CN109767056A - Boss station integrative graph management method, system and storage medium - Google Patents

Boss station integrative graph management method, system and storage medium Download PDF

Info

Publication number
CN109767056A
CN109767056A CN201811424870.6A CN201811424870A CN109767056A CN 109767056 A CN109767056 A CN 109767056A CN 201811424870 A CN201811424870 A CN 201811424870A CN 109767056 A CN109767056 A CN 109767056A
Authority
CN
China
Prior art keywords
main station
substation
station system
file
graphic file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811424870.6A
Other languages
Chinese (zh)
Inventor
季堃
吕洋
赵家庆
孙世明
陈玉慧
李春
马明明
韩肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Suzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Suzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, NARI Group Corp, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd, Suzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811424870.6A priority Critical patent/CN109767056A/en
Publication of CN109767056A publication Critical patent/CN109767056A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a kind of boss station integrative graph management method, system and storage mediums, to regulate and control main station system and subsystem in substation system to have mutually access graphic file by wide area file services, the function of realizing the synchronization Sharing Management for the electric system figure that boss stands under integrated frame completes the basic verification of figure during graphical interaction, being associated with of graphics device information and simulator, the replacement of pel, the filtering of the useless element of main website, compares etc. functions with upper hyposynchronous graphic file.It is achieved in substation figure to be shared automatically to main station side, effectively reduces main website maintenance work, it is horizontal to promote boss station board service.

Description

Boss station integrative graph management method, system and storage medium
Technical field
The invention belongs to power dispatching automation fields, and in particular to a kind of boss station integration figure based on file service Shape management method, system and storage medium can be widely applied in electric system regulate and control the figure of main station system and transformer substation system Shape is shared and manages.
Background technique
With the intelligent construction of construction the main website regulator control system and transformer substation system of smart grid, with big operation construction All-round popularization, management and running and equipment operation business great change has occurred, professional technique merges increasingly, and traditional power transformation is set Received shipment row monitoring business with it is at different levels scheduling it is intensive merge, capital equipment operating status in substation need to be monitored in real time in dispatching terminal, A large amount of device real-time monitoring information needs to be transmitted to scheduling station end.This merges the information between scheduling station and substation New demand is proposed with business interaction.The construction of boss's station integrative graph management can form the consistent figure of height, improve The security management and control of O&M process reduces work of the artificial nucleus to figure, improves O&M efficiency.
General each system manufacturers are described using privately owned form and are advised using CIM/SVG in terms of electric system figure description Model carries out the interaction of heterogeneous system, entrance international standard and promotion and implementation at home with CIM/G standard, most of system factory Furniture is standby to be described electric system figure using unified CIM/G specification, has boss station integration figure on this basis The development of shape management work, however there is only simple data interactions between main website and substation at present, can not effectively be schemed Shape management.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes that a kind of boss station integrative graph management method, this method pass through wide area text Part service is so that regulation main station system and subsystem in substation system have mutually access graphic file, the integrated frame in realization boss station The function of the synchronization Sharing Management of electric system figure under frame.
It realizes above-mentioned technical purpose, reaches above-mentioned technical effect, the invention is realized by the following technical scheme:
In a first aspect, providing a kind of boss station integrative graph management method, described method includes following steps:
Substation system graphing;
It is sent to main station system by the graphic file that wide area file services draw substation system, main station system is synchronous to be received The graphic file that substation system sends over;
It receives the graphic and model integration maintenance tool prompt figure after graphic file in main station system to update, if necessary to carry out this Ground file verification then passes through the accuracy of the received graphic file of the verification of the correction verification module in main station system;
Main station system verifies the graphic file received from substation system, and generates figure verification report;
Confirm figure verification report, updates main station system figure if if verifying.
With reference to first aspect, further, it is once connect needed for the figure supervisory control of substation that the substation system is drawn Line chart, chart spacing and used pel.
With reference to first aspect, further, the graphic file for being drawn substation system by wide area file services It is sent to main station system specifically: the wide area file services on main station system are called after the completion of substation system graphing, actively Send the graphics over main station system.
With reference to first aspect, further, the main station system verifies the graphic file received from substation system, and generates Figure verification report specifically:
Main station system parses it after receiving the graphic file from substation system, filters out master after unwanted file The device id for the substation system stood in the figure that will be parsed and the simulator ID of main station system carry out mapping association, will parse The main website pel mapping association corresponding with main station system of substation system pel out;
Compare main station system and whether the connection relationship of pel corresponding in substation system is consistent, and generates figure verification report It accuses.
Second aspect provides a kind of boss station integrative graph management system, comprising:
Drafting module: for substation system graphing;
Transmission module: the graphic file for being drawn substation system by wide area file services is sent to main station system, main The synchronous graphic file for receiving substation system and sending over of system of standing;
Graphical management module: receiving the graphic and model integration maintenance tool prompt figure after graphic file in main station system and update, If necessary to carry out local file verification then by the standard of the received graphic file of the correction verification module verification in main station system True property;
Main station system verifies the graphic file received from substation system, and generates figure verification report;
Confirm figure verification report, updates main station system figure if if verifying.
The third aspect provides a kind of boss station integrative graph management system, comprising: including memory and processor;
The memory is for storing instruction;
The processor is for the step of being operated according to described instruction to execute any one of first aspect the method.
Fourth aspect provides a kind of computer readable storage medium, is stored thereon with computer program, which is located Manage the step of any one of first aspect the method is realized when device executes.
The invention has the advantages that:
1, it avoids figure and repeats the work drawn, reduce work of the artificial nucleus to figure, improve O&M efficiency.
2, the wide area collaboration of graphic picture improves information fusion degree between boss station, promotes boss station integral application.
Detailed description of the invention
Fig. 1 is figure maintenance process schematic diagram in the present invention;
Fig. 2 is main website graphic file checking process figure in the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Application principle of the invention is explained in detail with reference to the accompanying drawing.
As shown in Figs. 1-2, boss station integrative graph management method, comprising the following steps:
Step 1: substation (subsystem in substation) drawing system figure, formation include station wiring diagram based on CIM/G description, Every figure etc.;
Step 2: the system figure that substation is drawn is published to (the substation system drafting of main website end system by wide area file services The wide area file services on main station system are called after the completion of figure, actively send the graphics over main station system.);Graphic file by Substation end active transmission obtains primitive information by parsing after parsing graphic file after main website receives, and whether checks local Pel is lacked, pel acquisition is directly carried out by access substation file service if missing.
Step 3: the synchronous graphic file for receiving substation system and sending over of main station system, and by main station system Correction verification module in graphic and model integration maintenance tool prompt prompt main station system has figure update;
Step 4: if necessary to carry out local file verification then by the correction verification module in main station system to from substation system CIM/G formatted file verified, the graphic file of the CIM/G format from substation system is parsed first, mistake Filter (scope of business of substation system and main station system has a certain difference, substation system draw system, some figure main websites System does not need, and to filter out, this is filtered through filter table realization, filter table flexibly configurable) the unwanted text of main station system The simulator ID of the device id of the substation system in the graphic file parsed and main station system is subjected to mapping association after part, By the substation system pel parsed main website pel mapping association corresponding with main station system;File verification is with main website graphic file On the basis of, compare main station system and whether the connection relationship of pel corresponding in substation system is consistent, such as compares master one by one The equipment in graphic file of standing and the equipment in the graphic file of substation, if main website side form type device id is looked in the graphic file of substation To occurrence, then continues to compare the device id being connect in the graphic file of boss station with the equipment and judge connected set It is standby whether consistent.
Step 5: generation figure verification report (including device id mapping relations, pel transformation record, element filter note Record), result report will be included in by comparing abnormal equipment.
Step 6: more capable to main station system according to the content that verification report passes through verification.
Generate result report need to explicitly point out main station side graphic file and the inconsistent pel position in substation, device name, ID, inconsistent type (including equipment is not present, connection error etc.).
Boss station provided in an embodiment of the present invention integrative graph management system, comprising:
Drafting module: for substation system graphing;
Transmission module: the graphic file for being drawn substation system by wide area file services is sent to main station system, main The synchronous graphic file for receiving substation system and sending over of system of standing;
Graphical management module: receiving the graphic and model integration maintenance tool prompt figure after graphic file in main station system and update, If necessary to carry out local file verification then by the standard of the received graphic file of the correction verification module verification in main station system True property;
Main station system verifies the graphic file received from substation system, and generates figure verification report;
Confirm figure verification report, updates main station system figure if if verifying.
Boss station provided by the invention integrative graph management system, can also be to include: including memory and processor;
The memory is for storing instruction;
The processor executes the step of boss station integrative graph management method for being operated according to described instruction.
The present invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, which is located Reason device realizes the step of aforementioned boss station integrative graph management method when executing.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (7)

  1. The integrative graph management method 1. boss stands, which comprises the following steps:
    Substation system graphing;
    It is sent to main station system by the graphic file that wide area file services draw substation system, main station system is synchronous to be received The graphic file that substation system sends over;
    It receives the graphic and model integration maintenance tool prompt figure after graphic file in main station system to update, if necessary to carry out this Ground file verification then passes through the accuracy of the received graphic file of the verification of the correction verification module in main station system;
    Main station system verifies the graphic file received from substation system, and generates figure verification report;
    Confirm figure verification report, updates main station system figure if if verifying.
  2. The integrative graph management method 2. boss according to claim 1 stands, which is characterized in that the figure that substation system is drawn Primary connection figure needed for shape packet supervisory control of substation, chart spacing and used pel.
  3. The integrative graph management method 3. boss according to claim 1 stands, which is characterized in that described to pass through wide area file It services the graphic file for drawing substation system and is sent to main station system specifically: called after the completion of substation system graphing Wide area file services on main station system, actively send the graphics over main station system.
  4. The integrative graph management method 4. boss according to claim 1 stands, which is characterized in that the main station system verification Graphic file received from substation system, and generate figure verification report specifically:
    Main station system parses it after receiving the graphic file from substation system, filters out master after unwanted file The device id for the substation system stood in the figure that will be parsed and the simulator ID of main station system carry out mapping association, will parse The main website pel mapping association corresponding with main station system of substation system pel out;
    Compare main station system and whether the connection relationship of pel corresponding in substation system is consistent, and generates figure verification report It accuses.
  5. The integrative graph management system 5. a kind of boss stands characterized by comprising
    Drafting module: for substation system graphing;
    Transmission module: the graphic file for being drawn substation system by wide area file services is sent to main station system, main The synchronous graphic file for receiving substation system and sending over of system of standing;
    Graphical management module: receiving the graphic and model integration maintenance tool prompt figure after graphic file in main station system and update, If necessary to carry out local file verification then by the standard of the received graphic file of the correction verification module verification in main station system True property;
    Main station system verifies the graphic file received from substation system, and generates figure verification report;
    Confirm figure verification report, updates main station system figure if if verifying.
  6. The integrative graph management system 6. a kind of boss stands characterized by comprising including memory and processor;
    The memory is for storing instruction;
    The processor is used to be operated according to described instruction to execute the step of any one the method according to claim 1 ~ 4 Suddenly.
  7. 7. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor The step of any one of claim 1 ~ 4 the method is realized when row.
CN201811424870.6A 2018-11-27 2018-11-27 Boss station integrative graph management method, system and storage medium Pending CN109767056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811424870.6A CN109767056A (en) 2018-11-27 2018-11-27 Boss station integrative graph management method, system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811424870.6A CN109767056A (en) 2018-11-27 2018-11-27 Boss station integrative graph management method, system and storage medium

Publications (1)

Publication Number Publication Date
CN109767056A true CN109767056A (en) 2019-05-17

Family

ID=66449878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811424870.6A Pending CN109767056A (en) 2018-11-27 2018-11-27 Boss station integrative graph management method, system and storage medium

Country Status (1)

Country Link
CN (1) CN109767056A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110705969A (en) * 2019-10-12 2020-01-17 许昌许继软件技术有限公司 Transformer substation monitoring system, main station and method for automatically associating measuring point ID
CN112580186A (en) * 2020-11-03 2021-03-30 国网江苏省电力有限公司营销服务中心 Method for generating marketing side power supply equipment GIS graph
CN117436671A (en) * 2023-12-20 2024-01-23 山东信诚同舟电力科技有限公司 Relay protection reconstruction method and system for cooperation of main station and sub station of grid-connected power plant

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390252A (en) * 2013-07-30 2013-11-13 国家电网公司 Method for interacting graphic information between dispatching center and intelligent substation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390252A (en) * 2013-07-30 2013-11-13 国家电网公司 Method for interacting graphic information between dispatching center and intelligent substation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110705969A (en) * 2019-10-12 2020-01-17 许昌许继软件技术有限公司 Transformer substation monitoring system, main station and method for automatically associating measuring point ID
CN112580186A (en) * 2020-11-03 2021-03-30 国网江苏省电力有限公司营销服务中心 Method for generating marketing side power supply equipment GIS graph
CN112580186B (en) * 2020-11-03 2024-03-08 国网江苏省电力有限公司营销服务中心 Method for generating GIS (geographic information System) diagram of marketing-side power supply equipment
CN117436671A (en) * 2023-12-20 2024-01-23 山东信诚同舟电力科技有限公司 Relay protection reconstruction method and system for cooperation of main station and sub station of grid-connected power plant
CN117436671B (en) * 2023-12-20 2024-03-29 山东信诚同舟电力科技有限公司 Relay protection reconstruction method and system for cooperation of main station and sub station of grid-connected power plant

Similar Documents

Publication Publication Date Title
CN104036429B (en) Intelligent transformer station configuration file standardized management system and file verification method
CN104360844B (en) Protocol conversion server and ATS systems based on OPC UA standards
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN101388903B (en) Mobile enterprise IT standardization management platform
CN109767056A (en) Boss station integrative graph management method, system and storage medium
CN103353871A (en) Interoperation picture file checking method based on CIM/G standard
CN102929911A (en) All-in-one modeling method for transformer substation and dispatching master station
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN105006017A (en) Simulation method for generating three-dimensional scene based on Unity dynamic technology
CN112698953A (en) Power grid intelligent operation and detection platform based on micro-service
CN109992571A (en) A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN110995859A (en) Intelligent transformer substation supporting platform system based on ubiquitous Internet of things
CN105760272B (en) Monitoring backstage business customizing method and its system based on plug-in unit
CN108054719B (en) Intelligent substation networked secondary circuit modeling method and fault diagnosis method
CN104063765A (en) SCD file management method for intelligent substation
CN113595761A (en) Micro-service component optimization method of power system information and communication integrated scheduling platform
CN109495290A (en) A kind of operational system boss stands exchange method and system
CN102916489A (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN104201779B (en) A kind of online monitoring data based on SVG is automatically integrating monitoring method
CN116628937A (en) Automatic fusion maintenance method, device, equipment and medium for power grid equipment model
CN107360143B (en) Method for monitoring state of railway passenger station equipment
CN103545933B (en) I0 interface communication method in intelligent substation on-line monitoring system station
CN106685759A (en) High-efficiency and zero-error updating and upgrading verification test method for scheduling main station
CN107274044A (en) The senior application object model of power distribution network is parsed and Core Generator automatically
CN106096835A (en) Model center construction method between based on the isomery dispatching patcher of agency service

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517