CN103793986A - Construction site entrance and exit information regulation and distribution system - Google Patents

Construction site entrance and exit information regulation and distribution system Download PDF

Info

Publication number
CN103793986A
CN103793986A CN201410059690.8A CN201410059690A CN103793986A CN 103793986 A CN103793986 A CN 103793986A CN 201410059690 A CN201410059690 A CN 201410059690A CN 103793986 A CN103793986 A CN 103793986A
Authority
CN
China
Prior art keywords
router
dvr
door body
access control
control plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410059690.8A
Other languages
Chinese (zh)
Inventor
赵波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI WELLNET NETWORK TECHNOLOGY Co Ltd
Original Assignee
GUANGXI WELLNET NETWORK TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI WELLNET NETWORK TECHNOLOGY Co Ltd filed Critical GUANGXI WELLNET NETWORK TECHNOLOGY Co Ltd
Priority to CN201410059690.8A priority Critical patent/CN103793986A/en
Publication of CN103793986A publication Critical patent/CN103793986A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lock And Its Accessories (AREA)

Abstract

The invention relates to the technical field of construction site information management and in particular relates to a construction site entrance and exit information regulation and distribution system. According to the technical scheme, the system comprises a door body and a swing gate connected with the door body, wherein an LED (light-emitting diode) display screen is embedded above the door body; a main power supply, a DVR (Digital Video Recorder), a router, an entrance guard control board and an LED control board are arranged in the LED display screen; the router is connected with a client; the client is connected with a remote server; the router is connected with the LED control board; the entrance guard control board is connected with the swing gate; two miniature cameras and an IC (Integrated Circuit) card reading device are arranged on the door body; the miniature cameras are connected with the DVR; the IC card reading device is connected with the entrance guard control board. The system has the beneficial effects that information of construction workers can be acquired, dynamic development of the construction workers is timely known, the production operation safety of construction enterprises and safety quality of the workers are further improved, and an effect of standardizing the construction market is achieved.

Description

Building ground turnover information monitoring and delivery system
Technical field
The present invention relates to information management technique field, building ground, be specifically related to a kind of building ground turnover information monitoring and delivery system.
Background technology
The information management of building ground mostly at present is and adopts building ground real-name management system, and the scope that it relates to is wider, just one of them subsystem of turnover management.But common buildings building site is practitioner's turnover record and the management of work attendance information for single project under construction at this piece of in-out management system, the C/S framework that database can only local storage, cannot realize resource sharing.System has some limitations, and the module input cost that is on the one hand to develop information upload function is high, lacks on the other hand guiding and the execution of competent authorities.
At present, though the common attendance recorder that comprises multiple biological identification technology such as two-in-one or three-in-one can be realized the upload function of networking, cannot guarantee that personnel are conscious to swipe the card, therefore the information of collection is not comprehensive.And general access control equipment can prompting personnel be swiped the card current as one barrier, but from systemic-function angle, just the data management of local type, cannot accomplish remote application information sharing, and easily there is the generation phenomenon such as swipe the card, do not guarantee the authenticity of attendance record.Secondly, common technical scheme is not carried out system docking with banking institution, and building ground personnel's work attendance and wage are linked up with by information-based means.In sum, for meeting the actual management demand of government building competent authorities, " building ground turnover supervision and the information issuing system " of my company's research and development, no matter from hardware device or software engineering, has its advance and operability, does not substitute.
Summary of the invention
Object of the present invention, in order to solve above-mentioned existing technical disadvantages, provides a kind of building ground turnover information monitoring and delivery system.
For achieving the above object, the technical solution used in the present invention is: the pendulum lock that comprises a body and be connected with door body, described door body top is embedded with LED display, in described LED display, be provided with general supply, DVR, router, access control plate and LED screen control panel, described router is connected with client, described client is connected with remote server, described router is connected with LED screen control panel, described access control plate is connected with pendulum lock, on described door body, be provided with two minisize pick-up heads and IC-card reading device, described minisize pick-up head is connected with DVR, described IC-card reading device is connected with access control plate.
Concrete, described door height is 2600mm, wide is 1328mm.
In addition, the amplitude of oscillation of described pendulum lock is 180 degree.
Further, described general supply adopts power lead to be connected with router, DVR, access control plate, and described access control plate adopts power lead to be connected with LED screen control panel, minisize pick-up head and IC-card reading device.
Further, described DVR adopts video line to be connected with minisize pick-up head, and described DVR Adoption Network line is connected with router.
Further, described access control plate Adoption Network line is connected with pendulum lock and IC-card read-write equipment respectively, and this access control plate also adopts power lead to be connected with router.
Preferably, also comprise base, described door body and pendulum lock adopt expansion bolt to be fixed on base.
The present invention has following beneficial effect:
1, hardware device degree simple for structure, integrated is high, easy to install, outward appearance is generous, quality safety is reliable, and use cost is lower, is convenient to building site Reusability.
2, system adopts B/S remote configuration to set up unified database, can further implement building worker's pre-job training and safety in production knowledge education, and can effectively solve arrears of wages problem, safeguards labor and management's legitimate rights and interests.
3, systemic-function is abundant, and gate inhibition is in conjunction with Network Video Surveillance, the video capture simultaneously of swiping the card, and automatic comparison, stops the generation phenomenon of swiping the card; And can utilize internet remote technology access video record, real time inspection working-yard engineering progress.
4, authentic and valid system operation, all records of swiping the card are kept in building site and remote server, to stay shelves for future reference.LED display is except showing that the current brushing card data in building site and personnel add up in addition, and relevant supervision department of government and enterprise also can be by long-range item and the security information of making an announcement of wireless GPRS mode, realizes the unified transmitting-receiving in full Guangxi.
5, system support is used special financial IC card, and function of keeping secret is strong, and the current function of associated work attendance, also possesses general financial function (as saved, transfer accounts, E-consumer etc.) simultaneously.
Pass in and out supervision and information issuing system by building ground, can realize building practitioner's information, understand in time its active development, comprise the situations such as workman's post training, man-hour statistics, wage are sent out in fact, settlement of insurance claim, be conducive to further improve construction enterprises' safety in production and worker's safety quality, reach the effect of standard construction market.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structured flowchart of building ground of the present invention turnover information monitoring and delivery system.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Based on the embodiment in the present invention, those of ordinary skills, not making the every other embodiment obtaining under creative work prerequisite, belong to the scope of protection of the invention.
Referring to Fig. 1, the invention provides the pendulum lock 5 that a kind of building ground turnover information monitoring and delivery system comprise a body 1 and be connected with door body 1, described door body 1 top is embedded with LED display 2, in described LED display 2, be provided with general supply 22, DVR (DVR:DigitalVideoRecorder) 21, router two 3, access control plate 24 and LED screen control panel 25, described router two 3 is connected with client 8, described client 8 is connected with remote server 9, described router two 3 is connected with LED screen control panel 25, described access control plate 24 is connected with pendulum lock 5, on described door body 1, be provided with two minisize pick-up heads 3 and IC-card reading device 4, described minisize pick-up head 3 is connected with DVR, described IC-card reading device is connected with access control plate.Building ground of the present invention turnover supervision and information issuing system are the supervision demands that coordinates house and the town and country construction Room, by unified building practitioner's the essential information warehouse-in of collecting, the turnover work attendance statistics of each engineering project is uploaded in real time given server and effectively supervises, and and bank finance system docking, information networking is shared, as long as the special card of bank finance IC of holding active registration just can the capable Guangxi District of all-purpose card in arbitrary building site, the B/S system management pattern of information-based remote application that Here it is.
As the concrete embodiment of the present invention, concrete, described door height is 2600mm, and wide is 1328mm.The amplitude of oscillation of described pendulum lock is 180 degree.Further, described general supply adopts power lead to be connected with router, DVR, access control plate, general supply is directly powered to router, DVR, access control plate, described access control plate adopts power lead to be connected with LED screen control panel, minisize pick-up head and IC-card reading device, and LED screen control panel, minisize pick-up head and IC-card reading device are powered by access control plate.Described DVR adopts video line to be connected with minisize pick-up head, and minisize pick-up head is taken the personnel that swipe the card, and information is passed to DVR, uploads to client by DVR by router, and described DVR Adoption Network line is connected with router.Further, described access control plate Adoption Network line is connected with pendulum lock and IC-card read-write equipment respectively, and this access control plate also adopts power lead to be connected with router.Preferably, also comprise base 6, described door body and pendulum lock adopt expansion bolt 7 to be fixed on base.
Principle of work of the present invention is: building ground practitioner is with effectively bank finance IC-card or bangle card brush are got the close IC read head of state on right-hand door pillar, now swing arm inside 90 ° open wide, camera on door pillar carries out video capture simultaneously, door body top LED display shows the people's that swipes the card essential information, Here it is an effective turnover attendance record.In addition,, whenever there being attendance data to produce, except being kept at building site project management department client computer, be uploaded to the remote server of building competent authorities so that real-time monitoring by network remote at once simultaneously.Software systems part adopts client and the double mode exploitation of webpage version, each building site client of supporting installation specify certain computer on, be responsible for all personnels' such as the building site managerial personnel of project management department, supervising engineer, workman essential information typing and submit to and upload, banking institution also can obtain the data needing from server, the foundation of providing as business wage.The relevant information in database be checked and be transferred in supervision department can at any time by webpage.Software has gate inhibition's Real-time Monitor Management module, personnel's basic information module, attendance data statistics to derive module, LED display information issuing module etc., compatible comprehensive regulatory requirement, and can increase successively corresponding function constantly perfect in the later stage according to actual conditions.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (7)

1. building ground turnover information monitoring and delivery system, it is characterized in that: the pendulum lock that comprises a body and be connected with door body, described door body top is embedded with LED display, in described LED display, be provided with general supply, DVR, router, access control plate and LED screen control panel, described router is connected with client, described client is connected with remote server, described router is connected with LED screen control panel, described access control plate is connected with pendulum lock, on described door body, be provided with two minisize pick-up heads and IC-card reading device, described minisize pick-up head is connected with DVR, described IC-card reading device is connected with access control plate.
2. building ground according to claim 1 turnover information monitoring and delivery system, is characterized in that: described door height is 2600mm, and wide is 1328mm.
3. building ground according to claim 1 turnover information monitoring and delivery system, is characterized in that: the amplitude of oscillation of described pendulum lock is 180 degree.
4. building ground according to claim 1 turnover information monitoring and delivery system, it is characterized in that: described general supply adopts power lead to be connected with router, DVR, access control plate, described access control plate adopts power lead to be connected with LED screen control panel, minisize pick-up head and IC-card reading device.
5. building ground according to claim 1 turnover information monitoring and delivery system, is characterized in that: described DVR adopts video line to be connected with minisize pick-up head, and described DVR Adoption Network line is connected with router.
6. building ground according to claim 1 turnover information monitoring and delivery system, is characterized in that: described access control plate Adoption Network line is connected with pendulum lock and IC-card read-write equipment respectively, and this access control plate also adopts power lead to be connected with router.
7. building ground according to claim 1 turnover information monitoring and delivery system, is characterized in that: also comprise base, described door body and pendulum lock adopt expansion bolt to be fixed on base.
CN201410059690.8A 2014-02-21 2014-02-21 Construction site entrance and exit information regulation and distribution system Pending CN103793986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410059690.8A CN103793986A (en) 2014-02-21 2014-02-21 Construction site entrance and exit information regulation and distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410059690.8A CN103793986A (en) 2014-02-21 2014-02-21 Construction site entrance and exit information regulation and distribution system

Publications (1)

Publication Number Publication Date
CN103793986A true CN103793986A (en) 2014-05-14

Family

ID=50669604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410059690.8A Pending CN103793986A (en) 2014-02-21 2014-02-21 Construction site entrance and exit information regulation and distribution system

Country Status (1)

Country Link
CN (1) CN103793986A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104200320A (en) * 2014-08-31 2014-12-10 山西一建集团有限公司 Construction personnel information and attendance management system
CN104346852A (en) * 2014-08-28 2015-02-11 绵阳市绵州通有限责任公司 Application method of access control applied to construction site
CN104574600A (en) * 2015-01-05 2015-04-29 云南会基科技有限公司 Access control system
CN104821027A (en) * 2015-05-14 2015-08-05 郭萌 Routing lock
CN105447948A (en) * 2015-12-31 2016-03-30 湖南城市学院 Laboratory monitoring system based on big data and facial recognition technology
CN106875505A (en) * 2017-01-20 2017-06-20 天筑科技股份有限公司 A kind of personal information system
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN111784532B (en) * 2020-05-28 2021-06-04 上海君实生物工程有限公司 Information display system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09198538A (en) * 1996-01-23 1997-07-31 Matsushita Electric Ind Co Ltd Entrance and exit management terminal equipment
JP4906604B2 (en) * 2007-06-18 2012-03-28 三菱電機株式会社 Entrance / exit management system
CN102663534A (en) * 2012-03-02 2012-09-12 广西罗氏科技有限公司 Work attendance system for construction site
CN202771507U (en) * 2012-02-07 2013-03-06 南京市公安局建邺分局 Intelligent all-purpose card management system for construction site
CN103327301A (en) * 2013-06-06 2013-09-25 四川艾普视达数码科技有限公司 Monitoring system used in construction sites
CN103559751A (en) * 2013-11-08 2014-02-05 杭州班博科技有限公司 Auxiliary device and method for confirming cheating attendance behavior

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09198538A (en) * 1996-01-23 1997-07-31 Matsushita Electric Ind Co Ltd Entrance and exit management terminal equipment
JP4906604B2 (en) * 2007-06-18 2012-03-28 三菱電機株式会社 Entrance / exit management system
CN202771507U (en) * 2012-02-07 2013-03-06 南京市公安局建邺分局 Intelligent all-purpose card management system for construction site
CN102663534A (en) * 2012-03-02 2012-09-12 广西罗氏科技有限公司 Work attendance system for construction site
CN103327301A (en) * 2013-06-06 2013-09-25 四川艾普视达数码科技有限公司 Monitoring system used in construction sites
CN103559751A (en) * 2013-11-08 2014-02-05 杭州班博科技有限公司 Auxiliary device and method for confirming cheating attendance behavior

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
无: "民爆企业生产工地门禁管理系统方案", 《百度文库》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104346852A (en) * 2014-08-28 2015-02-11 绵阳市绵州通有限责任公司 Application method of access control applied to construction site
CN104200320A (en) * 2014-08-31 2014-12-10 山西一建集团有限公司 Construction personnel information and attendance management system
CN104200320B (en) * 2014-08-31 2018-08-17 山西一建集团有限公司 Construction industry personal information and Work attendance management system
CN104574600A (en) * 2015-01-05 2015-04-29 云南会基科技有限公司 Access control system
CN104821027A (en) * 2015-05-14 2015-08-05 郭萌 Routing lock
CN104821027B (en) * 2015-05-14 2018-07-10 安恒世通(北京)网络科技有限公司 A kind of routing lockset
CN105447948A (en) * 2015-12-31 2016-03-30 湖南城市学院 Laboratory monitoring system based on big data and facial recognition technology
CN106875505A (en) * 2017-01-20 2017-06-20 天筑科技股份有限公司 A kind of personal information system
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN111784532B (en) * 2020-05-28 2021-06-04 上海君实生物工程有限公司 Information display system and method

Similar Documents

Publication Publication Date Title
CN103793986A (en) Construction site entrance and exit information regulation and distribution system
CN107665419B (en) Labor service real-name management system of intelligent building site management and control platform of national power grid
CN104200320B (en) Construction industry personal information and Work attendance management system
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN202153374U (en) Intelligent control device of rented houses and floating population
CN102360459B (en) Safety monitoring system for underground operating personnel
WO2015123810A1 (en) Electric power field operation system combined with smartphone
CN103514485B (en) The online reservation system of multi-media classroom based on the all-purpose card of LAN (Local Area Network)
CN103235987A (en) Intelligent card system of hotel
CN108197779A (en) Build service management
CN110430246A (en) Capital construction security management and control system
CN112132535A (en) Wisdom production garden management system
CN207319279U (en) The labor service real-name management system of national grid wisdom building site control platform
CN111861799A (en) Intelligent construction site management system and method
CN107103407A (en) A kind of power transmission cable based on Internet of Things installs management system
CN109472618A (en) A kind of crm system
CN110163576A (en) A kind of Schoolyard work attendance management system based on cloud network
CN202771507U (en) Intelligent all-purpose card management system for construction site
CN113487293A (en) Engineering project management cloud platform system
CN206672171U (en) Floating population management system with early warning function
US20240070233A1 (en) System for verifying digital representation of objects and events
CN107808238A (en) A kind of management method and system for equipping assets
CN110880096A (en) Multi-party cooperative office system for constructional engineering
US20230176246A1 (en) System for immutability verifying, recording and storing digital representation of objects and events
CN115345587A (en) Engineering cost management and control system based on BIM and big data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140514