CN113487293A - Engineering project management cloud platform system - Google Patents

Engineering project management cloud platform system Download PDF

Info

Publication number
CN113487293A
CN113487293A CN202110839206.3A CN202110839206A CN113487293A CN 113487293 A CN113487293 A CN 113487293A CN 202110839206 A CN202110839206 A CN 202110839206A CN 113487293 A CN113487293 A CN 113487293A
Authority
CN
China
Prior art keywords
management
project
submodule
unit
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110839206.3A
Other languages
Chinese (zh)
Inventor
杨天政
杨丰鸿
成孟谦
胡能
谢义旭
张东
陈珊珊
吴其永
刘德琳
李官辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dadetong Engineering Consulting Co ltd
Original Assignee
Dadetong Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dadetong Engineering Consulting Co ltd filed Critical Dadetong Engineering Consulting Co ltd
Priority to CN202110839206.3A priority Critical patent/CN113487293A/en
Publication of CN113487293A publication Critical patent/CN113487293A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses an engineering project management cloud platform system in the technical field of project management systems, wherein a cloud server is in electric signal connection with an input module and a storage, the input module is used for inputting project information, and the storage is used for storing the project information; the cloud server comprises a task management module, wherein the task management module comprises a task viewing submodule, a safety management submodule, a quality management submodule, a worker management submodule, an audit management submodule, a work arrangement submodule and a work dynamic submodule, the task viewing submodule is used for managing the progress and the construction condition of a project, the safety management submodule is used for managing the safety information of project construction, and the quality management submodule is used for recording the construction quality information of the project. By building the cloud platform system, managers can search required information at any time, and management efficiency is improved.

Description

Engineering project management cloud platform system
Technical Field
The invention relates to the technical field of engineering project management systems, in particular to an engineering project management cloud platform system.
Background
Project management means that an enterprise engaged in project management (hereinafter referred to as project management enterprise) is entrusted by a proprietor, and performs management and service of the whole process or several stages on behalf of the proprietor on the organization of a project according to contract agreement. Some enterprises have own construction organization, build and manage own engineering projects by themselves, and belong to the engineering project management range.
At present, project management is to carry out on-site supervision and management by a supervisor to a construction site, the supervisor archives recorded pictures, videos and text data, and the records cannot be read in time, so that engineering managers cannot inquire the records in time, a large amount of repetitive work is caused, and the decision of the managers on project development is also influenced. And the management work of the project process is a huge and complex work and has the characteristic of large information quantity. In the face of brand new industrial ecology brought by the big data era, a whole set of comprehensive and diversified management system is established by using new technologies such as big data and cloud computing, the overall operation efficiency of the project is promoted, the energy of managers can be greatly saved, and the efficiency and the level of project management are improved.
Disclosure of Invention
The invention aims to provide a project management cloud platform system, which can realize informatization management, relieve managers from complex, tedious and repeated affairs work, put more energy and time into more key management links in a project, improve management efficiency, find problems in time and promote the project to be carried out smoothly.
In order to achieve the purpose, the invention provides the following technical scheme: the engineering project management cloud platform system comprises a cloud server, wherein the cloud server is in electric signal connection with an input module and a storage, the input module is used for inputting project information, and the storage is used for storing the project information; the cloud server comprises a task management module, wherein the task management module comprises a task viewing submodule, a safety management submodule, a quality management submodule, a worker management submodule, an audit management submodule, a work arrangement submodule and a work dynamic submodule, the task viewing submodule is used for managing progress and construction conditions of a project, the safety management submodule is used for managing safety information of project construction, the quality management submodule is used for recording construction quality information of the project, the worker management submodule is used for managing and recording worker information, the audit management submodule is used for managing and approving applications, the work arrangement submodule is used for managing and arranging work, and the work dynamic submodule is used for displaying daily work dynamics.
The working principle and the beneficial effects of the invention are as follows: according to the project management system, through the construction project management cloud platform system, project supervision personnel and project management personnel can edit relevant information of project management through the input module, and the information is stored in the memory and is convenient to look up and edit.
The task viewing submodule can look up the progress and the construction condition of the project so as to regulate and control the project progress at any time and make arrangement and adjustment in real time; the safety management submodule is used for managing safety information of project construction so as to guarantee safe construction; the quality management submodule is used for recording construction quality information of a project, project supervisors and project managers check construction conditions of a construction site on site, and upload the quality conditions of the construction site to the quality management submodule, so that the quality of a project is conveniently supervised; the worker management submodule stores information of constructors, and the movement of the constructors can be conveniently and timely controlled; the auditing management sub-module is used for managing and approving applications, and the work arrangement sub-module is used for managing and arranging work. Through building the cloud platform system, managers can search for required information at any time, management efficiency is improved, and more energy and time are put into more key management links in a project.
Further, input module includes unmanned aerial vehicle and communication terminal, unmanned aerial vehicle is equipped with surveillance camera head, communication terminal includes mobile terminal and PC end. The image data acquired by the monitoring camera of the unmanned aerial vehicle can be used for obtaining a live-action data model after cloud computing processing, and various data information of the model can be extracted to provide support for subsequent information processing; the communication terminals comprise mobile terminals and PC terminals, the mobile terminals such as mobile phones, tablet computers and the like, the PC terminals are used as computer terminals, and all the communication terminals can flexibly realize on-line data input and on-line lookup of information of all the functional modules so as to facilitate engineering management.
Further, the cloud server comprises a login unit and a sending unit, the login unit comprises an account login subunit and an encryption subunit, the sending unit is used for background management personnel to edit random numbers and send the random numbers to corresponding workers, the sending unit comprises a timing subunit and an alarm subunit, the encryption subunit is used for inputting the random numbers, the timing subunit is used for stipulating the time requirement for the background management personnel to edit the random numbers, and the alarm subunit is used for sending an alarm.
In order to prevent irrelevant personnel without permission from logging in the system to cause the content of the system to be divulged, an account logging subunit and an encryption subunit are arranged, the account logging subunit is used for inputting a fixed account and a password, meanwhile, the encryption subunit inputs a random number immediately sent by background personnel, the communication terminal can be accessed into the system only if the random number and the password are in accordance, and meanwhile, the random number is manually input, so that the system can be prevented from being attacked by an external hacker to cause the encryption subunit to be invalid; and for background management personnel, the timing subunit requires the background management personnel to input random numbers at intervals, otherwise, the alarm subunit gives an alarm, and can also improve management and supervision on the work of the background management personnel, so that the background management personnel can process engineering project affairs at work posts at any time and in time.
Further, the task viewing submodule comprises a project log unit, an investment progress unit, a duty ratio dialing unit, a finished countdown unit and a contract amount unit. The project log unit is used for filling the progress condition of a project, the investment progress unit is used for checking the fund invested condition of the project, the proportion dialing unit is used for checking the proper fund proportion of the project, the completion countdown unit is used for displaying the ending time of the project construction, and the contract amount unit is used for displaying the contract signed in the project.
Furthermore, the safety management submodule comprises a safety civilization measure fee unit, a safety log unit, an education training unit, a safety measure unit, a safety record unit, a safety responsibility system unit and an rectification record unit. The safety civilization measure expense unit displays expenses generated by safety work, the safety log unit is used for filling in daily log reports of site safety supervision, the education training unit is used for displaying safety training education records, the safety responsibility system unit is used for checking the safety system of engineering projects, and the rectification and modification recording unit is used for recording rectification and modification conditions of potential safety hazards.
Further, the memory is a solid state disk. The solid state disk has high access speed and is convenient to access quickly.
Further, the task management module further comprises an organization framework module. The organization framework module can review detailed information and contact details of individual persons.
Further, the cloud server is connected with a printer through an electric signal. The printer is convenient to print.
Drawings
Fig. 1 is a block diagram of an architecture of an engineering project management cloud platform system according to embodiment 1;
fig. 2 is a block diagram of the architecture of embodiment 2.
Detailed Description
The following is further detailed by way of specific embodiments:
embodiment 1, an engineering project management cloud platform system, including the cloud ware, the mode electricity signal connection that the cloud ware passes through wireless network or wired network has input module and memory, and input module is used for the input information, and input module includes unmanned aerial vehicle and communication terminal, and unmanned aerial vehicle is equipped with the surveillance camera head, and communication terminal includes mobile terminal and PC end, and storage module is used for the storage project information, and storage module specifically is solid state hard drives.
The cloud server comprises a task management module, wherein the task management module comprises a task viewing sub-module, a safety management sub-module, a quality management sub-module, a worker management sub-module, an auditing management sub-module, a work arrangement sub-module, a work dynamic sub-module and an organization framework module.
The task viewing submodule comprises a project log unit, an investment progress unit, a duty ratio unit, a completion countdown unit and a contract amount unit. The project log unit is used for filling the progress condition of a project, the investment progress unit is used for checking the fund invested condition of the project, the proportion dialing unit is used for checking the proper fund proportion of the project, the completion countdown unit is used for displaying the ending time of the project construction, and the contract amount unit is used for displaying the contract signed in the project.
The safety management submodule is used for managing safety information of project construction and comprises a safety civilization measure fee unit, a safety log unit, an education training unit, a safety measure unit, a safety record unit, a safety responsibility system unit and a rectification record unit. The safety civilization measure expense unit displays expenses generated by safety work, the safety log unit is used for filling in daily log reports of site safety supervision, the education training unit is used for displaying safety training education records, the safety responsibility system unit is used for checking the safety system of engineering projects, and the rectification and modification recording unit is used for recording rectification and modification conditions of potential safety hazards.
The quality management sub-module is used for recording construction quality information of a project, the worker management sub-module is used for managing and recording worker information, the auditing management sub-module is used for managing and approving application, the work arrangement sub-module is used for managing and arranging work, the work dynamic sub-module is used for displaying daily work dynamic, and the organization framework module can refer to detailed information and contact information of each person.
According to the scheme, through the construction project management cloud platform system, project supervision personnel and project management personnel can edit relevant information of project management through a mobile terminal (such as a mobile phone) or a PC (personal computer) terminal, image data collected by a monitoring camera of an unmanned aerial vehicle can be used for obtaining a live-action data model after cloud computing processing, various data information of the model can be extracted, support is provided for subsequent information processing, and the information is stored in a solid state disk and is convenient to look up and edit.
The task viewing submodule can look up the progress and the construction condition of the project so as to regulate and control the project progress at any time and make arrangement and adjustment in real time; the safety management submodule is used for managing safety information of project construction so as to guarantee safe construction; the quality management submodule is used for recording construction quality information of a project, project supervisors and project managers check construction conditions of a construction site on site, and upload the quality conditions of the construction site to the quality management submodule, so that the quality of a project is conveniently supervised; the worker management submodule stores information of constructors, and the movement of the constructors can be conveniently and timely controlled; the auditing management sub-module is used for managing and approving applications, and the work arrangement sub-module is used for managing and arranging work. Through building the cloud platform system, managers can search for required information at any time, management efficiency is improved, and more energy and time are put into more key management links in a project.
Example 2: the cloud server is different from the embodiment 1 in that the cloud server comprises a login unit and a sending unit, the login unit comprises an account login subunit and an encryption subunit, the sending unit is used for a background manager to edit random numbers and send the random numbers to corresponding workers, the sending unit comprises a timing subunit and an alarm subunit, the encryption subunit is used for inputting the random numbers, the timing subunit is used for stipulating the time requirement for the background manager to edit the random numbers, and the alarm subunit is used for sending out an alarm.
In order to prevent irrelevant personnel without permission from logging in the system to cause the content of the system to be divulged, an account logging subunit and an encryption subunit are arranged, the account logging subunit is used for inputting a fixed account and a password, meanwhile, the encryption subunit inputs a random number immediately sent by background personnel, the communication terminal can be accessed into the system only if the random number and the password are in accordance, and meanwhile, the random number is manually input, so that the system can be prevented from being attacked by an external hacker to cause the encryption subunit to be invalid; and for background management personnel, the timing subunit requires the background management personnel to input random numbers at intervals (for example, every 30min), otherwise, the alarm subunit gives an alarm, and can also improve management and supervision on the work of the background management personnel, so that the background management personnel can process engineering project affairs at work posts at any time and in time.
It should be noted that, for those skilled in the art, various changes and modifications can be made without departing from the spirit of the invention, and these should be construed as the scope of the invention, which will not affect the effect of the invention and the applicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.

Claims (8)

1. The utility model provides an engineering project management cloud platform system, includes cloud ware, its characterized in that: the cloud server is electrically connected with an input module and a memory, the input module is used for inputting project information, and the memory is used for storing the project information; the cloud server comprises a task management module, wherein the task management module comprises a task viewing submodule, a safety management submodule, a quality management submodule, a worker management submodule, an audit management submodule, a work arrangement submodule and a work dynamic submodule, the task viewing submodule is used for managing progress and construction conditions of a project, the safety management submodule is used for managing safety information of project construction, the quality management submodule is used for recording construction quality information of the project, the worker management submodule is used for managing and recording worker information, the audit management submodule is used for managing and approving applications, the work arrangement submodule is used for managing and arranging work, and the work dynamic submodule is used for displaying daily work dynamics.
2. The engineering project management cloud platform system of claim 1, wherein: the input module comprises an unmanned aerial vehicle and a communication terminal, the unmanned aerial vehicle is provided with a monitoring camera, and the communication terminal comprises a mobile terminal and a PC (personal computer) terminal.
3. The project management cloud platform system of claim 2, wherein: the cloud server comprises a login unit and a sending unit, the login unit comprises an account login subunit and an encryption subunit, the sending unit is used for background management personnel to edit random numbers and send the random numbers to corresponding workers, the sending unit comprises a timing subunit and an alarm subunit, the encryption subunit is used for inputting the random numbers, the timing subunit is used for stipulating the time requirement for editing the random numbers by the background management personnel, and the alarm subunit is used for sending out an alarm.
4. The project management cloud platform system of claim 3, wherein: the task viewing submodule comprises a project log unit, an investment progress unit, a duty ratio unit, a completion countdown unit and a contract amount unit.
5. The project management cloud platform system of claim 4, wherein: the safety management submodule comprises a safety civilization measure fee unit, a safety log unit, an education training unit, a safety measure unit, a safety record unit, a safety responsibility system unit and an rectification record unit.
6. The project management cloud platform system of claim 5, wherein: the memory is a solid state disk.
7. The project management cloud platform system of claim 6, wherein: the task management module further comprises an organization architecture module.
8. The project management cloud platform system of claim 7, wherein: the cloud server is connected with a printer through an electric signal.
CN202110839206.3A 2021-07-23 2021-07-23 Engineering project management cloud platform system Withdrawn CN113487293A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110839206.3A CN113487293A (en) 2021-07-23 2021-07-23 Engineering project management cloud platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110839206.3A CN113487293A (en) 2021-07-23 2021-07-23 Engineering project management cloud platform system

Publications (1)

Publication Number Publication Date
CN113487293A true CN113487293A (en) 2021-10-08

Family

ID=77942320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110839206.3A Withdrawn CN113487293A (en) 2021-07-23 2021-07-23 Engineering project management cloud platform system

Country Status (1)

Country Link
CN (1) CN113487293A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114565353A (en) * 2022-02-10 2022-05-31 辉图建筑工程科技(上海)有限公司 Engineering project safety management solution based on cloud platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114565353A (en) * 2022-02-10 2022-05-31 辉图建筑工程科技(上海)有限公司 Engineering project safety management solution based on cloud platform

Similar Documents

Publication Publication Date Title
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN112163746A (en) Building engineering project management system based on BIM and GIS
CN115375146A (en) Digital construction integrated platform
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN113315838A (en) Intelligent building site comprehensive safe operation informatization supervision platform
CN103793986A (en) Construction site entrance and exit information regulation and distribution system
CN105491102A (en) Intelligent monitoring system based on cloud computing technology and device thereof
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
CN113487293A (en) Engineering project management cloud platform system
CN111970113A (en) Enterprise WeChat processing management big data platform framework
CN110880096B (en) Multi-party collaborative office system for building engineering
CN113672972A (en) Important asset safety monitoring method based on middleboxes
CN114466036B (en) Intelligent management and control platform combining eagle eye error prevention
CN107423035A (en) A kind of software development process product data management system
CN208112798U (en) A kind of logistic storage closed monitor system
CN110782198A (en) Webpage end rail transit equipment monitoring information control platform and implementation method thereof
CN115660317A (en) Multi-source information integration system based on BIM
CN107679693A (en) Device management platform based on the retrospect of two-dimensional code data interactive identification
CN112270634A (en) Information construction supervision service system for municipal engineering
CN113836104A (en) Safety management big data sharing system applied to power enterprises
CN112801809A (en) Salt and salt chemical industry intelligent manufacturing integrated management system
CN109754160A (en) Shield-tunneling construction supervisory systems
CN110728130A (en) Intellectual property file comparison and evaluation system
CN109684409A (en) Shield-tunneling construction monitoring and managing method
CN116070877B (en) Intelligent construction method and system for cockpit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20211008

WW01 Invention patent application withdrawn after publication