CN202474601U - Power grid fault rush repair system based on GIS - Google Patents

Power grid fault rush repair system based on GIS Download PDF

Info

Publication number
CN202474601U
CN202474601U CN 201120456238 CN201120456238U CN202474601U CN 202474601 U CN202474601 U CN 202474601U CN 201120456238 CN201120456238 CN 201120456238 CN 201120456238 U CN201120456238 U CN 201120456238U CN 202474601 U CN202474601 U CN 202474601U
Authority
CN
China
Prior art keywords
repairing
fault
information
module
gis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120456238
Other languages
Chinese (zh)
Inventor
高莉莎
徐爱华
赵晓波
吴文书
张文俊
郑涛
王峰
汤雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGSU SUYUAN HIGH-TECH Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN HIGH-TECH Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical JIANGSU SUYUAN HIGH-TECH Co Ltd
Priority to CN 201120456238 priority Critical patent/CN202474601U/en
Application granted granted Critical
Publication of CN202474601U publication Critical patent/CN202474601U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to a power grid fault rush repair system based on GIS (Geographic Information System), comprising: a fault information receiving module used for obtaining fault information; a power grid topology analysis module used for positioning distribution equipment corresponding to the fault information; a geographic information display module used for visually presenting the fault and fault equipment information on a GIS geographic map; a rush repair team distribution module used for determining a fault rush repair team and a rush repair vehicle; a vehicle position monitoring and scheduling module used for the rush repair team to check the position of the rush repair vehicle and schedule the vehicle; an on-site rush repair management module used for monitoring the rush repair process and acquiring real-time information and result information of the rush repair process; and a rush repair information push module used for pushing the real-time information and the result information of the rush repair process to the present 95598 repair system and informing a user. The power grid fault rush repair system based on GIS in the utility model is provided with the rush repair information push module, thus the power grid fault rush repair system can timely inform the 95598 system about the conditions of the rush repair process, then the 95598 system can inform the user, thereby enabling the user to timely grasp the fault rush repair conditions.

Description

Electric power network breakdown repair system based on GIS
Technical field
The utility model relates to a kind of electric power network breakdown repair system, belongs to electric power network administrative skill field.
Background technology
Existing electric power network breakdown repair system and distribution management system are not fully integrated, related yet not comprehensive with the user.When therefore after the user reports fault for repairment, carrying out breakdown repair, the user can not in time understand the progress of breakdown repair.In addition during scene rush to repair, the repairing personnel at the scene can not with breakdown repair system real-time, interactive, repairing work can not effectively be supervised.
The speed of the informatization of electric power network is to grow with each passing hour in recent years, and the all-round construction of " intelligent grid " has been quickened the fusion of marketing system and distribution management system.The advantage of while GIS technology in distribution programmed decision-making, emergency first-aid repair, science scheduling; And mobile communication technology such as 3G makes that big data quantity communications such as remote speech, video, data are more and more convenient, and these all are that condition has been created in the construction of the electric power network breakdown repair system of a new generation.
Summary of the invention
The technical problem that the utility model solves is: not enough to prior art, propose a kind ofly can form interaction, make the user in time grasp the electric power network breakdown repair system of breakdown repair situation with the user.
In order to solve the problems of the technologies described above; The technical scheme that the utility model proposes is: a kind of electric power network breakdown repair system based on GIS; Comprise fault message receiver module, power network topology analysis module, geographic information displaying module, repairing teams and groups distribution module, vehicle location monitoring and scheduling module and scene rush to repair administration module; Comprise that also repairing information pushes module, wherein:
The fault message receiver module provides interface to be used to obtain comprehensive fault message;
The power network topology analysis module is used for the topological relation of the corresponding controller switching equipment of analysis of failure information at electrical network, and the controller switching equipment of fault is positioned;
The geographic information displaying module, the fault and the faulty equipment information that are used for power network topology analysis module analyzing and positioning is obtained intuitively represent on the GIS geographical map;
Rush to repair teams and groups' distribution module, be used for confirming the repairing teams and groups and the recovery vehicle of fault;
Vehicle location monitoring and scheduling module is used to rush to repair teams and groups and checks the particular location of breakdown van and dispatch buses;
The scene rush to repair administration module is used to monitor repairing personnel's repairing process and gathers repairing process real-time information and object information;
Repairing information pushes module, is used for the real time information and the object information of repairing process are pushed to existing 95598 repair reporting systems, and existing 95598 repair reporting systems are informed the user with the real time information and the object information of repairing again.
As a preferred version of the utility model, said geographic information displaying module comprises map initialization unit, the position of fault and coverage display unit; Said map initialization unit is used for the facility information of electric power network is illustrated in the GIS geographical map intuitively, and the said position of fault and coverage display unit are used for the position of fault and fault incidence are illustrated in the GIS geographical map intuitively.
Preferred version as the utility model; Said vehicle location monitoring and scheduling module comprises vehicle location monitoring unit and vehicle scheduling unit; Described vehicle location monitoring unit is used for stroke and the monitoring repairing process that the tracing and monitoring recovery vehicle goes to the position of fault; Described vehicle scheduling unit is used for the position relation according to the breakdown van and the position of fault, through vehicle GPS breakdown van is carried out rational management, and on the GIS geographical map, shows.
As a preferred version of the utility model, said scene rush to repair administration module comprises the unit of confirming to reach the spot, field failure type confirmation unit, repairing scheduled maintenance unit, repairing typing unit as a result; The said affirmation unit of reaching the spot is used for the repairing personnel and informs that after reaching the spot the control centre reaches the spot; Said field failure type confirmation unit is used for repainting the fault effects zone and being sent to repairing information propelling movement module after the repairing personnel check the field failure type; Said repairing scheduled maintenance unit is used for the repairing personnel and safeguards the repairing progress msg, and said repairing typing unit as a result is used to rush to repair personnel's typing repairing result and is sent to repairing information propelling movement module.
The perfect of technique scheme is: the scene rush to repair administration module contains the video monitoring unit.
Further improving of technique scheme is: said video monitoring unit is 3G wireless video monitoring unit.
As a preferred version of the utility model, also comprise equipment and building enquiry module, said equipment and building enquiry module are used for query facility and building information and on the GIS geographical map, locate.
The perfect of technique scheme is: locate on the GIS geographical map according to its information of geographic elements of keyword query of equipment and building and according to geographic element.
Adopt the beneficial effect that the utlity model has of technique scheme to be: 1) to push module because system is provided with repairing information; Can repairing process real-time situation and object information in time be informed 95598 systems; Undertaken alternately by 95598 systems and client again, therefore can make the user can in time grasp the breakdown repair situation; 2) because based on GIS technology, can information such as the position of fault be presented in face of the repairing personnel intuitively, the fault message that receives simultaneously is more comprehensive, to the situation of fault judge more accurate, help fast, accurately rush to repair; 3) because integrated vehicle GPS navigation system can be carried out rational management to recovery vehicle, recovery vehicle is rationally utilized; 4) because the integrated video monitoring unit can return the repairing field condition and give command centre, be convenient to command centre repairing is given some on the spot guidance, the repairing process is effectively supervised, reduce loss of outage to greatest extent.
Description of drawings
Fig. 1 is the Organization Chart of the utility model based on the electric power network breakdown repair system of GIS.
Embodiment
As shown in Figure 1, the electric power network breakdown repair system based on GIS of this embodiment comprises that fault message receiver module 1, power network topology analysis module 2, geographic information displaying module 3, repairing teams and groups distribution module 4, vehicle location monitoring and scheduling module 5, scene rush to repair administration module 6 and repairing information push module 7.
Fault message receiver module 1 provides interface service, is used to obtain comprehensive fault message (comprising fault type, the position of fault, fault incidence, defective space information etc.).
Power network topology analysis module 2 is used for the topological relation of the corresponding controller switching equipment of analysis of failure information at electrical network; According to position and the equipment topological relation (promptly position) thereof of controller switching equipment on the GIS geographical map of fault message analysis of failure, thereby be that geographic information displaying module 3, repairing teams and groups' distribution module 4 and vehicle location monitoring and scheduler module 5 provide information to help.
Fault and faulty equipment information that geographic information displaying module 3 is used for power network topology analysis module analyzing and positioning is obtained intuitively represent on the GIS geographical map; It specifically comprises map initialization unit 31, the position of fault and coverage display unit 32.Map initialization unit 31 is used for information such as the equipment of electric power network and building are illustrated in the GIS geographical map intuitively; The position of fault and coverage display unit 32 are used for fault message receiver module 1 received fault message is showed (comprising location, the position of fault and displaying fault incidence) on the GIS geographical map.
Rush to repair teams and groups' distribution module 4, be used to obtain the repairing teams and groups and the recovery vehicle of fault, the defective space information that promptly obtains according to fault message receiver module 1 obtains the repairing teams and groups of fault automatically, distributes the repairing personnel to be responsible for repairing by these repairing teams and groups.
Vehicle location monitoring and scheduling module 5 is used to rush to repair teams and groups and checks the particular location of breakdown van and dispatch buses; It specifically comprises vehicle location monitoring unit 51, vehicle scheduling unit 52.Vehicle location monitoring unit 51 is used for stroke and the monitoring repairing process that the tracing and monitoring breakdown van goes to the position of fault; Vehicle scheduling unit 52 is used for the position relation according to the breakdown van and the position of fault; Through vehicle GPS recovery vehicle is carried out rational management; And on the GIS geographical map, show; Promptly according to the distance of the position of fault, whether have the repairing task dispatching that recovery vehicle is carried out rational management, the repairing resource is rationally utilized.
Scene rush to repair administration module 6 is used to monitor repairing personnel's repairing process and utilizes Vehicular video monitoring unit 65 to gather repairing process real-time information and object information; It specifically comprises the unit 61 of confirming to reach the spot, field failure type confirmation unit 62, repairing scheduled maintenance unit 63, repairing typing unit 64 as a result, also contains video monitoring unit 65, and present embodiment adopts 3G wireless video monitoring unit.The unit 61 of confirming to reach the spot is used for the repairing personnel and informs that after reaching the spot command centre reaches the spot; Field failure type confirmation unit 62 is used for repainting the fault effects zone and being sent to repairing information propelling movement module 7 after the repairing personnel check the field failure type, pushes module 7 by repairing information again and informs 95598 systems; Repairing scheduled maintenance unit 63 is used for the repairing personnel and safeguards the repairing progress msg; Repairing typing unit 64 as a result is used to rush to repair personnel's typing repairing result and is sent to repairing information propelling movement module 7, pushes module 7 by repairing information again and informs 95598 systems.
Repairing information pushes module 7, is used for the real time information and the object information of repairing process are pushed to existing 95598 repair reporting systems, and existing 95598 repair reporting systems are informed the user with the real time information and the object information of repairing again.
The electric power network breakdown repair system based on GIS of this embodiment also comprises equipment and building enquiry module 8.Equipment and building enquiry module 8 are used for query facility and building information and on the GIS geographical map, locate, and locate according to its information of geographic elements of keyword query of equipment and building and according to geographic element.
The utility model is not limited to the foregoing description.All employings are equal to the technical scheme that replacement forms, and all drop on the protection range of the utility model requirement.

Claims (8)

1. the electric power network breakdown repair system based on GIS comprises fault message receiver module, power network topology analysis module, geographic information displaying module, repairing teams and groups distribution module, vehicle location monitoring and scheduling module and scene rush to repair administration module,
Said fault message receiver module provides interface to be used to obtain fault message;
Said power network topology analysis module is used for the topological relation of the corresponding controller switching equipment of analysis of failure information at electrical network, and the controller switching equipment of fault is positioned;
Said geographic information displaying module, the fault and the faulty equipment information that are used for power network topology analysis module analyzing and positioning is obtained intuitively represent on the GIS geographical map;
Said repairing teams and groups distribution module is used for confirming the repairing teams and groups and the recovery vehicle of fault;
Said vehicle location monitoring and scheduling module is used to rush to repair teams and groups and checks the particular location of breakdown van and dispatch buses;
Said scene rush to repair administration module is used to monitor repairing personnel's repairing process and gathers repairing process real-time information and object information;
It is characterized in that: comprise that also repairing information pushes module,
Said repairing information pushes module, is used for the real time information and the object information of repairing process are pushed to existing 95598 repair reporting systems.
2. according to the said electric power network breakdown repair system of claim 1, it is characterized in that based on GIS: also comprise equipment and building enquiry module,
Said equipment and building enquiry module are used to inquire about fault message corresponding controller switching equipment and building information and on the GIS geographical map, locate.
3. according to the said electric power network breakdown repair system based on GIS of claim 2, it is characterized in that: said equipment and building enquiry module are located on the GIS geographical map according to its information of geographic elements of keyword query of corresponding controller switching equipment of fault message and building and according to geographic element.
4. according to claim 1,2 or 3 said electric power network breakdown repair systems based on GIS, it is characterized in that: said geographic information displaying module comprises map initialization unit, the position of fault and coverage display unit; Said map initialization unit is used for the facility information of electric power network is illustrated in the GIS geographical map intuitively, and the said position of fault and coverage display unit are used for the position of fault and fault incidence are illustrated in the GIS geographical map intuitively.
5. according to claim 1,2 or 3 said electric power network breakdown repair systems based on GIS; It is characterized in that: said vehicle location monitoring and scheduling module comprises vehicle location monitoring unit and vehicle scheduling unit; Said vehicle location monitoring unit is used for stroke and the monitoring repairing process that the tracing and monitoring breakdown van goes to the position of fault; Said vehicle scheduling unit is used for the position relation according to the breakdown van and the position of fault, through vehicle GPS recovery vehicle is dispatched, and on the GIS geographical map, is shown.
6. according to claim 1,2 or 3 said electric power network breakdown repair systems based on GIS, it is characterized in that: said scene rush to repair administration module comprises the unit of confirming to reach the spot, field failure type confirmation unit, repairing scheduled maintenance unit, repairing typing unit as a result; The said affirmation unit of reaching the spot is used for the repairing personnel and informs that after reaching the spot the control centre reaches the spot; Said field failure type confirmation unit is used for repainting the fault effects zone and being sent to repairing information propelling movement module after the repairing personnel check the field failure type; Said repairing scheduled maintenance unit is used for the repairing personnel and safeguards the repairing progress msg, and said repairing typing unit as a result is used to rush to repair personnel's typing repairing result and is sent to repairing information propelling movement module.
7. according to the said electric power network breakdown repair system based on GIS of claim 6, it is characterized in that: the scene rush to repair administration module contains the video monitoring unit.
8. according to the said electric power network breakdown repair system based on GIS of claim 7, it is characterized in that: said video monitoring unit is 3G wireless video monitoring unit.
CN 201120456238 2011-11-17 2011-11-17 Power grid fault rush repair system based on GIS Expired - Fee Related CN202474601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120456238 CN202474601U (en) 2011-11-17 2011-11-17 Power grid fault rush repair system based on GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120456238 CN202474601U (en) 2011-11-17 2011-11-17 Power grid fault rush repair system based on GIS

Publications (1)

Publication Number Publication Date
CN202474601U true CN202474601U (en) 2012-10-03

Family

ID=46922729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120456238 Expired - Fee Related CN202474601U (en) 2011-11-17 2011-11-17 Power grid fault rush repair system based on GIS

Country Status (1)

Country Link
CN (1) CN202474601U (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103149548A (en) * 2013-01-31 2013-06-12 重庆市电力公司电力科学研究院 Method and device of information display based on electric energy metering device
CN103618616A (en) * 2013-11-08 2014-03-05 广东电网公司东莞供电局 City electricity fault troubleshooting system
CN104376383A (en) * 2014-11-27 2015-02-25 东北大学 Grid voltage monitoring and prediction system and method based on geographic information system
CN104392312A (en) * 2014-11-18 2015-03-04 国家电网公司 Service supporting system applied to distribution network and application method of service supporting system
CN104991502A (en) * 2015-07-29 2015-10-21 成都国铁电气设备有限公司 Vehicular overhead line system running state detection data analyzing and processing system and method
CN105072187A (en) * 2015-08-17 2015-11-18 江苏省电力公司镇江供电公司 Star network topological structure and distribution network rush repair method based on star network topological structure
CN105207121A (en) * 2015-09-23 2015-12-30 国家电网公司 Power distribution network fault emergency maintenance method based on topology analysis
CN105305611A (en) * 2015-05-07 2016-02-03 国家电网公司 Power grid emergency repair method based on network learning platform
CN105429144A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Information processing method and information processing device for emergency repairing of distribution network
CN105429290A (en) * 2014-09-23 2016-03-23 国网河南省电力公司周口供电公司 Automatic scheduling system for electric power rapid first-aid repair
CN105509728A (en) * 2015-11-02 2016-04-20 湖南红太阳新能源科技有限公司 Photovoltaic power station failure equipment navigation method and system
CN105610622A (en) * 2015-12-31 2016-05-25 国网浙江奉化市供电公司 Safety accident prevention method and system
CN106161092A (en) * 2016-07-14 2016-11-23 国网山东省电力公司青岛供电公司 A kind of network distributing failure emergency repair work order distributing method and device
CN106168981A (en) * 2012-10-22 2016-11-30 国网山东省电力公司青岛供电公司 Electric network information real-time exhibition method and apparatus
CN106651645A (en) * 2016-11-22 2017-05-10 云南电网有限责任公司电力科学研究院 Fault data management method for direct-current transmission system
CN106680667A (en) * 2016-12-09 2017-05-17 国网北京市电力公司 Power equipment monitoring method, power equipment monitoring device and power equipment monitoring system
CN106992604A (en) * 2017-05-31 2017-07-28 泉州创先力智能科技有限公司 A kind of fault location and visual presentation device based on automation equipment virtual connections
CN107093036A (en) * 2017-06-13 2017-08-25 国网辽宁省电力有限公司锦州供电公司 The emergency first-aid repair car system of the light source containing XED and the intelligent dispatching method based on BP dijkstra's algorithms
CN108683713A (en) * 2018-04-25 2018-10-19 广州供电局有限公司 The method for pushing and pusher of fault outage information
CN108681980A (en) * 2018-05-10 2018-10-19 西安壹云电力科技有限公司 Interactive repair reporting system based on APP and method
CN108985572A (en) * 2018-06-21 2018-12-11 国电南瑞科技股份有限公司 A kind of region distribution net equipment breakdown repair method based on location-based service
CN109523140A (en) * 2018-10-23 2019-03-26 国网浙江省电力有限公司 A kind of management method and system of the vehicle of speedily carrying out rescue work based on dipper system
CN110556921A (en) * 2019-09-11 2019-12-10 中国南方电网有限责任公司 safety monitoring system for real-time operation of power grid
CN110942221A (en) * 2019-08-02 2020-03-31 国网浙江省电力有限公司嘉兴供电公司 Transformer substation fault rapid repairing method based on Internet of things
CN111262344A (en) * 2020-03-30 2020-06-09 佛山科学技术学院 Power grid monitoring emergency system
CN112564952A (en) * 2020-11-27 2021-03-26 广东电网有限责任公司肇庆供电局 Intelligent inspection system for distribution network line
CN113469384A (en) * 2021-07-13 2021-10-01 广东电网有限责任公司 Fault point first-aid repair auxiliary visualization method and system based on distributed system

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168981A (en) * 2012-10-22 2016-11-30 国网山东省电力公司青岛供电公司 Electric network information real-time exhibition method and apparatus
CN103149548B (en) * 2013-01-31 2015-11-18 重庆市电力公司电力科学研究院 A kind of method for information display based on electric power meter and device
CN103149548A (en) * 2013-01-31 2013-06-12 重庆市电力公司电力科学研究院 Method and device of information display based on electric energy metering device
CN103618616A (en) * 2013-11-08 2014-03-05 广东电网公司东莞供电局 City electricity fault troubleshooting system
CN105429290B (en) * 2014-09-23 2018-08-03 国网河南省电力公司周口供电公司 A kind of electric power rapid rush-repair automatic dispatching system
CN105429290A (en) * 2014-09-23 2016-03-23 国网河南省电力公司周口供电公司 Automatic scheduling system for electric power rapid first-aid repair
CN104392312A (en) * 2014-11-18 2015-03-04 国家电网公司 Service supporting system applied to distribution network and application method of service supporting system
CN104376383A (en) * 2014-11-27 2015-02-25 东北大学 Grid voltage monitoring and prediction system and method based on geographic information system
CN105305611A (en) * 2015-05-07 2016-02-03 国家电网公司 Power grid emergency repair method based on network learning platform
CN104991502A (en) * 2015-07-29 2015-10-21 成都国铁电气设备有限公司 Vehicular overhead line system running state detection data analyzing and processing system and method
CN105072187A (en) * 2015-08-17 2015-11-18 江苏省电力公司镇江供电公司 Star network topological structure and distribution network rush repair method based on star network topological structure
CN105207121A (en) * 2015-09-23 2015-12-30 国家电网公司 Power distribution network fault emergency maintenance method based on topology analysis
CN105509728A (en) * 2015-11-02 2016-04-20 湖南红太阳新能源科技有限公司 Photovoltaic power station failure equipment navigation method and system
CN105610622A (en) * 2015-12-31 2016-05-25 国网浙江奉化市供电公司 Safety accident prevention method and system
CN105429144A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Information processing method and information processing device for emergency repairing of distribution network
CN106161092A (en) * 2016-07-14 2016-11-23 国网山东省电力公司青岛供电公司 A kind of network distributing failure emergency repair work order distributing method and device
CN106651645A (en) * 2016-11-22 2017-05-10 云南电网有限责任公司电力科学研究院 Fault data management method for direct-current transmission system
CN106680667A (en) * 2016-12-09 2017-05-17 国网北京市电力公司 Power equipment monitoring method, power equipment monitoring device and power equipment monitoring system
CN106992604A (en) * 2017-05-31 2017-07-28 泉州创先力智能科技有限公司 A kind of fault location and visual presentation device based on automation equipment virtual connections
CN107093036A (en) * 2017-06-13 2017-08-25 国网辽宁省电力有限公司锦州供电公司 The emergency first-aid repair car system of the light source containing XED and the intelligent dispatching method based on BP dijkstra's algorithms
CN108683713A (en) * 2018-04-25 2018-10-19 广州供电局有限公司 The method for pushing and pusher of fault outage information
CN108683713B (en) * 2018-04-25 2021-08-31 广东电网有限责任公司广州供电局 Method and device for pushing fault power failure information
CN108681980A (en) * 2018-05-10 2018-10-19 西安壹云电力科技有限公司 Interactive repair reporting system based on APP and method
CN108985572A (en) * 2018-06-21 2018-12-11 国电南瑞科技股份有限公司 A kind of region distribution net equipment breakdown repair method based on location-based service
CN109523140A (en) * 2018-10-23 2019-03-26 国网浙江省电力有限公司 A kind of management method and system of the vehicle of speedily carrying out rescue work based on dipper system
CN110942221A (en) * 2019-08-02 2020-03-31 国网浙江省电力有限公司嘉兴供电公司 Transformer substation fault rapid repairing method based on Internet of things
CN110556921A (en) * 2019-09-11 2019-12-10 中国南方电网有限责任公司 safety monitoring system for real-time operation of power grid
CN111262344A (en) * 2020-03-30 2020-06-09 佛山科学技术学院 Power grid monitoring emergency system
CN112564952A (en) * 2020-11-27 2021-03-26 广东电网有限责任公司肇庆供电局 Intelligent inspection system for distribution network line
CN113469384A (en) * 2021-07-13 2021-10-01 广东电网有限责任公司 Fault point first-aid repair auxiliary visualization method and system based on distributed system

Similar Documents

Publication Publication Date Title
CN202474601U (en) Power grid fault rush repair system based on GIS
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN102646230B (en) A kind of infosystem realizing the management of distribution network failure fast power restoration
CN103714437A (en) Power line repair commanding method based on CIS and movable operation
CN103886511A (en) Real-time command system for power distribution network fault repair
CN108267670B (en) Distribution network fault study and judgment early warning system and implementation method thereof
CN104950855A (en) Town sewage plant and pump station operation monitoring management system and town sewage plant and pump station operation monitoring management method
CN102956021A (en) Power grid comprehensive visualization method based on multi-service system information fusion
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
CN105305393A (en) Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN109871965A (en) A kind of breakdown repair App platform of combination GIS and power customer fault location information
CN105564465A (en) System and method for controlling maintenance operation of railway electrical service signal equipment
US20120173296A1 (en) Method and system for outage restoration
CN102208048A (en) Technology support system of marketing and distribution integration power supply service and method thereof
CN102025196A (en) Service oriented architecture (SOA)-based grid equipment monitoring and failure positioning wireless system
CN201928087U (en) Grid-equipment-monitoring and fault-locating wireless system based on SOA (service-oriented architecture) architecture
CN103986227A (en) Electric power distribution network operation monitoring method and system based on GIS platform
CN101498927A (en) Central synthetic monitoring system of wind power station group
CN103246630A (en) Distribution network integrated platform information integration method based on model data center
CN105447772A (en) Intelligent power line repair scheduling system
CN102968689A (en) Intelligent monitoring method for remote control of power transformation overhaul work
CN201984132U (en) Distribution line fault positioning and on-line monitoring system
CN103606055A (en) Intelligent interaction platform for power fault rush repair
CN202395900U (en) Mobile urgent repair operation platform for urban distribution network
CN103034932A (en) Multifunctional integrated power failure management system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU SUYUAN HIGH-TECH CO., LTD. STATE GRID CORP

Free format text: FORMER OWNER: JIANGSU SUYUAN HIGH-TECH CO., LTD.

Effective date: 20121121

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121121

Address after: 210008 Zhongshan Road, Jiangsu, No. 251,

Patentee after: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee after: Jiangsu Suyuan High-Tech Co., Ltd.

Patentee after: State Grid Corporation of China

Patentee after: Jiangsu Electric Power Company

Address before: 210008 Zhongshan Road, Jiangsu, No. 251,

Patentee before: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee before: Jiangsu Suyuan High-Tech Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20181117

CF01 Termination of patent right due to non-payment of annual fee