CN106022648A - Electric power scheduling report form coordination and generation method - Google Patents
Electric power scheduling report form coordination and generation method Download PDFInfo
- Publication number
- CN106022648A CN106022648A CN201610406462.2A CN201610406462A CN106022648A CN 106022648 A CN106022648 A CN 106022648A CN 201610406462 A CN201610406462 A CN 201610406462A CN 106022648 A CN106022648 A CN 106022648A
- Authority
- CN
- China
- Prior art keywords
- power scheduling
- scheduling
- data
- electric power
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses an electric power scheduling report form coordination and generation method. The electric power scheduling report form coordination and generation method comprises steps: a lower electric power scheduling station reports; a higher electric power scheduling station receives data; a scheduling coordinator obtains an electric power scheduling plan, generates an electric power scheduling report, verifies an electric power scheduling report form and issues the electric power scheduling report form to the lower electric power scheduling station; the lower electric power scheduling station performs electric power plan scheduling; the lower electric power scheduling station generates a scheduling report form after the scheduling is finished and returns a feedback to the higher electric power scheduling station; and the higher electric power scheduling station performs verification and proofreading on the fed back scheduling report form. The electric power scheduling report form coordination and generation method can greatly improves uniformity of report form generation during the electric power scheduling process, improves safety and stability of electric power scheduling plan implementation, prevents report error during the scheduling process, realizes accuracy of report form generation, issuing and implementation, avoids work randomness and accidents, can find abnormal data in time and position the cause of the problem, and can guarantee data quality and improves working efficiency.
Description
Technical field
The invention belongs to power scheduling technical field, especially relate to a kind of power scheduling form and coordinate and generation method.
Background technology
Dispatching comprehensive data platform is the informationalized important development direction of current national grid company system call, is also the interim inevitable choice of power informatization development, and its technology and application are still evolving among perfect.But, at present, domestic power-management and communication centres at different levels have progressively built a collection of dedicated application system during dispatching automation in recent years and normal operation, define one and can meet multiple production management needs.Along with the development of integrated information environment, electric power dispatching system have also been obtained and develops faster.nullBut,Current electric power dispatching system is when the plan of being scheduling issues,Generally individually need to generate dispatch report,But,Due to each system generate form time owing to lacking Uniting and specification,Inter-system data exchange is day by day complicated with shared,One system must adapt to the most normalized special interface for the data obtaining other system,Result in the network structure of a kind of complexity and without profile data stream,Electric power secondary system security protection system proposes requirements at the higher level to the data interaction between system,Traditional data interactive mode can not be continued to use,The data dispersion of each system and repetition,Concordance is difficult to ensure that,And increase data maintenance difficulty,Each system is the biggest to the mark difference of data,Cause data association poor,For equipment nameplate、Electric network model、Physical state、The power system common informations such as running quality repeat safeguard,Easily cause data inconsistent、Disunity,Too increase maintenance workload simultaneously,Therefore,In order to adapt to the development of power system、Reform and control centre's work change、The needs that demand adjusts.Need the form to electric power dispatching system to coordinate with generation method and unify and improve.
Summary of the invention
The present invention is directed to existing technical problem, a kind of power scheduling form is provided to coordinate and the method for generation, the uniformity of report generation during power scheduling can be greatly improved, improve the safety and stability of power scheduling implementing plan, prevent the phenomenon that reports an error occurred in scheduling process, achieve report generation, assign, accuracy in implementation process, avoid the randomness of work, avoid the generation of security incident, the reason of data exception orientation problem can be found in time, ensure that the quality of data, improve work efficiency.
For achieving the above object, the present invention provides following technical scheme: a kind of power scheduling form is coordinated and the method for generation, it is characterised in that it comprises the following steps:
(1) electric power data gathered in respective institute compass of competency that subordinate's power scheduling station is real-time, and the data of this collection are transferred to data reporting module;
(2) data reception module at higher level's power scheduling station receives and passes through the electric power data in the respective institute compass of competency that data reporting module is sent from each subordinate's power scheduling station;
(3) data that each subordinate control station received by the scheduling coordinator analysis at higher level's power scheduling station is sent, draw power scheduling plan;
(4) the power scheduling report generation unit at higher level's power scheduling station power scheduling plan based on described step (3), generates power scheduling form;
(5) this power scheduling form is verified by power scheduling form correction verification module;
(6) the power scheduling form after the dispatch list at higher level's power scheduling station issues the verification that described step (5) is obtained by module is handed down to subordinate's power scheduling station;
(7) subordinate's power scheduling station receives and identifies this power scheduling table, and according to this power scheduling table, its region administered is carried out power project scheduling;
(8), after subordinate's power scheduling station has been dispatched according to the operation plan of described step (7), generate the dispatch report after having dispatched, respective dispatch report is fed back to higher level's power scheduling station;
(9) dispatch report fed back to is examined check and correction by higher level's power scheduling station.
Further, as preferably, power scheduling plan at least includes that system loading prediction, bus load prediction, unit generation plan, equipment stop multiple labour plan, unit adjustable extent, interconnection plan and stable cross section limit.
Further, as preferably, in described step (5), electric power form is verified and at least includes verifying in form data file name whether compliant requirement, check in form content data file whether compliant requirement, check data file in form the most exceeded the time of advent setting on call time, whether data file exists in inspection form the device name of None-identified, check whether form is existed the equipment of non-level scheduling administration in data file, check that in form, in data file, data are the most complete, check in form, in data file, whether same equipment exists multiple different data record, check that the data period that subordinate control station is reported is the most complete.
Further, as preferably, in described step (6), dispatch list at higher level's power scheduling station issue the verification that described step (5) is obtained by module after power scheduling form when being handed down to subordinate power scheduling station, also include the step that the content of dispatch list is stored, and the content of storage at least includes the electric network model that subordinate's power scheduling station is administered, device parameter, generating data, the electricity consumption data in area, powered data, load data, system frequency data, generation schedule, track data, overhaul data, large user's load, critical point electricity and meteorological data.
Further, as preferably, the storage operation in described step (6) uses cloud storage server to store.
Further, as preferably, in described step (4), the power scheduling report generation unit at higher level's power scheduling station is provided with report form template, when generating form, utilizes this report form template to automatically generate power scheduling form.
Further, as preferably, in described step (9), when the dispatch report fed back to is examined check and correction, if it find that scheduling error instructs during check and correction, then after the instruction of dispatcher's input scheduling administration authority, entering dispatcher's Real-Time Scheduling operating procedure, dispatcher is by carrying out refresh process to step (1), repeat step (1)-(9), regenerate dispatch list, re-start check and correction, till the dispatch list of feedback is examined correctly.
Compared with prior art, the invention has the beneficial effects as follows:
The present invention can be greatly improved the uniformity of report generation during power scheduling, improve the safety and stability of power scheduling implementing plan, prevent the phenomenon that reports an error occurred in scheduling process, achieve report generation, assign, accuracy in implementation process, avoid the randomness of work, it is to avoid the generation of security incident, it is possible to find data exception the reason of orientation problem in time, ensure that the quality of data, improve work efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme: a kind of power scheduling form is coordinated and the method for generation, it is characterised in that it comprises the following steps:
(1) electric power data gathered in respective institute compass of competency that subordinate's power scheduling station is real-time, and the data of this collection are transferred to data reporting module;
(2) data reception module at higher level's power scheduling station receives and passes through the electric power data in the respective institute compass of competency that data reporting module is sent from each subordinate's power scheduling station;
(3) data that each subordinate control station received by the scheduling coordinator analysis at higher level's power scheduling station is sent, draw power scheduling plan;
(4) the power scheduling report generation unit at higher level's power scheduling station power scheduling plan based on described step (3), generates power scheduling form;
(5) this power scheduling form is verified by power scheduling form correction verification module;
(6) the power scheduling form after the dispatch list at higher level's power scheduling station issues the verification that described step (5) is obtained by module is handed down to subordinate's power scheduling station;
(7) subordinate's power scheduling station receives and identifies this power scheduling table, and according to this power scheduling table, its region administered is carried out power project scheduling;
(8), after subordinate's power scheduling station has been dispatched according to the operation plan of described step (7), generate the dispatch report after having dispatched, respective dispatch report is fed back to higher level's power scheduling station;
(9) dispatch report fed back to is examined check and correction by higher level's power scheduling station.
In the present embodiment, power scheduling plan at least includes that system loading prediction, bus load prediction, unit generation plan, equipment stop multiple labour plan, unit adjustable extent, interconnection plan and stable cross section limit.
Further, as preferably, in described step (5), electric power form is verified and at least includes verifying in form data file name whether compliant requirement, check in form content data file whether compliant requirement, check data file in form the most exceeded the time of advent setting on call time, whether data file exists in inspection form the device name of None-identified, check whether form is existed the equipment of non-level scheduling administration in data file, check that in form, in data file, data are the most complete, check in form, in data file, whether same equipment exists multiple different data record, check that the data period that subordinate control station is reported is the most complete.
Wherein, in described step (6), dispatch list at higher level's power scheduling station issue the verification that described step (5) is obtained by module after power scheduling form when being handed down to subordinate power scheduling station, also include the step that the content of dispatch list is stored, and the content of storage at least include being administered at subordinate's power scheduling station electric network model, device parameter, generating data, electricity consumption data, powered data, load data, system frequency data, generation schedule, track data, overhaul data, large user's load, critical point electricity and the meteorological data in area.For the ease of storing scheduling information report, the storage operation in described step (6) uses cloud storage server to store.
In order to improve efficiency and the accuracy of report generation, in described step (4), the power scheduling report generation unit at higher level's power scheduling station is provided with report form template, when generating form, utilizes this report form template to automatically generate power scheduling form.In described step (9), when the dispatch report fed back to is examined check and correction, if it find that scheduling error instructs during check and correction, then after the instruction of dispatcher's input scheduling administration authority, entering dispatcher's Real-Time Scheduling operating procedure, dispatcher is by carrying out refresh process to step (1), repeat step (1)-(9), regenerate dispatch list, re-start check and correction, till the dispatch list of feedback is examined correctly.
The present invention can be greatly improved the uniformity of report generation during power scheduling, improve the safety and stability of power scheduling implementing plan, prevent the phenomenon that reports an error occurred in scheduling process, achieve report generation, assign, accuracy in implementation process, avoid the randomness of work, it is to avoid the generation of security incident, it is possible to find data exception the reason of orientation problem in time, ensure that the quality of data, improve work efficiency.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, being appreciated that and these embodiments can carry out multiple change without departing from the principles and spirit of the present invention, revise, replace and modification, the scope of the present invention be defined by the appended.
Claims (7)
1. a power scheduling form is coordinated and the method for generation, it is characterised in that it comprises the following steps:
(1) electric power data gathered in respective institute compass of competency that subordinate's power scheduling station is real-time, and the data of this collection are transferred to data reporting module;
(2) data reception module at higher level's power scheduling station receives and passes through the electric power data in the respective institute compass of competency that data reporting module is sent from each subordinate's power scheduling station;
(3) data that each subordinate control station received by the scheduling coordinator analysis at higher level's power scheduling station is sent, draw power scheduling plan;
(4) the power scheduling report generation unit at higher level's power scheduling station power scheduling plan based on described step (3), generates power scheduling form;
(5) this power scheduling form is verified by power scheduling form correction verification module;
(6) the power scheduling form after the dispatch list at higher level's power scheduling station issues the verification that described step (5) is obtained by module is handed down to subordinate's power scheduling station;
(7) subordinate's power scheduling station receives and identifies this power scheduling table, and according to this power scheduling table, its region administered is carried out power project scheduling;
(8), after subordinate's power scheduling station has been dispatched according to the operation plan of described step (7), generate the dispatch report after having dispatched, respective dispatch report is fed back to higher level's power scheduling station;
(9) dispatch report fed back to is examined check and correction by higher level's power scheduling station.
A kind of power scheduling form the most according to claim 1 is coordinated and the method for generation, it is characterised in that: power scheduling plan at least includes that system loading prediction, bus load prediction, unit generation plan, equipment stop multiple labour plan, unit adjustable extent, interconnection plan and stable cross section limit.
A kind of power scheduling form the most according to claim 1 is coordinated and the method for generation, it is characterized in that: in described step (5), electric power form is verified and at least includes verifying in form data file name whether compliant requirement, check in form content data file whether compliant requirement, check data file in form the most exceeded the time of advent setting on call time, whether data file exists in inspection form the device name of None-identified, check whether form is existed the equipment of non-level scheduling administration in data file, check that in form, in data file, data are the most complete, check in form, in data file, whether same equipment exists multiple different data record, check that the data period that subordinate control station is reported is the most complete.
A kind of power scheduling form the most according to claim 1 is coordinated and the method for generation, it is characterized in that: in described step (6), dispatch list at higher level's power scheduling station issue the verification that described step (5) is obtained by module after power scheduling form when being handed down to subordinate power scheduling station, also include the step that the content of dispatch list is stored, and the content of storage at least includes the electric network model that subordinate's power scheduling station is administered, device parameter, generating data, the electricity consumption data in area, powered data, load data, system frequency data, generation schedule, track data, overhaul data, large user's load, critical point electricity and meteorological data.
A kind of power scheduling form the most according to claim 4 is coordinated and the method for generation, it is characterised in that: the storage operation in described step (6) uses cloud storage server to store.
A kind of power scheduling form the most according to claim 1 is coordinated and the method for generation, it is characterized in that: in described step (4), the power scheduling report generation unit at higher level's power scheduling station is provided with report form template, when generating form, this report form template is utilized to automatically generate power scheduling form.
A kind of power scheduling form the most according to claim 1 is coordinated and the method for generation, it is characterized in that: in described step (9), when the dispatch report fed back to is examined check and correction, if it find that scheduling error instructs during check and correction, then after the instruction of dispatcher's input scheduling administration authority, enter dispatcher's Real-Time Scheduling operating procedure, dispatcher is by carrying out refresh process to step (1), repeat step (1)-(9), regenerate dispatch list, re-start check and correction, till the dispatch list of feedback is examined correctly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406462.2A CN106022648A (en) | 2016-06-12 | 2016-06-12 | Electric power scheduling report form coordination and generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406462.2A CN106022648A (en) | 2016-06-12 | 2016-06-12 | Electric power scheduling report form coordination and generation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106022648A true CN106022648A (en) | 2016-10-12 |
Family
ID=57090108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610406462.2A Withdrawn CN106022648A (en) | 2016-06-12 | 2016-06-12 | Electric power scheduling report form coordination and generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106022648A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107766975A (en) * | 2017-10-11 | 2018-03-06 | 广西电网有限责任公司 | A kind of traffic control task preferred allocation method for considering dispatcher's workload |
CN109523164A (en) * | 2018-11-16 | 2019-03-26 | 中广核工程有限公司 | A kind of full scope simulator of nuclear power station Acceptance Test appraisal procedure and system |
CN111105212A (en) * | 2019-12-23 | 2020-05-05 | 广东电网有限责任公司 | Power dispatching interaction process control method and device |
CN112183039A (en) * | 2020-09-16 | 2021-01-05 | 支付宝(杭州)信息技术有限公司 | Compliance verification method and device for business report |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090326726A1 (en) * | 2008-06-25 | 2009-12-31 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
CN102750654A (en) * | 2011-04-20 | 2012-10-24 | 中国南方电网有限责任公司 | Power dispatching information disclosure platform for large power grid |
CN105631583A (en) * | 2015-12-22 | 2016-06-01 | 南京南瑞集团公司 | Data acquisition and processing method for power grid province-region integrated dispatching report |
-
2016
- 2016-06-12 CN CN201610406462.2A patent/CN106022648A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090326726A1 (en) * | 2008-06-25 | 2009-12-31 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
CN102750654A (en) * | 2011-04-20 | 2012-10-24 | 中国南方电网有限责任公司 | Power dispatching information disclosure platform for large power grid |
CN105631583A (en) * | 2015-12-22 | 2016-06-01 | 南京南瑞集团公司 | Data acquisition and processing method for power grid province-region integrated dispatching report |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107766975A (en) * | 2017-10-11 | 2018-03-06 | 广西电网有限责任公司 | A kind of traffic control task preferred allocation method for considering dispatcher's workload |
CN107766975B (en) * | 2017-10-11 | 2021-04-13 | 广西电网有限责任公司 | Dispatching work task allocation method considering dispatcher workload |
CN109523164A (en) * | 2018-11-16 | 2019-03-26 | 中广核工程有限公司 | A kind of full scope simulator of nuclear power station Acceptance Test appraisal procedure and system |
CN111105212A (en) * | 2019-12-23 | 2020-05-05 | 广东电网有限责任公司 | Power dispatching interaction process control method and device |
CN112183039A (en) * | 2020-09-16 | 2021-01-05 | 支付宝(杭州)信息技术有限公司 | Compliance verification method and device for business report |
CN112183039B (en) * | 2020-09-16 | 2024-04-19 | 支付宝(杭州)信息技术有限公司 | Compliance verification method and device for business report |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106022648A (en) | Electric power scheduling report form coordination and generation method | |
CN112053041B (en) | Province-region integrated source network load storage real-time control system and control method | |
CN108053042A (en) | A kind of outage information is reported and submitted and delivery system | |
CN103489062A (en) | Scheduled outage method and device based on CIM model | |
CN105427041A (en) | Standardized maintenance method for reconstruction and extension information point table of running substation | |
CN103986227A (en) | Electric power distribution network operation monitoring method and system based on GIS platform | |
CN102938101A (en) | Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal | |
CN103440531A (en) | Wind power plant short-term wind power prediction system in view of operating state of wind power plant draught fan | |
CN104731657A (en) | Resource scheduling method and system | |
CN104156900A (en) | Smart water plant management information monitoring system | |
WO2023098375A1 (en) | Operation sheet processing method and device, storage medium, and electronic device | |
CN103606055A (en) | Intelligent interaction platform for power fault rush repair | |
CN115047841A (en) | Wind turbine generator system remote fault diagnosis system based on cloud platform | |
CN111798088A (en) | Power grid dispatching method and system | |
CN109064140A (en) | Internet of things equipment operation management system | |
CN111652493A (en) | Multi-project collaborative management system based on ACM platform | |
CN109767056A (en) | Boss station integrative graph management method, system and storage medium | |
CN110866061A (en) | Information visualization system based on GIS | |
CN113515831B (en) | Energy scheduling method and device, electronic equipment and storage medium | |
CN202795451U (en) | Asset entire life-cycle management process control application system based on topic base | |
CN105512956A (en) | Intelligent multimedia interactive platform system for electric power fault emergency repair process | |
CN104966152B (en) | Electric power safety production management system | |
CN104050527A (en) | Regional power grid dispatching intelligent operation order system | |
CN204989956U (en) | Gas -combustion generator remote management system | |
CN107578108A (en) | A kind of outdoor hybrid wind-solar energy device discrete type management system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20161012 |
|
WW01 | Invention patent application withdrawn after publication |