CN104915523B - A kind of regulation full-service unified modeling method based on time series - Google Patents

A kind of regulation full-service unified modeling method based on time series Download PDF

Info

Publication number
CN104915523B
CN104915523B CN201510383277.1A CN201510383277A CN104915523B CN 104915523 B CN104915523 B CN 104915523B CN 201510383277 A CN201510383277 A CN 201510383277A CN 104915523 B CN104915523 B CN 104915523B
Authority
CN
China
Prior art keywords
model
business
time
power grid
service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510383277.1A
Other languages
Chinese (zh)
Other versions
CN104915523A (en
Inventor
陈郑平
林静怀
任晓辉
黄文英
米为民
蒋国栋
程诗尧
武冰
张亮
余斯航
梅峥
蔡召
陈清山
韩洪飞
焦文文
马仲佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
State Grid Fujian Electric Power Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, State Grid Fujian Electric Power Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN201510383277.1A priority Critical patent/CN104915523B/en
Publication of CN104915523A publication Critical patent/CN104915523A/en
Application granted granted Critical
Publication of CN104915523B publication Critical patent/CN104915523B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The regulation full-service unified modeling method based on time series that the invention discloses a kind of, include the following steps: S1, the data structure system of power grid common model and the business model one of settling time label carries out the unified maintenance of full-service model/figure of time series, forms model database;S2, each operation system extract the power grid common model and business model of any time section from model database as needed;S3, each operation system generate communication concordance list as needed, in conjunction with the power grid common model and business model of extraction, generation when discontinuity surface figure, carry out co-verification;S4 after being verified, for on-line operation system, carries out the on-line synchronous of power grid common model and business model;For off-line system, power grid common model and business model are distributed to each operation system in a manner of CIM/E file.The method achieve the operations of dispatching of power netwoks control system and maintenance to be completely separated, and enhances the stability and reliability of on-line system.

Description

A kind of regulation full-service unified modeling method based on time series
Technical field
The present invention relates to a kind of unified modeling methods more particularly to a kind of regulation full-service based on time series uniformly to build Mould method belongs to dispatching automation of electric power systems field.
Background technique
Smart grid Dispatching Control System played an important role in " big operation " System Construction, be in regulations at different levels The integrative operation of systematic collaboration and regulation central interior full-service between the heart provides good technical support.Based on intelligence Dispatching of power netwoks control system basic platform is realized between regulation centers at different levels using the model splicing technology based on CIM/E Model, figure source maintenance and globally shared, in regulation central interior, also realize model between line service, figure substantially Shape is shared.
But existing smart grid Dispatching Control System has also discovered some shortcomings in actual operation, it is main to show : (1) model of smart grid Dispatching Control System mainly meet the needs of scheduling production run, regulation center other application Model, such as comprehensive stability analysis model, method of operation model etc. causes the weight of each application system there is no being really integrated into The problems such as rebuilding mould and inconsistent information.(2) the real-time state of smart grid Dispatching Control System, planning state, test state etc. are State in logic often influences whether Real-time running system, causes system when carrying out system maintenance based on planning state and test state Fluctuation of service.(3) management system of model data is also unsound.Regulating and controlling mechanism not yet establish through Study on Power Grid Planning, The entire process model data maintenance management system of engineering construction, new equipment debugging to operation of going into operation, need to improve do not come it is current, Online with the model maintenance process of offline coordinate operation.(4) the preposition verifying of smart grid Dispatching Control System is often because accidentally Operate and interfere the normal operation of real-time system.
In short, bulk power grid coordinated control proposes regulating and controlling mechanisms at different levels and each profession in terms of business cooperation and data sharing Higher demand, smart grid Dispatching Control System is on the basis of improving application on site, it is also necessary to further emerging system The offline mode of operation profession calculates and the offline class applications such as the adaptive setting of relay protection profession, and then further sophisticated model Data " source maintenance, the whole network are shared " mechanism, promotes regulation business cooperation operating capability.It is final to realize dispatching of power netwoks control system It runs and that safeguards is completely separated, enhance the stability and reliability of on-line system.
Summary of the invention
In view of the deficiencies of the prior art, a kind of based on time series technical problem to be solved by the present invention lies in providing Regulate and control full-service unified modeling method.
For achieving the above object, the present invention uses following technical solutions:
A kind of regulation full-service unified modeling method based on time series, includes the following steps:
S1, the data structure system of power grid common model and the business model one of settling time label carry out time sequence The full-service model of column/figure is unified to be safeguarded, model database is formed;
S2, each operation system extract the power grid common model and industry of any time section from model database as needed Business model;
S3, each operation system generate as needed communication concordance list, in conjunction with extraction power grid common model and business model, Generation when discontinuity surface figure, carry out co-verification;
S4 after being verified, for on-line operation system, carries out the on-line synchronous of power grid common model and business model; For off-line system, power grid common model and business model are distributed to each operation system in a manner of CIM/E file.
Wherein more preferably, in step sl, it includes complete for carrying out the unified maintenance of regulation full-service model/figure of time series The basic modeling of business and parameter maintenance for model;
Wherein, the model includes power grid common model and business model.
Wherein more preferably, in step s 2, the business model extraction of discontinuity surface includes the following steps: when
S21 extracts real-time model and meets the future models of time conditions from model database;
S22 filters out the power grid common model for meeting the business according to selected business;
S23 generates the business model of needs according to power grid common model and business model configuration information;
S24 obtains corresponding CIM/G file, according to model extraction rule, filters out equipment in figure and associated Pel, automatically generates topological relation, the figure of discontinuity surface when generation.
Wherein more preferably, business model=business real-time model+business future models of discontinuity surface when;Wherein, industry The real-time model of business be current time be less than equipment actually move back fortune the time when discontinuity surface business model;The following mould of business Type is the when discontinuity surface that the fortune time is moved back in the plan that plan of the current time more than or equal to equipment puts into operation the time, while being less than equipment Business model.
Wherein more preferably, in step s3, the co-verification includes model verifying, model/figure/communication concordance list The special verifying of co-verification and business model.
Wherein more preferably, the co-verification of the model/figure/communication concordance list, includes the following steps:
S31 sends SCADA system from front-end system for analogue data, consistent to model/drawn table of figure/communication Property is verified;
S32 carries out transmission test, will collect after the on-line operation system of main website receives the data of substation acquisition Data be sent to SCADA system from front-end system, model/figure/communication drawn table consistency is verified.
Wherein more preferably, model/figure/communication drawn table consistency is verified, is included the following steps:
S311 selects measuring point from communication concordance list to be verified, simulates front-end system by messaging bus and sends mould Quasi- data;
S312, SCADA system receive analogue data, real-time data base are written after processing;
S313, graphical browser obtain analogue data by service bus from real-time data base and carry out browsing inspection;
S314 judges in step S311-S313 whether the analogue data in model/drawn table of figure/communication is consistent, It is proved to be successful if always;Otherwise, authentication failed.
Wherein more preferably, in step s 4, for on-line operation system, carry out power grid common model and business model Line locking includes the following steps:
S41, according to one synchronous task of capital construction task creation;
S42, model/drawn table of figure/communication of discontinuity surface is added to synchronous appoint when selecting one from model database Business;
S43 safeguards own using graphic editor to the drawn table information of model/figure/communication in synchronous task The information of maintenance is automatically labeled as content to be synchronized;
S44 synchronizes task;After the completion of synchronous task, completes synchronous device attribute " actually put into operation state " and repair It is changed to current time, the status modifier of synchronous task is to have synchronized.
Wherein more preferably, in step s 4, for on-line operation system, carry out power grid common model and business model Line locking further includes following steps:
The power grid common model and business model of current on-line operation system are generated a version and are saved by S45, when When needing to retract, the selected synchronous task completed return back to last revision.
Wherein more preferably, the regulation full-service unified modeling method further includes following steps:
S5 presses Service creation model version after model is issued or synchronized in a manner of CIM/E file, CIM/G file automatically This information, and the model version information of generation is stored.
Regulation full-service unified modeling method provided by the present invention based on time series, passes through the regulation of time series The unified maintenance of full-service model, figure, when the power grid common model of discontinuity surface and extraction, the model/figure/communication of business model The co-verification of the information such as data directory, the model on-line synchronous based on capital construction task, the publication of offline application model, time industry The research for the technologies such as various dimensions model version management of being engaged in, solves the deficiency of smart grid Dispatching Control System, when realizing more The unified maintenance and management of state, more application model/figures, to regulate and control, each professional system of central interior is integrative coordinated to provide system One model data support, realizes the operation of dispatching of power netwoks control system and maintenance is completely separated, and enhances the steady of on-line system Qualitative and reliability.
Detailed description of the invention
Fig. 1 is the flow chart of regulation full-service unified modeling method provided by the present invention;
Fig. 2 is model/figure maintenance schematic diagram in regulation full-service unified modeling method provided by the invention;
Fig. 3 be regulation full-service unified modeling method provided by the invention in, when discontinuity surface model schematic;
Fig. 4 is that one is carried out from front-end system to SCADA system in regulation full-service unified modeling method provided by the invention The flow chart of cause property verifying;
Fig. 5 is to carry out transmission test in the regulation full-service unified modeling method provided by the invention based on time series Flow chart.
Specific embodiment
Detailed specific description is carried out to technology contents of the invention in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, in the regulation full-service unified modeling method provided by the present invention based on time series, including such as Lower step: firstly, the data structure system of power grid common model and the business model one of settling time label, on this basis Regulation full-service model/figure of development time sequence unifies maintenance tool, formed different time section full-service model and Figure (history of each business, real-time and future models).When each operation system extracts any from model database as needed The model (power grid common model and business model) of discontinuity surface.Wherein, the business model extraction of discontinuity surface can customize simultaneously when Personalized business model information, such as extract the model for not including disconnecting link and earthing knife-switch.For on-line operation system (in linear system System), when discontinuity surface model and after communication concordance list extracts, be loaded into real-time data base, carry out model/figure/communication index The co-verification of table after being verified, can form synchronous task, be synchronized to on-line operation system according to capital construction task.For Off-line system, when discontinuity surface model extraction and by verifying after, each operation system is distributed in a manner of CIM/E file.Under Detailed specific description is done in face of this process.
S1, the data structure system of power grid common model and the business model one of settling time label carry out time sequence The full-service model of column/figure is unified to be safeguarded, the model database of the regulation full-service of time series is formed.
Power grid common model is the universal model in all kinds of dispatching of power netwoks business such as real time monitoring, data acquisition, is each tune The common portion of electric network model required for control business, the universal model both included grid equipment model (electrical equipment class and its Basic parameter attribute), also include topology controlment (equipment is further abstracted as node, branch and electrical island).Business model It then include the common portion and the peculiar model of business of electric network model.It is extracted from the electric network model of each business in regulation center public Information establishes the incidence relation of power grid common model and business model, be mainly used for realizing more application models unified maintenance and Management.So as to form the regulation full-service unified model architecture of time series.
When safeguarding power grid common model, the basic letter of business model is automatically generated using business model configuration information Breath.Business model configuration information mainly includes application name, the class name in business model corresponding with power grid common model equipment, life Name rule, incidence relation and other attributes for needing to automatically generate and attribute value generation rule etc..When such as creating a bus, root 2 bus differential protection device information can be generated according to business model configuration information.
When safeguarding power grid common model, it is necessary to foundation is planned or the plan of capital construction task to maintain equipment puts into operation time and plan Move back the fortune time.Plan puts into operation the time and plan moves back the fortune time and is mainly used for managing future models, in the model of future time section It also will use when extraction.After equipment really puts into operation, plan puts into operation the time and plan moves back the fortune time and ceases to be in force automatically, the reality of equipment Put into operation the time and move back fortune the time come into effect.Graphic editor is the common electric network model of dispatch automated system/figure one Change maintenance tool, the maintaining method of above-mentioned power grid common model is usually to carry out on graphic editor.Graphic editor is unified Complete the drafting and modification of power grid common model.Although graphic editor solves the unification of time series regulation full-service model The problem of maintenance, but graphic editor is only responsible for basic modeling, therefore, for the parameter of power grid common model and business model Maintenance issues, it is also necessary to establish the parameter maintenance that an individual parameter maintenance process carries out model.Wherein, the ginseng of model is carried out The method of number maintenance uses any means in the prior art, just repeats no more herein.
S2, each operation system extract the power grid common model and industry of any time section from model database as needed Business model.
After forming the model database of the regulation full-service of time series, different time section is store in model database Full-service model and figure, historical models, real-time model and future models including each business.Each operation system is as needed The power grid common model and business model of any time section are extracted from model database.When discontinuity surface model be a certain Specified time (including historical time and future time) interior real-time model and plan put into operation the set of model.As shown in Figure 3, it is assumed that T1 < T2 < T3, T1 be greater than current time Tc, the plan of equipment move back fortune the time be all much larger than T3, arbitrarily select a time Ti.(1) As Tc≤Ti < T1, then it is shown that in Fig. 3 the rightmost side real-time model;(2) as T1≤Ti < T2, then it is shown that figure The model of discontinuity surface when time T1 is corresponding in 3;(3) as T2≤Ti < T3, then it is shown that when time T2 is corresponding in Fig. 3 The model of discontinuity surface;(4) as T3≤Ti, then it is shown that the model of the full-time discontinuity surface of the leftmost side Fig. 3.
Assuming that specifying a time Ts, the plan of equipment time of putting into operation is indicated with T1, and the plan of equipment moves back the fortune time and uses T2 Indicate, equipment actually move back fortune the time with T ' 2 indicate, then the business model of the section at Ts moment is as follows: when discontinuity surface business The future models (T1≤Ts < T2) of model=business real-time model (Ts < T ' 2)+business, i.e. real-time model+plan of business It puts into operation the time and plan moves back the fortune time and meets a T1≤Ts < T2 future models.When discontinuity surface business model extract specific packet Include that steps are as follows:
S21 extracts real-time model and meets the future models of time conditions from model database;
S22 filters out the power grid common model for meeting the business according to selected business;
S23, according to business model configuration information, generates the business model of needs on the basis of first two steps;
S24 obtains corresponding graphic file (CIM/G file), according to model extraction rule, filters out the equipment in figure And associated pel, automatically generate topological relation, the figure of discontinuity surface when generation.
S3, each operation system generate as needed communication concordance list, in conjunction with extraction power grid common model and business model, Generation when discontinuity surface figure, carry out co-verification.
In regulation full-service unified modeling method provided by the present invention, the real-time running data that needs is from on-line operation System obtains.For normal real time data, the data acquisition service of on-line operation system is in addition to giving the application of this system normal It sends outside data, while the depth verifying that same data are used for model being used, such as state estimation verifying.Transmission is tried The plant stand tested is not landed in this system after on-line data acquisition service receives the transmission data of substation transmission, i.e., not to this Systematic difference is sent, and is directly verified.
Each operation system extracts power grid common model and business model as needed, and when generating corresponding discontinuity surface figure Shape and communication concordance list.Different application is different to the specific requirements of model, and the mode to model verifying is also different, such as SCADA System needs to carry out model/figure/communication concordance list co-verification, for the application such as state estimation, also to verify mould Topology, parameter of type etc. will also verify secondary device model other than above-mentioned verifying for the adaptive setting of protection customization The information such as integrality.In embodiment provided by the present invention, it is illustrated by taking SCADA system as an example.
Co-verification includes that model verifying, model/figure/co-verification of communication concordance list and the special of business model are tested Card.Wherein, model verifying and the special verifying of business model use existing conventional verification method.In reality provided by the present invention It applies in example, using Liu Tao, meter Wei Min, Chen Zhengping et al. at " the electric network model integration secret sharing suitable for big operation architecture " The verifying of method implementation model disclosed in (being published in " Automation of Electric Systems " the 1st phase in 2015) and the special of business model are tested Card.It just repeats no more herein.And model/figure/communication concordance list co-verification, including two steps:
S31 sends SCADA system from front-end system for analogue data, consistent to model/drawn table of figure/communication Property is verified.
Verifying mainly verifying model/figure/communication drawn table consistency from front-end system to SCADA system.Such as Shown in Fig. 4, specifically comprise the following steps:
S311 selects measuring point from communication concordance list to be verified, simulates front-end system by messaging bus and sends mould Quasi- data;
S312, SCADA system receive analogue data, real-time data base are written after processing;
S313, graphical browser obtain analogue data by service bus from real-time data base and carry out browsing inspection.
S314 judges in step S311-S313 whether the analogue data in model/drawn table of figure/communication is consistent, It is proved to be successful if always;Otherwise, authentication failed.
In the whole process, if the analogue data that any one link shows in model/drawn table of figure/communication It is inconsistent, it can all cause data to show mistake, then authentication failed.For the ease of verifying, preposition simplation verification is in addition to manual operations Verifying is outer, and some authentication policies can also be arranged, as front-end system sends the point number of telemetering amount, automatic checking communication index The corresponding relationship of point number and equipment keyword in table, to verify model/figure/communication drawn table consistency.
S32 carries out transmission test, will collect after the on-line operation system of main website receives the data of substation acquisition Data be sent to SCADA system from front-end system, model/figure/communication drawn table consistency is verified.
As shown in figure 5, from substation to the verifying of main website front-end system, i.e. transmission test.The on-line operation of substation and main website System establishes normal acquisition communication link, but no communication concordance list in the link of on-line operation system, i.e., no collection point, The data acquisition service of on-line operation system directly carries out transmission test after receiving the data that substation is sent.This transmission test Advantage is not interfere with on-line operation system, will not cause the historical data of on-line operation system dirty because of transmission test Dye.
S4 after being verified, for on-line operation system, carries out the on-line synchronous of model;For off-line system, by model Each operation system is distributed in a manner of CIM/E file.
For on-line system, when discontinuity surface model (power grid common model and business model) and communication concordance list extract Afterwards, it is loaded into real-time data base, carrying out model/figure/communication concordance list co-verification can be according to base after being verified Task is built, synchronous task is formed, is synchronized to on-line operation system.For off-line system, when discontinuity surface model extraction and pass through After verifying, each operation system is distributed in a manner of CIM/E file.
The on-line synchronous of model can be divided into the online of the information such as model/figure/communication concordance list based on capital construction task Synchronous (on-line synchronous of abbreviation task based access control), the synchronization based on database table, file synchronization, holographic synchronization and Fast synchronization Deng.
The on-line synchronous of task based access control is the on-line synchronous mode of most common model, and the on-line synchronous of task based access control is specific Include the following steps:
S41, according to one synchronous task of capital construction task creation;
S42, model/drawn table of figure/communication of discontinuity surface is added to synchronous appoint when selecting one from model database Business;
S43 believes the drawn table of model/figure/communication in synchronous task using graphic editor and model maintenance tool Breath is safeguarded that the information of all maintenances is automatically labeled as content to be synchronized.
In embodiment provided by the present invention, the model of discontinuity surface when also can choose one is directly selected therein A part of information flag is content to be synchronized, if being related to the outlet of the plant stand, the plant stand equipment component of opposite end also can be certainly It is dynamic to be added to synchronous task, and synchronous task can automatically record the model and graphical information for needing to synchronize task.
The contents selection of synchronous task selectes the figure of sometime section generally by graphic editor, in editing machine The upper selected model information to be synchronized, can be entire plant stand, some voltage class being also possible in station is also possible to some Equipment in interval.
S44 after the completion of synchronous task, completes synchronous device attribute " actually put into operation state " and is revised as current time, together The status modifier of step task is to have synchronized.
The model of current on-line operation system is generated a version and is saved by S45, when needing to retract, is selected Synchronous task through completing, return back to last revision.
Synchronous task automatically records the description information of the task, including task creation people, and the task creation time needs to synchronize Model information, the modification information etc. of synchronous task.Synchronous task itself may browse through and count, the illustraton of model in synchronous task The information such as shape can be browsed by synchronous task, modified and be verified.
Synchronization based on database table is commonly used in dictionary table and other non-equipment lists etc., to maintenance system and on-line operation Same table of system is compared, and forms different information, different information is synchronized to on-line operation system.
File synchronization be commonly used in single graphic file synchronization, such as be only to some figure source on plant stand figure safeguard into It has gone modification, has not been related to model, then the figure of modification is synchronized to on-line operation system using the mode of file synchronization.
It is that the selected sometime information such as model/figure/communication concordance list of section are fully synchronized to online that holography, which synchronizes, Operating system, the method for synchronization using maintenance system when discontinuity surface model and on-line operation system full model carry out diversity ratio Compared with different information is synchronized to on-line operation system by formation different information.It is larger or online which is suitable for model modification amount The case where model of operating system is damaged due to hardware etc. by large area.
Fast synchronization is adapted to relate only to the smaller modification of model, such as modifies a parameter value of some equipment, Directly on-line operation system can be notified to modify, to improve efficiency without verification.
S5 presses Service creation model version after model is issued or synchronized in a manner of CIM/E file, CIM/G file automatically This information, and the model version information of generation is stored.
The version management of various dimensions model information issues in model or after synchronizing, automatically with CIM/E file, CIM/G file Mode presses Service creation model version information, and is saved.When off-line system Issuance model or on-line operation system It, can be according to various dimensions model information version back to before handling when needing to return to last revision after synchronizing task Version.
In conclusion the regulation full-service unified modeling method provided by the present invention based on time series, passes through foundation The data structure system of power grid common model and the business model one of time tag carries out the regulation full-service mould of time series Type/figure is unified to be safeguarded, the model database of the regulation full-service of time series is formed;Each operation system is as needed from model The power grid common model and business model of any time section are extracted in database;Each operation system generates communication rope as needed Draw table, in conjunction with the power grid common model and business model of extraction, generation when discontinuity surface figure, carry out co-verification;Verifying By rear, for on-line operation system, the on-line synchronous of model is carried out;For off-line system, by power grid common model and business Model is distributed to each operation system in a manner of CIM/E file.The method achieve the operation of dispatching of power netwoks control system and maintenances It is completely separated, enhances the stability and reliability of on-line system, solve the deficiency of smart grid Dispatching Control System, realize The unified maintenance and management of multi-time Scales, more application model/figures, for regulation, each professional system of central interior is integrative coordinated mentions Unified model data has been supplied to support.
The regulation full-service unified modeling method to provided by the present invention based on time series has carried out detailed above Explanation.For those of ordinary skill in the art, it is done under the premise of without departing substantially from true spirit any Obvious change, the infringement for all weighing composition to the invention patent will undertake corresponding legal liabilities.

Claims (10)

1. a kind of regulation full-service unified modeling method based on time series, it is characterised in that include the following steps:
S 1, the data structure system of power grid common model and the business model one of settling time label, carries out time series Full-service model/figure is unified to be safeguarded, model database is formed;
S2, each operation system extract the power grid common model and business mould of any time section from model database as needed Type;
S3, each operation system generate as needed communication concordance list and when discontinuity surface figure, in conjunction with the public mould of power grid of extraction Type and business model, generation when discontinuity surface figure, carry out co-verification;
S4 after being verified, for on-line operation system, carries out the on-line synchronous of power grid common model and business model;For Power grid common model and business model are distributed to each operation system by off-line system in a manner of CIM/E file.
2. regulation full-service unified modeling method as described in claim 1, it is characterised in that:
In step S 1, the unified maintenance of regulation full-service model/figure for carrying out time series includes that the basic of full-service is built Mould and parameter maintenance for power grid common model and business model.
3. regulation full-service unified modeling method as described in claim 1, it is characterised in that in step s 2, when discontinuity surface Business model extraction includes the following steps:
S21 extracts real-time model and meets the future models of time conditions from model database;The real-time model is to work as The business model of discontinuity surface when preceding;The future models are to plan the model that puts into operation in future time;
S22 filters out the power grid common model for meeting the business according to selected business;
S23 generates the business model of needs according to power grid common model and business model configuration information;
S24 obtains corresponding CIM/G file, according to model extraction rule, filters out the equipment in figure and associated figure Member, automatically generates topological relation, the figure of discontinuity surface when generation.
4. regulation full-service unified modeling method as claimed in claim 3, it is characterised in that:
When discontinuity surface business model=business real-time model+business future models;Wherein, the real-time model of business is to work as The preceding time be less than equipment actually move back fortune the time when discontinuity surface business model;The future models of business are that current time is greater than Plan equal to equipment puts into operation the time, at the same be less than equipment plan move back transport the time when discontinuity surface business model.
5. regulation full-service unified modeling method as described in claim 1, it is characterised in that:
In step s3, the co-verification includes model verifying, model/figure/communication concordance list co-verification and business The special verifying of model.
6. regulation full-service unified modeling method as claimed in claim 5, it is characterised in that the model/figure/communication rope The co-verification for drawing table, includes the following steps:
S31 sends SCADA system from front-end system for analogue data, to model/figure/communication drawn table consistency into Row verifying;
S32 carries out transmission test, by collected number after the on-line operation system of main website receives the data of substation acquisition It is sent to SCADA system according to from front-end system, model/figure/communication drawn table consistency is verified.
7. regulation full-service unified modeling method as claimed in claim 6, it is characterised in that drawn to model/figure/communication The consistency of table is verified, and is included the following steps:
S311, selects measuring point from communication concordance list to be verified, and simulation front-end system sends simulation number by messaging bus According to;
S312, SCADA system receive analogue data, real-time data base are written after processing;
S313, graphical browser obtain analogue data by service bus from real-time data base and carry out browsing inspection;
S314 judges in step S311~S313 whether the analogue data in model/drawn table of figure/communication is consistent, if It is consistent then be proved to be successful;Otherwise, authentication failed.
8. regulation full-service unified modeling method as described in claim 1, it is characterised in that in step s 4, for transporting online Row system carries out the on-line synchronous of power grid common model and business model, includes the following steps:
S41, according to one synchronous task of capital construction task creation;
S42, model/drawn table of figure/communication of discontinuity surface is added to synchronous task when selecting one from model database;
S43 safeguards the drawn table information of model/figure/communication in synchronous task using graphic editor, all maintenances Information flag be content to be synchronized;
S44 synchronizes task;After the completion of synchronous task, completes synchronous device attribute " actually put into operation state " and be revised as Current time, the status modifier of synchronous task are to have synchronized.
9. regulation full-service unified modeling method as claimed in claim 8, it is characterised in that in step s 4, for transporting online Row system carries out the on-line synchronous of power grid common model and business model, further includes following steps:
The power grid common model and business model of current on-line operation system are generated a version and are saved, work as needs by S45 When rollback, the selected synchronous task completed return back to last revision.
10. regulation full-service unified modeling method as described in claim 1, it is characterised in that further include following steps:
S5 presses Service creation model version information after model is issued or synchronized in a manner of CIM/E file, CIM/G file, And the model version information of generation is stored.
CN201510383277.1A 2015-07-02 2015-07-02 A kind of regulation full-service unified modeling method based on time series Expired - Fee Related CN104915523B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510383277.1A CN104915523B (en) 2015-07-02 2015-07-02 A kind of regulation full-service unified modeling method based on time series

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510383277.1A CN104915523B (en) 2015-07-02 2015-07-02 A kind of regulation full-service unified modeling method based on time series

Publications (2)

Publication Number Publication Date
CN104915523A CN104915523A (en) 2015-09-16
CN104915523B true CN104915523B (en) 2019-03-08

Family

ID=54084586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510383277.1A Expired - Fee Related CN104915523B (en) 2015-07-02 2015-07-02 A kind of regulation full-service unified modeling method based on time series

Country Status (1)

Country Link
CN (1) CN104915523B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105678447A (en) * 2015-12-31 2016-06-15 中国南方电网有限责任公司 CIM model verification servitization method between power grid upper-level and lower-level scheduling
CN107169180A (en) * 2017-05-02 2017-09-15 国电南瑞科技股份有限公司 A kind of power grid regulation model center system of two-stage deployment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101620691A (en) * 2008-06-30 2010-01-06 上海全成通信技术有限公司 Automatic data mining platform in telecommunications industry

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3757857B2 (en) * 2001-12-12 2006-03-22 ソニー株式会社 Data communication system, data transmission apparatus, data reception apparatus and method, and computer program

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101620691A (en) * 2008-06-30 2010-01-06 上海全成通信技术有限公司 Automatic data mining platform in telecommunications industry

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
基于CIM/E的电网调度中心应用模型信息共享方案;辛耀中等;《电力系统自动化》;20130425;第37卷(第8期);1-5页
基于CIM_G的电网图形维护与共享方案;李伟等;《电力系统自动化》;20150110;第39卷(第1期);42-47页
智能调度分布式一体化建模方案;米为民等;《电力系统自动化》;20101031;第34卷(第10期);6-9页

Also Published As

Publication number Publication date
CN104915523A (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104133953B (en) Intelligent substation secondary design system
CN112765258B (en) Power distribution network graph model checking management system and method thereof
CN109284346A (en) A kind of distribution network planning method and device based on cloud computing
CN104616101B (en) A kind of integrated power system resource model and foundation and maintaining method
CN103955789A (en) Power supply path analyzing method based on integrated model for allocation
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN108345739B (en) Method for identifying CIME and SVG model file information to realize protection fixed value on-line check function and obtain model
CN109992571A (en) A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN111160795B (en) Management system and method for distribution network pattern abnormal operation and power failure lean assessment
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN104678960A (en) Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training
CN103093024A (en) Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN103065217A (en) Digital model splicing method of electric power setting calculating system
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN101364284A (en) Production management system for electrical power system
CN110879543B (en) Real-time hybrid simulation platform of electric power system
CN109657816A (en) A kind of online check method of substation equipment monitoring information table
CN104915794A (en) Multi-time-state full-service unified modeling method based on model center
CN104915523B (en) A kind of regulation full-service unified modeling method based on time series
CN114372594A (en) Distributed power supply comprehensive analysis and safety management and control system
CN110187949A (en) A kind of configurable transformer core lamination robot workstation man-machine interactive system
CN110570109A (en) Data center full life cycle integrated service test process supervision system
CN113793111A (en) Power equipment asset management method, system, device and storage medium
CN107169180A (en) A kind of power grid regulation model center system of two-stage deployment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190308

Termination date: 20200702

CF01 Termination of patent right due to non-payment of annual fee