CN104678962A - Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system - Google Patents
Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system Download PDFInfo
- Publication number
- CN104678962A CN104678962A CN201510053010.6A CN201510053010A CN104678962A CN 104678962 A CN104678962 A CN 104678962A CN 201510053010 A CN201510053010 A CN 201510053010A CN 104678962 A CN104678962 A CN 104678962A
- Authority
- CN
- China
- Prior art keywords
- center
- site
- fault
- sheng
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 28
- 238000011017 operating method Methods 0.000 title abstract 2
- 238000012423 maintenance Methods 0.000 claims abstract description 47
- 238000009826 distribution Methods 0.000 claims abstract description 35
- 238000000034 method Methods 0.000 claims abstract description 32
- 238000012790 confirmation Methods 0.000 claims description 7
- 238000012954 risk control Methods 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 4
- 238000001514 detection method Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 16
- 238000004519 manufacturing process Methods 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 4
- 238000005111 flow chemistry technique Methods 0.000 abstract 1
- 230000007257 malfunction Effects 0.000 abstract 1
- 238000012545 processing Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 238000004891 communication Methods 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 230000006399 behavior Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000003416 augmentation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000002650 habitual effect Effects 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a safety monitoring system used in a power lines repairing operation and an operating method based on the safety monitoring system, belonging to the technical field of power distribution system maintenance. The safety monitoring system comprises a remote terminal, a signal reception tower, a server, an Internet, a power supply module, a safety monitoring module, a dispatching center, a production technology center and a plurality of on-site terminals, wherein the on-site terminals are wirelessly connected with the remote terminal; the remote terminal is connected with the server through wireless signals; data received by the server is transmitted to the power supply module, safety monitoring equipment, the dispatching center and the production technology center through the Internet respectively; transverse information sharing or information inter-transmission among the power supply module, the safety monitoring module, the dispatching center and the production technology center can be realized, and each of the power supply module, the safety monitoring module, the dispatching center and the production technology center can send instructions to the on-site terminals for implementing the power lines repairing operation through steps of preliminary judgment on malfunction, dispatching of working staff, examining and repairing and the like. Closed-loop management is implemented in the technical scheme, therefore, the whole maintenance process is subjected to standardization, flow processing and form processing; effects of reinforcing on-site management and control and eliminating on-site potential safety hazards are achieved.
Description
Technical field
The invention belongs to distribution system maintenance technique field, relate to distribution maintenance safety technique, especially relate to a kind of electric power first-aid operation safe monitoring system and the operational method based on this system.
Background technology
In the work of electrical network distribution, handling safety management is always very important, particularly in County Power Plant distribution safety management control process, also there is managerial weak link, sum up reason, mainly contain these points: one is that first-line staff's safe production awareness is not strong, lacks the most basic Safety and sense of self-protection, ignore rules and regulations, have order more than, there is habitual behavior violating the regulations; Two is the unreachable positions of on-the-spot rules and regulations, and field pipes control means fails really to land, and causes management and reality seriously to disconnect; Three is that repair personnel is poor in the result of use of operation field to relevant list, and existence is performed a task perfunctorily, mend behaviors such as filling out afterwards; Four is that in management system, the production information resource such as safety supervision department, production division, scheduling, each power supply station can not be shared, the problem in restriction production safety management work.The problems referred to above bring certain potential safety hazard to the operating personnel in the course of work, therefore, except Improvement and perfection management system, carry out security management and control very necessary by technological means to line operating personnel.
Summary of the invention
In order to solve the problem, the invention provides a kind of electric power first-aid operation safe monitoring system and the operational method based on this system, reaching the effect of good Automatic dispatching and security monitoring.
The present invention is achieved by following technical solution.
A kind of electric power first-aid operation safe monitoring system, comprise remote terminal, Signal reception tower, server, Internet, supply module, safety supervision module, dispatching center, Sheng Ji center and some on-site terminals, described on-site terminal and remote terminal wireless connections, be connected by wireless signal between remote terminal with server, the data that server receives are transferred to supply module respectively through Internet, safety supervision equipment, dispatching center and Sheng Ji center, described supply module, safety supervision module, horizontal information sharing can be realized between dispatching center and Sheng Ji center or pass mutually, and all can assign instruction to on-site terminal.
Further, described wireless signal is 3G or 4G wireless network signal.
Further, described on-site terminal be arranged on on-the-spot failure detection sensor and possess Signal reception, upload, the mobile terminal of Presentation Function or smart mobile phone.
Further, described on-site terminal provides takes pictures and camera function, implements on-site supervision for safety supervision module.
Further, described on-site terminal connects inner Internet by 3G or 4G network.
Based on an operational method for electric power first-aid operation safe monitoring system, its job step is:
1) fault anticipation: on-site terminal receives the fault-signal that on-site terminal detects, fault-signal is sent to server and Internet respectively by wireless signal, be assigned to supply module, safety supervision module, dispatching center, Sheng Ji center through Internet simultaneously, safety supervision module carries out fault anticipation, and anticipation fault is transmitted Sheng Ji center;
2) staff's scheduling: maintenance program is worked out at Sheng Ji center, and maintenance program is sent to dispatching center, maintenance program, to site examining and repairing, is sent to on-site terminal by dispatching center's scheduling staff simultaneously;
3) safety prepares: maintainer carries out maintenance and prepares and prepare safely, the instrument of getting goes to scene, maintainer calls distribution rush repair shop order by on-site terminal, and prepares one by one and choose risk control measure by repairing field requirement, safe preliminary work before fulfiling assignment;
4) overhaul: if anticipation fault is correct, then maintenance process performs according to on-site terminal distribution rush repair shop order completely, and is taken pictures by operation field and upload onto the server and Internet, for file and check; If anticipation bug, through on-site terminal, fault is reported Sheng Ji center after then needing to carry out site inspection, Sheng Ji center issues maintenance instructions through dispatching center to on-site terminal after again working out maintenance program again, and maintenance personal re-executes new safety practice and maintenance instructions according to new distribution rush repair shop order;
5) work termination: maintenance or after having rushed to repair, remove safety practice, floor photo, remote terminal is uploaded by wireless signal, be sent in server and file, upload to dispatching center, safety supervision module, supply module and Sheng Ji center through Internet, confirmation work completes simultaneously, without leftover problem, fill in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, and confirm without leftover problem, repair information is filed, work termination.
Further, in described maintenance step, if involved fault belongs to non-low pressure family table class, repairing can be implemented after power-off need being implemented by supply module according to the maintenance program at Sheng Ji center, and can power transmission be restarted after the work receiving on-site terminal completes instruction.
The invention has the beneficial effects as follows:
A kind of electric power first-aid operation safe monitoring system of the present invention and the operational method based on this system, by erection server, fire wall, utilize Internet technology, maintenance personal by 3G or 4G network to the related content real-time communication worked each time, be uploaded to server to the photo site of environment or video after environment before repairing operation and repairing operation by wireless 3G or 4G network to file, be convenient to inquire about afterwards, by security management and control straight cutting operation field, a stealthy safety monitoring system is added to operation field, reach and guarantee maintenance personal's strict safety code, form and abide by chapter custom, improve the Safety in maintenance and sense of self-protection, the effect eliminated safe hidden trouble, for production safety management work has built one in real time, controlled, efficient management platform.
Supervise field service personnel's strict implement maintenance program, and real-time communication, adjust maintenance program flexibly, improve consistance and the maintenance efficiency of on-the-spot management and control; By Maintenance Table Of Distribution Augmentation single electron and standardization, maintenance report can be completed and upload, consolidation form in scene after having keeped in repair, improving ageing, convenient file and inquiry; Realize each parallel inter-sectional information resources share, improve coordination and communication efficiency, implement closed loop management, whole maintenance flow standardization, procedure, list, thus alleviate the work load of production line personnel.
Accompanying drawing explanation
Fig. 1 is the safety monitoring system structural representation in the present invention;
Fig. 2 is the operation process chart based on safety monitoring system in the present invention;
Fig. 3 is the effect structure figure that the present invention is applied in management.
Embodiment
Technical scheme of the present invention is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As Fig. 1, Fig. 2, shown in Fig. 3, a kind of electric power first-aid operation safe monitoring system of the present invention, comprise remote terminal, Signal reception tower, server, Internet, supply module, safety supervision module, dispatching center, Sheng Ji center and some on-site terminals, described on-site terminal and remote terminal wireless connections, be connected by wireless signal between remote terminal with server, the data that server receives are transferred to supply module respectively through Internet, safety supervision equipment, dispatching center and Sheng Ji center, described supply module, safety supervision module, horizontal information sharing can be realized between dispatching center and Sheng Ji center or pass mutually, and all can assign instruction to on-site terminal.
Described wireless signal is 3G or 4G wireless network signal, to realize remote signal transmission.
Described on-site terminal be arranged on on-the-spot failure detection sensor and possess Signal reception, upload, the mobile terminal of Presentation Function or smart mobile phone or PAD or portable PC, to realize the function of long-range transmission information and data.
Described on-site terminal provides takes pictures and camera function, to provide contrast photo before and after trouble shooting or video data, implements on-site supervision for safety supervision module.
Described on-site terminal connects inner Internet by 3G or 4G network, uploads in real time, the function such as data-gathering and system update to realize data.
Based on an operational method for electric power first-aid operation safe monitoring system, the steps include:
1) fault anticipation: on-site terminal receives the fault-signal that on-site terminal detects, fault-signal is sent to server and Internet respectively by wireless signal, be assigned to supply module, safety supervision module, dispatching center, Sheng Ji center through Internet simultaneously, safety supervision module carries out fault anticipation, and anticipation fault is transmitted Sheng Ji center;
2) staff's scheduling: maintenance program is worked out at Sheng Ji center, and maintenance program is sent to dispatching center, maintenance program, to site examining and repairing, is sent to on-site terminal by dispatching center's scheduling staff simultaneously;
3) safety prepares: maintainer carries out maintenance and prepares and prepare safely, the instrument of getting goes to scene, maintainer calls distribution rush repair shop order by on-site terminal, and prepares one by one and choose risk control measure by repairing field requirement, safe preliminary work before fulfiling assignment;
4) overhaul: if anticipation fault is correct, then maintenance process performs according to on-site terminal distribution rush repair shop order completely, and is taken pictures by operation field and upload onto the server and Internet, for file and check; If anticipation bug, through on-site terminal, fault is reported Sheng Ji center after then needing to carry out site inspection, Sheng Ji center issues maintenance instructions through dispatching center to on-site terminal after again working out maintenance program again, and maintenance personal re-executes new safety practice and maintenance instructions according to new distribution rush repair shop order;
5) work termination: maintenance or after having rushed to repair, remove safety practice, floor photo, remote terminal is uploaded by wireless signal, be sent in server and file, upload to dispatching center, safety supervision module, supply module and Sheng Ji center through Internet, confirmation work completes simultaneously, without leftover problem, fill in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, and confirm without leftover problem, repair information is filed, work termination.
In described maintenance step, if involved fault belongs to non-low pressure family table class, repairing can be implemented after need implementing power-off by supply module according to the maintenance program at Sheng Ji center, and can power transmission be restarted after the work receiving on-site terminal completes instruction, to guarantee field staff's personal safety.
Embodiment one
Low pressure family table is safeguarded
Break down in scene, dispatching center's seat personnel receives user's repair call, or the fault-signal that remote terminal reception is sent to on-site terminal, information is sent to master server and Internet by 3G or 4G signal by remote terminal or seat personnel respectively, and fault-signal is delivered to safety supervision module, dispatching center and Sheng Ji center respectively by Internet; Safety supervision module carries out fault anticipation, and by anticipation fault feedback Sheng Ji center; Maintenance program is formulated at Sheng Ji center, and by maintenance program feedback scheduling center, staff is dispatched to site examining and repairing according to anticipation fault by dispatching center, and maintenance program is sent to on-site terminal; Maintainer carries out maintenance after receiving instruction and safety prepares, and get instrument according to anticipation fault and go to scene, shooting fault in-situ photo, distribution rush repair shop order is called by on-site terminal, and prepare one by one and choose risk control measure by repairing field requirement, safe preliminary work before fulfiling assignment.
If anticipation fault is correct, then directly to perform according to on-site terminal distribution rush repair shop order maintenance program, keep in repair rear dismounting safety practice, floor photo, and upload to remote terminal by on-site terminal, be sent to server and file, feed back to supply module, safety supervision module, dispatching center and Sheng Ji center respectively through Internet simultaneously, confirmation work completes, and without leftover problem, fills in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, confirm without leftover problem, repair information is filed, fault clearance, maintenance personal gives back instrument, work termination.
If anticipation bug, then judged by maintenance personal scene, and fault is uploaded Sheng Ji center through on-site terminal, again maintenance program is drafted and feedback scheduling center by Sheng Ji center, dispatching center assigns new instruction according to fault to on-site terminal, and scheduling maintenance personnel again, change or instrument of applying for another after maintenance personal receives new instruction, the scene that again returns is keeped in repair, and re-executes new safety practice and maintenance instructions according to new distribution rush repair shop order; Keep in repair rear dismounting safety practice, floor photo, and upload to remote terminal by on-site terminal, be sent to server to file, feed back to supply module, safety supervision module, dispatching center and Sheng Ji center respectively through Internet simultaneously, confirmation work completes, and without leftover problem, fills in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, confirm without leftover problem, repair information is filed, fault clearance, maintenance personal gives back instrument, work termination.
Embodiment two
Repairing operation
Break down in scene, dispatching center's seat personnel receives user's repair call, or the fault-signal that remote terminal reception is sent to on-site terminal, information is sent to master server and Internet by 3G or 4G signal by remote terminal or seat personnel respectively, and fault-signal is delivered to supply module, safety supervision module, dispatching center and Sheng Ji center respectively by Internet; Safety supervision module carries out fault anticipation, and by anticipation fault feedback Sheng Ji center; Rush Repair Scheme is formulated and feedback scheduling center in Sheng Ji center, dispatching center communicates information to supply module according to anticipation fault and maintenance program, Rush Repair Scheme is sent to on-site terminal simultaneously, supply module controls brief interruption fault area power grid and powers, and by information feed back safety supervision module and dispatching center, dispatching center's scheduling staff is to scene rush to repair; Maintenance personal carries out repairing after receiving instruction and safety prepares, and get instrument according to anticipation fault and go to scene, shooting fault in-situ photo, shooting fault in-situ photo, distribution rush repair shop order is called by on-site terminal, and prepare one by one and choose risk control measure by repairing field requirement, safe preliminary work before fulfiling assignment.
If anticipation fault is correct, then the direct Rush Repair Scheme according to on-site terminal distribution rush repair shop order is rushed to repair, rush to repair rear dismounting safety practice, floor photo, and upload to remote terminal by on-site terminal, be sent to server and file, feed back to supply module, safety supervision module, dispatching center and Sheng Ji center respectively through Internet simultaneously, confirmation work completes, and without leftover problem, fills in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, confirm without leftover problem, repair information is filed, fault clearance, maintenance personal gives back instrument, work termination, supply module controls to restart power supply.
If anticipation bug, then judged by maintenance personal scene, and fault is uploaded Sheng Ji center through on-site terminal, again maintenance program is drafted and feedback scheduling center by Sheng Ji center, dispatching center assigns new instruction according to fault to on-site terminal, and scheduling maintenance personnel again, change or instrument of applying for another after maintenance personal receives new instruction, the scene that again returns is rushed to repair, and re-executes new safety practice and maintenance instructions according to new distribution rush repair shop order; Rush to repair rear dismounting safety practice, floor photo, and upload to remote terminal by on-site terminal, be sent to server to file, feed back to supply module, safety supervision module, dispatching center and Sheng Ji center respectively through Internet simultaneously, confirmation work completes, and without leftover problem, fills in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, confirm without leftover problem, repair information is filed, fault clearance, maintenance personal gives back instrument, work termination, supply module controls to restart power supply.
Pass through the technical program, from receiving repairing task, site inspection situation, Analysis about Dangerous Point and risk control, scheduling grant, site safety measure execution, first-aid repair construction until end-of-job overall process is monitored in real time, produced on-site personnel rigidity is impelled to perform workflow and fill in list, realize closed loop management, the whole maintenance flow of specification.
Claims (7)
1. an electric power first-aid operation safe monitoring system, it is characterized in that: comprise remote terminal, Signal reception tower, server, Internet, supply module, safety supervision module, dispatching center, Sheng Ji center and some on-site terminals, described on-site terminal and remote terminal wireless connections, be connected by wireless signal between remote terminal with server, the data that server receives are transferred to supply module respectively through Internet, safety supervision equipment, dispatching center and Sheng Ji center, described supply module, safety supervision module, horizontal information sharing can be realized between dispatching center and Sheng Ji center or pass mutually, and all can assign instruction to on-site terminal.
2. a kind of electric power first-aid operation safe monitoring system according to claim 1, is characterized in that: described wireless signal is 3G or 4G wireless network signal.
3. a kind of electric power first-aid operation safe monitoring system according to claim 1, is characterized in that: described on-site terminal be arranged on on-the-spot failure detection sensor and possess Signal reception, upload, the mobile terminal of Presentation Function or smart mobile phone.
4. a kind of electric power first-aid operation safe monitoring system according to claim 1, is characterized in that: described on-site terminal provides takes pictures and camera function, implements on-site supervision for safety supervision module.
5. a kind of electric power first-aid operation safe monitoring system according to claim 1, is characterized in that: described on-site terminal connects inner Internet by 3G or 4G network.
6. based on an operational method for electric power first-aid operation safe monitoring system, it is characterized in that, job step is:
1) fault anticipation: on-site terminal receives the fault-signal that on-site terminal detects, fault-signal is sent to server and Internet respectively by wireless signal, be assigned to supply module, safety supervision module, dispatching center, Sheng Ji center through Internet simultaneously, safety supervision module carries out fault anticipation, and anticipation fault is transmitted Sheng Ji center;
2) staff's scheduling: maintenance program is worked out at Sheng Ji center, and maintenance program is sent to dispatching center, maintenance program, to site examining and repairing, is sent to on-site terminal by dispatching center's scheduling staff simultaneously;
3) safety prepares: maintainer carries out maintenance and prepares and prepare safely, the instrument of getting goes to scene, maintainer calls distribution rush repair shop order by on-site terminal, and prepares one by one and choose risk control measure by repairing field requirement, safe preliminary work before fulfiling assignment;
4) overhaul: if anticipation fault is correct, then maintenance process performs according to on-site terminal distribution rush repair shop order completely, and is taken pictures by operation field and upload onto the server and Internet, for file and check; If anticipation bug, through on-site terminal, fault is reported Sheng Ji center after then needing to carry out site inspection, Sheng Ji center issues maintenance instructions through dispatching center to on-site terminal after again working out maintenance program again, and maintenance personal re-executes new safety practice and maintenance instructions according to new distribution rush repair shop order;
5) work termination: maintenance or after having rushed to repair, remove safety practice, floor photo, remote terminal is uploaded by wireless signal, be sent in server and file, upload to dispatching center, safety supervision module, supply module and Sheng Ji center through Internet, confirmation work completes simultaneously, without leftover problem, fill in distribution rush repair shop order and fault handling situation by on-site terminal; Trouble spot in safety supervision module checks repairing operation process, safety practice arrange that situation, operation process picture, distribution rush repair shop order fill in situation and fault handling situation, and confirm without leftover problem, repair information is filed, work termination.
7. a kind of operational method based on electric power first-aid operation safe monitoring system according to claim 6, it is characterized in that: in described maintenance step, if involved fault belongs to non-low pressure family table class, repairing can be implemented after need implementing power-off by supply module according to the maintenance program at Sheng Ji center, and can power transmission be restarted after the work receiving on-site terminal completes instruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510053010.6A CN104678962B (en) | 2015-02-02 | 2015-02-02 | A kind of electric power first-aid operation safe monitoring system and the operational method based on the system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510053010.6A CN104678962B (en) | 2015-02-02 | 2015-02-02 | A kind of electric power first-aid operation safe monitoring system and the operational method based on the system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104678962A true CN104678962A (en) | 2015-06-03 |
CN104678962B CN104678962B (en) | 2018-03-20 |
Family
ID=53314193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510053010.6A Expired - Fee Related CN104678962B (en) | 2015-02-02 | 2015-02-02 | A kind of electric power first-aid operation safe monitoring system and the operational method based on the system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104678962B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106027983A (en) * | 2016-06-24 | 2016-10-12 | 国网安徽省电力公司黄山供电公司 | Method for monitoring, maintaining and managing grid lines |
CN106326991A (en) * | 2016-09-06 | 2017-01-11 | 西安华瑞网电设备有限公司 | User power distribution and utilization system flexible rush repair service platform and method based on Internet + |
CN106447531A (en) * | 2016-09-09 | 2017-02-22 | 国家电网公司 | Communication operation method |
CN107037766A (en) * | 2017-04-05 | 2017-08-11 | 西北工业大学 | A kind of solar collector monitoring system |
CN107390087A (en) * | 2017-07-12 | 2017-11-24 | 国网青海省电力公司海南供电公司 | Platform is supported in a kind of power network repairing operation |
CN107578109A (en) * | 2017-08-31 | 2018-01-12 | 成都英孚克斯科技有限公司 | A kind of monitoring station maintaining method of standard |
CN108171346A (en) * | 2018-01-25 | 2018-06-15 | 中广核核电运营有限公司 | Processing method, device and the computer equipment of nuclear power plant's instrument control mantenance data |
CN108394844A (en) * | 2018-03-02 | 2018-08-14 | 国网山东省电力公司泗水县供电公司 | A kind of multifunction power repairing platform |
CN109299855A (en) * | 2018-08-24 | 2019-02-01 | 国网天津市电力公司 | A kind of communicating for power information scheduling system and its dispatching method |
CN109450090A (en) * | 2018-11-14 | 2019-03-08 | 遵义华正电缆桥架有限公司 | One kind lacking place's operation safety and protects system |
CN111083207A (en) * | 2019-12-03 | 2020-04-28 | 国家电网有限公司 | System and method for emergency repair scheduling based on ubiquitous power Internet of things |
CN112162531A (en) * | 2020-08-27 | 2021-01-01 | 南京市晨枭软件技术有限公司 | Industrial system process monitoring and adjusting system based on Internet of things |
CN113435724A (en) * | 2021-06-18 | 2021-09-24 | 云南电网有限责任公司临沧供电局 | System and method for remote monitoring and management of distribution network operation |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102081399A (en) * | 2011-01-24 | 2011-06-01 | 深圳市赛远自动化系统有限公司 | Remote monitoring maintenance method and system based on 3G and wind-solar complementary power supply technology |
CN102376147A (en) * | 2011-11-07 | 2012-03-14 | 天津银箭科技有限公司 | Electric power security monitoring and commanding system |
CN102495549A (en) * | 2011-11-22 | 2012-06-13 | 中联重科股份有限公司 | Remote maintenance decision system and method for engineering machinery |
CN102708674A (en) * | 2012-04-28 | 2012-10-03 | 深圳市领华卫通数码科技有限公司 | Method and system of vehicle intelligent services |
CN102968101A (en) * | 2012-11-08 | 2013-03-13 | 合肥工大高科信息科技股份有限公司 | Mine multiple-system linkage control system based on imaging and control method thereof |
WO2013073742A1 (en) * | 2011-11-14 | 2013-05-23 | (주)아이블포토닉스 | Constant security monitoring system for power grid or power facility |
CN203070068U (en) * | 2013-01-23 | 2013-07-17 | 中禹环境工程(北京)有限公司 | Perception transmission equipment |
CN103279830A (en) * | 2013-05-28 | 2013-09-04 | 中国南方电网有限责任公司超高压输电公司广州局 | Transformer substation or converter station accident handling cloud terminal remote support decision-making method and system |
CN203278198U (en) * | 2013-05-08 | 2013-11-06 | 青岛数能电气工程有限公司 | Motor fault predetermination protective device |
CN103389690A (en) * | 2012-05-08 | 2013-11-13 | 邬彬 | Monitoring system, monitoring sub-system, monitoring node equipment and control center equipment |
CN103473626A (en) * | 2013-08-20 | 2013-12-25 | 国家电网公司 | Security protection method based on integrated dispatching data network operation and maintenance system |
CN103490523A (en) * | 2011-12-04 | 2014-01-01 | 江苏省电力公司南京供电公司 | Intelligent power distribution network fault treatment system |
CN103886511A (en) * | 2012-12-19 | 2014-06-25 | 重庆市电力公司南岸供电局 | Real-time command system for power distribution network fault repair |
CN104157021A (en) * | 2014-08-12 | 2014-11-19 | 广州中国科学院沈阳自动化研究所分所 | Intelligent inspection system and intelligent inspection method |
-
2015
- 2015-02-02 CN CN201510053010.6A patent/CN104678962B/en not_active Expired - Fee Related
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102081399A (en) * | 2011-01-24 | 2011-06-01 | 深圳市赛远自动化系统有限公司 | Remote monitoring maintenance method and system based on 3G and wind-solar complementary power supply technology |
CN102376147A (en) * | 2011-11-07 | 2012-03-14 | 天津银箭科技有限公司 | Electric power security monitoring and commanding system |
WO2013073742A1 (en) * | 2011-11-14 | 2013-05-23 | (주)아이블포토닉스 | Constant security monitoring system for power grid or power facility |
CN102495549A (en) * | 2011-11-22 | 2012-06-13 | 中联重科股份有限公司 | Remote maintenance decision system and method for engineering machinery |
CN103490523A (en) * | 2011-12-04 | 2014-01-01 | 江苏省电力公司南京供电公司 | Intelligent power distribution network fault treatment system |
CN102708674A (en) * | 2012-04-28 | 2012-10-03 | 深圳市领华卫通数码科技有限公司 | Method and system of vehicle intelligent services |
CN103389690A (en) * | 2012-05-08 | 2013-11-13 | 邬彬 | Monitoring system, monitoring sub-system, monitoring node equipment and control center equipment |
CN102968101A (en) * | 2012-11-08 | 2013-03-13 | 合肥工大高科信息科技股份有限公司 | Mine multiple-system linkage control system based on imaging and control method thereof |
CN103886511A (en) * | 2012-12-19 | 2014-06-25 | 重庆市电力公司南岸供电局 | Real-time command system for power distribution network fault repair |
CN203070068U (en) * | 2013-01-23 | 2013-07-17 | 中禹环境工程(北京)有限公司 | Perception transmission equipment |
CN203278198U (en) * | 2013-05-08 | 2013-11-06 | 青岛数能电气工程有限公司 | Motor fault predetermination protective device |
CN103279830A (en) * | 2013-05-28 | 2013-09-04 | 中国南方电网有限责任公司超高压输电公司广州局 | Transformer substation or converter station accident handling cloud terminal remote support decision-making method and system |
CN103473626A (en) * | 2013-08-20 | 2013-12-25 | 国家电网公司 | Security protection method based on integrated dispatching data network operation and maintenance system |
CN104157021A (en) * | 2014-08-12 | 2014-11-19 | 广州中国科学院沈阳自动化研究所分所 | Intelligent inspection system and intelligent inspection method |
Non-Patent Citations (1)
Title |
---|
郑崇盈: "供电企业安全生产管理信息系统设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106027983A (en) * | 2016-06-24 | 2016-10-12 | 国网安徽省电力公司黄山供电公司 | Method for monitoring, maintaining and managing grid lines |
CN106326991A (en) * | 2016-09-06 | 2017-01-11 | 西安华瑞网电设备有限公司 | User power distribution and utilization system flexible rush repair service platform and method based on Internet + |
CN106447531A (en) * | 2016-09-09 | 2017-02-22 | 国家电网公司 | Communication operation method |
CN107037766A (en) * | 2017-04-05 | 2017-08-11 | 西北工业大学 | A kind of solar collector monitoring system |
CN107390087A (en) * | 2017-07-12 | 2017-11-24 | 国网青海省电力公司海南供电公司 | Platform is supported in a kind of power network repairing operation |
CN107578109A (en) * | 2017-08-31 | 2018-01-12 | 成都英孚克斯科技有限公司 | A kind of monitoring station maintaining method of standard |
CN108171346A (en) * | 2018-01-25 | 2018-06-15 | 中广核核电运营有限公司 | Processing method, device and the computer equipment of nuclear power plant's instrument control mantenance data |
CN108394844A (en) * | 2018-03-02 | 2018-08-14 | 国网山东省电力公司泗水县供电公司 | A kind of multifunction power repairing platform |
CN109299855A (en) * | 2018-08-24 | 2019-02-01 | 国网天津市电力公司 | A kind of communicating for power information scheduling system and its dispatching method |
CN109299855B (en) * | 2018-08-24 | 2021-08-20 | 国网天津市电力公司 | Power information communication scheduling system and scheduling method thereof |
CN109450090A (en) * | 2018-11-14 | 2019-03-08 | 遵义华正电缆桥架有限公司 | One kind lacking place's operation safety and protects system |
CN109450090B (en) * | 2018-11-14 | 2022-03-15 | 遵义华正电缆桥架有限公司 | Lack department operation safety protection system |
CN111083207A (en) * | 2019-12-03 | 2020-04-28 | 国家电网有限公司 | System and method for emergency repair scheduling based on ubiquitous power Internet of things |
CN112162531A (en) * | 2020-08-27 | 2021-01-01 | 南京市晨枭软件技术有限公司 | Industrial system process monitoring and adjusting system based on Internet of things |
CN113435724A (en) * | 2021-06-18 | 2021-09-24 | 云南电网有限责任公司临沧供电局 | System and method for remote monitoring and management of distribution network operation |
Also Published As
Publication number | Publication date |
---|---|
CN104678962B (en) | 2018-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104678962A (en) | Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system | |
CN101968644B (en) | Unattended remote medical oxygenerator monitoring system | |
CN103903184A (en) | Method for processing information between power distribution network first-aid repair command platform and mobile terminal | |
CN103296112A (en) | Junction box and intelligent motoring system of solar battery component | |
CN108924168A (en) | A kind of service scheduling system and business interlock method of Intelligent Mobile Robot | |
CN102945028B (en) | Cloud technology application smart home with intelligent house grid control function | |
CN106829668A (en) | A kind of elevator long distance adjustment method and device | |
CN104895547A (en) | Intelligent mobile monitoring and full-automatic maintenance method and device of electric control system of drilling machine | |
CN103606055A (en) | Intelligent interaction platform for power fault rush repair | |
CN104010038A (en) | Method for uploading transformer substation graphic to scheduling master station according to JMS technology | |
CN103279083B (en) | A kind of ORC genset wireless supervisory control system and long-distance monitoring method | |
CN105978138A (en) | Electric power automation system data emergency transmission method and device | |
CN106022648A (en) | Electric power scheduling report form coordination and generation method | |
CN203479337U (en) | Online monitoring communication system for power transmission lines | |
CN107051707A (en) | A kind of on-line control system for movable Crushing work station | |
CN204759182U (en) | Emergent monitored control system of railway tunnel based on moving platform | |
CN105338102A (en) | Intelligent communication method of Internet of Things intelligent gas meter | |
CN102820069A (en) | Nuclear power station unit control method and system | |
CN204754902U (en) | Control of rig electrical system intelligent movement and full -automatic device of maintaining | |
CN202549028U (en) | Fire disaster alarm comprehensive control system used for urban rail traffic station | |
CN204909933U (en) | Oxygen cabin remote monitering system based on mobile network | |
CN105512956A (en) | Intelligent multimedia interactive platform system for electric power fault emergency repair process | |
CN201750206U (en) | Conversion device for main control station and non-main control station of DC control system | |
CN103984877A (en) | Evaluation system and method for running quality of secondary equipment of electric power system | |
CN102495898A (en) | state online detection data template generation association method and device for power grid device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180320 Termination date: 20190202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |