CN104036429B CN201410067729.0A CN201410067729A CN104036429B CN 104036429 B CN104036429 B CN 104036429B CN 201410067729 A CN201410067729 A CN 201410067729A CN 104036429 B CN104036429 B CN 104036429B
Authority
CN
China
Prior art keywords
scd file
management
file
configuration
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410067729.0A
Other languages
Chinese (zh)
Other versions
CN104036429A (en
Inventor
石光
赵勇
孔圣立
陆伟
吴春红
马伟东
赵文沛
刘磊
关延伟
李雷
马建胜
罗海冰
程宏伟
樊东峰
姚莉娜
王懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Zhongyuan Huadian Science & Technology Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
Wuhan Zhongyuan Huadian Science & Technology Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Zhongyuan Huadian Science & Technology Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical Wuhan Zhongyuan Huadian Science & Technology Co Ltd
Priority to CN201410067729.0A priority Critical patent/CN104036429B/en
Publication of CN104036429A publication Critical patent/CN104036429A/en
Application granted granted Critical
Publication of CN104036429B publication Critical patent/CN104036429B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses an intelligent transformer station configuration file standardized management system comprising a server terminal which is arranged in a scheduling department and configuration management client-terminals which are arranged in all intelligent transformer stations. The multiple configuration management client-terminals are communicated with the server terminal via a scheduling data network. Management flow of an SCD file is standardized, the intelligent transformer station SCD file can be locally analyzed, and the SCD file can be verified via auxiliary verification functions like shema verification, model static verification and model dynamic verification so that correctness, rationality and integrity of the SCD file are ensured. Besides, the SCD file of each intelligent transformer station is uploaded to the server terminal to be managed in a unified way so that an effective tool for managing and inspecting a configuration file is provided for a transformer station operation maintenance unit, proper use of the configuration file in the processes of construction, acceptance, operation maintenance and enlargement of the intelligent transformer stations is facilitated for basic technical personnel, reliable operation of the intelligent transformer stations is ensured, and thus the system can be widely applied to all levels of electric power scheduling centers.

Description

A kind of intelligent substation configuration file standardized management system and file verification method
Technical field
The present invention relates to a kind of intelligent substation profile management systems and file verification method, more particularly to a kind of intelligence Can transformer substation configuration file standardized management system and file verification method.
Background technology
SCD file, also known as intelligent substation whole station configuration file, which describes intelligence as the unified data source of whole station Communication configuration and empty terminal interconnection information in transformer station between the exemplary configuration and messaging parameter, IED of all IED etc., it is right The design of intelligent substation, debug, run, safeguarding significant.
With the continuous quickening that intelligent substation is built, to the SCD file as intelligent substation core configuration file Standardized management is brought into schedule, and the management of existing SCD file has many nonstandard behaviors, for example:
1) SCD file formality examination is not strict, and IED models do not follow the requirement of relevant criterion, such as《Q/GDW 396 61850 engineering relay protection application models of IEC》;
2) only modification, the lower configuration for filling single IED, but have ignored the lower dress of other associated IED configurations, causes Communication between IED goes wrong;
3) realistic model of IED devices describes inconsistent with SCD file;
4) SCD file being changed without authorization but to back up not in time, causing the multiple SCD files of interior appearance of standing, version is chaotic;
5) each power supply unit technical merit is uneven, causes the examination to SCD file and management to there is leak, to O&M Many inconvenience are brought with enlarging work, hidden danger are brought to safe operation.
Therefore, a kind of intelligent substation configuration file standardized management system and file verification method are needed badly, can be to SCD File carries out various ways verification, it is ensured that the correctness of SCD file, specifies the management responsibility of SCD file and the division of labor of all departments, The management process and specification of standard are set up, the standardized management of intelligent substation SCD file is effectively carried out.
The content of the invention
It is an object of the invention to provide a kind of intelligent substation configuration file standardized management system and file verification method, Various ways verification can be carried out to SCD file to ensure the correctness of SCD file, intelligent substation SCD is effectively carried out literary The standardized management of part.
The present invention adopts following technical proposals:
A kind of intelligent substation configuration file standardized management system, including the server end positioned at traffic department and is located at The configuration management client of each intelligent substation, multiple configuration management clients are led to server end by dispatch data net Letter;
Described configuration management client is used to locally realize that SCD file parsing, SCD are literary by graphical operation interface Part is verified and SCD file is uploaded, and by self-defined application protocol access services device end, this intelligent substation data is carried out far Thread management;
SCD file parsing includes obtaining SCD file from monitoring backstage and being parsed;
SCD file verification includes:
Shema verifications are carried out to SCD file, whether each grammatical rules meets in IEC61850.6 in judging SCD file The grammatical ruless that schema files are provided;
Retrieve the configuration information of each substation IED from SCD file in order, and to each power transformation The configuration information of smart machine of standing carries out model static check and model dynamic check, judges the substation IED respectively The model of configuration information description whether meet the needs of Practical Project and check the realistic model of the equipment whether with the equipment Configuration information description it is consistent;
SCD file is uploaded to be included SCD file is verified in shema verifications, model static check and model dynamic check The error message of gained is recorded and is uploaded onto the server;Will be in shema verifications, model static check and model dynamic check The SCD file that there is no mistake uploads onto the server;
Described server end is made up of engineer station and server;Engineer station is used to provide graphical operation interface, Dispatcher is made to carry out user management;Server carries out plant stand management, operation note for the SCD file to multiple intelligent substations Record, SCD file version management and check errors information management, record operation note, the SCD file history of each intelligent substation Version and SCD file check errors information;
Described dispatch data net is based on ICP/IP protocol.
Described configuration management client is provided with two electric Ethernet interfaces, configuration management client by the first electricity with Too network interface accesses station level network in intelligent substation, with monitoring backstage, intelligent secondary device and scheduling in intelligent substation Substation is in same LAN;Described configuration management client passes through the second electric Ethernet interface access dispatching data network, Communicate with server end.
Described server includes communication management module, application management module, data memory module and Subscriber Interface Module SIM;
Communication management module is for by server end access dispatching data network, and management server end and configuration management client The connection at end;Communication management module is in communication with each other with application management module, in the communication message of self-configuring in future management client The application data for parsing is sent to application management module, while the application data of self-application management module in future is encoded into communication Message is sent to configuration management client;
Described application management module realizes application data for being packaged to the operation of file and the operation of data base Management, classification and verify;
Described data memory module for storing to data such as SCD file, check errors information, power plant and substation's informations, And interface is provided for entering line access and management using management module and Subscriber Interface Module SIM;Application management module, user interface mould Block is in communication with each other with data memory module;
The Subscriber Interface Module SIM is used to provide visual human-computer interaction interface for configuration management client user, to clothes The data at business device end are checked, accessed and are managed.
A kind of intelligent substation configuration file method of calibration, it is characterised in that comprise the following steps:
A:Configuration management client obtains SCD file from monitoring backstage and is parsed, subsequently into step B;
B:Configuration management client carries out shema verifications to SCD file, judges in SCD file each grammatical rules whether Meet the grammatical ruless of schema files offer in IEC61850.6, if verification enters correctly into step C;If verification is incorrect Into step G;
C:Configuration management client retrieves the configuration information of a substation IED from SCD file in order, Subsequently into step D;
D:Configuration management client carries out model static check to the configuration information of this substation IED, judges the change Whether the model of the configuration information description of power station smart machine meets the needs of Practical Project, if met into step E;If Verification is unsatisfactory for into step G;
E:Configuration management client carries out model dynamic check to the configuration information of this substation IED, checks this to set Whether standby realistic model is consistent with the description of the configuration information of the equipment;If unanimously entering step F;If verification is unsatisfactory for Into step G;
F:Configuration management client checks whether the configuration information for also having substation IED will carry out school in SCD file Test, if then return to step C;Step H is entered if not;
G:Configuration management client records module records associated check error message, subsequently into step H;
H:Configuration management client judges whether associated check error message, wrong if there is associated check is then uploaded Return to step B after false information;If there is no then uploading SCD file, ends file checking procedure.
In the D steps, model static check includes following checking procedure:
D1:Information model consistency desired result, to logical node cited in SCD file, data object and data attribute The regulation for whether meeting IEC61850.7.3 and IEC61850.7.4 is verified, and step D2 is entered if meeting;If any not Meet;
D2:Information uniqueness is verified, under IED titles, the IP address of station level accessing points, same IED in SCD file Station level accessing points title, the title of LN under same station level accessing points under the title of logical device, same logical device, Only whether the ID of the AppID, MAC Address and ID, setting-group control block and report-control block of sampled value control block and event control block One enters verification, it is such as unique if into step D3;G is entered then if any not unique;
D3:All station level accessing points for judging to quote under Communication sections, sampled value control block, event control Whether block is defined in IED sections is verified, and step D4 is entered if being defined;G is entered then if any undefined;
D4:Judge institute's logical node of instantiation in IED, data object, whether enumerate with the data attribute of structure type It is defined in DataTypeTemplate, and the data not having in there is no DataTypeTemplate, if it is enter Enter step D5;G is entered if otherwise entering;
D5:Judge whether the logical node at cited data place in data set is defined, if then entering step D6; G is entered if otherwise entering;
D6:Empty terminal data validity and connection validity check, the input to the empty terminal of input and this IED of IED are empty Whether Inputs section of the interconnected relationship of the empty terminal of output of terminal and other IED in SCD file define, be input into void terminal and Whether the empty terminal of output defines and whether data type is identical, if yes then enter step D7;G is entered if otherwise entering;
D7:Whether the empty terminal of output for judging other IED in step D6 is that the output void terminal place IED of this IED is issued The member of data set judged, if yes then enter step D8, if otherwise entering step G;
D8:Judge the AppID of sampled value control block whether in the range of [0x4000 ~ 0x7fff], event control block AppID whether in the range of [0x0000 ~ 0x3fff], if yes then enter step E, if otherwise enter step G.
In the E steps, model dynamic check includes following checking procedure:
E1:Model consistency is verified, serviced by MMS communication obtain successively the LD of IED, logical node, Dataset, RCB, setting-group control block, DOI, SDOI, DAI and Dataset member, judge that can IED correctly respond, and return type with Whether SCD file is described consistent, if yes then enter step E2;If any otherwise into G;
E2:Data describe consistency desired result, by the Dynamic profiling of MMS communication service acquisition DOI, judge the dynamic of DOI Whether description is consistent with the static description in SCD file, and step F is entered if consistent;If any otherwise into G.
The specification of the present invention management process of SCD file, can be to carrying out to intelligent substation SCD file in local realization Parsing, and school is carried out to SCD file by the auxiliary examination function such as shema verifications, model static check, model dynamic check Test, it is ensured that the correctness of SCD file, reasonability and integrity, and the SCD file of each intelligent substation is uploaded onto the server End is managed collectively, and is provided a kind of management, is checked the effective tool of configuration file for transformer station's O&M unit, contributes to base Layer technical staff's proper use of configuration file during intelligent substation construction, examination, O&M, enlarging, it is ensured that intelligent power transformation The reliability service stood, can be widely applied for power-management centres at different levels.
Description of the drawings
Fig. 1 is the theory diagram of the present invention;
Fig. 2 is the flow chart of file verification method of the present invention.
Specific embodiment
As shown in figure 1, intelligent substation configuration file standardized management system of the present invention is included positioned at scheduling unit The server end and the configuration management client positioned at each intelligent substation of door, multiple configuration management clients are by dispatching number Communicate with server end according to net.
Described configuration management client is used to locally realize that SCD file parsing, SCD are literary by graphical operation interface Part is verified and SCD file is uploaded, and by self-defined application protocol access services device end, this intelligent substation data is carried out far Thread management.
Wherein, SCD file parsing includes obtaining SCD file from monitoring backstage and being parsed;
SCD file verification includes:
Shema verifications are carried out to SCD file, whether each grammatical rules meets in IEC61850.6 in judging SCD file The grammatical ruless that schema files are provided;
Retrieve the configuration information of each substation IED from SCD file in order, and to each power transformation The configuration information of smart machine of standing carries out model static check and model dynamic check, judges the substation IED respectively The model of configuration information description whether meet the needs of Practical Project and check the realistic model of the equipment whether with the equipment Configuration information description it is consistent;
SCD file is uploaded to be included SCD file is verified in shema verifications, model static check and model dynamic check The error message of gained is recorded and is uploaded onto the server;Will be in shema verifications, model static check and model dynamic check The SCD file that there is no mistake uploads onto the server.
The present invention, matched somebody with somebody to realize the standardized management of SCD file before newest SCD file uploads onto the server Put management client and will perform SCD file parsing, SCD file verification and SCD file upload procedure, SCD file verification bag successively Include schema verifications, model static check and model dynamic check.Therefore, specifically, configuration management visitor of the present invention Family end is used to perform following steps successively:
A:Configuration management client obtains SCD file from monitoring backstage and is parsed, subsequently into step B;
B:Configuration management client carries out shema verifications to SCD file, when shema verifications are carried out, judges SCD file In each grammatical rules whether meet the grammatical ruless that schema files are provided in IEC61850.6, the element that can such as use, unit The hierarchical relationship of element, order of elements, attribute of an element, attribute etc.;If verification enters correctly into step C;If verification is incorrect Into step G;
C:Configuration management client retrieves the configuration information of a substation IED from SCD file in order, Subsequently into step D;
D:Configuration management client carries out model static check to the configuration information of this substation IED, judges the change Whether the model of the configuration information description of power station smart machine meets the needs of Practical Project, if met into step E;If Verification is unsatisfactory for into step G;
Model static check includes checking procedure in detail below:
D1:Information model consistency desired result, to logical node cited in SCD file, data object and data attribute The regulation for whether meeting IEC61850.7.3 and IEC61850.7.4 is verified, and step D2 is entered if meeting;If any not Meet;
D2:Information uniqueness is verified, under IED titles, the IP address of station level accessing points, same IED in SCD file Station level accessing points title, the title of LN under same station level accessing points under the title of logical device, same logical device, Only whether the ID of the AppID, MAC Address and ID, setting-group control block and report-control block of sampled value control block and event control block One enters verification, it is such as unique if into step D3;G is entered then if any not unique;
D3:All station level accessing points for judging to quote under Communication sections, sampled value control block, event control Whether block is defined in IED sections is verified, and step D4 is entered if being defined;G is entered then if any undefined;
D4:Judge institute's logical node of instantiation in IED, data object, whether enumerate with the data attribute of structure type It is defined in DataTypeTemplate, and the data not having in there is no DataTypeTemplate, if it is enter Enter step D5;G is entered if otherwise entering;
D5:Judge whether the logical node at cited data place in data set is defined, if then entering step D6; G is entered if otherwise entering;
D6:Empty terminal data validity and connection validity check, the input to the empty terminal of input and this IED of IED are empty Whether Inputs section of the interconnected relationship of the empty terminal of output of terminal and other IED in SCD file define, be input into void terminal and Whether the empty terminal of output defines and whether data type is identical, if yes then enter step D7;G is entered if otherwise entering;
D7:Whether the empty terminal of output for judging other IED in step D6 is that the output void terminal place IED of this IED is issued The member of data set judged, if yes then enter step D8, if otherwise entering step G;
D8:Judge the AppID of sampled value control block whether in the range of [0x4000 ~ 0x7fff], event control block AppID whether in the range of [0x0000 ~ 0x3fff], if yes then enter step E, if otherwise enter step G.
E:Configuration management client carries out model dynamic check to the configuration information of this substation IED, checks this to set Whether standby realistic model is consistent with the description of the configuration information of the equipment;If unanimously entering step F;If verification is unsatisfactory for Into step G;
Model dynamic check includes checking procedure in detail below:
E1:Model consistency is verified, serviced by MMS communication obtain successively the LD of IED, logical node, Dataset, RCB, setting-group control block, DOI, SDOI, DAI and Dataset member, judge that can IED correctly respond, and return type with Whether SCD file is described consistent, if yes then enter step E2;If any otherwise into G;
E2:Data describe consistency desired result, by the Dynamic profiling of MMS communication service acquisition DOI, judge the dynamic of DOI Whether description is consistent with the static description in SCD file, and step F is entered if consistent;If any otherwise into G;
F:Configuration management client checks whether the configuration information for also having substation IED will carry out school in SCD file Test, if then return to step C;Step H is entered if not;
G:Configuration management client records associated check error message, subsequently into step H;
H:Configuration management client judges whether associated check error message, wrong if there is associated check is then uploaded Return to step B after false information;If there is no then uploading SCD file, ends file checking procedure.
Configuration management client is provided with two electric Ethernet interfaces, and configuration management client is connect by the first electric Ethernet Mouth accesses station level network in intelligent substation, at monitoring backstage, intelligent secondary device and scheduling sub-station in intelligent substation In same LAN;Intelligent secondary device include relay protection system, time dissemination system, TT&C system, fault recording system and Network message record analysis system.Described configuration management client passes through the second electric Ethernet interface access dispatching data network, Communicate with server end.By the first electric Ethernet, configuration management client can obtain newest SCD file from monitoring backstage, And by MMS directory services access intelligence secondary device;By the second electric Ethernet, configuration management client can pass through self-defined Application protocol access server end.
Described server end is made up of engineer station and server.Engineer station is used to provide graphical operation interface, Dispatcher is enable to carry out user management.Server carries out plant stand management, behaviour for the SCD file to multiple intelligent substations Note down, SCD file version management and check errors information management, record operation note, the SCD file of each intelligent substation Old version and SCD file check errors information;Server includes communication management module, application management module, data storage mould Block and Subscriber Interface Module SIM, communication management module are in communication with each other with application management module, application management module, Subscriber Interface Module SIM It is in communication with each other with data memory module, application management module, Subscriber Interface Module SIM are to the SCD file in data memory module, school The data such as error checking false information, power plant and substation's information enter line access and management.
Communication management module is for by server access dispatching data network, and management server and configuration management client Connection;Communication management module is in communication with each other with application management module, is parsed in the communication message of self-configuring in future management client The application data for going out is sent to application management module, while the application data of self-application management module in future is encoded into communication message It is sent to configuration management client.Configuration management client accesses the listening port of communication management module and asks connection, communication After the legitimacy of management module checking request connection, a threads of conversation can be created, and is managed using session management object. The subsequently communication of the configuration management client and server is all processed by the specific threads of conversation, while carrying out journal file Write.When configuration management client is exited, the listening port of communication management module will be accessed and release connection, telecommunication management is asked Module is with the corresponding threads of conversation of backed off after random and discharges related resource, and simultaneous session management object can delete all of the session Record.
Application management module realizes the pipe of application data for being packaged to the operation of file and the operation of data base Reason, classification and checking.Application management module can divide authority by application data management, and the request that client sends is entered Row is according to Authority Verification.Maximally utilizing for the ease of resource, application management module can divide request type and put into not In same container, if identical request then merges, the access to data base or file is so effectively reduced.Together When, application management module possesses load-balancing function to the read-write of data base querying, file using unified management, so multiple visitors When same affairs are inquired about at family end, directly related content is read from data buffer zone, enhance the responding ability of system, for money Source is using the lifting with matter.
Data memory module is for storing to data such as SCD file, check errors information, power plant and substation's informations, and provides Interface is for entering line access and management using management module and Subscriber Interface Module SIM.
The Subscriber Interface Module SIM is used to provide visual human-computer interaction interface for configuration management client user, to clothes The data of business device are checked, accessed and are managed.
Described dispatch data net is based on ICP/IP protocol, can run on any IP network, by dispatch data net Stable, the reliable communication that High Speed IP Network platform realizes server and configuration management client for being provided.
As shown in Fig. 2 file verification method of the present invention is comprised the following steps:
A:Configuration management client obtains SCD file from monitoring backstage and is parsed, subsequently into step B;
B:Configuration management client carries out shema verifications to SCD file, when shema verifications are carried out, judges SCD file In each grammatical rules whether meet the grammatical ruless that schema files are provided in IEC61850.6, the element that can such as use, unit The hierarchical relationship of element, order of elements, attribute of an element, attribute etc.;If verification enters correctly into step C;If verification is incorrect Into step G;
C:Configuration management client retrieves the configuration information of a substation IED from SCD file in order, Subsequently into step D;
D:Configuration management client carries out model static check to the configuration information of this substation IED, judges the change Whether the model of the configuration information description of power station smart machine meets the needs of Practical Project, if met into step E;If Verification is unsatisfactory for into step G;
Model static check includes checking procedure in detail below:
D1:Information model consistency desired result, to logical node cited in SCD file, data object and data attribute The regulation for whether meeting IEC61850.7.3 and IEC61850.7.4 is verified, and step D2 is entered if meeting;If any not Meet;
D2:Information uniqueness is verified, under IED titles, the IP address of station level accessing points, same IED in SCD file Station level accessing points title, the title of LN under same station level accessing points under the title of logical device, same logical device, Only whether the ID of the AppID, MAC Address and ID, setting-group control block and report-control block of sampled value control block and event control block One enters verification, it is such as unique if into step D3;G is entered then if any not unique;
D3:All station level accessing points for judging to quote under Communication sections, sampled value control block, event control Whether block is defined in IED sections is verified, and step D4 is entered if being defined;G is entered then if any undefined;
D4:Judge institute's logical node of instantiation in IED, data object, whether enumerate with the data attribute of structure type It is defined in DataTypeTemplate, and the data not having in there is no DataTypeTemplate, if it is enter Enter step D5;G is entered if otherwise entering;
D5:Judge whether the logical node at cited data place in data set is defined, if then entering step D6; G is entered if otherwise entering;
D6:Empty terminal data validity and connection validity check, the input to the empty terminal of input and this IED of IED are empty Whether Inputs section of the interconnected relationship of the empty terminal of output of terminal and other IED in SCD file define, be input into void terminal and Whether the empty terminal of output defines and whether data type is identical, if yes then enter step D7;G is entered if otherwise entering;
D7:Whether the empty terminal of output for judging other IED in step D6 is that the output void terminal place IED of this IED is issued The member of data set judged, if yes then enter step D8, if otherwise entering step G;
D8:Judge the AppID of sampled value control block whether in the range of [0x4000 ~ 0x7fff], event control block AppID whether in the range of [0x0000 ~ 0x3fff], if yes then enter step E, if otherwise enter step G.
E:Configuration management client carries out model dynamic check to the configuration information of this substation IED, checks this to set Whether standby realistic model is consistent with the description of the configuration information of the equipment;If unanimously entering step F;If verification is unsatisfactory for Into step G;
Model dynamic check includes checking procedure in detail below:
E1:Model consistency is verified, serviced by MMS communication obtain successively the LD of IED, logical node, Dataset, RCB, setting-group control block, DOI, SDOI, DAI and Dataset member, judge that can IED correctly respond, and return type with Whether SCD file is described consistent, if yes then enter step E2;If any otherwise into G;
E2:Data describe consistency desired result, by the Dynamic profiling of MMS communication service acquisition DOI, judge the dynamic of DOI Whether description is consistent with the static description in SCD file, and step F is entered if consistent;If any otherwise into G;
F:Configuration management client checks whether the configuration information for also having substation IED will carry out school in SCD file Test, if then return to step C;Step H is entered if not;
G:Configuration management client records associated check error message, subsequently into step H;
H:Configuration management client judges whether associated check error message, wrong if there is associated check is then uploaded Return to step B after false information;If there is no then uploading SCD file, ends file checking procedure.

Claims (3)

1. a kind of intelligent substation configuration file standardized management system, it is characterised in that:Including the service positioned at traffic department Device end and the configuration management client positioned at each intelligent substation, multiple configuration management clients are by dispatch data net and clothes The communication of business device end;
Described configuration management client is used to locally realize SCD file parsing, SCD file school by graphical operation interface Test and upload with SCD file, and by self-defined application protocol access services device end, this intelligent substation data are remotely managed Reason;
SCD file parsing includes obtaining SCD file from monitoring backstage and being parsed;
SCD file verification includes:
Shema verifications are carried out to SCD file, whether each grammatical rules meets in IEC61850.6 in judging SCD file The grammatical ruless that schema files are provided;
Retrieve the configuration information of each substation IED from SCD file in order, and to each transformer station's intelligence The configuration information of energy equipment carries out model static check and model dynamic check, judges the configuration of the substation IED respectively Whether whether the model of information description met the needs of Practical Project and check the realistic model of the equipment to be matched somebody with somebody with the equipment It is consistent that confidence breath is described;
SCD file is uploaded to be included SCD file in shema verifications, model static check and model dynamic check obtained by verification Error message record and upload onto the server;Will not deposit in shema verifications, model static check and model dynamic check Upload onto the server in the SCD file of mistake;
Described server end is made up of engineer station and server;Engineer station is used to provide graphical operation interface, makes tune Degree personnel carry out user management;Server for the SCD file to multiple intelligent substations carry out plant stand management, operation note, SCD file version management and check errors information management, record operation note, the SCD file history version of each intelligent substation Originally with SCD file check errors information;
Described dispatch data net is based on ICP/IP protocol.
2. intelligent substation configuration file standardized management system according to claim 1, it is characterised in that:Described matches somebody with somebody Put management client and be provided with two electric Ethernet interfaces, configuration management client accesses intelligence by the first electric Ethernet interface In transformer station, in station level network, with intelligent substation, monitoring backstage, intelligent secondary device and scheduling sub-station are in same local In net;Described configuration management client is communicated with server end by the second electric Ethernet interface access dispatching data network.
3. intelligent substation configuration file standardized management system according to claim 2, it is characterised in that:Described clothes Business device includes communication management module, application management module, data memory module and Subscriber Interface Module SIM;
Communication management module is for by server end access dispatching data network, and management server end and configuration management client Connection;Communication management module is in communication with each other with application management module, is parsed in the communication message of self-configuring in future management client The application data for going out is sent to application management module, while the application data of self-application management module in future is encoded into communication message It is sent to configuration management client;
Described application management module realizes the pipe of application data for being packaged to the operation of file and the operation of data base Reason, classification and checking;
Described data memory module is for storing to SCD file, check errors information and power plant and substation's information data, and provides Interface is for entering line access and management using management module and Subscriber Interface Module SIM;Application management module, Subscriber Interface Module SIM and number It is in communication with each other according to memory module;
The Subscriber Interface Module SIM is used to provide visual human-computer interaction interface for configuration management client user, to server The data at end are checked, accessed and are managed.
CN201410067729.0A 2014-02-27 2014-02-27 Intelligent transformer station configuration file standardized management system and file verification method Active CN104036429B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410067729.0A CN104036429B (en) 2014-02-27 2014-02-27 Intelligent transformer station configuration file standardized management system and file verification method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410067729.0A CN104036429B (en) 2014-02-27 2014-02-27 Intelligent transformer station configuration file standardized management system and file verification method

Publications (2)

Publication Number Publication Date
CN104036429A CN104036429A (en) 2014-09-10
CN104036429B true CN104036429B (en) 2017-04-26

Family

ID=51467191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410067729.0A Active CN104036429B (en) 2014-02-27 2014-02-27 Intelligent transformer station configuration file standardized management system and file verification method

Country Status (1)

Country Link
CN (1) CN104036429B (en)

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104851056A (en) * 2015-05-26 2015-08-19 中国电力科学研究院 Intelligent transformer station secondary system model standard library management system and method
CN104951620B (en) * 2015-07-09 2017-12-26 国家电网公司 Intelligent substation configuration file SCD file checking method based on business rule
CN105095571B (en) * 2015-07-09 2017-11-14 中国能源建设集团山西省电力勘测设计院有限公司 Intelligent substation intelligent apparatus allocation plan checking method based on business rule
CN105117305A (en) * 2015-08-25 2015-12-02 国网浙江省电力公司 Data management apparatus for intelligent device of intelligent substation
CN105224511A (en) * 2015-09-23 2016-01-06 山东网聪信息科技有限公司 A kind of method of calibration of intelligent substation SCD file
CN105279085A (en) * 2015-10-08 2016-01-27 国网天津市电力公司 Rule self-defining based smart substation configuration file test system and method
CN105404269B (en) * 2015-10-23 2017-09-19 江苏省电力公司南京供电公司 A kind of remote signalling Acceptance Test System of intelligent substation three
CN105205039A (en) * 2015-11-04 2015-12-30 国网新疆电力公司电力科学研究院 Customizable SCD (substation configuration description) file verification method
CN105912513A (en) * 2016-04-11 2016-08-31 南京国电南自电网自动化有限公司 Fast analytic method of smart substation SCL files
CN105930170B (en) * 2016-05-12 2019-01-22 国网辽宁省电力有限公司鞍山供电公司 A kind of SCD file semantization method for edition management based on comparison parsing result
CN106209418A (en) * 2016-06-27 2016-12-07 哈尔滨工业大学 A kind of intelligent substation GOOSE message simulation generates and detection method
CN106411747B (en) * 2016-08-31 2021-08-27 中国电力科学研究院 Method and system applied to intelligent substation switch message forwarding
CN106156373A (en) * 2016-09-09 2016-11-23 黑龙江省电力科学研究院 A kind of intelligent substation SCD file Explore of Unified Management Ideas and system
CN106788917B (en) * 2016-12-30 2020-07-24 深圳市科漫达智能管理科技有限公司 Method for uploading service data based on parking lot
CN109285086A (en) * 2017-07-20 2019-01-29 许继电气股份有限公司 A kind of intelligent substation SCD file managing and control system
CN109561114B (en) * 2017-09-26 2021-04-30 中国电力科学研究院有限公司 Communication method and system of measurement and control device
CN107911440A (en) * 2017-11-13 2018-04-13 广东电网有限责任公司电力科学研究院 The standard configurations parameter management-control method and system of station level data remote equipment
CN108551394A (en) * 2018-02-09 2018-09-18 国电南瑞科技股份有限公司 A kind of intelligent substation station level device parameter configuration method of calibration
CN109086062B (en) * 2018-07-26 2022-06-10 云南电网有限责任公司电力科学研究院 Transformer substation file version management method and system
CN109245316B (en) * 2018-11-28 2021-09-24 国网宁夏电力有限公司检修公司 Intelligent substation reconstruction and extension bus protection field calibration device and method
CN109961156A (en) * 2019-03-18 2019-07-02 国网江苏省电力有限公司徐州供电分公司 A kind of substation equipment point detection system development approach
CN110334051A (en) * 2019-05-28 2019-10-15 广州供电局有限公司 Profile data packet method for sorting, device, computer equipment and storage medium
CN110736609B (en) * 2019-10-24 2021-07-30 云南电网有限责任公司昆明供电局 Optical port power testing method based on automatic matching
CN111143315A (en) * 2019-12-27 2020-05-12 贵州电网有限责任公司 Version management method of transformer substation secondary circuit information model based on Git
CN111555445B (en) * 2020-04-28 2024-01-16 国网山东省电力公司临沂供电公司 Automatic graph assembly method for intelligent substation
CN111539187A (en) * 2020-06-24 2020-08-14 贵州电网有限责任公司 Intelligent substation SCL file comparison method
CN112419094B (en) * 2020-08-12 2024-03-29 国网江西省电力有限公司信息通信分公司 Power distribution Internet of things data product construction method and device and readable storage medium
CN112256683B (en) * 2020-10-23 2022-09-16 贵州电网有限责任公司电力科学研究院 Information management method and device for substation automation system
CN113010225B (en) * 2021-03-05 2022-07-26 国网河南省电力公司电力科学研究院 Automatic loading method and system for configuration files of intelligent substation
CN113268249A (en) * 2021-06-09 2021-08-17 深圳市分秒网络科技有限公司 Android APK file analysis and automatic configuration method
CN113533885A (en) * 2021-07-13 2021-10-22 国网河北省电力有限公司电力科学研究院 Transformer substation secondary circuit model inspection method and device and terminal equipment
CN113612638A (en) * 2021-07-30 2021-11-05 成都交大许继电气有限责任公司 Centralized control data transmission system and method based on virtual multi-IED forwarding
CN114429408B (en) * 2021-12-31 2023-10-20 中国南方电网有限责任公司 Method, device, equipment and system for checking configuration file of intelligent substation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005818A (en) * 2010-11-10 2011-04-06 国电南瑞科技股份有限公司 Method for detecting consistency of SCD (System Configuration Document) and IED (Intelligent Electronic Device) model on line
CN103077093A (en) * 2013-01-14 2013-05-01 山东电力集团公司 Substation configuration description (SCD) calibration method based on model objectification semantics

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005818A (en) * 2010-11-10 2011-04-06 国电南瑞科技股份有限公司 Method for detecting consistency of SCD (System Configuration Document) and IED (Intelligent Electronic Device) model on line
CN103077093A (en) * 2013-01-14 2013-05-01 山东电力集团公司 Substation configuration description (SCD) calibration method based on model objectification semantics

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于配置文件的智能变电站二次系统全过程管理与控制;唐志军 等;《电力与电工》;20131230;第33卷(第4期);第56-59页 *

Also Published As

Publication number Publication date
CN104036429A (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN104036429B (en) Intelligent transformer station configuration file standardized management system and file verification method
CN107357856B (en) Method for realizing data integration and data service based on power grid panoramic service model
CN106951694B (en) Adaptive modeling method for online monitoring system of secondary equipment of power system
RU2518178C2 (en) System and method for control of electric power system
CN105790441A (en) Intelligent transformer substation relay protection inspection system
CN106712001A (en) Data modeling method for network message recording analysis device
CN106096741A (en) A kind of implementation method of Intelligent fault O&M DSS
CN105989436A (en) Background management system of charging pile
CN103440367A (en) Panoramic data modeling method for transformer substation
CN103441570A (en) One-button type sequential control operation control method based on integrated information platform
Liu et al. Study on data management of fundamental model in control center for smart grid operation
CN109450094A (en) A kind of substation relay protection method for inspecting and system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN108270640A (en) A kind of intelligence battalion is with information integrated system Information Interoperability conformance test method
CN106549495A (en) A kind of power system method of real-time
CN105389675A (en) Business process management system
CN109902919A (en) Server assets management method, device, equipment and readable storage medium storing program for executing
CN104881739B (en) Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards
CN109962529B (en) On-line monitoring and operation and maintenance device of electrical secondary equipment
CN103295164A (en) Power grid safety monitoring management information system and management method
CN107601187A (en) A kind of lift management system and method
CN109767056A (en) Boss station integrative graph management method, system and storage medium
CN107274044A (en) The senior application object model of power distribution network is parsed and Core Generator automatically
CN107146166B (en) Distribution network planning auxiliary system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170330

Address after: 450052 Songshan, Zhengzhou, Henan District No. 27 South Road, No. 85

Applicant after: Electric Power Research Institute, State Grid Henan Electric Power Company

Applicant after: Wuhan Zhongyuan Huadian Science & Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Electric Power Research Institute, State Grid Henan Electric Power Company

Applicant before: Wuhan Zhongyuan Huadian Science & Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant