CN106096427A - The management-control method of transformer substation system configuration file and system - Google Patents
The management-control method of transformer substation system configuration file and system Download PDFInfo
- Publication number
- CN106096427A CN106096427A CN201610452843.4A CN201610452843A CN106096427A CN 106096427 A CN106096427 A CN 106096427A CN 201610452843 A CN201610452843 A CN 201610452843A CN 106096427 A CN106096427 A CN 106096427A
- Authority
- CN
- China
- Prior art keywords
- work
- config
- sys
- groups
- server end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 38
- 230000008521 reorganization Effects 0.000 claims abstract description 36
- 238000012423 maintenance Methods 0.000 claims abstract description 28
- 230000008859 change Effects 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 11
- 230000009466 transformation Effects 0.000 claims description 5
- 230000000739 chaotic effect Effects 0.000 abstract description 5
- 201000004224 Schnyder corneal dystrophy Diseases 0.000 description 57
- 238000007726 management method Methods 0.000 description 21
- 230000008569 process Effects 0.000 description 12
- 238000004458 analytical method Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000004069 differentiation Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- RFHAOTPXVQNOHP-UHFFFAOYSA-N fluconazole Chemical compound C1=NC=NN1CC(C=1C(=CC(F)=CC=1)F)(O)CN1C=NC=N1 RFHAOTPXVQNOHP-UHFFFAOYSA-N 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/604—Tools and structures for managing or administering access control systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6209—Protecting access to data via a platform, e.g. using keys or access control rules to a single file or object, e.g. in a secure envelope, encrypted and accessed using a key, or with access control rules appended to the object itself
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2221/00—Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/21—Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/2141—Access rights, e.g. capability lists, access control lists, access tables, access matrices
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Computer Security & Cryptography (AREA)
- Economics (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Bioethics (AREA)
- Software Systems (AREA)
- Human Resources & Organizations (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Automation & Control Theory (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
Embodiments provide management-control method and the system of a kind of transformer substation system configuration file, wherein, the method includes: after intelligent substation puts into operation, propose described intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for work, teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;Complete maintenance or reorganization and expansion work and handles after work ticket finishes, the amended CONFIG.SYS that reception work teams and groups upload in work teams and groups, amended CONFIG.SYS is stored in described server end.The management and control of program CONFIG.SYS is combined with project progress, it is ensured that the uniqueness of CONFIG.SYS, is easy to the most very much in the intelligent substation judging currently to run the CONFIG.SYS used, it is to avoid the problem that CONFIG.SYS version management is chaotic.
Description
Technical field
The present invention relates to the art file management technology field of intelligent substation, particularly to a kind of transformer substation system configuration file
Management-control method and system.
Background technology
Transformer substation system configuration (substation configuration in transformer substation IEC 61850 standard
Description, referred to as SCD, after intelligent substation capital construction puts into operation, formed SCD file prototype version) file be storage
In intelligent substation between all secondary devices connect configuration relation file, be the core of the whole electrical secondary system of intelligent substation
The heart.Change in once SCD file, it is meant that in transformer station, protect the input and output annexation of the secondary devices such as control
There occurs change, directly influence the safe and stable operation of transformer station.Therefore, after intelligent substation capital construction puts into operation, as
Really secondary device there occurs change, it is necessary to is modified SCD file on the basis of the prototype version of SCD file, makes SCD's
The change of change and secondary device synchronizes.The maintenance each along with transformer station or reconstruction and extension project, SCD file all can become
Change, therefore, the management and control to SCD file is particularly important, it is necessary to assure SCD file from prototype version to each time maintenance or reorganization and expansion
The concordance between revision after engineering.
The most ripe SCD file managing and control system, some areas transformer station uses simple unit backup management
Method, or directly give integrator of transformer station by SCD file and carry out management and control.All there is greater risk in both management-control methods,
During station or reorganization and expansion, SCD file cannot be traced to the source, and ultimately results in operation of power networks department, maintenance department, debugging
Department, traffic department, integration of equipments business all hold SCD file, it is impossible to judge which is currently to run the SCD used in transformer station
File.
At present, SCD file management and control, there is a kind of land parcel change trace differentiation to compare and methods of exhibiting, i.e. utilize following of SCD file
Ring redundancy check code (CRC code), carries out differentiation by SCD file with old version and compares, be reduced into concrete by CRC check code
Virtual Channel information, and the SCD file function of its correspondence of land parcel change trace is provided.
But, the method exists following two defect:
1) poor with engineering Pair Analysis.SCD file only just may require that during intelligent substation maintenance or reorganization and expansion and changes
Dynamic, when properly functioning, SCD file will not change, and therefore, the managing and control system of SCD file should be combined with project progress, only exists
After intelligent substation maintenance or reconstruction and extension project, just should carry out SCD file comparison management and filing-up work, when there is no engineering
When carrying out, SCD file should not carried out any operation.
2) it is difficult to ensure that the uniqueness of SCD file.Before all SCD file need to modify, must ensure to work as
Front to need to revise SCD file be the version being currently running, and this version is unique.Present management means is difficult to
Control the channel of the SCD file acquirement that integrator is revised, say, that, it is impossible to judge that SCD file to be modified is integrator
Oneself unit achieves, or engineering staff's computer preserves, so can increase the risk of SCD file management and control.
Summary of the invention
Embodiments provide the management-control method of a kind of transformer substation system configuration file, to solve in prior art
SCD file management-control method is with engineering Pair Analysis is poor, be difficult to ensure the technical problem of the uniqueness of card SCD file.The method includes: in intelligence
Can propose described intelligent substation is overhauled or during reorganization and expansion application in the teams and groups that work, for described work after transformer station puts into operation
Make teams and groups and provide a work ticket, and only allow the work teams and groups obtaining described work ticket to become from the described intelligence of server end download
The CONFIG.SYS in power station, wherein, work ticket is only issued to work teams and groups within the same time, complete at a work ticket
Before knot, server end is forbidden modifying CONFIG.SYS;Maintenance or reorganization and expansion work is completed in described work teams and groups
And handle after work ticket finishes, receive the amended CONFIG.SYS that described work teams and groups upload, by described amended
CONFIG.SYS is stored in described server end.
In one embodiment, before intelligent substation puts into operation, also include: propose described intelligence in described work teams and groups
Can transformer station carry out putting into operation application time, provide a work ticket for described work teams and groups, and only receive and obtain described work ticket
The CONFIG.SYS of the described intelligent substation that work teams and groups upload to server end;The work that puts into operation is completed in described work teams and groups
Make and handle after work ticket finishes, the CONFIG.SYS of the described intelligent substation uploaded is stored in described server end.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end
CONFIG.SYS in carry preset number signature;Described amended CONFIG.SYS is stored in described server
End, including: after determining that the preset number that described amended CONFIG.SYS carries is signed correctly, by described amended
CONFIG.SYS is stored in described server end.
In one embodiment, described amended CONFIG.SYS is stored in described server end, including: really
The preset number signature that fixed described amended CONFIG.SYS carries is correct, and described amended CONFIG.SYS language
After method is correct, described amended CONFIG.SYS is stored in described server end.
In one embodiment, the CONFIG.SYS of the described intelligent substation uploaded is stored in described server
End, including: the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, the CONFIG.SYS uploaded is added
Enter described preset number sign and be stored in described server end.
The embodiment of the present invention additionally provides the managing and control system of a kind of transformer substation system configuration file, to solve in prior art
SCD file management-control method is with engineering Pair Analysis is poor, be difficult to ensure the technical problem of the uniqueness of card SCD file.This system includes: service
Device end and client, wherein, described client, including: application sending module, for after intelligent substation puts into operation, to described
Described intelligent substation being overhauled or reorganization and expansion application of server end transmission work teams and groups' proposition;File download uploads mould
Block, the system downloading described intelligent substation from described server end for obtaining the work teams and groups of described work ticket configures literary composition
Part, completes maintenance or reorganization and expansion works and handles after work ticket finishes in described work teams and groups, uploads to described server end
Amended CONFIG.SYS;Described server end, including: work ticket distribution module, it is used for receiving described work teams and groups and carries
Go out overhauls described intelligent substation or reorganization and expansion application, provides a work ticket for described work teams and groups, and only permits
Permitted the work teams and groups the obtaining described work ticket CONFIG.SYS from the server end described intelligent substation of download, wherein, work
Making ticket and be only issued to work teams and groups within the same time, before a work ticket finishes, server end is forbidden system
Configuration file is modified;File storage module, the amended system uploaded for receiving and store described work teams and groups is joined
Put file.
In one embodiment, described application sending module, it is additionally operable to before intelligent substation puts into operation, to described service
The application that described intelligent substation is put into operation that device end transmission work teams and groups propose;Transmission module on described file download, also uses
In completing to put into operation work handle after work ticket finishes in described work teams and groups, upload the power transformation of described intelligence to described server end
The CONFIG.SYS stood;Described work ticket distribution module, is additionally operable to receive the becoming described intelligence of described work teams and groups proposition
Power station carries out the application that puts into operation, and provides a work ticket for described work teams and groups, and only receives the shift obtaining described work ticket
Group uploads the CONFIG.SYS of described intelligent substation to server end;Described file storage module, is additionally operable to receive and deposit
Store up the CONFIG.SYS of the amended described intelligent substation that described work teams and groups upload.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end
CONFIG.SYS in carry preset number signature;Described file storage module, be additionally operable to determine described amended
After the preset number that CONFIG.SYS carries is signed correctly, described amended CONFIG.SYS is stored in described service
Device end.
In one embodiment, described file storage module, it is additionally operable to determining described amended CONFIG.SYS
After the preset number signature carried is correct, and described amended CONFIG.SYS is syntactically correct, by described amended system
System configuration file is stored in described server end.
In one embodiment, described file storage module, it is additionally operable to the CONFIG.SYS uploaded is carried out grammer inspection
Look into, after syntactically correct, the CONFIG.SYS uploaded added described preset number and signs and be stored in described server end.
In embodiments of the present invention, propose intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for
Work teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download intelligent substation from server end
CONFIG.SYS, completes maintenance or reorganization and expansion work and handles after work ticket finishes, in reception work teams and groups in work teams and groups
The amended CONFIG.SYS passed, owing to the management and control of CONFIG.SYS is combined with work ticket so that CONFIG.SYS
Management and control be combined with project progress, only after intelligent substation maintenance or reconstruction and extension project, just carry out system configuration civilian
The filing-up work of part;Simultaneously as work ticket is the writ permitting working on electrical equipment and systems soft ware, same
In time, only one work ticket of granting is to work teams and groups, and server end is only permission acquisition work while providing work ticket
The work teams and groups of ticket download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, and service
Device end is forbidden modifying CONFIG.SYS, work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish
After, only receive and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload so that obtain CONFIG.SYS
Channel can only be to download from server end, and only allow the work teams and groups obtaining work ticket to download, upload in the same time to be
System configuration file, it is ensured that the uniqueness of CONFIG.SYS, is easy in the intelligent substation judging currently to run use the most very much
CONFIG.SYS, it is to avoid the problem that CONFIG.SYS version management is chaotic.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, not
Constitute limitation of the invention.In the accompanying drawings:
Fig. 1 is the flow chart of the management-control method of a kind of transformer substation system configuration file that the embodiment of the present invention provides;
Fig. 2 is the flow chart of the management-control method of a kind of newly-built transformer substation system configuration file that the embodiment of the present invention provides;
Fig. 3 is a kind of maintenance or the management-control method of reorganization and expansion transformer substation system configuration file of embodiment of the present invention offer
Flow chart;
Fig. 4 is the structured flowchart of the managing and control system of a kind of transformer substation system configuration file that the embodiment of the present invention provides.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, right
The present invention is described in further details.Here, the exemplary embodiment of the present invention and explanation thereof are used for explaining the present invention, but also
Not as a limitation of the invention.
In embodiments of the present invention, it is provided that the management-control method of a kind of transformer substation system configuration file, as it is shown in figure 1, be somebody's turn to do
Method includes:
Step 101: after intelligent substation puts into operation, proposes to overhaul described intelligent substation or change in work teams and groups
During enlarging application, provide a work ticket for described work teams and groups, and only allow the work teams and groups obtaining described work ticket from clothes
Business device end downloads the CONFIG.SYS of described intelligent substation, and wherein, work ticket is only issued to a work within the same time
Making teams and groups, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
Step 102: complete maintenance or reorganization and expansion work and handles after work ticket finishes in described work teams and groups, receive described in
The amended CONFIG.SYS that work teams and groups upload, is stored in described server by described amended CONFIG.SYS
End.
Flow process as shown in Figure 1 understands, and in embodiments of the present invention, proposes to examine intelligent substation in work teams and groups
Repair or during reorganization and expansion application, provide a work ticket for work teams and groups, and only allow the work teams and groups obtaining work ticket from service
Device end downloads the CONFIG.SYS of intelligent substation, completes maintenance or reorganization and expansion works and to handle work ticket complete in work teams and groups
After knot, receive the amended CONFIG.SYS that work teams and groups upload, owing to the management and control of CONFIG.SYS is tied with work ticket
Close so that the management and control of CONFIG.SYS is combined with project progress, only complete in intelligent substation maintenance or reconstruction and extension project
After, just carry out the filing-up work of CONFIG.SYS;Simultaneously as work ticket is to permit work on electrical equipment and systems soft ware
The writ made, only provides a work ticket within the same time and is providing work ticket to work teams and groups, server end
While only allow the work teams and groups obtaining work ticket to download the CONFIG.SYS of intelligent substation from server end, at one
Before work ticket finishes, server end is forbidden modifying CONFIG.SYS, and in work, teams and groups complete maintenance or reorganization and expansion
Work and handle after work ticket finishes, only receiving and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload,
Making the channel obtaining CONFIG.SYS can only be to download from server end, and only allows in the same time to obtain work ticket
Work teams and groups download, uploading system configuration file, it is ensured that the uniqueness of CONFIG.SYS, are easy to judge currently to run the most very much
Intelligent substation in the CONFIG.SYS that uses, it is to avoid the problem that CONFIG.SYS version management is chaotic.
When being embodied as, in order to further ensure that the uniqueness of CONFIG.SYS, in the present embodiment, obtain described work
Make the CONFIG.SYS of described intelligent substation that the work teams and groups of ticket download from server end carries preset number label
Name;Described amended CONFIG.SYS is stored in described server end, including: determining that described amended system is joined
Put preset number signature that file carries correct after, described amended CONFIG.SYS is stored in described server end.
Concrete, during intelligent substation maintenance or reorganization and expansion, obtain the intelligence that the work teams and groups of work ticket download from server end
Can transformer station CONFIG.SYS in carry preset number signature, complete maintenance or reorganization and expansion work and handle work ticket
After finishing, end that the amended CONFIG.SYS carrying preset number signature is uploaded onto the server, examine at server end
Measure preset number signature correct after, more amended CONFIG.SYS is stored server end, preset number label at this
The preset number that name correctly may refer to carry in the CONFIG.SYS downloaded is signed and in amended CONFIG.SYS
Preset number signature consistent, if unanimously, illustrate that amended CONFIG.SYS is at the CONFIG.SYS base downloaded
Amendment on plinth, otherwise, illustrates that the amended CONFIG.SYS uploaded is to repair on the basis of the CONFIG.SYS downloaded
Change, do not allow it to upload.At this, preset number signature can also be correctly other implications, as long as amended system can be judged
System configuration file is amendment on the basis of the CONFIG.SYS downloaded.
When being embodied as, after determining that the preset number that described amended CONFIG.SYS carries is signed correctly, right
Amended CONFIG.SYS carries out syntax check, after grammer is also correct, is deposited by described amended CONFIG.SYS
Storage is at described server end.
When being embodied as, it is unique in order to ensure the primal system configuration file uploaded, in the present embodiment, in intelligence
Before transformer station puts into operation, also include: when described work teams and groups propose to put into operation described intelligent substation application, for described
Work teams and groups provide a work ticket, and the described intelligence that the work teams and groups only receiving the described work ticket of acquisition upload to server end
The CONFIG.SYS of energy transformer station;Complete to put into operation work handle after work ticket finishes, by upload in described work teams and groups
The CONFIG.SYS of described intelligent substation is stored in described server end.Concrete, work teams and groups propose described intelligence
Transformer station carry out putting into operation application time, for work, teams and groups provide a work ticket, finish completing to put into operation work and handle work ticket
After, the most only CONFIG.SYS of the intelligent substation that the work teams and groups of permission acquisition work ticket upload to server end, and will
The CONFIG.SYS of the intelligent substation uploaded is stored in server end, to ensure the original system configuration of intelligent substation
File is unique.
When being embodied as, at server end, receiving intelligent substation that the work teams and groups obtaining work ticket upload
After CONFIG.SYS, the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, to the system configuration uploaded
File adds above-mentioned preset number and signs and be stored in server end.
The management-control method of above-mentioned transformer substation system configuration file is described below in conjunction with concrete example.With newly-built transformer station it is
, there is not user and download the process of SCD file from server end, for setting up the process of the prototype version of SCD file, specifically flow in example
Journey is as shown in Figure 2.Wherein dotted arrow path is work ticket flow process, shift group membership propose transformer station put into operation application and obtain
After the work ticket license that server end is provided, carry out the work that puts into operation of transformer station, and handle work ticket after the work that puts into operation completes
Finish.Corresponding solid arrow path is the SCD file management and control flow process combining work ticket flow process, and in work, teams and groups propose power transformation
Put into operation and apply for simultaneously, to upload the SCD file prototype version of newly-built transformer station, the server end SCD to uploading at user side in station
File carries out syntax check, correct after add digital signature, work teams and groups or the specific responsibility SCD file to adding digital signature afterwards
After examination & verification is correct, archive operation can be carried out, by the filing storage of SCD file prototype version.
As a example by the maintenance running transformer station or reorganization and expansion work, first user should download SCD file from server, in work
The SCD file of amendment again being uploaded onto the server after work again and verify and store, its flow process is as shown in Figure 3.Wherein,
Dotted arrow path is work ticket flow process, and shift group membership proposes station or reorganization and expansion Request For Work and obtains service
After the work ticket license that device is provided, carry out maintenance or the reorganization and expansion work of transformer station, and after maintenance or reorganization and expansion have worked
Handle work ticket to finish.Corresponding solid arrow path is the SCD file management and control flow process combining work ticket flow process, in shift
Group carries Request For Work simultaneously, should download the SCD file of transformer station from server, and the SCD file downloaded from a server is with spy
Fixed digital signature, when maintenance or reorganization and expansion works and handle after work ticket finishes, and work teams and groups are by amended SCD heavily
Newly uploading onto the server end, first server end is digitally signed inspection to the SCD file uploaded.If digital signature is the most just
Really, then illustrate that the SCD file uploaded is not the amendment carried out on the basis of the SCD file of server end storage, do not allow on it
Pass.If digital signature checks correct, then the server end SCD file to uploading carries out syntax check, work afterwards teams and groups or
After specializing in the SCD file examination & verification correctly uploaded, archive operation can be carried out, the SCD file version filing storage that will upload.
From figures 2 and 3, it will be seen that the management and control flow process of SCD file is combined closely with work ticket flow process, the license of work ticket
The inevitable download with SCD file or upload, the inevitable filing storage with SCD file that finishes of work ticket.A job
During ticket is carried out, SCD file frozen can forbid amendment at server end, thus without occurring causing SCD file because of forked working
The version that amendment variation causes repeatedly is chaotic.
Based on same inventive concept, the embodiment of the present invention additionally provides the management and control system of a kind of transformer substation system configuration file
System, as described in the following examples.Owing to the managing and control system of transformer substation system configuration file solves principle and the transformer station of problem
The management-control method of CONFIG.SYS is similar, and therefore the enforcement of the managing and control system of transformer substation system configuration file may refer to power transformation
Stand the enforcement of management-control method of CONFIG.SYS, repeat no more in place of repetition.Used below, term " unit " or
" module " can realize the software of predetermined function and/or the combination of hardware.Although the device described by following example is preferably
Realize with software, but hardware, or the realization of the combination of software and hardware also may and be contemplated.
Fig. 4 is a kind of structured flowchart of the managing and control system of the transformer substation system configuration file of the embodiment of the present invention, such as Fig. 4 institute
Show, including: server end 401 and client 402, below this structure is illustrated.
Described client 402, including:
Application sending module 4021, for after intelligent substation puts into operation, carries to described server end transmission work teams and groups
Go out overhauls described intelligent substation or reorganization and expansion application;
Transmission module 4022 on file download, download institute for obtaining the work teams and groups of described work ticket from described server end
State the CONFIG.SYS of intelligent substation, described work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish
After, the amended CONFIG.SYS uploaded to described server end;
Described server end 401, including:
Work ticket distribution module 4011, for receiving the overhauling described intelligent substation of described work teams and groups proposition
Or reorganization and expansion application, for described work teams and groups provide a work ticket, and only allow obtain described work ticket work teams and groups from
Server end downloads the CONFIG.SYS of described intelligent substation, and wherein, work ticket is only issued to one within the same time
Work teams and groups, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
File storage module 4012, for receiving and store the amended system configuration literary composition that described work teams and groups upload
Part.
In one embodiment, described application sending module, it is additionally operable to before intelligent substation puts into operation, to described service
The application that described intelligent substation is put into operation that device end transmission work teams and groups propose;Transmission module on described file download, also uses
In completing to put into operation work handle after work ticket finishes in described work teams and groups, upload the power transformation of described intelligence to described server end
The CONFIG.SYS stood;Described work ticket distribution module, is additionally operable to receive the becoming described intelligence of described work teams and groups proposition
Power station carries out the application that puts into operation, and provides a work ticket for described work teams and groups, and only receives the shift obtaining described work ticket
Group uploads the CONFIG.SYS of described intelligent substation to server end;Described file storage module, is additionally operable to receive and deposit
Store up the CONFIG.SYS of the amended described intelligent substation that described work teams and groups upload.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end
CONFIG.SYS in carry preset number signature;Described file storage module, be additionally operable to determine described amended
After the preset number that CONFIG.SYS carries is signed correctly, described amended CONFIG.SYS is stored in described service
Device end.
In one embodiment, described file storage module, it is additionally operable to determining described amended CONFIG.SYS
After the preset number signature carried is correct, and described amended CONFIG.SYS is syntactically correct, by described amended system
System configuration file is stored in described server end.
In one embodiment, described file storage module, it is additionally operable to the CONFIG.SYS uploaded is carried out grammer inspection
Look into, after syntactically correct, the CONFIG.SYS uploaded added described preset number and signs and be stored in described server end.
In embodiments of the present invention, propose intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for
Work teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download intelligent substation from server end
CONFIG.SYS, completes maintenance or reorganization and expansion work and handles after work ticket finishes, in reception work teams and groups in work teams and groups
The amended CONFIG.SYS passed, owing to the management and control of CONFIG.SYS is combined with work ticket so that CONFIG.SYS
Management and control be combined with project progress, only after intelligent substation maintenance or reconstruction and extension project, just carry out system configuration civilian
The filing-up work of part;Simultaneously as work ticket is the writ permitting working on electrical equipment and systems soft ware, same
In time, only one work ticket of granting is to work teams and groups, and server end is only permission acquisition work while providing work ticket
The work teams and groups of ticket download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, and service
Device end is forbidden modifying CONFIG.SYS, work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish
After, only receive and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload so that obtain CONFIG.SYS
Channel can only be to download from server end, and only allow the work teams and groups obtaining work ticket to download, upload in the same time to be
System configuration file, it is ensured that the uniqueness of CONFIG.SYS, is easy in the intelligent substation judging currently to run use the most very much
CONFIG.SYS, it is to avoid the problem that CONFIG.SYS version management is chaotic.
Obviously, those skilled in the art should be understood that each module of the above-mentioned embodiment of the present invention or each step are permissible
Realizing with general calculating device, they can concentrate on single calculating device, or is distributed in multiple calculating device
On the network formed, alternatively, they can realize with calculating the executable program code of device, it is thus possible to by it
Store and perform by calculating device in the storage device, and in some cases, can hold with the order being different from herein
Step shown or described by row, or they are fabricated to respectively each integrated circuit modules, or multiple by them
Module or step are fabricated to single integrated circuit module and realize.So, the embodiment of the present invention is not restricted to any specific hard
Part and software combine.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area
For art personnel, the embodiment of the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made
Any modification, equivalent substitution and improvement etc., should be included within the scope of the present invention.
Claims (10)
1. the management-control method of a transformer substation system configuration file, it is characterised in that including:
After intelligent substation puts into operation, propose described intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work,
Provide a work ticket for described work teams and groups, and only allow the work teams and groups obtaining described work ticket to download institute from server end
Stating the CONFIG.SYS of intelligent substation, wherein, work ticket is only issued to work teams and groups within the same time, at one
Before work ticket finishes, server end is forbidden modifying CONFIG.SYS;
Complete maintenance or reorganization and expansion works and handles after work ticket finishes in described work teams and groups, receive described work teams and groups and upload
Amended CONFIG.SYS, described amended CONFIG.SYS is stored in described server end.
2. the management-control method of transformer substation system configuration file as claimed in claim 1, it is characterised in that throw at intelligent substation
Before fortune, also include:
When described work teams and groups propose to put into operation described intelligent substation application, provide a Zhang Gong for described work teams and groups
Make ticket, and only receive the system configuration obtaining the described intelligent substation that the work teams and groups of described work ticket upload to server end
File;
Complete to put into operation work handle after work ticket finishes in described work teams and groups, the system of described intelligent substation that will upload
Configuration file is stored in described server end.
3. the management-control method of transformer substation system configuration file as claimed in claim 1 or 2, obtains the shift of described work ticket
Carrying preset number signature from server end the CONFIG.SYS of the described intelligent substation that group is downloaded, its feature exists
In,
Described amended CONFIG.SYS is stored in described server end, including:
After determining that the preset number that described amended CONFIG.SYS carries is signed correctly, by described amended system
Configuration file is stored in described server end.
4. the management-control method of transformer substation system configuration file as claimed in claim 3, it is characterised in that by described amended
CONFIG.SYS is stored in described server end, including:
Determining that the preset number signature that described amended CONFIG.SYS carries is correct, and described amended system is being joined
Put file syntax correct after, described amended CONFIG.SYS is stored in described server end.
5. the management-control method of transformer substation system configuration file as claimed in claim 3, it is characterised in that the described intelligence that will upload
The CONFIG.SYS of energy transformer station is stored in described server end, including:
The CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, the CONFIG.SYS uploaded is added institute
State preset number sign and be stored in described server end.
6. the managing and control system of a transformer substation system configuration file, it is characterised in that including: server end and client, wherein,
Described client, including:
Application sending module, for after intelligent substation puts into operation, to described server end transmission work teams and groups propose to institute
State intelligent substation to carry out overhauling or reorganization and expansion application;
Transmission module on file download, downloads described intelligence change for obtaining the work teams and groups of described work ticket from described server end
The CONFIG.SYS in power station, completes maintenance or reorganization and expansion works and handles after work ticket finishes, to institute in described work teams and groups
State the amended CONFIG.SYS that server end is uploaded;
Described server end, including:
Work ticket distribution module, for receiving overhauling described intelligent substation or reorganization and expansion of described work teams and groups proposition
Application, provides a work ticket for described work teams and groups, and only allows the work teams and groups obtaining described work ticket from server end
Downloading the CONFIG.SYS of described intelligent substation, wherein, work ticket is only issued to work teams and groups within the same time,
Before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
File storage module, for receiving and store the amended CONFIG.SYS that described work teams and groups upload.
7. the managing and control system of transformer substation system configuration file as claimed in claim 6, it is characterised in that described application sends mould
Block, is additionally operable to before intelligent substation puts into operation, to described server end transmission work teams and groups propose to the power transformation of described intelligence
Station carries out the application that puts into operation;
Transmission module on described file download, is additionally operable to complete to put into operation work handle after work ticket finishes in described work teams and groups,
The CONFIG.SYS of described intelligent substation is uploaded to described server end;
Described work ticket distribution module, is additionally operable to receive the Shen of putting into operation described intelligent substation that described work teams and groups propose
Please, provide a work ticket for described work teams and groups, and only receive the work teams and groups of the described work ticket of acquisition on server end
Pass the CONFIG.SYS of described intelligent substation;
Described file storage module, is additionally operable to receive and store the amended described intelligent substation that described work teams and groups upload
CONFIG.SYS.
The managing and control system of transformer substation system configuration file the most as claimed in claims 6 or 7, obtains the shift of described work ticket
Carrying preset number signature from server end the CONFIG.SYS of the described intelligent substation that group is downloaded, its feature exists
In, described file storage module, it is additionally operable to determining that the preset number that described amended CONFIG.SYS carries just is being signed
After Que, described amended CONFIG.SYS is stored in described server end.
9. the managing and control system of transformer substation system configuration file as claimed in claim 8, it is characterised in that described file storage mould
Block, is additionally operable to determining that the preset number signature that described amended CONFIG.SYS carries is correct and described amended
After CONFIG.SYS is syntactically correct, described amended CONFIG.SYS is stored in described server end.
10. the managing and control system of transformer substation system configuration file as claimed in claim 8, it is characterised in that described file stores
Module, is additionally operable to the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, to the CONFIG.SYS uploaded
Add described preset number sign and be stored in described server end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610452843.4A CN106096427B (en) | 2016-06-21 | 2016-06-21 | Control method and system for configuration file of transformer substation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610452843.4A CN106096427B (en) | 2016-06-21 | 2016-06-21 | Control method and system for configuration file of transformer substation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106096427A true CN106096427A (en) | 2016-11-09 |
CN106096427B CN106096427B (en) | 2020-03-13 |
Family
ID=57237759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610452843.4A Active CN106096427B (en) | 2016-06-21 | 2016-06-21 | Control method and system for configuration file of transformer substation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106096427B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107943901A (en) * | 2017-11-17 | 2018-04-20 | 国家电网公司 | Automation of transformation substations information point table management method |
CN108121662A (en) * | 2017-12-29 | 2018-06-05 | 广东欧珀移动通信有限公司 | The collocation method and its device of test equipment |
CN109086062A (en) * | 2018-07-26 | 2018-12-25 | 云南电网有限责任公司电力科学研究院 | A kind of substation's file edition management method and system |
CN109285086A (en) * | 2017-07-20 | 2019-01-29 | 许继电气股份有限公司 | A kind of intelligent substation SCD file managing and control system |
CN109460679A (en) * | 2018-01-29 | 2019-03-12 | 国网浙江省电力公司湖州供电公司 | A kind of intelligent substation configuration file uniqueness method of calibration based on Encryption Algorithm |
CN111752592A (en) * | 2020-05-09 | 2020-10-09 | 国电南瑞科技股份有限公司 | Power system secondary equipment version control method, client and system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102611199A (en) * | 2012-03-07 | 2012-07-25 | 长园深瑞继保自动化有限公司 | Design and configuration integrated system for intelligent substation |
CN103605705A (en) * | 2013-11-11 | 2014-02-26 | 国家电网公司 | SCD (substation configuration description) file management system |
CN104467188A (en) * | 2014-12-17 | 2015-03-25 | 国网浙江慈溪市供电公司 | Operation and maintenance safety control system of transformer substation |
-
2016
- 2016-06-21 CN CN201610452843.4A patent/CN106096427B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102611199A (en) * | 2012-03-07 | 2012-07-25 | 长园深瑞继保自动化有限公司 | Design and configuration integrated system for intelligent substation |
CN103605705A (en) * | 2013-11-11 | 2014-02-26 | 国家电网公司 | SCD (substation configuration description) file management system |
CN104467188A (en) * | 2014-12-17 | 2015-03-25 | 国网浙江慈溪市供电公司 | Operation and maintenance safety control system of transformer substation |
Non-Patent Citations (1)
Title |
---|
郑文彬 等: "基于控制虚端子修改的智能变电站SCD版本权限管理技术", 《智能电网》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109285086A (en) * | 2017-07-20 | 2019-01-29 | 许继电气股份有限公司 | A kind of intelligent substation SCD file managing and control system |
CN107943901A (en) * | 2017-11-17 | 2018-04-20 | 国家电网公司 | Automation of transformation substations information point table management method |
CN108121662A (en) * | 2017-12-29 | 2018-06-05 | 广东欧珀移动通信有限公司 | The collocation method and its device of test equipment |
CN109460679A (en) * | 2018-01-29 | 2019-03-12 | 国网浙江省电力公司湖州供电公司 | A kind of intelligent substation configuration file uniqueness method of calibration based on Encryption Algorithm |
CN109086062A (en) * | 2018-07-26 | 2018-12-25 | 云南电网有限责任公司电力科学研究院 | A kind of substation's file edition management method and system |
CN111752592A (en) * | 2020-05-09 | 2020-10-09 | 国电南瑞科技股份有限公司 | Power system secondary equipment version control method, client and system |
Also Published As
Publication number | Publication date |
---|---|
CN106096427B (en) | 2020-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106096427A (en) | The management-control method of transformer substation system configuration file and system | |
CN106708719B (en) | Service function testing method and device | |
CN105677404B (en) | Zookeeper-based configuration updating method and device | |
EP2541420A1 (en) | Method and system for automated system migration | |
CN109117170B (en) | Operation environment building method and device and code incorporating method and system | |
CN106792630A (en) | It is a kind of to realize moving the method and system that network service is opened | |
CN109858828B (en) | Power distribution network fixed value automatic setting method and device and distribution network system | |
CN113726890B (en) | Federal prediction method and system for block chain data service | |
CN106575227A (en) | Automatic software-update framework | |
CN105871998A (en) | Data displaying method and device | |
Patwardhan | Analysis of software delivery process shortcomings and architectural pitfalls | |
CN116185383A (en) | Draggable self-configuration workflow generation method and system | |
CN105119771A (en) | Test method and system of electric power communication system | |
Reza et al. | Toward model-based requirement engineering tool support | |
CN109286617A (en) | A kind of data processing method and relevant device | |
Fagerström et al. | Verdict machinery: On the need to automatically make sense of test results | |
CN113220561A (en) | Test case management method, device, equipment and medium | |
CN112650815B (en) | Method and device for synchronizing environment data, storage medium and electronic device | |
CN105897476B (en) | A kind of method and device creating transmission channel | |
CN113592453A (en) | Information system operation compliance examination method and system based on block chain | |
CN115563067A (en) | API request data sharing method and device, electronic equipment and storage medium | |
CN111597156A (en) | Civil aviation data processing method and device, electronic equipment and storage medium | |
Adamčík et al. | Local Modular Departure Control System for Airports | |
CN115102879B (en) | Test method of shared service platform, electronic equipment and storage medium | |
CN104317701B (en) | The device and method of ERP parameter testings is realized by prefab data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |