CN104133443A - Method for automatically generating power grid dispatching operation order through power grid overhaul application forms - Google Patents

Method for automatically generating power grid dispatching operation order through power grid overhaul application forms Download PDF

Info

Publication number
CN104133443A
CN104133443A CN201410358075.7A CN201410358075A CN104133443A CN 104133443 A CN104133443 A CN 104133443A CN 201410358075 A CN201410358075 A CN 201410358075A CN 104133443 A CN104133443 A CN 104133443A
Authority
CN
China
Prior art keywords
request slip
maintenance request
power grid
automatically
grouping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410358075.7A
Other languages
Chinese (zh)
Inventor
于磊
金言
刘伟
谢旭
穆亮
谷文旗
王双
王延平
孟玲梅
王永星
朱梅
侯科难
韩宇龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHANGJIAKOU POWER SUPPLY COMPANY STATE GRID JIBEI ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
ZHANGJIAKOU POWER SUPPLY COMPANY STATE GRID JIBEI ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAKOU POWER SUPPLY COMPANY STATE GRID JIBEI ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical ZHANGJIAKOU POWER SUPPLY COMPANY STATE GRID JIBEI ELECTRIC POWER Co Ltd
Priority to CN201410358075.7A priority Critical patent/CN104133443A/en
Publication of CN104133443A publication Critical patent/CN104133443A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for automatically generating a power grid dispatching operation order through power grid overhaul application forms. The method comprises the first step of obtaining the overhaul application forms and all pieces of state information of shutdown devices, the second step of automatically packaging and grouping the obtained overhaul application forms according to the power grid topological relation, the third step of combining and analyzing the content of the grouped overhaul application forms, the fourth step of simulating the final states of all the related devices, and the fifth step of automatically generating the operation order according to an analysis result and the states of the devices. By means of the method, a great part of current workload of a routine dispatcher can be automatically completed through a computer, so the workload of the dispatcher is substantially relieved, and the billing time is shortened.

Description

A kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip
Technical field
The present invention relates to power technology field, particularly relate to a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip.
Background technology
The formulation of operation order is one of important content of Power Grid Dispatching Work, has occupied a large amount of energy and time of Dispatchers on duty.Along with the continuous expansion of electrical network scale, number of devices becomes geometric growth, and maintenance workload multiplication makes to dispatch operator on duty and is busy with every day making out an invoice, and must take it for the time and efforts of monitoring and the analysis of power grid security, becomes power network safety operation hidden danger.Therefore a kind of method that, needs new automatic generation operation scheduling on transmission net of electric power.
Summary of the invention
The object of the present invention is to provide a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip, to realize the automatic generation of operation order, thereby alleviate Dispatchers on duty workload, make it save more energy for power grid security analysis, ensure power network safety operation.
Object of the present invention is achieved through the following technical solutions:
A kind of method that automatically generates operation scheduling on transmission net of electric power by grid maintenance request slip comprises the steps:
1) obtain the relevant information of overhauling request slip and stopping the equipment of using as a servant;
2) according to power network topology relation to obtaining the grouping of automatically packing of maintenance request slip;
3) the maintenance request slip after grouping is carried out to merging and the parsing of content;
4) simulating grid and relevant device state, generate the end-state of all relevant devices;
5) according to described analysis result and equipment state, automatic generating run ticket.
Further, in described step 1 each status information comprise stop using as a servant equipment end-state, plan on-stream time, plan completion date, postpone and extension information data.
Further, in described step 2, to obtaining automatically the pack condition of grouping of maintenance request slip, be: the one, the time should be at one time section (can manually set according to demand), the 2nd, the equipment in repair apparatus or safety practice possesses close topological connection relation (manually definition rule, for example, by the end of bus).
Further, in described step 3 to the maintenance request slip after grouping carry out the merging of content and parsing comprise be to after packing on the same group in the content of all maintenance request slips extract, decompose and merge, obtain operating the end-state of object and all relevant devices.
The invention has the advantages that:
In the inventive method, the processing procedure that generates operation scheduling on transmission net of electric power according to maintenance request slip is all completed automatically by computing machine, and thoroughly change originally can only be by the working method of artificial judgment.In the method, use the topological connection relation having between grid equipment to solve the key link that automatic packing grouping in maintenance request slip automatic generating run ticket process and request slip are resolved, thereby realize by maintenance request slip, automatically generated Dispatching.Automatically the method one that generates operation scheduling on transmission net of electric power by grid maintenance request slip provided by the present invention is to have realized the automatic generation of operation order according to service work, a large amount of ticket time and workloads write have been saved, the 2nd, realized electric network synthetic maintenance, the 3rd, realized anti-misoperation locking and closed loop management between maintenance application work and Dispatching work simultaneously.
The present invention can complete most workload of present Dispatchers on duty by computing machine automatically, significantly alleviates yardman's workload, and compression is made out an invoice the time.The present invention is applicable to power-management centres at different levels, transformer station and centralized control center.Therefore, the present invention has Practical significance and value very much.
Accompanying drawing explanation
Fig. 1 is for automatically being generated the process schematic diagram of operation scheduling on transmission net of electric power by grid maintenance request slip;
Fig. 2 is one group of equipment that typically possesses tight topological connection relation described in the embodiment of the present invention.
Embodiment
Below in conjunction with drawings and Examples, describe the specific embodiment of the present invention in detail.
As shown in Figure 1, a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip of the present invention, its method step is as follows:
(1) obtain stopping labour equipment, respectively stop using as a servant equipment end-state, plan on-stream time, plan completion date, postponing and the data such as extension information of maintenance request slip.In a maintenance application group, can comprise one or more maintenance request slips, and grouping information dynamically updates according to situations such as the postponing of maintenance request slip, extensions, if any renewal, can point out at operation order interface.
(2) the maintenance request slip grouping of automatically packing.Can make service work optimization process, reduce and repeat service work, reduce scheduled outage, realize so the comprehensive maintenance of grid equipment.
The grouping of maintenance request slip.The request slip that can assign to one group has two necessary conditions: 1) time coincide: the on-stream time/completion date of request slip is section at one time; 2) relevant device possesses topological connection relation closely: the equipment in repair apparatus or safety practice can arrange to overhaul together (such as the equipment such as circuit and circuit both sides switch, disconnecting link can be arranged in one group) on topological connection relation.
(3) parsing of maintenance request slip.Analyze the safety practice in maintenance request slip group, analyze main operation object and the end-state of relevant device.During the end-state of analytical equipment, consider that other go into operation, whether relate to these equipment in the safety practice of uncompleted request slip: such as this group request slip requires certain switch, turn cold standby, and other request slip require this switch to turn maintenance.The end-state of this switch just should be maintenance so, rather than cold standby.
(4) simulate the end-state of all relevant devices.According to request slip content, carry out the end-state of all relevant devices in comprehensive simulation electrical network, and carry out anti-error verification.
(5) automatic generating run ticket.According to the operation object parsing, and the original state of relevant device and end-state, according to scheduling term and code requirement, generate traffic order one by one, thereby automatically generate an operation order.
This method has obviously also comprised mutual safety check between maintenance request slip and Dispatching, for example service work is confirmed had a power failure operation and associated safety measure before starting, after service work finishes, just can carry out the power transmission operation of equipment, otherwise carry out alarm prompting.
Below in conjunction with accompanying drawing and instantiation, a kind of method that automatically generates operation scheduling on transmission net of electric power by grid maintenance request slip provided by the invention is elaborated.
1) as shown in Figure 2, dispatching center receives two maintenance request slips, and the task of a maintenance request slip is " XX circuit overhauls ", and an other maintenance request slip task is " line switching A overhauls ", by contrast, the planned time of these two maintenance request slips is on the same day.
2) system is obtained XX circuit by docking and is turned the relevant informations that maintenance and line switching A turn two maintenance request slips of maintenance, comprises the scope of repair, plan on-stream time, plans completion date, safety practice etc.
3) system judgement: XX line maintenance need to by line switching A and line switching B transfers cold standby state to by running status and at circuit side-by-side mounting ground wire, and line switching A maintenance need to transfer switch A to inspecting state by running status.
4) because the relevant devices of two maintenance applications on same link, so system is placed on same maintenance by two maintenance applications and stops labour grouping, task is that XX line maintenance is along band line switching A maintenance.
5) system is decomposed respectively and comprehensive merging the operation task of two maintenance applications, show that line switching A turns maintenance by operation, and line switching B turns cold standby by operation, and at line switching B side hanging ground-wire.So just generated the scheduling operation sequence of Dispatching.
6) system generates the scheduling operating command of standard, standard according to the requirement of scheduling standard.Carry out anti-misoperation check simultaneously, guarantee the correctness of nominal value order.
7) according to scheduling standard, add the preposition order of operational order, rearmounted order etc. and check order.
8) final, generate a complete scheduling power failure operation order.
9) same, after service work, according to complete report, can automatically resolve current electrical network mode, automatically generate power transmission operational order, and then generate a complete scheduling power transmission operation order.
Should be appreciated that the above detailed description of technical scheme of the present invention being carried out by preferred embodiment is illustrative and not restrictive.Those of ordinary skill in the art modifies reading the technical scheme that can record each embodiment on the basis of instructions of the present invention, or part technical characterictic is wherein equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (4)

1. by grid maintenance request slip, automatically generated a method for operation scheduling on transmission net of electric power, it is characterized in that, the method comprises the steps:
1) obtain the relevant information of overhauling request slip and stopping the equipment of using as a servant;
2) according to power network topology relation to obtaining the grouping of automatically packing of maintenance request slip;
3) the maintenance request slip after grouping is carried out to merging and the parsing of content;
4) simulating grid and relevant device state, generate the end-state of all relevant devices;
5) according to described analysis result and equipment state, automatic generating run ticket.
2. a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip according to claim 1, is characterized in that, in described step 1, relevant information comprises on-stream time, completion date, the scope of repair and postpones and extension information data.
3. a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip according to claim 1, it is characterized in that, in described step 2, to obtaining automatically the pack condition of grouping of maintenance request slip, be: the time should be at one time section, the equipment in repair apparatus or safety practice should possess close topological connection relation.
4. a kind of method that is automatically generated operation scheduling on transmission net of electric power by grid maintenance request slip according to claim 1, it is characterized in that, in described step 3 to the maintenance request slip after grouping carry out the merging of content and parsing comprise be to after packing on the same group in the content of all maintenance request slips extract, decompose and merge, obtain operating the end-state of object and all relevant devices.
CN201410358075.7A 2014-07-25 2014-07-25 Method for automatically generating power grid dispatching operation order through power grid overhaul application forms Pending CN104133443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410358075.7A CN104133443A (en) 2014-07-25 2014-07-25 Method for automatically generating power grid dispatching operation order through power grid overhaul application forms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410358075.7A CN104133443A (en) 2014-07-25 2014-07-25 Method for automatically generating power grid dispatching operation order through power grid overhaul application forms

Publications (1)

Publication Number Publication Date
CN104133443A true CN104133443A (en) 2014-11-05

Family

ID=51806162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410358075.7A Pending CN104133443A (en) 2014-07-25 2014-07-25 Method for automatically generating power grid dispatching operation order through power grid overhaul application forms

Country Status (1)

Country Link
CN (1) CN104133443A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427039A (en) * 2015-05-22 2016-03-23 国网青海省电力公司西宁供电公司 Efficient processing method of distribution network repair work orders based on responsibility areas
CN105894172A (en) * 2015-11-17 2016-08-24 国家电网公司 Joint outage judging method based on marketing and distribution fusion
CN108011312A (en) * 2017-10-30 2018-05-08 镇江千月广告传媒有限公司 A kind of automatic method for drafting maintenance step for AC network
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task
CN108985468A (en) * 2018-06-27 2018-12-11 中国南方电网有限责任公司 A method of the single intelligence of association maintenance generates operation order
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system
CN109728645A (en) * 2018-12-17 2019-05-07 深圳供电局有限公司 Power dispatching anti-misoperation method and system
CN110796390A (en) * 2019-11-08 2020-02-14 云南电网有限责任公司昆明供电局 Distribution network maintenance, production and live working application fusion system based on dynamic model
CN110852697A (en) * 2019-10-08 2020-02-28 国家电网有限公司 Automatic generating system for switching operation ticket of transformer substation
CN111062191A (en) * 2019-12-16 2020-04-24 国网浙江台州市黄岩区供电有限公司 Operation ticket generation method and device for power grid
CN111340253A (en) * 2020-02-17 2020-06-26 国网山东省电力公司东营供电公司 Main network maintenance request form analysis method and system
CN112001602A (en) * 2020-08-03 2020-11-27 国网山东省电力公司安丘市供电公司 Power grid operation ticket generation method, system, terminal and storage medium
CN112183977A (en) * 2020-09-18 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent generation method and equipment for power grid dispatching outage operation ticket
CN112182208A (en) * 2020-09-22 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent binding method for power grid maintenance application form
CN112184152A (en) * 2020-09-18 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent generation method and equipment for power grid dispatching and decommissioning operation ticket
CN112541601A (en) * 2020-12-14 2021-03-23 深圳供电局有限公司 Application form generation method and device, computer equipment and storage medium
CN113867287A (en) * 2021-09-28 2021-12-31 浙江华章科技有限公司 Industrial data acquisition method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102169570A (en) * 2011-05-12 2011-08-31 东北电力大学 Two tickets combined inference billing method of power grid based on work task analysis
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102169570A (en) * 2011-05-12 2011-08-31 东北电力大学 Two tickets combined inference billing method of power grid based on work task analysis
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈长清等: "基于图形平台的电网调度运行系统设计与实现", 《电力系统及其自动化学报》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427039A (en) * 2015-05-22 2016-03-23 国网青海省电力公司西宁供电公司 Efficient processing method of distribution network repair work orders based on responsibility areas
CN105894172A (en) * 2015-11-17 2016-08-24 国家电网公司 Joint outage judging method based on marketing and distribution fusion
CN108011312A (en) * 2017-10-30 2018-05-08 镇江千月广告传媒有限公司 A kind of automatic method for drafting maintenance step for AC network
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task
CN108985468A (en) * 2018-06-27 2018-12-11 中国南方电网有限责任公司 A method of the single intelligence of association maintenance generates operation order
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system
CN109728645A (en) * 2018-12-17 2019-05-07 深圳供电局有限公司 Power dispatching anti-misoperation method and system
CN110852697A (en) * 2019-10-08 2020-02-28 国家电网有限公司 Automatic generating system for switching operation ticket of transformer substation
CN110796390A (en) * 2019-11-08 2020-02-14 云南电网有限责任公司昆明供电局 Distribution network maintenance, production and live working application fusion system based on dynamic model
CN111062191A (en) * 2019-12-16 2020-04-24 国网浙江台州市黄岩区供电有限公司 Operation ticket generation method and device for power grid
CN111340253A (en) * 2020-02-17 2020-06-26 国网山东省电力公司东营供电公司 Main network maintenance request form analysis method and system
CN111340253B (en) * 2020-02-17 2023-12-29 国网山东省电力公司东营供电公司 Analysis method and system for main network maintenance application form
CN112001602A (en) * 2020-08-03 2020-11-27 国网山东省电力公司安丘市供电公司 Power grid operation ticket generation method, system, terminal and storage medium
CN112183977A (en) * 2020-09-18 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent generation method and equipment for power grid dispatching outage operation ticket
CN112184152A (en) * 2020-09-18 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent generation method and equipment for power grid dispatching and decommissioning operation ticket
CN112182208A (en) * 2020-09-22 2021-01-05 国网福建省电力有限公司龙岩供电公司 Intelligent binding method for power grid maintenance application form
CN112182208B (en) * 2020-09-22 2022-09-16 国网福建省电力有限公司龙岩供电公司 Intelligent binding method for power grid maintenance application form
CN112541601A (en) * 2020-12-14 2021-03-23 深圳供电局有限公司 Application form generation method and device, computer equipment and storage medium
CN113867287A (en) * 2021-09-28 2021-12-31 浙江华章科技有限公司 Industrial data acquisition method and system
CN113867287B (en) * 2021-09-28 2023-12-05 浙江华章科技有限公司 Industrial data acquisition method and system

Similar Documents

Publication Publication Date Title
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN108736465B (en) Future-state power grid model construction method and device
CN101436790B (en) On-line splicing and coalition method for electric network model containing complex T connection line
CN107180314B (en) Operation and maintenance business model modeling method based on primary and secondary system incidence relation
CN104678960A (en) Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training
CN111160795B (en) Management system and method for distribution network pattern abnormal operation and power failure lean assessment
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN104269934B (en) Based on the supervisory control of substation information adjustment method of moving analog scheduling station
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN109510314B (en) Method for scheduling interaction between intelligent command DICP system and inspection robot system
CN108171362A (en) Power supply facilities breakdown repair method, system and terminal device
CN105447175A (en) Power grid model sharing method applicable to distributed computation of power system
CN103065269A (en) Marketing and distribution main data management system
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN104156230A (en) Automatic red and black figure implementation method based on debug system data objectification
CN109840675B (en) Intelligent power transfer application system and method in power distribution network fault state
CN107391617A (en) Model method is led based on monitoring system automatically
CN107766949A (en) Failure rapid rush-repair commander's business information exchange method based on meta-model
CN116227964A (en) Data asset management optimization method, system and equipment
CN106655176B (en) Power distribution network online loop closing decision method and system
CN107122834B (en) Intelligent order dispatching system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141105

RJ01 Rejection of invention patent application after publication