CN109285086A - A kind of intelligent substation SCD file managing and control system - Google Patents

A kind of intelligent substation SCD file managing and control system Download PDF

Info

Publication number
CN109285086A
CN109285086A CN201710598101.7A CN201710598101A CN109285086A CN 109285086 A CN109285086 A CN 109285086A CN 201710598101 A CN201710598101 A CN 201710598101A CN 109285086 A CN109285086 A CN 109285086A
Authority
CN
China
Prior art keywords
scd file
work station
intelligent substation
engineer
process layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710598101.7A
Other languages
Chinese (zh)
Inventor
王雨峰
陈先勇
李瑞明
易永辉
李保恩
时谊
韩湘
司鹏
宋德印
王斌
张伟峰
孙宏力
李海猛
杨德剑
吕彦召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuji Group Co Ltd
XJ Electric Co Ltd
Original Assignee
Xuji Group Co Ltd
XJ Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuji Group Co Ltd, XJ Electric Co Ltd filed Critical Xuji Group Co Ltd
Priority to CN201710598101.7A priority Critical patent/CN109285086A/en
Publication of CN109285086A publication Critical patent/CN109285086A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/044Network management architectures or arrangements comprising hierarchical management structures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/28Restricting access to network management systems or functions, e.g. using authorisation function to access network configuration
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of intelligent substation SCD file managing and control systems, and the control of intelligent substation SCD file is realized by " three kinds of equipment, two-stage control "." three kinds of equipment " refers to Profile Up management plant stand work station, engineer work station, process layer configuration and CRC monitoring IED." two-stage control " refers to that Profile Up management module is responsible for the management of all intelligent substation configuration files of company level, plant stand end pipe control, which refers to, to be managed after SCD file editorial management permission is handed over to plant stand by plant stand end, convenient for engineering construction, after engineering finishes, plant stand end SCD manages module and administrative power is handed over to Profile Up management module.So, uniqueness, accuracy, integrity, consistency and the normalization of intelligent substation SCD file be ensure that, so that the debugging of intelligent substation, design, O&M efficiency are improved.

Description

A kind of intelligent substation SCD file managing and control system
Technical field
The invention belongs to intelligent substation technical fields, and in particular to a kind of intelligent substation SCD file managing and control system.
Background technique
Intelligent substation is intelligence as one of energy conversion and the product platform of control is realized in the construction of strong smart grid The important component of energy power grid.It realizes the basic training such as automatic collection, measurement, control, protection, metering and the detection of information Energy.
Substation configuration description (Substation Configuration Description, SCD) file, also known as intelligently Substation's whole station system configuration file, this document describe all intelligent electronic device (Intelligence in intelligent substation Electronic Device, IEC) exemplary configuration and messaging parameter, IED between communication configuration and intelligent substation one Subsystem structure is the core configuration file of intelligent substation, similar to the secondary drawing and electric loop of conventional substation.
For an intelligent substation, either newly-built, enlarging, technological transformation or fortune inspection, SCD file is that work in every can The basis smoothly carried out, and guarantee the core that device various functions can operate normally in substation, thus it is guaranteed that SCD is literary It is vital that part is correct and consistent with running equipment relevant configuration.
Currently, the SCD file production of intelligent substation is completed by producer, SCD file control is also completed by producer.With a certain For company, the control process of SCD file is as shown in Figure 1 at present.
It is that service supervisor assigns task first when some intelligent substation has newly-built, increase-volume or maintenance task Engineering Service personnel are given, Engineering Service personnel search to client service management system according to mission bit stream and download newest filing money Material;Then Engineering Service personnel such as debug to scene, safeguard at the specific works, again newest related data after the completion of working Customer service system is backed up and be uploaded to, and applies for backup audit to supervisor;Supervisor's audit newest backup information in the station, if Data is problematic, improves and uploads again it is required that engineering staff modifies, and audits and passes through if there is no problem if backup, this Secondary service profile is filed successfully.
It is mainly rested in producer's hand by SCD file it can be seen from above process, this will cause SCD file modification It is random.Moreover, the secondary device of intelligent substation is usually several producers, it, may in actually debugging and maintenance process Will appear is not the case where SCD file is modified according to their own needs by the producer of integrator, this will result in the mixed of SCD file Disorderly, it also will appear the inconsistent phenomenon that the device configuration file some of actual motion is consistent with SCD file, has.In addition, engineering The notebook of personnel is possible to be poisoned, and the adjustment of producer's interior business or backup server collapse etc., these can all cause The loss of SCD file.It is above it is various can all cause after work during maintenance, increase-volume, technological transformation of substation etc. and be difficult to hold Exhibition, problematic.
Summary of the invention
The purpose of the present invention is to provide a kind of intelligent substation SCD file managing and control systems, to solve in the prior art The random problem of SCD file managerial confusion caused by the control process of SCD file, modification.
In order to solve the above technical problems, the technical solution of the present invention is as follows:
A kind of intelligent substation SCD file managing and control system of the invention, IIIth area of safety including electric system is arranged in Profile Up manages plant stand work station, and Ith area of safety or the engineer work station in IIth area of electric system is arranged in, with And process layer configuration and the monitoring IED in Ith area of safety or IIth area of electric system are set;
It is interconnected between the Profile Up management plant stand work station and engineer work station by communication line in standing, The engineer work station and process layer configure and monitor IED and pass through the station level network interconnection;The process layer configuration and monitoring IED is used for connection procedure layer network;
SCD file is sent to engineer's work for storing SCD file by the Profile Up management plant stand work station It stands, and receives the SCD file of engineer work station's transmission;
The engineer work station is used in the SCD file for receiving Profile Up management plant stand work station transmission Afterwards, SCD file is modified, and sends process layer configuration and monitoring IED to, IED is configured and monitored by process layer and is completed The lower dress of full station equipment device;It is also used to the process-level network GOOSE message of real-time collection process layer configuration and monitoring IED monitoring CRC check information, and by SCD file be sent to Profile Up management plant stand work station;
The process layer configuration and monitoring IED are used for the CRC check information of monitoring process layer network GOOSE message, and will It is sent in CRC check information to engineer work station;It is also used to complete full station equipment according to the SCD file that engineer work station transmits The lower dress of device.
Further, the engineer work station is also used to receiving the Profile Up management plant stand work station After the SCD file of transmission, the SCD file saved with the machine is compared, and when the alignment is identical, is modified to SCD file.
Further, when SCD file is moved out system, SCD file becomes lock state;It is moved in SCD file and is When system, SCD file becomes editable state;The lock state indicates that SCD file cannot be edited and be moved out.
Further, the engineer work station is also used to the visual presentation of SCD file, shows virtual terminator connection.
Further, the process layer configuration and monitoring IED will be sent in CRC check information to engineer by MMS mode Work station.
Further, the process layer configuration and monitoring IED are configured to gateway.
Further, the process layer configuration and monitoring IED are also used to an engineer work station according to derived from SCD file CCD file, under be attached in full station equipment device.
Further, forward and reverse isolating device is provided on communication line in the station.
Beneficial effects of the present invention: intelligent substation SCD file managing and control system of the invention passes through " three kinds of equipment, two-stage The control of intelligent substation SCD file is realized in control "." three kinds of equipment " refers to that Profile Up manages plant stand work station, work Cheng Shi work station, process layer configuration and monitoring IED;It is of company level that " two-stage control " refers to that Profile Up management module is responsible for The management of all intelligent substation configuration files, plant stand end pipe control refer to after SCD file editorial management permission is handed over to plant stand by Plant stand end is managed, and engineering construction is convenient for, and after engineering finishes, plant stand end SCD manages module and administrative power is handed over to configuration Running paper management module.
So, so that the modification of SCD file can only be completed by engineer work station, rather than as the prior art In many relevant units can modify to SCD file, ensure that the uniqueness of intelligent substation SCD file, accuracy, Integrity, consistency and normalization prevent SCD file from illegally being distorted, and alleviate artificial many and diverse work, so that intelligent power transformation The debugging stood, design, O&M efficiency are improved, and be ensure that the safe operation of intelligent substation, are improved intelligent substation Maintenance levels.
Detailed description of the invention
Fig. 1 is intelligent substation SCD file management-control method flow chart in the prior art;
Fig. 2 is intelligent substation SCD file managing and control system figure of the invention;
Fig. 3 is the newly-built substation SCD control process signal in intelligent substation SCD file managing and control system of the invention Figure;
Fig. 4 is that the technological transformation enlarging substation SCD control process in intelligent substation SCD file managing and control system of the invention is shown It is intended to.
Specific embodiment
To keep the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, to the present invention It is described in further detail, but embodiments of the present invention are not limited thereto.
Intelligent substation SCD file managing and control system structure of the invention is as shown in Figure 2.The system is mainly by three parts group At Profile Up manages plant stand work station, engineer work station and the configuration of independent process layer and monitoring IED.
Profile Up management module is the submodule of power dispatch system operation and management system or production management system, be scheduled for, Relevant units' access such as O&M maintenance, engineering design, construction debugging use.Meanwhile corresponding plant stand work is disposed in substation It stands for access and operation of the units to system such as O&M maintenance, construction debugging.Profile Up management module includes that setting exists The Profile Up in IIIth area of power system security manages plant stand work station, can share host with substation's OA system.
Host can be shared with integrated monitoring in plant stand Ith area of safety or II area's deployment engineer's work station, the work station, born Blame modification and the lower dress of device configuration of SCD file.Engineer work station can pass through the real-time acquisition interval layer IED of MMS mode and mistake The CRC information of journey layer IED, and can be checked online with SCD file.Engineer work station can manage factory with Profile Up It stands and is interconnected by forward and reverse isolating device between work station.
It configures independent process layer configuration and monitoring IED, each GOOSE net of equipment connection procedure layer passes through GOOSE mode The CRC information of each process layer device configuration file of real-time monitoring, and in a manner of MMS on send to engineer work station.The IED is also carried on a shoulder pole When process layer configures gateway function, the CCD file generated by engineer work station can carry out process layer devices by this IED Lower dress.
The function of each module is explained below.
Profile Up manages plant stand work station major function:
1) the SCD text that Profile Up management module can be accessed by browser, and modification can be verified Part uploads to Profile Up management module;
2) Profile Up management plant stand work station using move into/move out, locking mechanism;
3) SCD file can be sent to engineer work station by reverse isolation device, can also pass through forward direction by communication function Isolating device receives the SCD file that engineer work station sends.
Engineer work station's major function:
1) the modification editor of SCD file;
2) CID and CCD file is exported, and can configure and monitor IED completion whole station by station level network or process layer and set The lower dress of standby configuration;
3) SCD file visualization compares, intuitive to show the SCD file difference of technological transformation enlarging front and back;It can be by Profile Up The SCD file of management module storage is compared with the work station that engineer work station stores;
4) SCD file visualizes, and can intuitively show that virtual terminator connects, the convenient audit to SCD file;
5) MMS communication mode is supported to realize that SCD file is checked online with device configuration file, verifying device and device configure Consistency;
6) SCD prevents substation's technological transformation from modifying when extending the mistake of interval configuration by interval or IED lock function;
7) SCD file is moved into/is moved out and lock function, and if necessary, SCD file is moved out to laptop, is led at this time The editor that laptop completes SCD file is crossed, after moving out, SCD file becomes lock state;After SCD file is moved into, SCD File conjugates editable state again, and executable moving out next time.
8) in the locked state, SCD file can only be browsed and be downloaded, and cannot be edited and be moved out again;
9) communication function can receive the SCD that plant stand work station is managed from Profile Up by reverse isolation device File;Also SCD file to Profile Up can be transmitted by positive isolating device manages plant stand work station.
Process layer configuration and monitoring IED major function:
1) configuration is no less than 6 groups of optical ports, is separately connected each GOOSE center switch of process layer, real-time monitoring GOOSE report Text;
2) according to SCD file, the cyclic redundancy check of each process layer IED configuration file of discriminance analysis;
3) CRC is sent to engineer work station by MMS mode;
4) gateway function is configured, respective process layer IED will be filled under CCD file derived from SCD file.
The each relevant unit being related to and its responsibility are as follows:
O&M unit:
1) it is responsible for the examination and audit of intelligent substation configuration file;
2) it is responsible for the intelligent substation configuration file management in O&M stage;
3) it is responsible for providing configuration file and related data to regulation department.
Construction engineering units:
It is responsible for transferring configuration file and related data to O&M unit before engineering is gone into operation, and guarantees its correctness, complete Property and with scene consistency.
Equipment manufacturer:
It is responsible for completing the configuration of IED.
Designing unit:
It is responsible for the design of the engineerings such as the newly-built, renovating and enlarging, technological transformation of intelligent substation, SCD file is provided.
On the whole, intelligent substation SCD file managing and control system of the invention is attributed to " three kinds of equipment, two-stage control ". " three kinds of equipment " refers to Profile Up management plant stand work station, engineer work station, process layer configuration and monitoring IED;" two Grade control " refers to that Profile Up management module is responsible for the management of all intelligent substation configuration files of company level, plant stand End pipe control, which refers to, to be managed after SCD file editorial management permission is handed over to plant stand by plant stand end, is convenient for engineering construction, is worked as engineering After finishing, plant stand end SCD manages module and administrative power is handed over to Profile Up management module.So, it ensure that intelligence Uniqueness, accuracy, integrity, consistency and the normalization of energy substation SCD file.
Lifting system is managed based on above-mentioned intelligent substation SCD file, below to the control stream of a newly-built substation Journey explains, as shown in Figure 3.
When newly-built substation, designing unit extracts corresponding from the Profile Up management module of intelligent substation ICD file, and virtual terminator G- Design is carried out, carry out SCD file production.
The SCD file to complete delivers scene, is managed collectively into engineer work station, and equipment manufacturer uses IED Configuration tool export CID/CCD file, and under be filled to device;Construction unit completes intelligent Substation System debugging, if debugging In find the problem, then debugged again after needing to modify SCD file;O&M unit is responsible for intelligent substation function and configuration file It checks and accepts and audits.After O&M unit is checked and accepted and audited, designing institute provides formal version SCD file, provides formal version virtual terminator figure simultaneously It affixes one's seal confirmation.Consistency guaranty is filled in by construction unit, and consistency guaranty moves into SCD file control in company with SCD file together System.
The control process of technological transformation and enlarging substation is spoken frankly below, as shown in Figure 4.
When substation needs technological transformation or compatilizing mechanism, SCD file is moved out to Profile Up from managing and control system first Plant stand work station is managed, engineer work station is sent to by reverse isolation device.
Text is saved with the machine in the SCD file that engineer work station brings Profile Up management plant stand work station Part is compared, and when two files are completely the same, then can carry out edit-modify on its basis;If inconsistent, need artificially to join With analysis, accurate version is confirmed, carry out edit-modify on its basis again after waiting confirmation.SCD file after the completion of edit-modify is led New feeder apparatus and adapting device are filled under CID/CCD out, and carries out function check.
Pilot process is the same with the process of newly-built substation.After debugging, SCD file after technological transformation should being extended with SCD file before carries out business comparison, should analyze its reasonability for difference section.Confirm errorless SCD file with same Cause property guaranty is sent to configuration operational management module plant stand work station by positive isolating device, and is moved by specified account To file managing and control system.
It is discussed in detail although the contents of the present invention have passed through above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (8)

1. a kind of intelligent substation SCD file managing and control system, which is characterized in that IIIth area of safety including electric system is arranged in Profile Up manages plant stand work station, and Ith area of safety or the engineer work station in IIth area of electric system is arranged in, with And process layer configuration and the monitoring IED in Ith area of safety or IIth area of electric system are set;
It is interconnected between the Profile Up management plant stand work station and engineer work station by communication line in standing, it is described Engineer work station and process layer configure and monitor IED and pass through the station level network interconnection;The process layer configuration and monitoring IED are used In connection procedure layer network;
The Profile Up management plant stand work station is sent to engineer's work for storing SCD file, by SCD file It stands, and receives the SCD file of engineer work station's transmission;
The engineer work station is used for after receiving the SCD file that Profile Up management plant stand work station is sent, will SCD file is modified, and sends process layer configuration and monitoring IED to, and IED completion whole station is configured and monitored by process layer and is set The lower dress of standby device;It is also used to the CRC of the process-level network GOOSE message of real-time collection process layer configuration and monitoring IED monitoring Check information, and SCD file is sent to Profile Up management plant stand work station;
Process layer configuration and monitoring IED are used for the CRC check information of monitoring process layer network GOOSE message, and by the school CRC It tests in information and send to engineer work station;It is also used to complete full station equipment device according to the SCD file that engineer work station transmits Lower dress.
2. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that engineer's work Station is also used to after receiving the SCD file that the Profile Up management plant stand work station is sent, the SCD saved with the machine File is compared, and when the alignment is identical, modifies to SCD file.
3. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that when SCD file is moved out When system, SCD file becomes lock state;When SCD file is moved to system, SCD file becomes editable state;The lock Determining state indicates that SCD file cannot be edited and be moved out.
4. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that engineer's work Station is also used to the visual presentation of SCD file, shows virtual terminator connection.
5. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that the process layer configuration And monitoring IED will be sent in CRC check information to engineer work station by MMS mode.
6. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that the process layer configuration And monitoring IED is configured to gateway.
7. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that the process layer configuration And monitoring IED be also used to engineer work station CCD file according to derived from SCD file, under be attached in full station equipment device.
8. intelligent substation SCD file managing and control system according to claim 1, which is characterized in that connection in the station Road is provided with forward and reverse isolating device.
CN201710598101.7A 2017-07-20 2017-07-20 A kind of intelligent substation SCD file managing and control system Pending CN109285086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598101.7A CN109285086A (en) 2017-07-20 2017-07-20 A kind of intelligent substation SCD file managing and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598101.7A CN109285086A (en) 2017-07-20 2017-07-20 A kind of intelligent substation SCD file managing and control system

Publications (1)

Publication Number Publication Date
CN109285086A true CN109285086A (en) 2019-01-29

Family

ID=65185468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598101.7A Pending CN109285086A (en) 2017-07-20 2017-07-20 A kind of intelligent substation SCD file managing and control system

Country Status (1)

Country Link
CN (1) CN109285086A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110515759A (en) * 2019-05-17 2019-11-29 国网辽宁省电力有限公司 A kind of configuration file consistency management-control method based on cyclic redundancy check review technology
CN111555445A (en) * 2020-04-28 2020-08-18 国网山东省电力公司临沂供电公司 Automatic diagram assembling method for intelligent substation
CN113010225A (en) * 2021-03-05 2021-06-22 国网河南省电力公司电力科学研究院 Automatic loading method and system for configuration file of intelligent substation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101697551A (en) * 2009-11-05 2010-04-21 华北电力大学(保定) Networked power telecontrol communication method
WO2014000317A1 (en) * 2012-06-29 2014-01-03 北京东土科技股份有限公司 Configuration information auto-management method based on intelligent substation
CN103903188A (en) * 2014-03-18 2014-07-02 国家电网公司 Controlling method of configuration file of intelligent transformer substation system
CN104036429A (en) * 2014-02-27 2014-09-10 国家电网公司 Intelligent transformer station configuration file standardized management system and file verification method
CN106096427A (en) * 2016-06-21 2016-11-09 华北电力科学研究院有限责任公司 The management-control method of transformer substation system configuration file and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101697551A (en) * 2009-11-05 2010-04-21 华北电力大学(保定) Networked power telecontrol communication method
WO2014000317A1 (en) * 2012-06-29 2014-01-03 北京东土科技股份有限公司 Configuration information auto-management method based on intelligent substation
CN104036429A (en) * 2014-02-27 2014-09-10 国家电网公司 Intelligent transformer station configuration file standardized management system and file verification method
CN103903188A (en) * 2014-03-18 2014-07-02 国家电网公司 Controlling method of configuration file of intelligent transformer substation system
CN106096427A (en) * 2016-06-21 2016-11-09 华北电力科学研究院有限责任公司 The management-control method of transformer substation system configuration file and system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110515759A (en) * 2019-05-17 2019-11-29 国网辽宁省电力有限公司 A kind of configuration file consistency management-control method based on cyclic redundancy check review technology
CN111555445A (en) * 2020-04-28 2020-08-18 国网山东省电力公司临沂供电公司 Automatic diagram assembling method for intelligent substation
CN111555445B (en) * 2020-04-28 2024-01-16 国网山东省电力公司临沂供电公司 Automatic graph assembly method for intelligent substation
CN113010225A (en) * 2021-03-05 2021-06-22 国网河南省电力公司电力科学研究院 Automatic loading method and system for configuration file of intelligent substation
CN113010225B (en) * 2021-03-05 2022-07-26 国网河南省电力公司电力科学研究院 Automatic loading method and system for configuration files of intelligent substation

Similar Documents

Publication Publication Date Title
CN107346917B (en) Secondary device based on virtual machine integrates joint debugging method
CN109326034B (en) Intelligent lock work ticket management system for electric cabinet
CN104101791A (en) Relay protection device fixed vale automatic test method and system
CN107332347A (en) Intelligent substation secondary intelligence Computer Aided Design platform
CN109285086A (en) A kind of intelligent substation SCD file managing and control system
Leonardi et al. Towards the smart grid: substation automation architecture and technologies
CN107085759A (en) Risk management method and system for land based transportation systems
CN104483842A (en) Regulation and control integrated automatic master station comparison method
CN109034616A (en) A kind of statistical analysis system based on intelligent substation configuration data control
CN105069587A (en) Mobile Internet-based relay protection verification device
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN103905270A (en) Smart grid android system safety base line automatic checking system and method
KR20170097468A (en) DlAGNOSTIC AND MANAGING METHOD OF NEW RENEWABLE ENERGY APPATUS USING MOBILE DEVICE AND THE SYSTEM THEREOF
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN102142108A (en) Information processing method of corresponding relationship among materials and equipment suitable for power system
CN103676661A (en) Multifunctional simulation verifying system and simulation verifying method thereof
CN105321126A (en) SCD-based method for checking intelligent substation device
CN108072855A (en) A kind of test device and test system
CN106713387A (en) Million-kilowatt-class nuclear power station emergency data acquisition system
CN115115332A (en) Intelligent comprehensive management and control platform suitable for medium and small hydropower stations
CN104915523B (en) A kind of regulation full-service unified modeling method based on time series
CN115146942A (en) Electronic operation ticket system of hydraulic power plant and operation method
CN208924243U (en) A kind of homologous test macro of transformer station's signal
CN114123482A (en) Main plant station information joint debugging decoupling method
Silva Vazquez et al. A modelling language for the resilience assessment of networked systems of systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190129