CN109657816A - A kind of online check method of substation equipment monitoring information table - Google Patents
A kind of online check method of substation equipment monitoring information table Download PDFInfo
- Publication number
- CN109657816A CN109657816A CN201811553841.XA CN201811553841A CN109657816A CN 109657816 A CN109657816 A CN 109657816A CN 201811553841 A CN201811553841 A CN 201811553841A CN 109657816 A CN109657816 A CN 109657816A
- Authority
- CN
- China
- Prior art keywords
- monitoring information
- information table
- substation equipment
- check
- audit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 137
- 238000000034 method Methods 0.000 title claims abstract description 61
- 238000012550 audit Methods 0.000 claims abstract description 34
- 238000012795 verification Methods 0.000 claims abstract description 33
- 238000007726 management method Methods 0.000 claims abstract description 32
- 230000008569 process Effects 0.000 claims abstract description 28
- 238000010606 normalization Methods 0.000 claims abstract description 4
- 238000012423 maintenance Methods 0.000 claims description 9
- 230000008859 change Effects 0.000 claims description 8
- 230000010354 integration Effects 0.000 claims description 7
- 238000012790 confirmation Methods 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 230000004075 alteration Effects 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000012552 review Methods 0.000 claims description 3
- 230000004927 fusion Effects 0.000 claims description 2
- 241000196324 Embryophyta Species 0.000 description 4
- 230000009466 transformation Effects 0.000 description 2
- 241000227272 Agarista populifolia Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The present invention relates to intelligent substation technical field, especially a kind of online check method of substation equipment monitoring information table.This kind of online check method of substation equipment monitoring information table, including version is checked, verification record management, four parts of real-time check, normalization and integrality audit.A kind of online check method of substation equipment monitoring information table of the invention can be realized the online editing of monitoring information table and audit publication, carry out online editing, audit, approval, publication and browsing, implementation process to new supervisory control of substation information table and circulate online;It can be realized monitoring information table version management, the version number of substation equipment monitoring information table be managed;It can be realized verification record management, interacted with real time data in regulation integral system, title, time inquiring and matching are carried out to Real-time Alarm information, SOE record etc.;It can be realized monitoring information table real-time check, obtain original plant stand or interval information and compared with new monitoring information table with verification is carried out.
Description
Technical field
The present invention relates to intelligent substation technical field, especially a kind of substation equipment monitoring information table side of check online
Method.
Background technique
With the continuous expansion of power grid scale, substation put into operation quantity increase, ground county integration construct pattern transformation, regulation
Integral system substation equipment monitoring information access scale expands rapidly, and the plant stand of access regulation integral system has covered confession
Each user in electric office, company, county tune pipe plant stand and power grid scope, power plant plant stand.After regulating and controlling integrated operational mode transformation,
Monitoring information need to meet Centralized Monitoring needs, and monitoring information covers substation equipment by original power grid basis monitoring and monitors.
Substation equipment monitoring information refer to for meet Centralized Monitoring need access regulation integral system substation one,
The monitoring of secondary device and ancillary equipment controls information, these monitoring informations form monitoring information table, and power supply enterprise need to be to monitoring
Information table, which is prepared and reviewed, checked and executed, achieves work.According to the difference of transformer substation voltage grade and number of devices, monitoring
Information is differed from thousands of to up to ten thousand.The work such as the establishment of monitoring information table, examination, check and verification archive are yet by manual type
It completes, inefficiency, while the problems such as there is also history release difficult managements.
For substation equipment monitoring information table in current regulation integral system in version, check, verification record management
There are problems that intricate operation repeats, is related to more professional, the subsequent integration of shortage technical support means and application in work, it is comprehensive
The management method for closing existing substation equipment monitoring information proposes a kind of online check method of substation equipment monitoring information table,
It establishes from monitoring information table establishment audit to the overall process technical support means for executing filing, is promoted and substation equipment is monitored
The management level of information improves the working efficiency of related operation maintenance personnel.
Summary of the invention
The purpose of the present invention is to provide a kind of online check methods of substation equipment monitoring information table, overcome aforementioned existing
Deficiency existing for technology, foundation is from monitoring information table establishment audit to the overall process technical support means for executing filing, promotion pair
In the management level of substation equipment monitoring information, the working efficiency of related operation maintenance personnel is improved.
The technical scheme adopted by the invention to solve the technical problem is that:
A kind of online check method of substation equipment monitoring information table, including version check, verification record management, real-time check,
Normative and integrality audits four parts;The version checks the version number that part proposes a kind of substation equipment monitoring information table
Method for edition management in generation method and system, the different editions for completing substation equipment monitoring information table are checked, and version is formed
Management information and check comparison information, including details diversity ratio pair and report;The verification record management part is by melting
Real time data in regulation integral system, Real-time Alarm information, SOE record are closed, title, time inquiring matching is carried out, forms electricity
Sonization verification record replaces papery verification record, realizes substation equipment monitoring information table verification record ordering and centralization
Management, and used for the integration of later data and support is provided;The real-time check part passes through in crawl regulation integral system
Real-time running data library information and monitoring information table carry out verification and compare, generate and check record report, regulation integration is provided
System and the inconsistent information of monitoring information table are modified for system operation maintenance personnel to be checked, the accuracy and work of staff are improved
Efficiency, realize for regulation integral system in monitoring information reversed check work, effectively improve information accuracy and can
The property used;Normative and integrality audit part utilizes the crucial monitoring that should include in monitoring information naming rule and interval
Rule information calls two methods by mandatory calling and selectivity, and formation is corresponding to check record, promotes the accurate of work
Property and working efficiency.
Preferably, the process that the version checks part includes the following steps:
A1, monitoring information version are checked: the new monitoring information table worked out, submitted is compared with original monitoring information table version,
Monitoring information table content alteration record is generated, and fixed value list process management and control platform is called to initiate auditing flow;
A2, monitoring information variation audit: including adjusting monitoring, automation, relay protection, the method for operation et al. in monitoring information review process
Member, wherein automation personnel chooses whether to be monitored signal auditing by other roles as needed, such as also needs other professions
It is audited, workflow is to other profession audits, and after the approval, system generates the version number of corresponding monitoring information table, and
Carry out Electronic Signature confirmation and archive;In the case where there is monitoring information to audit unacceptable situation, process return back to monitoring information without exception
Link is worked out, the monitoring information table regrouped reenters step A1.
Preferably, the process of the verification record management part includes the following steps:
B1, basis have completed the monitoring information table of audit, generate electronics verification record list;
Alarm and SOE information in B2, crawl regulation integral system, are compared with the monitoring information table that audit is completed,
And carry out title, time inquiring matching;
Electronic signature confirmation audit is carried out, electronic substation equipment monitoring information table verification record is formed.
Preferably, the process of the real-time check part includes the following steps:
C1, original plant stand or the monitoring information at interval in regulation integral system are obtained;
C2, real-time check is carried out for the substation equipment monitoring information table for completing to come into force, and generate change record in detail to say
Bright consistency detection situation;
C3, monitoring information check report is formed, is modified for system operation maintenance personnel and checks regulation integral system.
Preferably, the process of normative and integrality audit part includes the following steps:
D1, substation equipment monitoring information Naming conventions and integrity rule database are formed
D2, self study, and formation rule database are carried out to monitoring information hierarchical layered opinion;
D3, calling rule database are verified and are audited to the Naming conventions and integrality of monitoring information table;
D4, it provides and checks report, work out each link personnel for monitoring information table and check inspection.
The beneficial effects of the present invention are: compared with prior art, a kind of substation equipment monitoring information table of the invention exists
Line check method has the advantages that (1) can be realized the online editing of monitoring information table and audit publication, to new change
Monitoring power station information table carries out online editing, audit, approval, publication and browsing, implementation process and circulates online;(2) it can be realized
Monitoring information table version management is managed the version number of substation equipment monitoring information table, realizes the comparison of new and old edition
Check function;(3) it can be realized verification record management, interacted with real time data in regulation integral system, accused to real-time
Alert information, SOE record etc. carry out title, time inquiring and matching;It can be realized monitoring information table real-time check, obtain original factory
It stands or interval information is compared with new monitoring information table with verification is carried out, generate change record;(4) monitoring information rule be can be realized
Plasticity and integrity check check record using respective rule generation monitoring information for having access to one by one;(5) change is greatly improved
The working efficiency of power station end and dispatching automation main station side operation maintenance personnel reduces error rate, improves automation personnel and correlation
The lean of unit of fit operation management is horizontal.
Detailed description of the invention
Fig. 1 is that a kind of version of online check method of substation equipment monitoring information table of the invention checks process;
Fig. 2 is a kind of check and correction record management process of online check method of substation equipment monitoring information table of the invention;
Fig. 3 is a kind of real-time check process of online check method of substation equipment monitoring information table of the invention;
Fig. 4 is the normalization and integrity check stream of a kind of online check method of substation equipment monitoring information table of the invention
Journey.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.
In embodiment as shown in Figs 1-4, a kind of online check method of substation equipment monitoring information table, including version school
Core, verification record management, real-time check, normalization and integrality audit four parts;The version checks part and proposes a kind of change
Method for edition management in the version number's generation method and system of power station equipment monitoring information table completes substation equipment monitoring information
The different editions of table are checked, and are formed version management information and are checked comparison information, including details diversity ratio pair and report;Institute
Verification record management part is stated by real time data, Real-time Alarm information, SOE record in fusion regulation integral system, is carried out
Title, time inquiring matching form electronization verification record, replace papery verification record, realize substation equipment monitoring information
Table verification record ordering and centralized management, and used for the integration of later data and support is provided;The real-time check part
Verification is carried out with monitoring information table by the real-time running data library information in crawl regulation integral system to compare, and is generated and is checked
Record report, the inconsistent information for providing regulation integral system and monitoring information table modifies inspection for system operation maintenance personnel, real
Referring now to the reversed check work of monitoring information in regulation integral system;Normative and integrality audit part utilizes prison
The crucial monitoring information rule that should include in control information naming rule and interval calls two by mandatory calling and selectivity
Kind method forms corresponding check and records.
As shown in Figure 1, the process that the version checks part includes the following steps:
A1, monitoring information version are checked: the new monitoring information table worked out, submitted is compared with original monitoring information table version,
Monitoring information table content alteration record is generated, and fixed value list process management and control platform is called to initiate auditing flow;
A2, monitoring information variation audit: including adjusting monitoring, automation, relay protection, the method for operation et al. in monitoring information review process
Member, wherein automation personnel chooses whether to be monitored signal auditing by other roles as needed, such as also needs other professions
It is audited, workflow is to other profession audits, and after the approval, system generates the version number of corresponding monitoring information table, and
Carry out Electronic Signature confirmation and archive;In the case where there is monitoring information to audit unacceptable situation, process return back to monitoring information without exception
Link is worked out, the monitoring information table regrouped reenters step A1.
As shown in Fig. 2, the process of the verification record management part includes the following steps:
B1, basis have completed the monitoring information table of audit, generate electronics verification record list;
Alarm and SOE information in B2, crawl regulation integral system, are compared with the monitoring information table that audit is completed,
And carry out title, time inquiring matching;
B3, electronic signature confirmation audit is carried out, forms electronic substation equipment monitoring information table verification record.
As shown in figure 3, the process of the real-time check part includes the following steps:
C1, original plant stand or the monitoring information at interval in regulation integral system are obtained;
C2, real-time check is carried out for the substation equipment monitoring information table for completing to come into force, and generate change record in detail to say
Bright consistency detection situation;
C3, monitoring information check report is formed, is modified for system operation maintenance personnel and checks regulation integral system.
As shown in figure 4, the process of normative and integrality audit part includes the following steps:
D1, substation equipment monitoring information Naming conventions and integrity rule database are formed
D2, self study, and formation rule database are carried out to monitoring information hierarchical layered opinion;
D3, calling rule database are verified and are audited to the Naming conventions and integrality of monitoring information table;
D4, it provides and checks report, work out each link personnel for monitoring information table and check inspection.
Above-mentioned specific embodiment is only specific case of the invention, and scope of patent protection of the invention includes but is not limited to
The product form and style of above-mentioned specific embodiment, any claims of the present invention and any technical field of meeting
The appropriate changes or modifications that those of ordinary skill does it, all shall fall within the protection scope of the present invention.
Claims (5)
1. a kind of online check method of substation equipment monitoring information table, it is characterised in that: checked including version, verification record pipe
Reason, real-time check, normalization and integrality audit four parts;The version checks part and proposes a kind of substation equipment monitoring letter
Method for edition management in the version number's generation method and system of table is ceased, the different editions school of substation equipment monitoring information table is completed
Core forms version management information and checks comparison information, including details diversity ratio pair and report;The verification record management
Part carries out title, time inquiring by real time data, Real-time Alarm information, SOE record in fusion regulation integral system
Match, form electronization verification record, replace papery verification record, realizes the verification record ordering of substation equipment monitoring information table
It and is the integration of later data with providing support with centralized management;The real-time check part passes through crawl regulation one
Real-time running data library information in change system carries out verification with monitoring information table and compares, and generates and checks record report, provides tune
The inconsistent information for controlling integral system and monitoring information table modifies inspection for system operation maintenance personnel, realizes for regulation integration
The reversed check work of monitoring information in system;Described normative and integrality audit part using monitoring information naming rule and
The crucial monitoring information rule that should include in interval is called two methods by mandatory calling and selectivity, is formed corresponding
Check record.
2. a kind of online check method of substation equipment monitoring information table as described in claim 1, it is characterised in that: the version
The process of this check part includes the following steps:
A1, monitoring information version are checked: the new monitoring information table worked out, submitted is compared with original monitoring information table version,
Monitoring information table content alteration record is generated, and fixed value list process management and control platform is called to initiate auditing flow;
A2, monitoring information variation audit: including adjusting monitoring, automation, relay protection, the method for operation et al. in monitoring information review process
Member, wherein automation personnel chooses whether to be monitored signal auditing by other roles as needed, such as also needs other professions
It is audited, workflow is to other profession audits, and after the approval, system generates the version number of corresponding monitoring information table, and
Carry out Electronic Signature confirmation and archive;In the case where there is monitoring information to audit unacceptable situation, process return back to monitoring information without exception
Link is worked out, the monitoring information table regrouped reenters step A1.
3. a kind of online check method of substation equipment monitoring information table as described in claim 1, it is characterised in that: the core
The process of record management part is included the following steps:
B1, basis have completed the monitoring information table of audit, generate electronics verification record list;
Alarm and SOE information in B2, crawl regulation integral system, are compared with the monitoring information table that audit is completed,
And carry out title, time inquiring matching;
B3, electronic signature confirmation audit is carried out, forms electronic substation equipment monitoring information table verification record.
4. a kind of online check method of substation equipment monitoring information table as described in claim 1, it is characterised in that: the reality
The process of the part Shi Jiaohe includes the following steps:
C1, original plant stand or the monitoring information at interval in regulation integral system are obtained;
C2, real-time check is carried out for the substation equipment monitoring information table for completing to come into force, and generate change record in detail to say
Bright consistency detection situation;
C3, monitoring information check report is formed, is modified for system operation maintenance personnel and checks regulation integral system.
5. a kind of online check method of substation equipment monitoring information table as described in claim 1, it is characterised in that: the rule
Plasticity and the process of integrality audit part include the following steps:
D1, substation equipment monitoring information Naming conventions and integrity rule database are formed
D2, self study, and formation rule database are carried out to monitoring information hierarchical layered opinion;
D3, calling rule database are verified and are audited to the Naming conventions and integrality of monitoring information table;
D4, it provides and checks report, work out each link personnel for monitoring information table and check inspection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811553841.XA CN109657816A (en) | 2018-12-19 | 2018-12-19 | A kind of online check method of substation equipment monitoring information table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811553841.XA CN109657816A (en) | 2018-12-19 | 2018-12-19 | A kind of online check method of substation equipment monitoring information table |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109657816A true CN109657816A (en) | 2019-04-19 |
Family
ID=66114904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811553841.XA Pending CN109657816A (en) | 2018-12-19 | 2018-12-19 | A kind of online check method of substation equipment monitoring information table |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109657816A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110298585A (en) * | 2019-06-28 | 2019-10-01 | 云南电网有限责任公司昭通供电局 | A kind of substation equipment monitoring information hierarchical layered automatic auditing method |
CN110378809A (en) * | 2019-07-29 | 2019-10-25 | 国网河北省电力公司 | A kind of intelligent check method of supervisory control of substation information table information data |
CN110705906A (en) * | 2019-10-15 | 2020-01-17 | 广东电网有限责任公司 | Method and system for verifying monitoring information in EMS system |
CN111079284A (en) * | 2019-12-12 | 2020-04-28 | 北京中电普华信息技术有限公司 | Power grid global logic data model verification method, device, server and medium |
CN111369230A (en) * | 2020-04-07 | 2020-07-03 | 国家电网有限公司 | Constant-value one-key management and control system for substation automation equipment |
CN112149396A (en) * | 2020-09-29 | 2020-12-29 | 浙江中控技术股份有限公司 | Information processing method and device based on IO point |
CN113627156A (en) * | 2021-08-11 | 2021-11-09 | 湖北中巽泰科技有限公司 | System and method for auditing monitoring information table of transformer substation equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN108572983A (en) * | 2017-03-13 | 2018-09-25 | 国网辽宁省电力有限公司 | The intelligent prompt method of data inputting in a kind of supervisory control of substation information table generating process |
CN108985578A (en) * | 2018-06-26 | 2018-12-11 | 云南电网有限责任公司大理供电局 | A kind of automation of transformation substations information checking method and system |
-
2018
- 2018-12-19 CN CN201811553841.XA patent/CN109657816A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108572983A (en) * | 2017-03-13 | 2018-09-25 | 国网辽宁省电力有限公司 | The intelligent prompt method of data inputting in a kind of supervisory control of substation information table generating process |
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN108985578A (en) * | 2018-06-26 | 2018-12-11 | 云南电网有限责任公司大理供电局 | A kind of automation of transformation substations information checking method and system |
Non-Patent Citations (2)
Title |
---|
肖艳炜等: "变电站监控信息智能管控平台的研究与开发", 《电力安全技术》 * |
鲁华永等: "基于正则表达式的变电站集中监控信息解析方法", 《电力系统自动化》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110298585A (en) * | 2019-06-28 | 2019-10-01 | 云南电网有限责任公司昭通供电局 | A kind of substation equipment monitoring information hierarchical layered automatic auditing method |
CN110298585B (en) * | 2019-06-28 | 2024-01-26 | 云南电网有限责任公司昭通供电局 | Hierarchical automatic auditing method for monitoring information of substation equipment |
CN110378809A (en) * | 2019-07-29 | 2019-10-25 | 国网河北省电力公司 | A kind of intelligent check method of supervisory control of substation information table information data |
CN110705906A (en) * | 2019-10-15 | 2020-01-17 | 广东电网有限责任公司 | Method and system for verifying monitoring information in EMS system |
CN111079284A (en) * | 2019-12-12 | 2020-04-28 | 北京中电普华信息技术有限公司 | Power grid global logic data model verification method, device, server and medium |
CN111369230A (en) * | 2020-04-07 | 2020-07-03 | 国家电网有限公司 | Constant-value one-key management and control system for substation automation equipment |
CN112149396A (en) * | 2020-09-29 | 2020-12-29 | 浙江中控技术股份有限公司 | Information processing method and device based on IO point |
CN113627156A (en) * | 2021-08-11 | 2021-11-09 | 湖北中巽泰科技有限公司 | System and method for auditing monitoring information table of transformer substation equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109657816A (en) | A kind of online check method of substation equipment monitoring information table | |
CN109740837A (en) | Based on regulating and controlling integrated power grid and save ground network to issue an order and safe related function method | |
Liu et al. | Automatically updating maintenance information from a BIM database | |
CN102455698B (en) | Automatic control rate and stable rate monitoring system and monitoring method based on tree structure | |
CN112132443B (en) | Reliability distribution network power supply management and control system | |
CN109190777A (en) | A kind of Maintenance Schedule Optimization method that Multiple Time Scales are coordinated | |
CN108932589A (en) | A kind of IT application in enterprises project implementation management system | |
CN107169617A (en) | A kind of controller switching equipment state evaluation system | |
CN112633531A (en) | Wind power plant operation maintenance system | |
CN103177327A (en) | Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures | |
CN102567800A (en) | Decision-making modeling method for relay protection on-line condition based maintenance of power system | |
CN111967658A (en) | Comprehensive power failure analysis method based on marketing and distribution information integration platform | |
CN113283619A (en) | Power failure maintenance planning auxiliary method and system based on knowledge graph | |
CN115859688B (en) | Emergency handling method, terminal, platform and medium based on multistage simulation system | |
CN107169180A (en) | A kind of power grid regulation model center system of two-stage deployment | |
CN106991562A (en) | A kind of cost progress becomes more meticulous system | |
CN110738427A (en) | electric power part work quality scoring system | |
CN114372594A (en) | Distributed power supply comprehensive analysis and safety management and control system | |
CN111915048A (en) | Novel power failure management method based on intelligent analysis decision theory technology | |
CN104915523B (en) | A kind of regulation full-service unified modeling method based on time series | |
CN110942161B (en) | Method for improving power supply reliability based on business middle station | |
CN115049004A (en) | Power distribution network line loss management aid decision-making system based on multi-source data fusion | |
CN103166322A (en) | Monitoring method and system of under frequency load shedding device | |
CN106897525A (en) | The intellectualizing system platform and method of a kind of energy internet communication planning and designing | |
CN112270619A (en) | Intelligent lean overhaul management system for power transformation equipment based on big data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |