CN202771507U - Intelligent all-purpose card management system for construction site - Google Patents
Intelligent all-purpose card management system for construction site Download PDFInfo
- Publication number
- CN202771507U CN202771507U CN 201220037345 CN201220037345U CN202771507U CN 202771507 U CN202771507 U CN 202771507U CN 201220037345 CN201220037345 CN 201220037345 CN 201220037345 U CN201220037345 U CN 201220037345U CN 202771507 U CN202771507 U CN 202771507U
- Authority
- CN
- China
- Prior art keywords
- card
- client
- management system
- management module
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides an intelligent all-purpose card management system for a construction site; the intelligent all-purpose card management system comprises an attendance management module and a database server, wherein the attendance management module is connected with the database server through an internet; and the attendance management module comprises a radio frequency card, a radio frequency card attendance machine and a client, wherein the radio frequency card attendance machine is connected with the client through a network. Through the adoption of the intelligent all-purpose card management system provided by the utility model, a reliable information entry method is provided for employee access registration in Youth Olympic construction site, so that uncertain factors in the artificial operation process are eliminated, the access registration process of the employees is greatly simplified and the system is helpful for public security bureau to monitor movement traces of floating populations in the construction site.
Description
Technical field
The utility model relates to electronic communication field, relates in particular to a kind of electronic management system of utilizing wireless radio-frequency.
Background technology
Olympianly day by day close on along with Second Committee in 2014 is young, the construction of Hexi Area, Nanjing region is maked rapid progress, and scale and the quantity in newly-built building site constantly increase.And Among The Migrant Construction Workers is from various places, and peopleware is uneven and mobile greatly.Larceny case and because the cases such as having a fist fight of causing of various disputes, crowd fighting take place frequently in the building ground, civilian worker's dormitory, and personnel have brought a new difficult problem to management such as public security, work, health.At present the building site is adopted the mode of artificial handwriting table to carry out personnel and is passed in and out registration, not only complex operation, efficient extremely low, make mistakes easily, and be difficult for permanent the preservation.Therefore, lack at present strict resignation system and control and registration of personnel information, the quantity and mobile disconnection that cause population registration management and civilian worker day by day to increase bring difficulty for the cracking of cases of site management and public security system.
Summary of the invention
The utility model discloses a kind of intelligent traffic card management system of using in green grass or young crops building site difficult to understand, by allotting radio-frequency card to blue or green meeting building site employee difficult to understand, takes to pass in and out the mode of swiping the card, automatically registration of personnel discrepancy information.
This use is novel to provide following technical scheme:
A kind of building site intelligent traffic card management system, comprise attendance management module and server, described attendance management module is connected by the internet with server, described attendance management module comprises radio-frequency card, radio frequency card check-in device, client, wherein radio frequency card check-in device and client are passed through network connection, the quantity of described attendance management module is at least one, also comprise ID (identity number) card information reading device and card sender, described ID (identity number) card information reading device and client are by wired or wireless network connection, and described card sender and client are by wired or wireless network connection.
As preferably, described ID (identity number) card information reading device is second-generation ID card reader.
The disclosed building site of the utility model intelligent traffic card management system can typing employee turnover, I.D. and radio frequency card number information, provides a kind of reliable information registration mode for green grass or young crops building site employee difficult to understand comes in and goes out, and stops the uncertain factor in the manual operation process.Not only greatly simplify personnel's enrollment process of coming in and going out, and for public security bureau provides personnel identity and turnover information, helped the movement locus that public security bureau and relevant departments monitor blue or green building site floating population difficult to understand, grasped in real time site staff's information.
Description of drawings
Fig. 1 is building site intelligent traffic card management system connection diagram.
Specific implementation method
Further specify the technical scheme that the utility model provides below in conjunction with embodiment:
Building site intelligent traffic card management system as shown in Figure 1 comprises attendance management module and server, and wherein attendance management module and server 4 are connected by the internet.The attendance management module comprises radio-frequency card 1, radio frequency card check-in device 2, client 3, and wherein radio frequency card check-in device 2 passes through network connection with client 3.In this example, radio frequency card check-in device 2 and client 3 are connected by cable LAN, also can adopt in actual use wireless network to connect.In this example, client 3 is the data management computer in building site.This building site attendance management module can be installed in each building site, and server 4 is installed in the branch office of public security bureau, and the client 3 in all the building site attendance management modules in branch office's compass of competency and the server of this branch office of public security bureau 4 are connected by the internet.
When the employee enters first blue or green building site difficult to understand and carries out construction operation, need employee information is logined into building site intelligent traffic card management system.At first, preferably read the information such as a name, identification card number, registered permanent residence location on the I.D. by ID (identity number) card information reading device 5, described ID (identity number) card information reading device 5 transfers to ID (identity number) card information in the client 3 of native system.Preferred use card sender 6 to read this employee to hold the radio-frequency card card number and transfer in the client 3 of native system, operating personnel can manually bind radio-frequency card card number and this employee's ID (identity number) card information, and can manually input this employee's the additional informations such as work post, phone.ID (identity number) card information reading device 5 is second-generation ID card reader in this example.After the login of all employee information is complete, can manually send or timing automatic sends employee information to server 4.The quantity of the attendance management module in the native system is at least one, the attendance management module can be installed in each blue or green building site difficult to understand, all be sent to server 4 after each building site client 3 is complete with building site employee information login, wherein be sent in the process of server 4 data and automatically encrypt.
On server 4, the police of branch office of public security bureau can check the employee information that enters building site work.
When the building site employee passed in and out blue or green building site difficult to understand, near the signal reception area on the radio frequency card check-in device 2, radio frequency card check-in device 2 transferred to the card number of this radio-frequency card 1 in the client 3 with radio-frequency card 1, recorded this employee information in the client 3 and passed in and out charge time.
If any the building site labor turnover, only need in this client, to nullify, client 3 sends and nullifies card number to server after nullifying, and information is encrypted automatically in this process of transmitting.Radio-frequency card 1 can be for new registration employee after nullifying.
In server 4, the operating personnel of branch office of public security bureau can view blue or green difficult to understand each building site personnel's personal information and turnover time, also can Telnet building site client 3, and real time inspection site staff information, its movement locus of effective monitoring.
Native system can dock with the police service platform, for it provides the floating population statistics, and can be used for the public security bureau computing machine in the personal information registered compare, study and judge.
Native system also can be applicable to the environment such as the more factory of various types of building sites except blue or green building site difficult to understand or other mobile personnel, enterprise.
Claims (2)
1. building site intelligent traffic card management system, comprise attendance management module and server, described attendance management module is connected by the internet with server, described attendance management module comprises radio-frequency card, radio frequency card check-in device, client, wherein radio frequency card check-in device and client are passed through network connection, it is characterized in that: the quantity of described attendance management module is at least one, also comprise ID (identity number) card information reading device and card sender, described ID (identity number) card information reading device and client are by wired or wireless network connection, and described card sender and client are by wired or wireless network connection.
2. building site according to claim 1 intelligent traffic card management system, it is characterized in that: described ID (identity number) card information reading device is second-generation ID card reader.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220037345 CN202771507U (en) | 2012-02-07 | 2012-02-07 | Intelligent all-purpose card management system for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220037345 CN202771507U (en) | 2012-02-07 | 2012-02-07 | Intelligent all-purpose card management system for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202771507U true CN202771507U (en) | 2013-03-06 |
Family
ID=47778066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220037345 Expired - Fee Related CN202771507U (en) | 2012-02-07 | 2012-02-07 | Intelligent all-purpose card management system for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202771507U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103793986A (en) * | 2014-02-21 | 2014-05-14 | 广西维安特网络技术有限公司 | Construction site entrance and exit information regulation and distribution system |
CN104200532A (en) * | 2014-07-31 | 2014-12-10 | 杭州班博科技有限公司 | Construction site real-name system attendance method |
CN105869099A (en) * | 2016-04-28 | 2016-08-17 | 贵州大学 | Floating population data collection method and system based on fingerprints |
CN106097507A (en) * | 2016-06-07 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of construction site system of real name access control system |
CN106875505A (en) * | 2017-01-20 | 2017-06-20 | 天筑科技股份有限公司 | A kind of personal information system |
CN107230043A (en) * | 2017-06-13 | 2017-10-03 | 中国五冶集团有限公司 | A kind of construction site safety of workers intelligent management |
-
2012
- 2012-02-07 CN CN 201220037345 patent/CN202771507U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103793986A (en) * | 2014-02-21 | 2014-05-14 | 广西维安特网络技术有限公司 | Construction site entrance and exit information regulation and distribution system |
CN104200532A (en) * | 2014-07-31 | 2014-12-10 | 杭州班博科技有限公司 | Construction site real-name system attendance method |
CN105869099A (en) * | 2016-04-28 | 2016-08-17 | 贵州大学 | Floating population data collection method and system based on fingerprints |
CN106097507A (en) * | 2016-06-07 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of construction site system of real name access control system |
CN106875505A (en) * | 2017-01-20 | 2017-06-20 | 天筑科技股份有限公司 | A kind of personal information system |
CN107230043A (en) * | 2017-06-13 | 2017-10-03 | 中国五冶集团有限公司 | A kind of construction site safety of workers intelligent management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203720889U (en) | Handheld polling terminal | |
CN202771507U (en) | Intelligent all-purpose card management system for construction site | |
CN107665419B (en) | Labor service real-name management system of intelligent building site management and control platform of national power grid | |
CN203720890U (en) | Wearable polling terminal | |
CN206132978U (en) | Office building personnel positioning system based on bluetooth | |
CN103726881B (en) | Safety of coal mines hidden danger signal acquiring processing system and method | |
CN204270381U (en) | The working-yard personnel of taking part in building are carried out to the system of system of real name management and control | |
CN104700211A (en) | RFID management system for site construction worker safety | |
CN104076767B (en) | Railway signal equipment overhauling control system and method | |
CN104978692A (en) | Handheld terminal collecting system | |
CN107424252A (en) | A kind of site staff's real-name management system and method | |
CN103793863A (en) | Campus management system | |
CN201993822U (en) | School safety management system | |
CN106326946A (en) | Administrative law enforcement electronic equipment for typing-in and confirmation of identity information of supervision object | |
CN103810577A (en) | Cloud attendance method based on human body biological characteristics | |
CN104519460A (en) | Kindergarten monitoring system | |
CN106384312A (en) | Tour group service management platform | |
CN104123602A (en) | Intelligent school badge management system and method | |
CN112132535A (en) | Wisdom production garden management system | |
CN103227811A (en) | External network server-side management and control method for electric power working site management and control system | |
CN108734421A (en) | A kind of Intelligent campus information management platform | |
CN110430246A (en) | Capital construction security management and control system | |
CN109377170A (en) | Work attendance method and attendance checking system | |
CN203870675U (en) | Campus management system | |
CN207718443U (en) | A kind of attendance checking system based on WIFI sniff technologies |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130306 Termination date: 20150207 |
|
EXPY | Termination of patent right or utility model |