CN106096427A - The management-control method of transformer substation system configuration file and system - Google Patents

The management-control method of transformer substation system configuration file and system Download PDF

Info

Publication number
CN106096427A
CN106096427A CN201610452843.4A CN201610452843A CN106096427A CN 106096427 A CN106096427 A CN 106096427A CN 201610452843 A CN201610452843 A CN 201610452843A CN 106096427 A CN106096427 A CN 106096427A
Authority
CN
China
Prior art keywords
work
config
sys
groups
server end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610452843.4A
Other languages
Chinese (zh)
Other versions
CN106096427B (en
Inventor
黄天啸
孟超
张硕
王丰
赵康伟
刘蔚
高旭
姜昌胜
刘苗
李烜
辛光明
王沛然
张思琪
王晓斐
杜丽艳
范登博
郭鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shengtaiyang Electrical Appliance Co Ltd
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
State Grid Jibei Electric Power Co Ltd
Beijing Electric Power Transmission and Transformation Co
Original Assignee
Beijing Shengtaiyang Electrical Appliance Co Ltd
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
State Grid Jibei Electric Power Co Ltd
Beijing Electric Power Transmission and Transformation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shengtaiyang Electrical Appliance Co Ltd, State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd, State Grid Jibei Electric Power Co Ltd, Beijing Electric Power Transmission and Transformation Co filed Critical Beijing Shengtaiyang Electrical Appliance Co Ltd
Priority to CN201610452843.4A priority Critical patent/CN106096427B/en
Publication of CN106096427A publication Critical patent/CN106096427A/en
Application granted granted Critical
Publication of CN106096427B publication Critical patent/CN106096427B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/604Tools and structures for managing or administering access control systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6209Protecting access to data via a platform, e.g. using keys or access control rules to a single file or object, e.g. in a secure envelope, encrypted and accessed using a key, or with access control rules appended to the object itself
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2221/00Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/21Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/2141Access rights, e.g. capability lists, access control lists, access tables, access matrices

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Bioethics (AREA)
  • Software Systems (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Automation & Control Theory (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

Embodiments provide management-control method and the system of a kind of transformer substation system configuration file, wherein, the method includes: after intelligent substation puts into operation, propose described intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for work, teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;Complete maintenance or reorganization and expansion work and handles after work ticket finishes, the amended CONFIG.SYS that reception work teams and groups upload in work teams and groups, amended CONFIG.SYS is stored in described server end.The management and control of program CONFIG.SYS is combined with project progress, it is ensured that the uniqueness of CONFIG.SYS, is easy to the most very much in the intelligent substation judging currently to run the CONFIG.SYS used, it is to avoid the problem that CONFIG.SYS version management is chaotic.

Description

The management-control method of transformer substation system configuration file and system
Technical field
The present invention relates to the art file management technology field of intelligent substation, particularly to a kind of transformer substation system configuration file Management-control method and system.
Background technology
Transformer substation system configuration (substation configuration in transformer substation IEC 61850 standard Description, referred to as SCD, after intelligent substation capital construction puts into operation, formed SCD file prototype version) file be storage In intelligent substation between all secondary devices connect configuration relation file, be the core of the whole electrical secondary system of intelligent substation The heart.Change in once SCD file, it is meant that in transformer station, protect the input and output annexation of the secondary devices such as control There occurs change, directly influence the safe and stable operation of transformer station.Therefore, after intelligent substation capital construction puts into operation, as Really secondary device there occurs change, it is necessary to is modified SCD file on the basis of the prototype version of SCD file, makes SCD's The change of change and secondary device synchronizes.The maintenance each along with transformer station or reconstruction and extension project, SCD file all can become Change, therefore, the management and control to SCD file is particularly important, it is necessary to assure SCD file from prototype version to each time maintenance or reorganization and expansion The concordance between revision after engineering.
The most ripe SCD file managing and control system, some areas transformer station uses simple unit backup management Method, or directly give integrator of transformer station by SCD file and carry out management and control.All there is greater risk in both management-control methods, During station or reorganization and expansion, SCD file cannot be traced to the source, and ultimately results in operation of power networks department, maintenance department, debugging Department, traffic department, integration of equipments business all hold SCD file, it is impossible to judge which is currently to run the SCD used in transformer station File.
At present, SCD file management and control, there is a kind of land parcel change trace differentiation to compare and methods of exhibiting, i.e. utilize following of SCD file Ring redundancy check code (CRC code), carries out differentiation by SCD file with old version and compares, be reduced into concrete by CRC check code Virtual Channel information, and the SCD file function of its correspondence of land parcel change trace is provided.
But, the method exists following two defect:
1) poor with engineering Pair Analysis.SCD file only just may require that during intelligent substation maintenance or reorganization and expansion and changes Dynamic, when properly functioning, SCD file will not change, and therefore, the managing and control system of SCD file should be combined with project progress, only exists After intelligent substation maintenance or reconstruction and extension project, just should carry out SCD file comparison management and filing-up work, when there is no engineering When carrying out, SCD file should not carried out any operation.
2) it is difficult to ensure that the uniqueness of SCD file.Before all SCD file need to modify, must ensure to work as Front to need to revise SCD file be the version being currently running, and this version is unique.Present management means is difficult to Control the channel of the SCD file acquirement that integrator is revised, say, that, it is impossible to judge that SCD file to be modified is integrator Oneself unit achieves, or engineering staff's computer preserves, so can increase the risk of SCD file management and control.
Summary of the invention
Embodiments provide the management-control method of a kind of transformer substation system configuration file, to solve in prior art SCD file management-control method is with engineering Pair Analysis is poor, be difficult to ensure the technical problem of the uniqueness of card SCD file.The method includes: in intelligence Can propose described intelligent substation is overhauled or during reorganization and expansion application in the teams and groups that work, for described work after transformer station puts into operation Make teams and groups and provide a work ticket, and only allow the work teams and groups obtaining described work ticket to become from the described intelligence of server end download The CONFIG.SYS in power station, wherein, work ticket is only issued to work teams and groups within the same time, complete at a work ticket Before knot, server end is forbidden modifying CONFIG.SYS;Maintenance or reorganization and expansion work is completed in described work teams and groups And handle after work ticket finishes, receive the amended CONFIG.SYS that described work teams and groups upload, by described amended CONFIG.SYS is stored in described server end.
In one embodiment, before intelligent substation puts into operation, also include: propose described intelligence in described work teams and groups Can transformer station carry out putting into operation application time, provide a work ticket for described work teams and groups, and only receive and obtain described work ticket The CONFIG.SYS of the described intelligent substation that work teams and groups upload to server end;The work that puts into operation is completed in described work teams and groups Make and handle after work ticket finishes, the CONFIG.SYS of the described intelligent substation uploaded is stored in described server end.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end CONFIG.SYS in carry preset number signature;Described amended CONFIG.SYS is stored in described server End, including: after determining that the preset number that described amended CONFIG.SYS carries is signed correctly, by described amended CONFIG.SYS is stored in described server end.
In one embodiment, described amended CONFIG.SYS is stored in described server end, including: really The preset number signature that fixed described amended CONFIG.SYS carries is correct, and described amended CONFIG.SYS language After method is correct, described amended CONFIG.SYS is stored in described server end.
In one embodiment, the CONFIG.SYS of the described intelligent substation uploaded is stored in described server End, including: the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, the CONFIG.SYS uploaded is added Enter described preset number sign and be stored in described server end.
The embodiment of the present invention additionally provides the managing and control system of a kind of transformer substation system configuration file, to solve in prior art SCD file management-control method is with engineering Pair Analysis is poor, be difficult to ensure the technical problem of the uniqueness of card SCD file.This system includes: service Device end and client, wherein, described client, including: application sending module, for after intelligent substation puts into operation, to described Described intelligent substation being overhauled or reorganization and expansion application of server end transmission work teams and groups' proposition;File download uploads mould Block, the system downloading described intelligent substation from described server end for obtaining the work teams and groups of described work ticket configures literary composition Part, completes maintenance or reorganization and expansion works and handles after work ticket finishes in described work teams and groups, uploads to described server end Amended CONFIG.SYS;Described server end, including: work ticket distribution module, it is used for receiving described work teams and groups and carries Go out overhauls described intelligent substation or reorganization and expansion application, provides a work ticket for described work teams and groups, and only permits Permitted the work teams and groups the obtaining described work ticket CONFIG.SYS from the server end described intelligent substation of download, wherein, work Making ticket and be only issued to work teams and groups within the same time, before a work ticket finishes, server end is forbidden system Configuration file is modified;File storage module, the amended system uploaded for receiving and store described work teams and groups is joined Put file.
In one embodiment, described application sending module, it is additionally operable to before intelligent substation puts into operation, to described service The application that described intelligent substation is put into operation that device end transmission work teams and groups propose;Transmission module on described file download, also uses In completing to put into operation work handle after work ticket finishes in described work teams and groups, upload the power transformation of described intelligence to described server end The CONFIG.SYS stood;Described work ticket distribution module, is additionally operable to receive the becoming described intelligence of described work teams and groups proposition Power station carries out the application that puts into operation, and provides a work ticket for described work teams and groups, and only receives the shift obtaining described work ticket Group uploads the CONFIG.SYS of described intelligent substation to server end;Described file storage module, is additionally operable to receive and deposit Store up the CONFIG.SYS of the amended described intelligent substation that described work teams and groups upload.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end CONFIG.SYS in carry preset number signature;Described file storage module, be additionally operable to determine described amended After the preset number that CONFIG.SYS carries is signed correctly, described amended CONFIG.SYS is stored in described service Device end.
In one embodiment, described file storage module, it is additionally operable to determining described amended CONFIG.SYS After the preset number signature carried is correct, and described amended CONFIG.SYS is syntactically correct, by described amended system System configuration file is stored in described server end.
In one embodiment, described file storage module, it is additionally operable to the CONFIG.SYS uploaded is carried out grammer inspection Look into, after syntactically correct, the CONFIG.SYS uploaded added described preset number and signs and be stored in described server end.
In embodiments of the present invention, propose intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for Work teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download intelligent substation from server end CONFIG.SYS, completes maintenance or reorganization and expansion work and handles after work ticket finishes, in reception work teams and groups in work teams and groups The amended CONFIG.SYS passed, owing to the management and control of CONFIG.SYS is combined with work ticket so that CONFIG.SYS Management and control be combined with project progress, only after intelligent substation maintenance or reconstruction and extension project, just carry out system configuration civilian The filing-up work of part;Simultaneously as work ticket is the writ permitting working on electrical equipment and systems soft ware, same In time, only one work ticket of granting is to work teams and groups, and server end is only permission acquisition work while providing work ticket The work teams and groups of ticket download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, and service Device end is forbidden modifying CONFIG.SYS, work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish After, only receive and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload so that obtain CONFIG.SYS Channel can only be to download from server end, and only allow the work teams and groups obtaining work ticket to download, upload in the same time to be System configuration file, it is ensured that the uniqueness of CONFIG.SYS, is easy in the intelligent substation judging currently to run use the most very much CONFIG.SYS, it is to avoid the problem that CONFIG.SYS version management is chaotic.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, not Constitute limitation of the invention.In the accompanying drawings:
Fig. 1 is the flow chart of the management-control method of a kind of transformer substation system configuration file that the embodiment of the present invention provides;
Fig. 2 is the flow chart of the management-control method of a kind of newly-built transformer substation system configuration file that the embodiment of the present invention provides;
Fig. 3 is a kind of maintenance or the management-control method of reorganization and expansion transformer substation system configuration file of embodiment of the present invention offer Flow chart;
Fig. 4 is the structured flowchart of the managing and control system of a kind of transformer substation system configuration file that the embodiment of the present invention provides.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, right The present invention is described in further details.Here, the exemplary embodiment of the present invention and explanation thereof are used for explaining the present invention, but also Not as a limitation of the invention.
In embodiments of the present invention, it is provided that the management-control method of a kind of transformer substation system configuration file, as it is shown in figure 1, be somebody's turn to do Method includes:
Step 101: after intelligent substation puts into operation, proposes to overhaul described intelligent substation or change in work teams and groups During enlarging application, provide a work ticket for described work teams and groups, and only allow the work teams and groups obtaining described work ticket from clothes Business device end downloads the CONFIG.SYS of described intelligent substation, and wherein, work ticket is only issued to a work within the same time Making teams and groups, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
Step 102: complete maintenance or reorganization and expansion work and handles after work ticket finishes in described work teams and groups, receive described in The amended CONFIG.SYS that work teams and groups upload, is stored in described server by described amended CONFIG.SYS End.
Flow process as shown in Figure 1 understands, and in embodiments of the present invention, proposes to examine intelligent substation in work teams and groups Repair or during reorganization and expansion application, provide a work ticket for work teams and groups, and only allow the work teams and groups obtaining work ticket from service Device end downloads the CONFIG.SYS of intelligent substation, completes maintenance or reorganization and expansion works and to handle work ticket complete in work teams and groups After knot, receive the amended CONFIG.SYS that work teams and groups upload, owing to the management and control of CONFIG.SYS is tied with work ticket Close so that the management and control of CONFIG.SYS is combined with project progress, only complete in intelligent substation maintenance or reconstruction and extension project After, just carry out the filing-up work of CONFIG.SYS;Simultaneously as work ticket is to permit work on electrical equipment and systems soft ware The writ made, only provides a work ticket within the same time and is providing work ticket to work teams and groups, server end While only allow the work teams and groups obtaining work ticket to download the CONFIG.SYS of intelligent substation from server end, at one Before work ticket finishes, server end is forbidden modifying CONFIG.SYS, and in work, teams and groups complete maintenance or reorganization and expansion Work and handle after work ticket finishes, only receiving and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload, Making the channel obtaining CONFIG.SYS can only be to download from server end, and only allows in the same time to obtain work ticket Work teams and groups download, uploading system configuration file, it is ensured that the uniqueness of CONFIG.SYS, are easy to judge currently to run the most very much Intelligent substation in the CONFIG.SYS that uses, it is to avoid the problem that CONFIG.SYS version management is chaotic.
When being embodied as, in order to further ensure that the uniqueness of CONFIG.SYS, in the present embodiment, obtain described work Make the CONFIG.SYS of described intelligent substation that the work teams and groups of ticket download from server end carries preset number label Name;Described amended CONFIG.SYS is stored in described server end, including: determining that described amended system is joined Put preset number signature that file carries correct after, described amended CONFIG.SYS is stored in described server end. Concrete, during intelligent substation maintenance or reorganization and expansion, obtain the intelligence that the work teams and groups of work ticket download from server end Can transformer station CONFIG.SYS in carry preset number signature, complete maintenance or reorganization and expansion work and handle work ticket After finishing, end that the amended CONFIG.SYS carrying preset number signature is uploaded onto the server, examine at server end Measure preset number signature correct after, more amended CONFIG.SYS is stored server end, preset number label at this The preset number that name correctly may refer to carry in the CONFIG.SYS downloaded is signed and in amended CONFIG.SYS Preset number signature consistent, if unanimously, illustrate that amended CONFIG.SYS is at the CONFIG.SYS base downloaded Amendment on plinth, otherwise, illustrates that the amended CONFIG.SYS uploaded is to repair on the basis of the CONFIG.SYS downloaded Change, do not allow it to upload.At this, preset number signature can also be correctly other implications, as long as amended system can be judged System configuration file is amendment on the basis of the CONFIG.SYS downloaded.
When being embodied as, after determining that the preset number that described amended CONFIG.SYS carries is signed correctly, right Amended CONFIG.SYS carries out syntax check, after grammer is also correct, is deposited by described amended CONFIG.SYS Storage is at described server end.
When being embodied as, it is unique in order to ensure the primal system configuration file uploaded, in the present embodiment, in intelligence Before transformer station puts into operation, also include: when described work teams and groups propose to put into operation described intelligent substation application, for described Work teams and groups provide a work ticket, and the described intelligence that the work teams and groups only receiving the described work ticket of acquisition upload to server end The CONFIG.SYS of energy transformer station;Complete to put into operation work handle after work ticket finishes, by upload in described work teams and groups The CONFIG.SYS of described intelligent substation is stored in described server end.Concrete, work teams and groups propose described intelligence Transformer station carry out putting into operation application time, for work, teams and groups provide a work ticket, finish completing to put into operation work and handle work ticket After, the most only CONFIG.SYS of the intelligent substation that the work teams and groups of permission acquisition work ticket upload to server end, and will The CONFIG.SYS of the intelligent substation uploaded is stored in server end, to ensure the original system configuration of intelligent substation File is unique.
When being embodied as, at server end, receiving intelligent substation that the work teams and groups obtaining work ticket upload After CONFIG.SYS, the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, to the system configuration uploaded File adds above-mentioned preset number and signs and be stored in server end.
The management-control method of above-mentioned transformer substation system configuration file is described below in conjunction with concrete example.With newly-built transformer station it is , there is not user and download the process of SCD file from server end, for setting up the process of the prototype version of SCD file, specifically flow in example Journey is as shown in Figure 2.Wherein dotted arrow path is work ticket flow process, shift group membership propose transformer station put into operation application and obtain After the work ticket license that server end is provided, carry out the work that puts into operation of transformer station, and handle work ticket after the work that puts into operation completes Finish.Corresponding solid arrow path is the SCD file management and control flow process combining work ticket flow process, and in work, teams and groups propose power transformation Put into operation and apply for simultaneously, to upload the SCD file prototype version of newly-built transformer station, the server end SCD to uploading at user side in station File carries out syntax check, correct after add digital signature, work teams and groups or the specific responsibility SCD file to adding digital signature afterwards After examination & verification is correct, archive operation can be carried out, by the filing storage of SCD file prototype version.
As a example by the maintenance running transformer station or reorganization and expansion work, first user should download SCD file from server, in work The SCD file of amendment again being uploaded onto the server after work again and verify and store, its flow process is as shown in Figure 3.Wherein, Dotted arrow path is work ticket flow process, and shift group membership proposes station or reorganization and expansion Request For Work and obtains service After the work ticket license that device is provided, carry out maintenance or the reorganization and expansion work of transformer station, and after maintenance or reorganization and expansion have worked Handle work ticket to finish.Corresponding solid arrow path is the SCD file management and control flow process combining work ticket flow process, in shift Group carries Request For Work simultaneously, should download the SCD file of transformer station from server, and the SCD file downloaded from a server is with spy Fixed digital signature, when maintenance or reorganization and expansion works and handle after work ticket finishes, and work teams and groups are by amended SCD heavily Newly uploading onto the server end, first server end is digitally signed inspection to the SCD file uploaded.If digital signature is the most just Really, then illustrate that the SCD file uploaded is not the amendment carried out on the basis of the SCD file of server end storage, do not allow on it Pass.If digital signature checks correct, then the server end SCD file to uploading carries out syntax check, work afterwards teams and groups or After specializing in the SCD file examination & verification correctly uploaded, archive operation can be carried out, the SCD file version filing storage that will upload.
From figures 2 and 3, it will be seen that the management and control flow process of SCD file is combined closely with work ticket flow process, the license of work ticket The inevitable download with SCD file or upload, the inevitable filing storage with SCD file that finishes of work ticket.A job During ticket is carried out, SCD file frozen can forbid amendment at server end, thus without occurring causing SCD file because of forked working The version that amendment variation causes repeatedly is chaotic.
Based on same inventive concept, the embodiment of the present invention additionally provides the management and control system of a kind of transformer substation system configuration file System, as described in the following examples.Owing to the managing and control system of transformer substation system configuration file solves principle and the transformer station of problem The management-control method of CONFIG.SYS is similar, and therefore the enforcement of the managing and control system of transformer substation system configuration file may refer to power transformation Stand the enforcement of management-control method of CONFIG.SYS, repeat no more in place of repetition.Used below, term " unit " or " module " can realize the software of predetermined function and/or the combination of hardware.Although the device described by following example is preferably Realize with software, but hardware, or the realization of the combination of software and hardware also may and be contemplated.
Fig. 4 is a kind of structured flowchart of the managing and control system of the transformer substation system configuration file of the embodiment of the present invention, such as Fig. 4 institute Show, including: server end 401 and client 402, below this structure is illustrated.
Described client 402, including:
Application sending module 4021, for after intelligent substation puts into operation, carries to described server end transmission work teams and groups Go out overhauls described intelligent substation or reorganization and expansion application;
Transmission module 4022 on file download, download institute for obtaining the work teams and groups of described work ticket from described server end State the CONFIG.SYS of intelligent substation, described work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish After, the amended CONFIG.SYS uploaded to described server end;
Described server end 401, including:
Work ticket distribution module 4011, for receiving the overhauling described intelligent substation of described work teams and groups proposition Or reorganization and expansion application, for described work teams and groups provide a work ticket, and only allow obtain described work ticket work teams and groups from Server end downloads the CONFIG.SYS of described intelligent substation, and wherein, work ticket is only issued to one within the same time Work teams and groups, before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
File storage module 4012, for receiving and store the amended system configuration literary composition that described work teams and groups upload Part.
In one embodiment, described application sending module, it is additionally operable to before intelligent substation puts into operation, to described service The application that described intelligent substation is put into operation that device end transmission work teams and groups propose;Transmission module on described file download, also uses In completing to put into operation work handle after work ticket finishes in described work teams and groups, upload the power transformation of described intelligence to described server end The CONFIG.SYS stood;Described work ticket distribution module, is additionally operable to receive the becoming described intelligence of described work teams and groups proposition Power station carries out the application that puts into operation, and provides a work ticket for described work teams and groups, and only receives the shift obtaining described work ticket Group uploads the CONFIG.SYS of described intelligent substation to server end;Described file storage module, is additionally operable to receive and deposit Store up the CONFIG.SYS of the amended described intelligent substation that described work teams and groups upload.
In one embodiment, the described intelligent substation that the work teams and groups of described work ticket download is obtained from server end CONFIG.SYS in carry preset number signature;Described file storage module, be additionally operable to determine described amended After the preset number that CONFIG.SYS carries is signed correctly, described amended CONFIG.SYS is stored in described service Device end.
In one embodiment, described file storage module, it is additionally operable to determining described amended CONFIG.SYS After the preset number signature carried is correct, and described amended CONFIG.SYS is syntactically correct, by described amended system System configuration file is stored in described server end.
In one embodiment, described file storage module, it is additionally operable to the CONFIG.SYS uploaded is carried out grammer inspection Look into, after syntactically correct, the CONFIG.SYS uploaded added described preset number and signs and be stored in described server end.
In embodiments of the present invention, propose intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, for Work teams and groups provide a work ticket, and only allow the work teams and groups obtaining work ticket to download intelligent substation from server end CONFIG.SYS, completes maintenance or reorganization and expansion work and handles after work ticket finishes, in reception work teams and groups in work teams and groups The amended CONFIG.SYS passed, owing to the management and control of CONFIG.SYS is combined with work ticket so that CONFIG.SYS Management and control be combined with project progress, only after intelligent substation maintenance or reconstruction and extension project, just carry out system configuration civilian The filing-up work of part;Simultaneously as work ticket is the writ permitting working on electrical equipment and systems soft ware, same In time, only one work ticket of granting is to work teams and groups, and server end is only permission acquisition work while providing work ticket The work teams and groups of ticket download the CONFIG.SYS of intelligent substation from server end, before a work ticket finishes, and service Device end is forbidden modifying CONFIG.SYS, work teams and groups complete maintenance or reorganization and expansion work and handle work ticket and finish After, only receive and obtain the amended CONFIG.SYS that the work teams and groups of work ticket upload so that obtain CONFIG.SYS Channel can only be to download from server end, and only allow the work teams and groups obtaining work ticket to download, upload in the same time to be System configuration file, it is ensured that the uniqueness of CONFIG.SYS, is easy in the intelligent substation judging currently to run use the most very much CONFIG.SYS, it is to avoid the problem that CONFIG.SYS version management is chaotic.
Obviously, those skilled in the art should be understood that each module of the above-mentioned embodiment of the present invention or each step are permissible Realizing with general calculating device, they can concentrate on single calculating device, or is distributed in multiple calculating device On the network formed, alternatively, they can realize with calculating the executable program code of device, it is thus possible to by it Store and perform by calculating device in the storage device, and in some cases, can hold with the order being different from herein Step shown or described by row, or they are fabricated to respectively each integrated circuit modules, or multiple by them Module or step are fabricated to single integrated circuit module and realize.So, the embodiment of the present invention is not restricted to any specific hard Part and software combine.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the embodiment of the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made Any modification, equivalent substitution and improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the management-control method of a transformer substation system configuration file, it is characterised in that including:
After intelligent substation puts into operation, propose described intelligent substation overhauled or during reorganization and expansion application in the teams and groups that work, Provide a work ticket for described work teams and groups, and only allow the work teams and groups obtaining described work ticket to download institute from server end Stating the CONFIG.SYS of intelligent substation, wherein, work ticket is only issued to work teams and groups within the same time, at one Before work ticket finishes, server end is forbidden modifying CONFIG.SYS;
Complete maintenance or reorganization and expansion works and handles after work ticket finishes in described work teams and groups, receive described work teams and groups and upload Amended CONFIG.SYS, described amended CONFIG.SYS is stored in described server end.
2. the management-control method of transformer substation system configuration file as claimed in claim 1, it is characterised in that throw at intelligent substation Before fortune, also include:
When described work teams and groups propose to put into operation described intelligent substation application, provide a Zhang Gong for described work teams and groups Make ticket, and only receive the system configuration obtaining the described intelligent substation that the work teams and groups of described work ticket upload to server end File;
Complete to put into operation work handle after work ticket finishes in described work teams and groups, the system of described intelligent substation that will upload Configuration file is stored in described server end.
3. the management-control method of transformer substation system configuration file as claimed in claim 1 or 2, obtains the shift of described work ticket Carrying preset number signature from server end the CONFIG.SYS of the described intelligent substation that group is downloaded, its feature exists In,
Described amended CONFIG.SYS is stored in described server end, including:
After determining that the preset number that described amended CONFIG.SYS carries is signed correctly, by described amended system Configuration file is stored in described server end.
4. the management-control method of transformer substation system configuration file as claimed in claim 3, it is characterised in that by described amended CONFIG.SYS is stored in described server end, including:
Determining that the preset number signature that described amended CONFIG.SYS carries is correct, and described amended system is being joined Put file syntax correct after, described amended CONFIG.SYS is stored in described server end.
5. the management-control method of transformer substation system configuration file as claimed in claim 3, it is characterised in that the described intelligence that will upload The CONFIG.SYS of energy transformer station is stored in described server end, including:
The CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, the CONFIG.SYS uploaded is added institute State preset number sign and be stored in described server end.
6. the managing and control system of a transformer substation system configuration file, it is characterised in that including: server end and client, wherein,
Described client, including:
Application sending module, for after intelligent substation puts into operation, to described server end transmission work teams and groups propose to institute State intelligent substation to carry out overhauling or reorganization and expansion application;
Transmission module on file download, downloads described intelligence change for obtaining the work teams and groups of described work ticket from described server end The CONFIG.SYS in power station, completes maintenance or reorganization and expansion works and handles after work ticket finishes, to institute in described work teams and groups State the amended CONFIG.SYS that server end is uploaded;
Described server end, including:
Work ticket distribution module, for receiving overhauling described intelligent substation or reorganization and expansion of described work teams and groups proposition Application, provides a work ticket for described work teams and groups, and only allows the work teams and groups obtaining described work ticket from server end Downloading the CONFIG.SYS of described intelligent substation, wherein, work ticket is only issued to work teams and groups within the same time, Before a work ticket finishes, server end is forbidden modifying CONFIG.SYS;
File storage module, for receiving and store the amended CONFIG.SYS that described work teams and groups upload.
7. the managing and control system of transformer substation system configuration file as claimed in claim 6, it is characterised in that described application sends mould Block, is additionally operable to before intelligent substation puts into operation, to described server end transmission work teams and groups propose to the power transformation of described intelligence Station carries out the application that puts into operation;
Transmission module on described file download, is additionally operable to complete to put into operation work handle after work ticket finishes in described work teams and groups, The CONFIG.SYS of described intelligent substation is uploaded to described server end;
Described work ticket distribution module, is additionally operable to receive the Shen of putting into operation described intelligent substation that described work teams and groups propose Please, provide a work ticket for described work teams and groups, and only receive the work teams and groups of the described work ticket of acquisition on server end Pass the CONFIG.SYS of described intelligent substation;
Described file storage module, is additionally operable to receive and store the amended described intelligent substation that described work teams and groups upload CONFIG.SYS.
The managing and control system of transformer substation system configuration file the most as claimed in claims 6 or 7, obtains the shift of described work ticket Carrying preset number signature from server end the CONFIG.SYS of the described intelligent substation that group is downloaded, its feature exists In, described file storage module, it is additionally operable to determining that the preset number that described amended CONFIG.SYS carries just is being signed After Que, described amended CONFIG.SYS is stored in described server end.
9. the managing and control system of transformer substation system configuration file as claimed in claim 8, it is characterised in that described file storage mould Block, is additionally operable to determining that the preset number signature that described amended CONFIG.SYS carries is correct and described amended After CONFIG.SYS is syntactically correct, described amended CONFIG.SYS is stored in described server end.
10. the managing and control system of transformer substation system configuration file as claimed in claim 8, it is characterised in that described file stores Module, is additionally operable to the CONFIG.SYS uploaded is carried out syntax check, after syntactically correct, to the CONFIG.SYS uploaded Add described preset number sign and be stored in described server end.
CN201610452843.4A 2016-06-21 2016-06-21 Control method and system for configuration file of transformer substation system Active CN106096427B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610452843.4A CN106096427B (en) 2016-06-21 2016-06-21 Control method and system for configuration file of transformer substation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610452843.4A CN106096427B (en) 2016-06-21 2016-06-21 Control method and system for configuration file of transformer substation system

Publications (2)

Publication Number Publication Date
CN106096427A true CN106096427A (en) 2016-11-09
CN106096427B CN106096427B (en) 2020-03-13

Family

ID=57237759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610452843.4A Active CN106096427B (en) 2016-06-21 2016-06-21 Control method and system for configuration file of transformer substation system

Country Status (1)

Country Link
CN (1) CN106096427B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107943901A (en) * 2017-11-17 2018-04-20 国家电网公司 Automation of transformation substations information point table management method
CN108121662A (en) * 2017-12-29 2018-06-05 广东欧珀移动通信有限公司 The collocation method and its device of test equipment
CN109086062A (en) * 2018-07-26 2018-12-25 云南电网有限责任公司电力科学研究院 A kind of substation's file edition management method and system
CN109285086A (en) * 2017-07-20 2019-01-29 许继电气股份有限公司 A kind of intelligent substation SCD file managing and control system
CN109460679A (en) * 2018-01-29 2019-03-12 国网浙江省电力公司湖州供电公司 A kind of intelligent substation configuration file uniqueness method of calibration based on Encryption Algorithm
CN111752592A (en) * 2020-05-09 2020-10-09 国电南瑞科技股份有限公司 Power system secondary equipment version control method, client and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102611199A (en) * 2012-03-07 2012-07-25 长园深瑞继保自动化有限公司 Design and configuration integrated system for intelligent substation
CN103605705A (en) * 2013-11-11 2014-02-26 国家电网公司 SCD (substation configuration description) file management system
CN104467188A (en) * 2014-12-17 2015-03-25 国网浙江慈溪市供电公司 Operation and maintenance safety control system of transformer substation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102611199A (en) * 2012-03-07 2012-07-25 长园深瑞继保自动化有限公司 Design and configuration integrated system for intelligent substation
CN103605705A (en) * 2013-11-11 2014-02-26 国家电网公司 SCD (substation configuration description) file management system
CN104467188A (en) * 2014-12-17 2015-03-25 国网浙江慈溪市供电公司 Operation and maintenance safety control system of transformer substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑文彬 等: "基于控制虚端子修改的智能变电站SCD版本权限管理技术", 《智能电网》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109285086A (en) * 2017-07-20 2019-01-29 许继电气股份有限公司 A kind of intelligent substation SCD file managing and control system
CN107943901A (en) * 2017-11-17 2018-04-20 国家电网公司 Automation of transformation substations information point table management method
CN108121662A (en) * 2017-12-29 2018-06-05 广东欧珀移动通信有限公司 The collocation method and its device of test equipment
CN109460679A (en) * 2018-01-29 2019-03-12 国网浙江省电力公司湖州供电公司 A kind of intelligent substation configuration file uniqueness method of calibration based on Encryption Algorithm
CN109086062A (en) * 2018-07-26 2018-12-25 云南电网有限责任公司电力科学研究院 A kind of substation's file edition management method and system
CN111752592A (en) * 2020-05-09 2020-10-09 国电南瑞科技股份有限公司 Power system secondary equipment version control method, client and system

Also Published As

Publication number Publication date
CN106096427B (en) 2020-03-13

Similar Documents

Publication Publication Date Title
CN106096427A (en) The management-control method of transformer substation system configuration file and system
CN106708719B (en) Service function testing method and device
CN105677404B (en) Zookeeper-based configuration updating method and device
EP2541420A1 (en) Method and system for automated system migration
CN109117170B (en) Operation environment building method and device and code incorporating method and system
CN106792630A (en) It is a kind of to realize moving the method and system that network service is opened
CN109858828B (en) Power distribution network fixed value automatic setting method and device and distribution network system
CN113726890B (en) Federal prediction method and system for block chain data service
CN106575227A (en) Automatic software-update framework
CN105871998A (en) Data displaying method and device
Patwardhan Analysis of software delivery process shortcomings and architectural pitfalls
CN116185383A (en) Draggable self-configuration workflow generation method and system
CN105119771A (en) Test method and system of electric power communication system
Reza et al. Toward model-based requirement engineering tool support
CN109286617A (en) A kind of data processing method and relevant device
Fagerström et al. Verdict machinery: On the need to automatically make sense of test results
CN113220561A (en) Test case management method, device, equipment and medium
CN112650815B (en) Method and device for synchronizing environment data, storage medium and electronic device
CN105897476B (en) A kind of method and device creating transmission channel
CN113592453A (en) Information system operation compliance examination method and system based on block chain
CN115563067A (en) API request data sharing method and device, electronic equipment and storage medium
CN111597156A (en) Civil aviation data processing method and device, electronic equipment and storage medium
Adamčík et al. Local Modular Departure Control System for Airports
CN115102879B (en) Test method of shared service platform, electronic equipment and storage medium
CN104317701B (en) The device and method of ERP parameter testings is realized by prefab data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant