CN103886511A - Real-time command system for power distribution network fault repair - Google Patents
Real-time command system for power distribution network fault repair Download PDFInfo
- Publication number
- CN103886511A CN103886511A CN201210554869.1A CN201210554869A CN103886511A CN 103886511 A CN103886511 A CN 103886511A CN 201210554869 A CN201210554869 A CN 201210554869A CN 103886511 A CN103886511 A CN 103886511A
- Authority
- CN
- China
- Prior art keywords
- repairing
- commander
- repair
- time
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 claims abstract description 6
- 238000007418 data mining Methods 0.000 claims abstract description 4
- 230000015556 catabolic process Effects 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 6
- 230000002452 interceptive effect Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 4
- 238000012935 Averaging Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 claims description 3
- 238000007405 data analysis Methods 0.000 claims 1
- 238000004364 calculation method Methods 0.000 abstract 1
- 238000012800 visualization Methods 0.000 abstract 1
- 230000000007 visual effect Effects 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
Images
Abstract
The invention relates to a real-time command system for power distribution network repair. The real-time command system comprises a command master station system, a command workstation system, and a command smart tablet personal computer system. The command master station system is used to provide services including GIS data based on the power supply bureau area, the fault repair progress, repair team route data and fault historical data mining analysis based on GIS and GPS and fault repair dispatching management and report management for the command workstation system. The fault repair progress calculation is used to estimate the repair time according to field repair steps and history to realize visualization display of the repair progress so as to make both of managers and users can master the repair progress on a real-time basis, so the fault repair efficiency, the repair supervision level and the use satisfaction can be greatly improved.
Description
Technical field
The present invention relates to a kind of real time commanding system towards distribution network failure repairing
Background technology
Breakdown repair is the vital task in power distribution network work, and whether repairing directly has influence on the safe operation of power distribution network and electrical network user's satisfaction in time.After power distribution network breaks down, traditional method is to concentrate the troublshooting of accepted users by 95598, then by paper document, repairing task is distributed to concrete repairing operating crew.But because distribution network widely dispersed, equipment are various, topological structure of electric and surrounding enviroment complexity, but simultaneously repair personnel and repairing resource very limited.Traditionally on paper mode has brought huge difficulty to raising breakdown repair efficiency and supervision level, and management specific responsibility and user cannot grasp repairing progress in real time.
Summary of the invention
The present invention will overcome above-mentioned deficiency, propose a kind ofly towards distribution network failure repairing, integrate the real time commanding system of Geographic Information System GIS, visual scheduling, visual, the with no paper form of repairing progress and historical data excavation.Native system can carry out effective management and control to the repairing status information that distributes wide, and the configuration with repairing resource according to repair personnel's distribution situation, the schedule of repairing task is realized and estimated with real-time update and show, thereby utilize to optimization resource, make management specific responsibility and user can grasp in real time repairing progress, can greatly improve breakdown repair efficiency, repairing supervision level, and user's satisfaction.
A kind of real time commanding system towards power distribution network repairing involved in the present invention, is characterized in that: comprise commander's main station system, commander's workstation system and commander's Intelligent flat system;
Described commander's main station system, be used to commander's workstation system and commander's Intelligent flat system that the service of multiple systems level is provided, this system-level service comprises the GIS data based on area under one's jurisdiction under power supply administration, the method for visualizing of breakdown repair progress, the repairing teams and groups course data based on GIS and GPS, fault history data mining analysis, breakdown repair management and running and Report Server Management.
Described commander's workstation system, be used to yardman, the repairing personnel of teams and groups and management specific responsibility to provide relevant work responsibility required management tool, comprise that position of fault map shows, the dynamic change of repairing state shows, repairing teams and groups course shows, scheduler task management, repairing task browse.
Described commander's Intelligent flat system, with GPS and vision sensor module, it is the fore device of data input and live video/picture collection, it is again the tool system that repair personnel and management specific responsibility can be carried out real-time, interactive, be used for rushing to repair the personnel of teams and groups input fault diagnostic data, collection site operation video/picture, and the mobile GIS service that provides of indicating command main station system, repairing task, repairing workflow, repairing goods and materials status information.
The method for visualizing of described breakdown repair progress, adopt the basic application model of browser/server, utilize based on dynamic WEB interactive application technology, show and export in real time the progress percentage of the whole deadline of fault task to browser, be convenient to management specific responsibility and user and grasp in real time repairing progress, repairing task schedule is to be calculated by following steps:
1) specialize in repairing place P and estimate repairing task deadline T by commanding workstation system to send to commander's main station system and commanding Intelligent flat system by management, estimate task deadline T=repairing time T '+the T3 of return trip time, repairing time T '=go journey time T 1+ job step time T 2;
2) commander's main station system, by according to the gps data of commanding Intelligent flat system to pass back, calculates in real time repairing teams and groups and the distance of rushing to repair place, and calculates away journey time T 1 in real time according to road conditions;
3) after the repairing personnel of teams and groups reach the spot, start repairing workflow, now command Intelligent flat system to form data by wireless communication networks with commander's main station system and synchronize;
4) the repairing personnel of teams and groups, by on-the-spot anticipation fault type input commander Intelligent flat system, now command Intelligent flat system to generate the some job steps that solve this fault, and the repairing personnel of teams and groups often complete a step and just scratch out a step;
5) commander's main station system is received after fault type information, rush to repair and estimate job step time T 2 averaging time according to the history of this fault type, and the data of passing back according to commander's Intelligent flat system of receiving, further complete the time real-time update T2 of each step;
6) repeat 4) 5) step, until fault is got rid of and is completed all working step;
7) after job step completes, repairing teams and groups return, the gps data of passing back according to commander's Intelligent flat system equally, calculates in real time the T3 of return trip time, and upgrades and estimate task deadline T.
Accompanying drawing explanation
Fig. 1 is the Organization Chart towards the real time commanding system of distribution network failure repairing
Embodiment
Below in conjunction with drawings and Examples, the present invention is further described as follows:
Commander's main station system 1, be used to commander's workstation system and commander's Intelligent flat system that the service of multiple systems level is provided, this system-level service comprises the GIS data 11 based on area under one's jurisdiction under power supply administration, the method for visualizing 12 of breakdown repair progress, the repairing teams and groups course data 13 based on GIS and GPS, fault history data mining analysis 14, breakdown repair management and running and Report Server Management 15.
Commander's workstation system 2, be used to yardman, the repairing personnel of teams and groups and management specific responsibility to provide relevant work responsibility required management tool, comprise that position of fault map shows 21, rushes to repair state dynamic change demonstration 22, repairing teams and groups course shows 23, scheduler task management 24, repairing task browse 25.
Commander's Intelligent flat system 3, with GPS and vision sensor module, it is the fore device of data input and live video/picture collection, it is again the tool system that repair personnel and management specific responsibility can be carried out real-time, interactive, be used for rushing to repair the personnel of teams and groups input fault diagnostic data 31, collection site operation video/picture 32, and the mobile GIS that indicating command main station system provides serves 33, repairing task 34, repairing workflow step 35.
Embodiment
Mou Tianmou power supply administration obtains the fault of somewhere P power failure and declares, specialize in 4 by repairing place P and estimate repairing task deadline T by management and send to commander's main station system 1 and command Intelligent flat system 3 by commander's workstation system 2, it is 4 hours that task deadline T is estimated in 1 analysis, go journey T1 and return T3 to need 1 hour, repairing job step time T ' estimate 3 hours, and generate job schedule bar, send to 2 and 3 by 41 in Fig. 1 and 51 communication routes.Now command main station system 1 by the gps data of passing back according to commander's Intelligent flat system 3, calculate in real time repairing teams and groups and the distance of rushing to repair place, and calculate away journey time T 1 and T.T. T in real time according to road conditions, owing to blocking up, go the journey time to spend more than usual half an hour, now T.T. T is from dynamically becoming 4.5 hours;
After the repairing personnel of teams and groups 5 reach the spot, spent 1 hour, progress displaying number percent 1/4.5=22%, starts repairing workflow step 35, now commands Intelligent flat system to form data by wireless communication networks 51 with commander's main station system and synchronizes;
The repairing personnel of teams and groups, by on-the-spot anticipation fault type input commander Intelligent flat system 41, now command Intelligent flat system to generate the some job steps that solve this fault, and the repairing personnel of teams and groups often complete a step and just scratch out a step; Commander's main station system is received after fault type information, estimates job step time T 2 averaging time according to the history repairing of this fault type, and the data of passing back according to commander's Intelligent flat system of receiving, further completes the time real-time update T2 of each step; After job step completes, repairing teams and groups return, the gps data of passing back according to commander's Intelligent flat system equally, calculates in real time the T3 of return trip time, and upgrades and estimate task deadline T.
The present embodiment is estimated the repairing time according to scene rush to repair step and history, realize the visual demonstration of repairing progress, make management specific responsibility and user can grasp in real time repairing progress, can greatly improve breakdown repair efficiency, repairing supervision level, and user's satisfaction.
Claims (2)
1. towards a real time commanding system for power distribution network repairing, it is characterized in that: comprise commander's main station system, commander's workstation system and commander's Intelligent flat system;
Described commander's main station system, be used to commander's workstation system and commander's Intelligent flat system that the service of multiple systems level is provided, this system-level service comprises the GIS data based on area under one's jurisdiction under power supply administration, the method for visualizing of breakdown repair progress, the repairing teams and groups course data based on GIS and GPS, fault history data mining analysis, breakdown repair management and running and Report Server Management.
Described commander's workstation system, be used to yardman, the repairing personnel of teams and groups and management specific responsibility to provide relevant work responsibility required management tool, comprise that position of fault map shows, the dynamic change of repairing state shows, repairing teams and groups course shows, scheduler task management, repairing task browse, data analysis, statement analysis.
Described commander's Intelligent flat system, with GPS and vision sensor module, it is the fore device of data input and live video/picture collection, it is again the tool system that repair personnel and management specific responsibility can be carried out real-time, interactive, be used for rushing to repair the personnel of teams and groups input fault diagnostic data, collection site operation video/picture, and the mobile GIS service that provides of indicating command main station system, repairing task, repairing workflow.
2. a kind of real time commanding system towards power distribution network repairing according to claim 1, it is characterized in that: the method for visualizing of described breakdown repair progress, adopt the basic application model of browser/server, utilize based on dynamic WEB interactive application technology, show and export in real time the progress percentage of the whole deadline of fault task to browser, be convenient to management specific responsibility and user and grasp in real time repairing progress, repairing task schedule is to be calculated by following steps:
1) specialize in repairing place P and estimate repairing task deadline T by commanding workstation system to send to commander's main station system and commanding Intelligent flat system by management, estimate task deadline T=repairing time T '+the T3 of return trip time, repairing time T '=go journey time T 1+ job step time T 2;
2) commander's main station system, by according to the gps data of commanding Intelligent flat system to pass back, calculates in real time repairing teams and groups and the distance of rushing to repair place, and calculates away journey time T 1 in real time according to road conditions;
3) after the repairing personnel of teams and groups reach the spot, start repairing workflow, now command Intelligent flat system to form data by wireless communication networks with commander's main station system and synchronize;
4) the repairing personnel of teams and groups, by on-the-spot anticipation fault type input commander Intelligent flat system, now command Intelligent flat system to generate the some job steps that solve this fault, and the repairing personnel of teams and groups often complete a step and just scratch out a step;
5) commander's main station system is received after fault type information, rush to repair and estimate job step time T 2 averaging time according to the history of this fault type, and the data of passing back according to commander's Intelligent flat system of receiving, further complete the time real-time update T2 of each step;
6) repeat 4) 5) step, until fault is got rid of and is completed all working step;
7) after job step completes, repairing teams and groups return, the gps data of passing back according to commander's Intelligent flat system equally, calculates in real time the T3 of return trip time, and upgrades and estimate task deadline T.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210554869.1A CN103886511A (en) | 2012-12-19 | 2012-12-19 | Real-time command system for power distribution network fault repair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210554869.1A CN103886511A (en) | 2012-12-19 | 2012-12-19 | Real-time command system for power distribution network fault repair |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103886511A true CN103886511A (en) | 2014-06-25 |
Family
ID=50955389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210554869.1A Pending CN103886511A (en) | 2012-12-19 | 2012-12-19 | Real-time command system for power distribution network fault repair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103886511A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104318368A (en) * | 2014-10-20 | 2015-01-28 | 国家电网公司 | Smartphone based power distribution network patrol and fault repair method |
CN104678962A (en) * | 2015-02-02 | 2015-06-03 | 天柱供电局 | Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system |
CN105072187A (en) * | 2015-08-17 | 2015-11-18 | 江苏省电力公司镇江供电公司 | Star network topological structure and distribution network rush repair method based on star network topological structure |
CN105741043A (en) * | 2016-02-03 | 2016-07-06 | 国家电网公司 | Distribution network first-aid system and method capable of combining with power network graph |
CN105824960A (en) * | 2016-03-31 | 2016-08-03 | 国网北京市电力公司 | Visualization processing method and visualization processing device |
CN106651161A (en) * | 2016-12-08 | 2017-05-10 | 国网浙江杭州市富阳区供电公司 | Acquisition operation and maintenance and dynamic tasking method |
CN106643765A (en) * | 2016-12-08 | 2017-05-10 | 国网浙江省电力公司 | Method for calculating collection abnormality maintenance time |
CN106682826A (en) * | 2016-12-22 | 2017-05-17 | 海南电网有限责任公司 | Emergency repair command platform for distribution network |
CN106815647A (en) * | 2016-12-28 | 2017-06-09 | 国家电网公司 | A kind of high efficiency distribution network failure repairing system and method based on data analysis |
CN109120069A (en) * | 2018-10-15 | 2019-01-01 | 云南电网有限责任公司临沧供电局 | A kind of power distribution network O&M control platform and method |
CN109840690A (en) * | 2018-12-29 | 2019-06-04 | 国网山东省电力公司日照供电公司 | A kind of artificial intelligence electric power first-aid system and method based on big data |
CN111026008A (en) * | 2019-12-16 | 2020-04-17 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN113704376A (en) * | 2021-08-27 | 2021-11-26 | 国网上海市电力公司 | Mobile operation-based intelligent navigation method for inspection and first-aid repair of electric power facilities |
CN117391373A (en) * | 2023-10-30 | 2024-01-12 | 江苏国贸酝领智能科技股份有限公司 | Multi-dimensional data-based full-channel intelligent operation and maintenance management method and system |
-
2012
- 2012-12-19 CN CN201210554869.1A patent/CN103886511A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104318368A (en) * | 2014-10-20 | 2015-01-28 | 国家电网公司 | Smartphone based power distribution network patrol and fault repair method |
CN104678962A (en) * | 2015-02-02 | 2015-06-03 | 天柱供电局 | Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system |
CN105072187A (en) * | 2015-08-17 | 2015-11-18 | 江苏省电力公司镇江供电公司 | Star network topological structure and distribution network rush repair method based on star network topological structure |
CN105741043B (en) * | 2016-02-03 | 2019-08-13 | 国家电网公司 | A kind of distribution repairing system and method for combination grid graph |
CN105741043A (en) * | 2016-02-03 | 2016-07-06 | 国家电网公司 | Distribution network first-aid system and method capable of combining with power network graph |
CN105824960A (en) * | 2016-03-31 | 2016-08-03 | 国网北京市电力公司 | Visualization processing method and visualization processing device |
CN106651161A (en) * | 2016-12-08 | 2017-05-10 | 国网浙江杭州市富阳区供电公司 | Acquisition operation and maintenance and dynamic tasking method |
CN106643765A (en) * | 2016-12-08 | 2017-05-10 | 国网浙江省电力公司 | Method for calculating collection abnormality maintenance time |
CN106651161B (en) * | 2016-12-08 | 2020-10-20 | 国网浙江杭州市富阳区供电公司 | Dynamic dispatching method for collection operation and maintenance |
CN106682826A (en) * | 2016-12-22 | 2017-05-17 | 海南电网有限责任公司 | Emergency repair command platform for distribution network |
CN106815647A (en) * | 2016-12-28 | 2017-06-09 | 国家电网公司 | A kind of high efficiency distribution network failure repairing system and method based on data analysis |
CN109120069A (en) * | 2018-10-15 | 2019-01-01 | 云南电网有限责任公司临沧供电局 | A kind of power distribution network O&M control platform and method |
CN109840690A (en) * | 2018-12-29 | 2019-06-04 | 国网山东省电力公司日照供电公司 | A kind of artificial intelligence electric power first-aid system and method based on big data |
CN111026008A (en) * | 2019-12-16 | 2020-04-17 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN111026008B (en) * | 2019-12-16 | 2021-12-24 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN113704376A (en) * | 2021-08-27 | 2021-11-26 | 国网上海市电力公司 | Mobile operation-based intelligent navigation method for inspection and first-aid repair of electric power facilities |
CN117391373A (en) * | 2023-10-30 | 2024-01-12 | 江苏国贸酝领智能科技股份有限公司 | Multi-dimensional data-based full-channel intelligent operation and maintenance management method and system |
CN117391373B (en) * | 2023-10-30 | 2024-04-02 | 江苏国贸酝领智能科技股份有限公司 | Multi-dimensional data-based full-channel intelligent operation and maintenance management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103886511A (en) | Real-time command system for power distribution network fault repair | |
CN105320712B (en) | The dynamic posture drawing method of situation automatic plotting system based on GIS map | |
CN103837796B (en) | The transmission line malfunction visualization report method of a kind of sing on web and GIS and system | |
US9505318B2 (en) | Electric vehicle fleet charging system | |
CN106685074B (en) | A kind of electric command system of guarantor and method | |
CN103915827B (en) | Power distribution network fault analysis method and study and judge system | |
CN104537573A (en) | Power grid operation information panoramic visualized display system | |
CN106203830A (en) | Promote Distribution Network Failure response and the electric service system of repairing ability | |
US20120173296A1 (en) | Method and system for outage restoration | |
CN102208048A (en) | Technology support system of marketing and distribution integration power supply service and method thereof | |
CN102938101A (en) | Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal | |
CN104966154A (en) | BIM technology-based temporary water and temporary electricity management method and system | |
CN104504483B (en) | Method for realizing province and local integration of anti-misoperation tickets | |
CN103679545A (en) | Power distribution network reliability theoretical evaluation system | |
CN104698918A (en) | Engineering machinery remote monitoring system | |
CN102567572A (en) | Sand-table exercising system for power grid simulation | |
CN104599093A (en) | Distribution network power failure range visualization method based on GIS (geographic information system) imaging | |
CN104951994A (en) | GIS-based comprehensive display method and system of distribution network production special topic view | |
CN102968689A (en) | Intelligent monitoring method for remote control of power transformation overhaul work | |
CN104966137A (en) | Smart power grid project optimizing method | |
CN110673559A (en) | Robot scheduling management system | |
CN103279898A (en) | Electric power operating information displaying method and system | |
CN103226792A (en) | Electric power work management and control method combining motion trail | |
CN102438040A (en) | Multi-source real-time data calibration method of with provincial and local integration | |
CN105512956A (en) | Intelligent multimedia interactive platform system for electric power fault emergency repair process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140625 |