CN103226792A - Electric power work management and control method combining motion trail - Google Patents

Electric power work management and control method combining motion trail Download PDF

Info

Publication number
CN103226792A
CN103226792A CN2012105785856A CN201210578585A CN103226792A CN 103226792 A CN103226792 A CN 103226792A CN 2012105785856 A CN2012105785856 A CN 2012105785856A CN 201210578585 A CN201210578585 A CN 201210578585A CN 103226792 A CN103226792 A CN 103226792A
Authority
CN
China
Prior art keywords
button
client device
mobile client
management
clicked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105785856A
Other languages
Chinese (zh)
Inventor
余慧华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Fuyang power supply bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyang power supply bureau, State Grid Corp of China SGCC filed Critical Fuyang power supply bureau
Priority to CN2012105785856A priority Critical patent/CN103226792A/en
Publication of CN103226792A publication Critical patent/CN103226792A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention relates to an electric power work management and control method combining a motion trail. The method comprises the steps as follows: providing a page layout displaying an overhaul plan in a working period of a work group comprising all external network users, marking all completed exploration and permission of the overhaul plan and a work responsible person's signature position on a map; and listing all usable mobile client equipment, types and the time of lastly uploading a GPS position by the map, and further displaying the history trail of the mobile client equipment moving in a period of time. The method carries out comprehensive monitoring and management of electric power overhaul by combining GPS data and the motion trail, provides multifunctional and visual process of the implement, monitoring and maintenance of the electric power overhaul work, improves management level of operation, maintenance, overhaul and urgent maintenance of electric power enterprises, normalize work procedures including daily operation and maintenance, overhaul and fault urgent maintenance, improves fault urgent maintenance efficiency, enhances filed operation dispatch, improves the modern electric grid control ability of the electric power enterprises, and ensures reliable, efficient and economical operation of the power grid.

Description

Electric operating management-control method in conjunction with movement locus
Technical field
The present invention relates to electric operating management-control method in conjunction with movement locus.
Background technology
Along with high development of social economy, enterprise, resident are increasing for the demand of electric power, and also more and more higher to the requirement of power supply reliability, delivery rises year by year.Power department also carries out synchronously for the transformation and upgrade of electrical network, and it is complicated that the line network shelf structure more becomes, and on-the-spot power construction setting is more and more.
Conventional safety in production risk management and control method, be to serve as theme with plan, each link string of construction is saved, but still adopt the work responsible official to be responsible for for the security risk management and control at scene, managerial personnel in conjunction with advance with go out, put in place to the hilllock, safety is checked, flight check is auxilliary to measures such as site inspections.Whether but be subjected to the restriction of human and material resources, limited supervision strength can't be grasped in real time to the work on the spot situation, exist operation lack of standardization, situation such as habitual violating the regulations can not in time correct and sum up management for the scene.Under new economic development environment, the drawback of conventional management pattern and means and hysteresis progressively manifest.
Summary of the invention
Technical matters to be solved by this invention provides a kind of electric operating management-control method in conjunction with movement locus, to promote electric power enterprise O﹠M, maintenance and repairing management level, the daily O﹠M of standard, maintenance and breakdown repair work flow improve breakdown repair efficient, strengthen the site work scheduling.For this reason, the present invention is by the following technical solutions: described method is based on the on-the-spot managing and control system of electric operating, the on-the-spot managing and control system of described electric operating comprises on-the-spot managing and control system of outer net electric operating and Intranet risk management and control system, the on-the-spot managing and control system of outer net electric operating is made up of the outer network server of operation field management and control and a plurality of mobile client device, described mobile client device has camera arrangement, and described mobile client device realizes that by the 3G wireless network two-way data communication is connected with the outer network server of operation field management and control; Intranet risk management and control system is made up of interior network server and Intranet client device; Described method is realized by described mobile client device, comprises following process:
1), mobile client device logins the processing procedure of mobile client to the user, described method provides login page in user's login process process, and carries out the user name identity and judge;
When being verified as supvr user, then enter following process as user identity:
2), detect and whether to have program to need to upgrade, if any showing that then new edition program updates content and prompting user upgrade;
3), the page of the turnaround plan of a work period that demonstrates all user place teams and groups of outer net is provided, the position at while displayed map and the acquiescence current place of mark mobile client device on map in the described page, the described page also is provided for selecting retrieving first button of turnaround plan of termination of having worked in the turnaround plan tabulation, be used to select to show second button of mobile client device management, be used to select to show the 3rd button of mobile client device movement locus, be used to select the 4th button of video calling, be used to select the 5th button of message propelling movement
4), when receiving the clicked pairing instruction of first button, the turnaround plan that all working that is mapped out has terminated make an on-the-spot survey position, permission position, the work responsible official position of signing;
When receiving the clicked pairing instruction of second button, list all on the next door of map and can use mobile client device, and show its unit type and upload time of its GPS position for the last time,
When receiving the clicked pairing instruction of the 3rd button, show the historical track of mobile client device motion in a period of time;
When receiving the clicked pairing instruction of the 4th button, described method initiate with the 4th button under mobile client device carry out the process of video calling;
When receiving the clicked pairing instruction of the 5th button, described method provides the transmission message page, and the dialog box of input information is provided in sending message page, and sends the message of being imported to selected equipment.
On the basis of adopting technique scheme, the present invention also can adopt following further technical scheme:
It also provides for the 6th button and the 7th button clicked;
When receiving the clicked pairing instruction of the 6th button, in map, mark the up-to-date position of removable location of client devices; The 7th button is in before the renewal of removable client device on the map on the last position, when receiving the clicked pairing instruction of the 7th button, then shows GPS positional information and writing time that this equipment is up-to-date.
Historical track for described mobile client device motion, provide with each of removable client device and upload GPS position corresponding buttons, during the clicked pairing instruction of the button in receiving historical track, show time and GPS position when removable client device moves to this position.
Owing to adopt technical scheme of the present invention, the present invention is to the electric power enterprise O﹠M, on the further investigation of maintenance and repairing basic unit business and regulatory requirement and the basis of analysis, a kind of electric operating management-control method in conjunction with movement locus has been proposed, not only can realize daily servicing and information interchange based on the external net client of the on-the-spot managing and control system of electric operating, and can utilize gps data electric power overhaul comprehensively to be monitored and managed in conjunction with movement locus, enforcement to the electric power overhaul operation, monitoring and maintenance provide multi-functional, processing procedure intuitively, to promote the electric power enterprise O﹠M, maintenance and repairing management level, the daily O﹠M of standard, maintenance and breakdown repair work flow, improve breakdown repair efficient, strengthen the site work scheduling, promote the control ability of electric power enterprise, guarantee that electrical network is reliable modern power network, efficiently, economical operation.
Description of drawings
Fig. 1 is the synoptic diagram of the on-the-spot managing and control system of electric operating among the present invention.
Fig. 2 is the process flow diagram of embodiment provided by the present invention.
Embodiment
With reference to accompanying drawing.Electric operating management and control disposal route in conjunction with movement locus provided by the present invention, based on the on-the-spot managing and control system of electric operating, the on-the-spot managing and control system of described electric operating comprises on-the-spot managing and control system of outer net electric operating and Intranet risk management and control system, the on-the-spot managing and control system of outer net electric operating is made up of the outer network server 1 of operation field management and control and a plurality of mobile client device 11, and described mobile client device 11 realizes that by the 3G wireless network two-way data communication is connected with the outer network server 1 of operation field management and control; Intranet risk management and control system is made up of interior network server 2 and Intranet client device 21;
Between on-the-spot managing and control system of outer net electric operating and the Intranet risk management and control system by synchronous courier's instrument 3 Data transmission, described synchronous courier's instrument 3 has storer and data-interface, described mobile client device 11 and Intranet client device 21 all have the supporting data-interface of data-interface with synchronous courier's instrument, and described synchronous courier's instrument 3 is connected with Intranet client device plug-in with mobile client device by data-interface.
Intranet risk management and control system is the source of turnaround plan relevant information in the site work management and control, also is filing, the distribution platform of site work management and control feedback information.
Mobile client device 11 is an operation field management and control client, be made for the industry personnel and can check the information that all are relevant with turnaround plan, and by wireless 3G network, the site work relevant information is fed back to the outer network server 1 of operation field management and control, and feedback information comprises photo, video, GPS positional information etc.
Being configured to of the outer network server 1 of operation field management and control: 1 or a plurality of CPU, the above internal memory of 512M, the above available hard disk space of 4G; And support following software: be fit to run on operating systems such as Windows 2000 Sp3 are above, Linux, database supports more than the Oracle 8i that administrative client requires more than the IE6.0.
Being configured to of mobile client device 11: support WIFI or 3G online, GPS location, support the operating system of the above version of android2.2.Described mobile client device 11 can be that 3G mobile is or/and panel computer.
Synchronous being configured to of courier's instrument 3: 1 or a plurality of CPU, the above internal memory of 128M, the above available hard disk space of 10m; Support Windows operating system.
Described mobile client device also can be furnished with independently fingerprint signature instrument 4, and described fingerprint signature instrument 4 is connected with the mobile client device plug-in by data-interface.
Described data-interface generally can adopt USB2.0 interface or other special-purpose data-interface.
Described electric operating management-control method comprises following processing procedure:
Described method is based on the on-the-spot managing and control system of electric operating, the on-the-spot managing and control system of described electric operating comprises on-the-spot managing and control system of outer net electric operating and Intranet risk management and control system, the on-the-spot managing and control system of outer net electric operating is made up of the outer network server of operation field management and control and a plurality of mobile client device, described mobile client device has camera arrangement, and described mobile client device realizes that by the 3G wireless network two-way data communication is connected with the outer network server of operation field management and control; Intranet risk management and control system is made up of interior network server and Intranet client device; Described method is realized by described mobile client device, comprises following process:
1), 11 couples of users of mobile client device login the processing procedure of mobile client, described method provides login page in user's login process process, and carries out the user name identity and judge;
When being verified as supvr user, then enter following process as user identity:
2), detect and whether to have program to need to upgrade, if any showing that then new edition program updates content and prompting user upgrade;
3), the page of the turnaround plan of a work period that demonstrates all user place teams and groups of outer net is provided, the position at while displayed map and the acquiescence current place of mark mobile client device on map in the described page, the described page also is provided for selecting retrieving first button of turnaround plan of termination of having worked in the turnaround plan tabulation, be used to select to show second button of mobile client device management, be used to select to show the 3rd button of mobile client device movement locus, be used to select the 4th button of video calling, be used to select the 5th button of message propelling movement
4), when receiving the clicked pairing instruction of first button, the turnaround plan that all working that is mapped out has terminated make an on-the-spot survey position, permission position, the work responsible official position of signing;
When receiving the clicked pairing instruction of second button, list all on the next door of map and can use mobile client device, and show its unit type and upload time of its GPS position for the last time,
When receiving the clicked pairing instruction of the 3rd button, show the historical track of mobile client device motion in a period of time; Historical track for described mobile client device motion, described method provides with each of removable client device and uploads GPS position corresponding buttons, during the clicked pairing instruction of the button in receiving historical track, show time and GPS position when removable client device moves to this position;
When receiving the clicked pairing instruction of the 4th button, described method initiate with the 4th button under mobile client device carry out the process of video calling;
When receiving the clicked pairing instruction of the 5th button, described method provides the transmission message page, and the dialog box of input information is provided in sending message page, and sends the message of being imported to selected equipment.
The present invention also provides for the 6th button and the 7th button clicked; When receiving the clicked pairing instruction of the 6th button, in map, mark the up-to-date position of removable location of client devices; The 7th button is in before the renewal of removable client device on the map on the last position, when receiving the clicked pairing instruction of the 7th button, then shows GPS positional information and writing time that this equipment is up-to-date.

Claims (3)

1. in conjunction with the electric operating management-control method of movement locus, it is characterized in that described method is based on the on-the-spot managing and control system of electric operating, the on-the-spot managing and control system of described electric operating comprises on-the-spot managing and control system of outer net electric operating and Intranet risk management and control system, the on-the-spot managing and control system of outer net electric operating is made up of the outer network server of operation field management and control and a plurality of mobile client device, described mobile client device has camera arrangement, and described mobile client device realizes that by the 3G wireless network two-way data communication is connected with the outer network server of operation field management and control; Intranet risk management and control system is made up of interior network server and Intranet client device; Described method is realized by described mobile client device, comprises following process:
1), mobile client device logins the processing procedure of mobile client to the user, described method provides login page in user's login process process, and carries out the user name identity and judge;
When being verified as supvr user, then enter following process as user identity:
2), detect and whether to have program to need to upgrade, if any showing that then new edition program updates content and prompting user upgrade;
3), the page of the turnaround plan of a work period that demonstrates all user place teams and groups of outer net is provided, the position at while displayed map and the acquiescence current place of mark mobile client device on map in the described page, the described page also is provided for selecting retrieving first button of turnaround plan of termination of having worked in the turnaround plan tabulation, be used to select to show second button of mobile client device management, be used to select to show the 3rd button of mobile client device movement locus, be used to select the 4th button of video calling, be used to select the 5th button of message propelling movement
4), when receiving the clicked pairing instruction of first button, the turnaround plan that all working that is mapped out has terminated make an on-the-spot survey position, permission position, the work responsible official position of signing;
When receiving the clicked pairing instruction of second button, list all on the next door of map and can use mobile client device, and show its unit type and upload time of its GPS position for the last time,
When receiving the clicked pairing instruction of the 3rd button, show the historical track of mobile client device motion in a period of time;
When receiving the clicked pairing instruction of the 4th button, described method initiate with the 4th button under mobile client device carry out the process of video calling;
When receiving the clicked pairing instruction of the 5th button, described method provides the transmission message page, and the dialog box of input information is provided in sending message page, and sends the message of being imported to selected equipment.
2. the electric operating management-control method in conjunction with movement locus as claimed in claim 1 is characterized in that also providing for the 6th button and the 7th button clicked for it;
When receiving the clicked pairing instruction of the 6th button, in map, mark the up-to-date position of removable location of client devices; The 7th button is in before the renewal of removable client device on the map on the last position, when receiving the clicked pairing instruction of the 7th button, then shows GPS positional information and writing time that this equipment is up-to-date.
3. the electric operating management-control method in conjunction with movement locus as claimed in claim 1, it is characterized in that historical track for described mobile client device motion, provide with each of removable client device and upload GPS position corresponding buttons, during the clicked pairing instruction of the button in receiving historical track, show time and GPS position when removable client device moves to this position.
CN2012105785856A 2012-12-27 2012-12-27 Electric power work management and control method combining motion trail Pending CN103226792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105785856A CN103226792A (en) 2012-12-27 2012-12-27 Electric power work management and control method combining motion trail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105785856A CN103226792A (en) 2012-12-27 2012-12-27 Electric power work management and control method combining motion trail

Publications (1)

Publication Number Publication Date
CN103226792A true CN103226792A (en) 2013-07-31

Family

ID=48837229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105785856A Pending CN103226792A (en) 2012-12-27 2012-12-27 Electric power work management and control method combining motion trail

Country Status (1)

Country Link
CN (1) CN103226792A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104075723A (en) * 2014-06-18 2014-10-01 国家电网公司 Navigation system of electric system and navigation method thereof
CN106789248A (en) * 2016-12-22 2017-05-31 国网山东省电力公司鄄城县供电公司 Power utility check distribution method and device
CN108574689A (en) * 2017-11-20 2018-09-25 北京视联动力国际信息技术有限公司 A kind of method and apparatus of video call
CN112419673A (en) * 2020-11-06 2021-02-26 江苏荣泽信息科技股份有限公司 River water level monitoring and early warning system based on block chain
CN113537783A (en) * 2021-07-19 2021-10-22 国网吉林省电力有限公司吉林供电公司 Intelligent management and control method for power grid maintenance safety risk

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030009347A1 (en) * 2001-07-09 2003-01-09 Yasushi Iwai Method and system for surveillance and operation services of power generating equipment
CN102663545A (en) * 2012-03-23 2012-09-12 电子科技大学 Power distribution network maintenance operation management system based on intelligent mobile phone

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030009347A1 (en) * 2001-07-09 2003-01-09 Yasushi Iwai Method and system for surveillance and operation services of power generating equipment
CN102663545A (en) * 2012-03-23 2012-09-12 电子科技大学 Power distribution network maintenance operation management system based on intelligent mobile phone

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104075723A (en) * 2014-06-18 2014-10-01 国家电网公司 Navigation system of electric system and navigation method thereof
CN106789248A (en) * 2016-12-22 2017-05-31 国网山东省电力公司鄄城县供电公司 Power utility check distribution method and device
CN108574689A (en) * 2017-11-20 2018-09-25 北京视联动力国际信息技术有限公司 A kind of method and apparatus of video call
CN108574689B (en) * 2017-11-20 2020-07-03 视联动力信息技术股份有限公司 Method and device for video call
CN112419673A (en) * 2020-11-06 2021-02-26 江苏荣泽信息科技股份有限公司 River water level monitoring and early warning system based on block chain
CN113537783A (en) * 2021-07-19 2021-10-22 国网吉林省电力有限公司吉林供电公司 Intelligent management and control method for power grid maintenance safety risk
CN113537783B (en) * 2021-07-19 2023-04-07 国网吉林省电力有限公司吉林供电公司 Intelligent management and control method for power grid maintenance safety risk

Similar Documents

Publication Publication Date Title
CN103049876A (en) Extranet client management and control method for electric power working site management and control system
CN103227811A (en) External network server-side management and control method for electric power working site management and control system
CN105023200A (en) Power emergency drilling system and emergency drilling method thereof
CN104102974B (en) Controller switching equipment intelligent mobile palm management system
CN103226792A (en) Electric power work management and control method combining motion trail
CN104636868A (en) Application management system for nuclear power station equipment maintenance information and application method thereof
CN104978692A (en) Handheld terminal collecting system
CN104076767B (en) Railway signal equipment overhauling control system and method
CN103761621A (en) Mobile operation licensing method based on anti-explosion handheld terminal
CN104992375A (en) Hand-held transformer-substation intelligent patrol system based on XML data conversion
CN103679319A (en) Grid social management service system
CN106373034A (en) Management system for data acquisition process of underground power pipeline
CN104636883A (en) Mobile contractor safety skill evaluation method
CN103227774B (en) The intranet and extranet method of data synchronization of electric operating field pipes Ore-controlling Role
CN105243500A (en) Informatization engineering supervision system and method
CN202771507U (en) Intelligent all-purpose card management system for construction site
CN104377835A (en) Anti-misoperation intelligent terminal for power distribution
AU2018278857A1 (en) Booking system for personnel supply chains
CN202978434U (en) Power operation site management and control system
AU2022100094A4 (en) Booking system for personnel supply chains
CN203366330U (en) Questionnaire type-in device for health management
CN203054911U (en) Mobile intelligent terminal safety check system
KR101841347B1 (en) Mobile Terminal for Maintaining Wind Power Generator and Maintaining Method
CN103389713A (en) Power cable operation work comprehensive management platform based on cloud service system
CN115098920A (en) Intelligent electric power management and control method, device and system based on mobile visualization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA HANGZHOU POWER SUP

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA

Effective date: 20140825

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 311400 No. 5 Guangming Road, Hangzhou, Zhejiang, Fuyang

Applicant after: State Grid Zhejiang Fuyang Power Supply Co.

Applicant after: State Grid Corporation of China

Address before: 311400 No. 5 Guangming Road, Hangzhou, Zhejiang, Fuyang

Applicant before: Fuyang Power Supply Bureau

Applicant before: State Grid Corporation of China

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: FUYANG POWER SUPPLY BUREAU TO: STATE GRID ZHEJIANG FUYANG POWER SUPPLY COMPANY

TA01 Transfer of patent application right

Effective date of registration: 20140825

Address after: Fuchun street Fuyang Guangming Road Hangzhou City, Zhejiang province 311400 No. 3

Applicant after: State Grid Zhejiang Fuyang Power Supply Co.

Applicant after: State Grid Corporation of China

Applicant after: HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Address before: 311400 No. 5 Guangming Road, Hangzhou, Zhejiang, Fuyang

Applicant before: State Grid Zhejiang Fuyang Power Supply Co.

Applicant before: State Grid Corporation of China

RJ01 Rejection of invention patent application after publication

Application publication date: 20130731

RJ01 Rejection of invention patent application after publication