service data-transmission channel with existing 95598 systems; Said line fault information pushes module and links through GPRS message information transmission passage or Web service data-transmission channel with existing power distribution automation management system; Said usefulness is adopted fault message propelling movement module and is linked through the Web service data-transmission channel with existing power information acquisition system; It is to utilize the SIM of the remote signalling displacement device that is arranged on switch to constitute that said GPRS message information transmits passage, and it is LAN that said information is sent out passage outward.
The perfect of technique scheme is: said storage be with the fault message classification and storage of the separate sources that receives in the fault message table of type separately; Said analytical integration is top-down arrangement the in order of line topological structure according to mesolow; Comprise from user profile-ammeter information-distribution transforming information-On line switch information-transformer station's outlet switching information and analyzing; And set up the relation that can inquire about each other, the result who analyzes is stored in the analysis result table.
The perfect of technique scheme is: said user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content; Said switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated factory station, three-phase current and three-phase voltage; Said distribution transforming and user's fault message comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
The perfect of technique scheme is: said fault message comprises 95598 user's repairing information, and existing power information acquisition system (CSM) reports fault message and existing power distribution automation management system (DMS) to report fault message; Said fault type comprises low district's fault, distribution transforming fault, middle pressure client's internal fault, part line fault and the circuit fault completely of presenting a theatrical performance as the last item on a programme.
The perfect of technique scheme is: when said fault message is that 95598 users are when reporting fault message for repairment; Said source device is low pressure ammeter box equipment or the negative control device that is associated through the existing acquisition user of power distribution management system according to the Customs Assigned Number that reports for repairment, and actual geographical coordinate information of said source device and account information are to obtain through existing power distribution management system queries according to low pressure ammeter box equipment or negative unique coding of controlling device; When said fault message is an existing power information acquisition system when reporting fault message or existing power distribution automation management system to report fault message, said source device is distribution transforming, switch and the negative control device that obtains through existing power distribution management system according to the asset of equipments numbering; Actual geographical coordinate information of said source device and account information are to obtain through existing power distribution management system queries according to source distribution transforming, switch and negative unique coding of controlling device.
The perfect of technique scheme is: said controller switching equipment comprises circuit, switch, distribution transformer and middle pressure user, and said power failure influences equipment and comprises low-pressure meter case and middle pressure user.
The beneficial effect of the utility model is: 1) because fault message propelling movement module is reported in setting for repairment respectively in existing 95598 systems, power distribution automation management system and power information acquisition system, line fault information pushes module and pushes module with adopting fault message, initiatively send the fault message that is reported to 95598 systems, power distribution automation management system and power information acquisition system to the fault message receiver module; Therefore realization gathers the electric network fault information that has the collection of various electrical network operation system channel now and initiatively transmits; 2) fault message is studied and judged system and can be shifted to an earlier date automatically the very first time after reception reports fault message and study and judge; And obtain accurately fault type, the position of fault and fault effects zone; Thereby, and then improve the efficient of breakdown repair and administration of power networks for breakdown repair and management provide strong foundation; 3) the breakdown repair information transmission system that stops supplying power can initiatively directly influence user's propelling movement with the power failure information and the information that restores electricity to having a power failure, and the user is known the very first time stop sending electrical information, is convenient to the user and carries out relative measures; 4) client can the short message service passage and fiber data passage inquiry power failure information with restore electricity information, be convenient to carry out alternately with the client.
Description of drawings
Be described further below in conjunction with the adapted electric network fault total system of accompanying drawing the utility model.
Fig. 1 is the module rack composition of embodiment one adapted electric network fault total system.
Fig. 2 is the module rack composition of embodiment two adapted electric network fault total systems.
Embodiment
Embodiment one
The adapted electric network fault total system of present embodiment comprises that fault information acquisition device A, fault message study and judge device B and the breakdown repair information push-delivery apparatus C that stops supplying power.
Fault information acquisition device A comprises being arranged at and existing 95598 intrasystemly reports that fault message pushes module 1, the line fault information in the existing power distribution automation management system of being arranged at pushes module 2 for repairment, is arranged at usefulness in the existing power information acquisition system and adopts fault message and push module 3, fault message receiver module 4, fault message processing module 5 and fault message sending module 6.
Fault message is studied and judged device B and is comprised faulty equipment locating module 7, fault message screening module 8, line topological analysis module 9, equipment operation information analysis module 10, line switching analysis module 11, failure analysis module 12 and fault display module 13.
The breakdown repair information push-delivery apparatus C that stops supplying power comprises that breakdown repair allocation schedule module 14, scene rush to repair administration module 15, repairing information push module 16 and stop power supply information and pushes module 17.
Reporting fault message for repairment pushes module 1 and reports fault message for repairment in order to the user that will be reported to 95598 systems and be pushed to fault message receiver module 4;
Line fault information pushes module 2 and is pushed to fault message receiver module 4 in order to the switch changed position fault message that will be reported to power distribution automation management system (DMS);
Be pushed to fault message receiver module 4 with adopting fault message propelling movement module 3 in order to distribution transforming and user's fault message that will be reported to power information acquisition system (CSM);
Fault message pushes module 1 to fault message receiver module 4, line fault information pushes module 2 and pushes the next fault message of module 3 propelling movements with adopting fault message from reporting for repairment with verification in order to receive;
Fault message processing module 5 is stored in order to the fault message that fault message receiver module 4 is received; According to the power network line topological structure from the low-voltage customer to the high-tension apparatus; Carry out analytical integration with uniform data model, push to faulty equipment locating module 6 again;
The fault message of fault message sending module 6 in order to fault message processing module 5 is handled sent out passage outward through information and is sent to said faulty equipment locating module, and it generally is LAN that information is sent out passage outward;
Faulty equipment locating module 7 is used to receive the fault message that fault message sending module 6 sends, and obtains the actual geographical position and the account information of the source device relevant with fault message through existing power distribution management system (PMS);
Fault message screening module 8 is used for the fault message behind the equipment location is screened, and gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Line topological analysis module 9 is used for the adapted electric line under the fault message that filters out is carried out topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment tabulation of associated topologies structure;
Equipment operation information analysis 10 modules are used for the circuit charging equipment of circuit charging equipment tabulation is carried out the cls analysis of calling together of equipment operation information step by step, and judge whether the circuit charging equipment exists fault;
Line switching analysis module 11 is used to the switch folding information that detects the On line switch on the adapted electric line and go out wiretap, and judges whether the adapted electric line exists line fault;
Failure analysis module 12 is used for confirming fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure; Fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module 14, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop power supply information propelling movement module 17;
Breakdown repair allocation schedule module 14 is used for confirming according to fault type, the position of fault and fault effects zone the repairing teams and groups and the scheduling recovery vehicle of fault;
Scene rush to repair administration module 15 is used to monitor and gather repairing personnel's the repairing procedural information and the information that restores electricity;
Repairing information pushes module 16 and is used for repairing procedural information is pushed to fault display module 13, and will the information of restoring electricity be pushed to and stops power supply information propelling movement module 17;
Fault display module 13 is used for having circuit charging equipment and the account information thereof of fault, the influence area and the repairing procedural information of adapted electric line through existing adapted power grid GIS system demonstration;
Stopping power supply information propelling movement module 17 is used for through existing 95598 customer service systems, short message service passage and fiber data passage the fault outage information and the information that restores electricity being influenced user's propelling movement to having a power failure.
The above-mentioned fault message propelling movement module 1 of reporting for repairment links through the Web service data-transmission channel with existing 95598 systems; Above-mentioned line fault information pushes module 2 and links through GPRS message information transmission passage or Web service data-transmission channel with existing power distribution automation management system; Above-mentioned usefulness is adopted fault message propelling movement module 3 and is linked through the Web service data-transmission channel with existing power information acquisition system; It is to utilize the SIM of the remote signalling displacement device that is arranged on switch to constitute that above-mentioned GPRS message information transmits passage, and it is LAN that above-mentioned information is sent out passage outward.
Above-mentioned storage be with the fault message classification and storage of the separate sources that receives in the fault message table of type separately.
Above-mentioned analytical integration is top-down arrangement the in order of line topological structure according to mesolow; Comprise from user profile-ammeter information-distribution transforming information-On line switch information-transformer station's outlet switching information and analyzing; And set up the relation that can inquire about each other, the result who analyzes is stored in the analysis result table.
Above-mentioned user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content.
Above-mentioned switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated factory station, three-phase current and three-phase voltage; Above-mentioned distribution transforming and user's fault message comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
Above-mentioned fault message comprises 95598 user's repairing information, and existing power information acquisition system (CSM) reports fault message and existing power distribution automation management system (DMS) to report fault message.
Above-mentioned fault type comprises low district's fault, distribution transforming fault, middle pressure client's internal fault, part line fault and the circuit fault completely of presenting a theatrical performance as the last item on a programme.
When above-mentioned fault message is that 95598 users are when reporting fault message for repairment; Source device is low pressure ammeter box equipment or the negative control device that is associated through the existing acquisition user of power distribution management system according to the Customs Assigned Number that reports for repairment, and actual geographical coordinate information of source device and account information are to obtain through existing power distribution management system queries according to low pressure ammeter box equipment or negative unique coding of controlling device.
When above-mentioned fault message is an existing power information acquisition system when reporting fault message or existing power distribution automation management system to report fault message, source device is distribution transforming, switch and the negative control device that obtains through existing power distribution management system according to the asset of equipments numbering; Actual geographical coordinate information of source device and account information are to obtain through existing power distribution management system queries according to source distribution transforming, switch and negative unique coding of controlling device.
Above-mentioned controller switching equipment comprises circuit, switch, distribution transformer and middle pressure user, and above-mentioned power failure influences equipment and comprises low-pressure meter case and middle pressure user.
Embodiment two
The adapted electric network fault total system and the embodiment one of present embodiment are basic identical, and different is: also comprise being used for carrying out interactive interactive module 18 through short message service passage and fiber data passage and user; Interaction is meant that the user sends code and the user number inquiry stops sending electrical information. when code was power failure, interactive module 18 was according to user number inquiry client's region power failure information and Spoke-to-Client; When code when restoring electricity, interactive module 4 is according to restore electricity information and inform the user of user number inquiry client region.
The utility model is not limited to above-mentioned each embodiment, and all employings are equal to the technical scheme that replacement forms, and all drop on the protection range of the utility model requirement.

Claims (8)

1. adapted electric network fault total system; It is characterized in that: comprise that fault information acquisition device, fault message are studied and judged device and breakdown repair stops the information push-delivery apparatus of supplying power, said fault information acquisition device comprises being arranged at and existing 95598 intrasystemly reports that fault message pushes module, the line fault information in the existing power distribution automation management system of being arranged at pushes module for repairment, is arranged at usefulness in the existing power information acquisition system and adopts fault message and push module, fault message receiver module, fault message processing module and fault message sending module; Said fault message is studied and judged device and is comprised faulty equipment locating module, fault message screening module, line topological analysis module, equipment operation information analysis module, line switching analysis module, failure analysis module and fault display module; The said breakdown repair information push-delivery apparatus that stops supplying power comprises that breakdown repair allocation schedule module, scene rush to repair administration module, repairing information push module and stop power supply information and pushes module;
The said fault message that reports for repairment pushes module and reports fault message for repairment in order to the user that will be reported to 95598 systems and be pushed to said fault message receiver module;
Said line fault information pushes module and is pushed to said fault message receiver module in order to the switch changed position fault message that will be reported to the power distribution automation management system;
Said usefulness is adopted fault message propelling movement module and is pushed to said fault message receiver module in order to distribution transforming and user's fault message that will be reported to the power information acquisition system;
Fault message pushes module to said fault message receiver module, line fault information pushes module and pushes the next fault message of module propelling movement with adopting fault message from reporting for repairment with verification in order to receive;
Said fault message processing module is stored in order to the fault message that said fault message receiver module is received, and from the low-voltage customer to the high-tension apparatus, carries out analytical integration with uniform data model according to the power network line topological structure;
The fault message of said fault message sending module in order to the fault message processing module is handled sent out passage outward through information and is sent to said faulty equipment locating module;
Said faulty equipment locating module is used to receive the fault message that said fault message sending module sends, and obtains the actual geographical position and the account information of the source device relevant with fault message through existing power distribution management system;
Said fault message screening module is used for the fault message behind the equipment location is screened, and gets rid of the scheduled outage fault message and the confirmed fault message that have generated;
Said line topological analysis module is used for the adapted electric line under the fault message that filters out is carried out topological analysis, obtains the topological structure of this adapted electric line and the circuit charging equipment tabulation of associated topologies structure;
Said equipment operation information analysis module is used for the circuit charging equipment of circuit charging equipment tabulation is carried out the cls analysis of calling together of equipment operation information step by step, and judges whether the circuit charging equipment exists fault;
Said line switching analysis module is used to the switch folding information that detects the On line switch on the adapted electric line and go out wiretap, and judges whether the adapted electric line exists line fault;
Said failure analysis module is used for confirming fault type, the position of fault and fault effects zone according to equipment operation information, switch folding information and topological structure; Fault type, the position of fault and fault effects zone are pushed to breakdown repair allocation schedule module, generate fault outage information and push to according to fault type, the position of fault and fault effects zone and stop power supply information propelling movement module;
Said breakdown repair allocation schedule module is used for confirming according to fault type, the position of fault and fault effects zone the repairing teams and groups and the scheduling recovery vehicle of fault;
Said scene rush to repair administration module is used to monitor and gather repairing personnel's the repairing procedural information and the information that restores electricity;
Said repairing information pushes module and is used for repairing procedural information is pushed to said fault display module, and will the information of restoring electricity be pushed to and stops power supply information propelling movement module;
Said fault display module is used for having circuit charging equipment and the account information thereof of fault, the influence area and the repairing procedural information of adapted electric line through existing adapted power grid GIS system demonstration;
The said power supply information propelling movement module of stopping is used for through existing 95598 customer service systems, short message service passage and fiber data passage the fault outage information and the information that restores electricity being influenced user's propelling movement to having a power failure.
2. according to the said adapted electric network fault of claim 1 total system, it is characterized in that: also comprise being used for carrying out interactive interactive module through short message service passage and fiber data passage and user; Said interaction is that the user sends code and the user number inquiry stops sending electrical information, stops sending electrical information and transmission to inform the user by interactive module according to user number inquiring user region.
3. according to the said adapted electric network fault of claim 2 total system; It is characterized in that: the said fault message propelling movement module of reporting for repairment links through the Web service data-transmission channel with existing 95598 systems; Said line fault information pushes module and links through GPRS message information transmission passage or Web service data-transmission channel with existing power distribution automation management system; Said usefulness is adopted fault message propelling movement module and is linked through the Web service data-transmission channel with existing power information acquisition system; It is to utilize the SIM of the remote signalling displacement device that is arranged on switch to constitute that said GPRS message information transmits passage, and it is LAN that said information is sent out passage outward.
4. according to claim 1,2 or 3 said adapted electric network fault total systems, it is characterized in that: said storage be with the fault message classification and storage of the separate sources that receives in the fault message table of type separately; Said analytical integration is top-down arrangement the in order of line topological structure according to mesolow; Comprise from user profile-ammeter information-distribution transforming information-On line switch information-transformer station's outlet switching information and analyzing; And set up the relation that can inquire about each other, the result who analyzes is stored in the analysis result table.
5. according to claim 1,2 or 3 said adapted electric network fault total systems, it is characterized in that: said user reports fault message for repairment and comprises Customs Assigned Number, user's name, station address, contact method and fault content; Said switch changed position fault message comprises the message of switch number, on off state, circuit number, affiliated factory station, three-phase current and three-phase voltage; Said distribution transforming and user's fault message comprise distribution transforming numbering, distribution transforming title, critical point numbering, ammeter numbering, critical point numbering and acquisition time.
6. according to claim 1,2 or 3 said adapted electric network fault total systems; It is characterized in that: said fault message comprises 95598 user's repairing information, and existing power information acquisition system reports fault message and existing power distribution automation management system to report fault message; Said fault type comprises low district's fault, distribution transforming fault, middle pressure client's internal fault, part line fault and the circuit fault completely of presenting a theatrical performance as the last item on a programme.
7. according to claim 1,2 or 3 said adapted electric network fault total systems; It is characterized in that: when said fault message is that 95598 users are when reporting fault message for repairment; Said source device is low pressure ammeter box equipment or the negative control device that is associated through the existing acquisition user of power distribution management system according to the Customs Assigned Number that reports for repairment, and actual geographical coordinate information of said source device and account information are to obtain through existing power distribution management system queries according to low pressure ammeter box equipment or negative unique coding of controlling device; When said fault message is an existing power information acquisition system when reporting fault message or existing power distribution automation management system to report fault message, said source device is distribution transforming, switch and the negative control device that obtains through existing power distribution management system according to the asset of equipments numbering; Actual geographical coordinate information of said source device and account information are to obtain through existing power distribution management system queries according to source distribution transforming, switch and negative unique coding of controlling device.
8. according to claim 1,2 or 3 said adapted electric network fault total systems, it is characterized in that: said controller switching equipment comprises circuit, switch, distribution transformer and middle pressure user, and said power failure influences equipment and comprises low-pressure meter case and middle pressure user.
CN 201120496869 2011-12-04 2011-12-04 Comprehensive processing system of failure of power distribution and supply grid Expired - Lifetime CN202475009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120496869 CN202475009U (en) 2011-12-04 2011-12-04 Comprehensive processing system of failure of power distribution and supply grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120496869 CN202475009U (en) 2011-12-04 2011-12-04 Comprehensive processing system of failure of power distribution and supply grid

Publications (1)

Publication Number Publication Date
CN202475009U true CN202475009U (en) 2012-10-03

Family

ID=46923136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120496869 Expired - Lifetime CN202475009U (en) 2011-12-04 2011-12-04 Comprehensive processing system of failure of power distribution and supply grid

Country Status (1)

Country Link
CN (1) CN202475009U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102570602A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Fault comprehensive processing platform and method of distribution network
CN103501053A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network
CN103605047A (en) * 2013-11-29 2014-02-26 国家电网公司 Power restoration monitoring system and method
CN103915827A (en) * 2014-03-14 2014-07-09 国网山东省电力公司青岛供电公司 Power distribution network fault studying and judging method and system
CN105277851A (en) * 2015-10-16 2016-01-27 国网甘肃省电力公司天水供电公司 Distribution network fault judgment searching and positioning system
CN105429144A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Information processing method and information processing device for emergency repairing of distribution network
CN106841908A (en) * 2016-12-19 2017-06-13 国电南瑞科技股份有限公司 The visual presentation method of the distribution network failure positioning based on power grid GIS
CN107425600A (en) * 2017-05-02 2017-12-01 广东电网有限责任公司惠州供电局 One kind power supply distribution transformer monitoring system
CN108520624A (en) * 2018-05-08 2018-09-11 国网安徽省电力有限公司 A kind of low-voltage intelligent acquires the double channels acquisition method of complexes and low pressure acquisition
CN110289682A (en) * 2019-06-11 2019-09-27 广西电网有限责任公司南宁供电局 A kind of distribution repairing aid decision and intelligent managing and control system
CN110412421A (en) * 2019-07-31 2019-11-05 深圳供电局有限公司 Method and system for intelligently analyzing and positioning faults
CN110995809A (en) * 2019-11-25 2020-04-10 国家电网有限公司 System and method for inquiring line state based on ubiquitous power Internet of things
CN111146756A (en) * 2019-12-12 2020-05-12 国网陕西省电力公司 Protection constant value checking method and system
CN112381245A (en) * 2020-11-16 2021-02-19 国网山东省电力公司临沂供电公司 Join in marriage automatic pushing means of net fault power failure information
CN113472592A (en) * 2021-07-19 2021-10-01 国网河北省电力有限公司邢台供电分公司 Equipment distribution network management method, system and device

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102570602A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Fault comprehensive processing platform and method of distribution network
CN103501053A (en) * 2011-12-04 2014-01-08 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network
CN103501053B (en) * 2011-12-04 2015-05-13 江苏省电力公司南京供电公司 Comprehensive fault handling system for power distribution and consumption network
CN103605047A (en) * 2013-11-29 2014-02-26 国家电网公司 Power restoration monitoring system and method
CN103915827A (en) * 2014-03-14 2014-07-09 国网山东省电力公司青岛供电公司 Power distribution network fault studying and judging method and system
CN103915827B (en) * 2014-03-14 2016-08-24 国网山东省电力公司青岛供电公司 Power distribution network fault analysis method and study and judge system
CN105277851A (en) * 2015-10-16 2016-01-27 国网甘肃省电力公司天水供电公司 Distribution network fault judgment searching and positioning system
CN105429144A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Information processing method and information processing device for emergency repairing of distribution network
CN106841908A (en) * 2016-12-19 2017-06-13 国电南瑞科技股份有限公司 The visual presentation method of the distribution network failure positioning based on power grid GIS
CN107425600A (en) * 2017-05-02 2017-12-01 广东电网有限责任公司惠州供电局 One kind power supply distribution transformer monitoring system
CN108520624A (en) * 2018-05-08 2018-09-11 国网安徽省电力有限公司 A kind of low-voltage intelligent acquires the double channels acquisition method of complexes and low pressure acquisition
CN108520624B (en) * 2018-05-08 2020-01-10 国网安徽省电力有限公司 Low-voltage intelligent acquisition complete device and low-voltage acquisition double-channel acquisition method
CN110289682A (en) * 2019-06-11 2019-09-27 广西电网有限责任公司南宁供电局 A kind of distribution repairing aid decision and intelligent managing and control system
CN110412421A (en) * 2019-07-31 2019-11-05 深圳供电局有限公司 Method and system for intelligently analyzing and positioning faults
CN110412421B (en) * 2019-07-31 2021-07-13 深圳供电局有限公司 Method and system for intelligently analyzing and positioning faults
CN110995809A (en) * 2019-11-25 2020-04-10 国家电网有限公司 System and method for inquiring line state based on ubiquitous power Internet of things
CN111146756A (en) * 2019-12-12 2020-05-12 国网陕西省电力公司 Protection constant value checking method and system
CN112381245A (en) * 2020-11-16 2021-02-19 国网山东省电力公司临沂供电公司 Join in marriage automatic pushing means of net fault power failure information
CN112381245B (en) * 2020-11-16 2023-01-10 国网山东省电力公司临沂供电公司 Join in marriage automatic pushing tools of net fault power failure information
CN113472592A (en) * 2021-07-19 2021-10-01 国网河北省电力有限公司邢台供电分公司 Equipment distribution network management method, system and device

Similar Documents

Publication Publication Date Title
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN102570602B (en) Fault comprehensive processing platform and method of distribution network
CN103490520B (en) Power distribution network fault treatment method
CN103490523B (en) Intelligent power distribution network fault treatment system
CN103490522A (en) Intelligent power distribution network fault treatment method
CN103501054A (en) Fault handling method for power distribution network
CN103501052A (en) Comprehensive fault handling method for power distribution and consumption network
CN103501053B (en) Comprehensive fault handling system for power distribution and consumption network
CN202474601U (en) Power grid fault rush repair system based on GIS
CN105305393A (en) Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN104091231A (en) Distribution network fault repairing commanding and processing system and method
CN202159369U (en) Information processing device for improving fault repairing work order merging rate of electrical power system
CN109472476B (en) Power failure identification analysis method and system
CN109871965A (en) A kind of breakdown repair App platform of combination GIS and power customer fault location information
CN102497017B (en) Power grid failure information comprehensive collection platform and collection method
CN102565572A (en) Platform and method for judging fault of match power grid
CN105809373A (en) Distribution network fault information comprehensive collection and management platform
CN105277851A (en) Distribution network fault judgment searching and positioning system
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
CN103607042A (en) Power distribution network fault processing method for suburb long overhead line-oriented fault indicator
CN103246630A (en) Distribution network integrated platform information integration method based on model data center
CN103066700B (en) Power grid fault information processing method and system
CN105071376A (en) Method for implementing integrated framework of main distribution network
CN110969827A (en) Low-voltage power line carrier meter reading system and method
CN104882962A (en) Information acquisition monitoring system based on BeiDou satellite and information acquisition method based on BeiDou satellite

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU SUYUAN HIGH-TECH CO., LTD. STATE GRID CORP

Free format text: FORMER OWNER: JIANGSU SUYUAN HIGH-TECH CO., LTD.

Effective date: 20121121

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121121

Address after: 210008 Zhongshan Road, Jiangsu, No. 251,

Patentee after: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee after: Jiangsu Suyuan High-Tech Co., Ltd.

Patentee after: State Grid Corporation of China

Patentee after: Jiangsu Electric Power Company

Address before: 210008 Zhongshan Road, Jiangsu, No. 251,

Patentee before: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee before: Jiangsu Suyuan High-Tech Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20121003

Effective date of abandoning: 20131030

RGAV Abandon patent right to avoid regrant