CN104678962B - A kind of electric power first-aid operation safe monitoring system and the operational method based on the system - Google Patents

A kind of electric power first-aid operation safe monitoring system and the operational method based on the system Download PDF

Info

Publication number
CN104678962B
CN104678962B CN201510053010.6A CN201510053010A CN104678962B CN 104678962 B CN104678962 B CN 104678962B CN 201510053010 A CN201510053010 A CN 201510053010A CN 104678962 B CN104678962 B CN 104678962B
Authority
CN
China
Prior art keywords
site
maintenance
terminal
safety
internet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510053010.6A
Other languages
Chinese (zh)
Other versions
CN104678962A (en
Inventor
梁敏
袁毅
肖建华
杨应坤
杨槐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianzhu Power Supply Administration
Original Assignee
Tianzhu Power Supply Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianzhu Power Supply Administration filed Critical Tianzhu Power Supply Administration
Priority to CN201510053010.6A priority Critical patent/CN104678962B/en
Publication of CN104678962A publication Critical patent/CN104678962A/en
Application granted granted Critical
Publication of CN104678962B publication Critical patent/CN104678962B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Abstract

The invention discloses a kind of electric power first-aid operation safe monitoring system and the operational method based on the system, belong to distribution system maintenance technique field, including remote terminal, signal receives tower, server, Internet, power supply module, safety supervision module, control centre, raw skill center and some on-site terminals, the on-site terminal and remote terminal wireless connection, connected between remote terminal and server by wireless signal, the data that server receives are respectively transmitted to power supply module through Internet, safety supervision equipment, control centre and raw skill center, power supply module, safety supervision module, horizontal information sharing can be achieved between control centre and raw skill center or mutually pass, and instruction can be assigned to on-site terminal, just sentenced by failure, staff dispatches, the steps such as maintenance implement operation.The technical program whole maintenance flow standardization, procedure, list, has reached the live management and control of reinforcement, has eliminated the effect of site safety hidden danger by implementing closed loop management.

Description

A kind of electric power first-aid operation safe monitoring system and the operational method based on the system
Technical field
The invention belongs to distribution system maintenance technique field, is related to distribution maintenance safe practice, more particularly, to a kind of electricity Power rushes to repair operation safe monitoring system and the operational method based on the system.
Background technology
In the work of power network distribution, safe operation management is always particularly significant, particularly County Power Plant distribution safety In management control process, managerial weak link also be present, summarize reason, mainly there are these points:First, first-line staff pacifies Full production consciousness is not strong, lacks most basic Safety and sense of self-protection, ignores rules and regulations, has order more than, exists Habituation behavior violating the regulations;Second, the live unreachable position of rules and regulations, live management and control measures fail really to land, cause to manage With actual serious disconnection;Third, repair personnel is poor to the using effect of related list in operation field, exist perform a task perfunctorily, thing The behavior such as fill out is mended afterwards;Fourth, the production information resource such as safety supervision department, production division, scheduling, each power supply station can not in management system It is shared, the problem of restriction in production safety management work.Above mentioned problem brings certain to the operating personnel in the course of work Potential safety hazard, therefore, in addition to improve and perfect management system, bursting tube is carried out to a line operating personnel by technological means Control is very necessary.
The content of the invention
In order to solve the above problems, the invention provides a kind of electric power first-aid operation safe monitoring system and based on the system Operational method, reached the effect of preferable Automatic dispatching and security monitoring.
The present invention is achieved by following technical solution.
A kind of electric power first-aid operation safe monitoring system, including remote terminal, signal receive tower, server, Internet, Power supply module, safety supervision module, control centre, raw skill center and some on-site terminals, the on-site terminal and remote terminal without Line connects, and is connected between remote terminal and server by wireless signal, the data that server receives pass respectively through Internet It is defeated to arrive power supply module, safety supervision equipment, control centre and raw skill center, the power supply module, safety supervision module, control centre and raw skill Horizontal information sharing can be achieved between center or mutually pass, and instruction can be assigned to on-site terminal.
Further, the wireless signal is 3G or 4G wireless network signals.
Further, the on-site terminal for installation failure detection sensor at the scene and possess signal receive, on Pass, the mobile terminal or smart mobile phone of display function.
Further, the on-site terminal, which provides, takes pictures and camera function, implements on-site supervision for safety supervision module.
Further, the on-site terminal can pass through Internet inside 3G or 4G network connections.
A kind of operational method based on electric power first-aid operation safe monitoring system, its job step are:
1) failure prejudges:On-site terminal receives the fault-signal that on-site terminal detects, fault-signal passes through wireless signal Server and Internet are respectively transmitted to, power supply module, safety supervision module, control centre, life are assigned to simultaneously through Internet Skill center, safety supervision module carry out failure anticipation, and will the raw skill center of anticipation failure transmission;
2) staff dispatches:Maintenance program is worked out at raw skill center, and maintenance program is sent into control centre, control centre Scheduling human hand is sent to on-site terminal to site examining and repairing, while by maintenance program;
3) safety prepares:Maintainer carries out maintenance preparation and safety prepares, and the instrument of getting goes to scene, and maintainer is led to Cross on-site terminal and call distribution rush repair job note, and prepare one by one by repairing field requirement and choose risk control measure, Safe preparation before fulfiling assignment;
4) overhaul:If prejudging, failure is correct, and maintenance process is held fully according to on-site terminal distribution rush repair job note OK, and by operation field take pictures and upload onto the server and Internet, for achieving and checking;If prejudging bug, need Carry out that failure reported into raw skill center through on-site terminal after site inspection, raw skill center is worked out after maintenance program again through adjusting again Maintenance instructions are issued in degree center to on-site terminal, and maintenance personal re-executes new peace according to new distribution rush repair job note Full measure and maintenance instructions;
5) work termination:After the completion of maintenance or repairing, safety measure, floor photo, by wireless signal are removed Remote terminal is passed, is sent in server and achieves, while control centre, safety supervision module, power supply module are uploaded to through Internet With raw skill center, confirm that work is completed, no leftover problem, filled in by on-site terminal at distribution rush repair job note and failure Reason situation;Trouble point, safety measure arrangement situation in safety supervision module checks repairing operation process, operation process picture, distribution Rush repair job note fills in situation and troubleshooting situation, confirms no leftover problem, repair information filing, work termination.
Further, in the maintenance step, if involved failure belongs to non-low pressure family table class, need to by power supply module according to The maintenance program at raw skill center can be implemented to rush to repair after implementing power-off, and complete instruction rear in the work for receiving on-site terminal Power transmission can be restarted.
The beneficial effects of the invention are as follows:
A kind of electric power first-aid operation safe monitoring system of the present invention and the operational method based on the system, pass through frame If server, fire wall, using Internet technologies, maintenance personal can by 3G or 4G networks to the phase of each task inside the Pass Hold real-time communication, wireless 3G or 4G nets can be passed through to the photo site or video of environment after environment before repairing operation and repairing operation Network is uploaded to server archive, is easy to inquire about afterwards, by security management and control straight cutting operation field, to operation field add one it is hidden The safety monitoring system of shape, having reached ensures maintenance personal's strict safety code, forms and abides by chapter custom, improves in maintenance Safety and sense of self-protection, the effect to eliminate safe hidden trouble, a reality is built for production safety management work When, controllable, efficient management platform.
Field service personnel's strict implement maintenance program, and real-time communication are supervised, maintenance program is adjusted flexibly, improves scene The uniformity and maintenance efficiency of management and control;, can scene completion maintenance report after the completion of maintenance by Maintenance Table Of Distribution Augmentation single electron and standardization And upload, unified form, improve ageing, convenient archive and inquiry;Each parallel inter-sectional information resources share is realized, improves association Mediation communication efficiency, implements closed loop management, whole maintenance flow standardization, procedure, list, so as to alleviate production line The work load of personnel.
Brief description of the drawings
Fig. 1 is the safety monitoring system structural representation in the present invention;
Fig. 2 is the operation process chart based on safety monitoring system in the present invention;
Fig. 3 is the effect structure figure that the present invention is applied in management.
Embodiment
Technical scheme is further described below in conjunction with the accompanying drawings, but claimed scope is not limited to institute State.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of electric power first-aid operation safe monitoring system of the present invention, including it is long-range whole End, signal receive tower, server, Internet, power supply module, safety supervision module, control centre, raw skill center and some scenes Terminal, the on-site terminal and remote terminal wireless connection, are connected, server between remote terminal and server by wireless signal The data received are respectively transmitted to power supply module, safety supervision equipment, control centre and raw skill center, the power supply through Internet Horizontal information sharing can be achieved between module, safety supervision module, control centre and raw skill center or mutually pass, and can be to on-site terminal Assign instruction.
The wireless signal is 3G or 4G wireless network signals, to realize that remote signal is transmitted.
The on-site terminal is the failure detection sensor installed at the scene and possesses signal reception, uploads, display work( The mobile terminal or smart mobile phone or PAD or portable PC of energy, to realize the long-range function of sending information and data.
The on-site terminal offer is taken pictures and camera function, to provide the contrast photo or video money before and after trouble shooting Material, implement on-site supervision for safety supervision module.
The on-site terminal can by Internet inside 3G or 4G network connections, with realize data upload in real time, data The function such as lookup and system update.
A kind of operational method based on electric power first-aid operation safe monitoring system, its step are:
1) failure prejudges:On-site terminal receives the fault-signal that on-site terminal detects, fault-signal passes through wireless signal Server and Internet are respectively transmitted to, power supply module, safety supervision module, control centre, life are assigned to simultaneously through Internet Skill center, safety supervision module carry out failure anticipation, and will the raw skill center of anticipation failure transmission;
2) staff dispatches:Maintenance program is worked out at raw skill center, and maintenance program is sent into control centre, control centre Scheduling human hand is sent to on-site terminal to site examining and repairing, while by maintenance program;
3) safety prepares:Maintainer carries out maintenance preparation and safety prepares, and the instrument of getting goes to scene, and maintainer is led to Cross on-site terminal and call distribution rush repair job note, and prepare one by one by repairing field requirement and choose risk control measure, Safe preparation before fulfiling assignment;
4) overhaul:If prejudging, failure is correct, and maintenance process is held fully according to on-site terminal distribution rush repair job note OK, and by operation field take pictures and upload onto the server and Internet, for achieving and checking;If prejudging bug, need Carry out that failure reported into raw skill center through on-site terminal after site inspection, raw skill center is worked out after maintenance program again through adjusting again Maintenance instructions are issued in degree center to on-site terminal, and maintenance personal re-executes new peace according to new distribution rush repair job note Full measure and maintenance instructions;
5) work termination:After the completion of maintenance or repairing, safety measure, floor photo, by wireless signal are removed Remote terminal is passed, is sent in server and achieves, while control centre, safety supervision module, power supply module are uploaded to through Internet With raw skill center, confirm that work is completed, no leftover problem, filled in by on-site terminal at distribution rush repair job note and failure Reason situation;Trouble point, safety measure arrangement situation in safety supervision module checks repairing operation process, operation process picture, distribution Rush repair job note fills in situation and troubleshooting situation, confirms no leftover problem, repair information filing, work termination.
, need to be by power supply module according to raw skill center if involved failure belongs to non-low pressure family table class in the maintenance step Maintenance program implement power-off after can implement to rush to repair, and can restart and send after instruction is completed in the work for receiving on-site terminal Electricity, to ensure Field Force's personal safety.
Embodiment one
Low pressure family table is safeguarded
Scene is broken down, and control centre's seat personnel is connected to user's repair call, or remote terminal reception to it is live eventually Hold the fault-signal sent, remote terminal or seat personnel by 3G or 4G signals by information be separately sent to master server and Internet, fault-signal are delivered to safety supervision module, control centre and raw skill center by Internet respectively;Safety supervision module is entered Row failure prejudges, and will the raw skill center of anticipation failure feedback;Maintenance program is formulated at raw skill center, by maintenance program feedback scheduling The heart, control centre are sent to on-site terminal according to anticipation failure scheduling human hand to site examining and repairing, and by maintenance program;Maintainer Maintenance is carried out after being connected to instruction and safety prepares, and instrument is got according to anticipation failure and goes to scene, shoots fault in-situ photo, Distribution rush repair job note is called by on-site terminal, and prepares and choose risk control to arrange one by one by repairing field requirement Apply, safe preparation before fulfiling assignment.
If it is correct to prejudge failure, directly performed according to on-site terminal distribution rush repair job note maintenance program, maintenance After the completion of remove safety measure, floor photo, and remote terminal is uploaded to by on-site terminal, is sent to server and deposits Shelves, while feed back to power supply module, safety supervision module, control centre and raw skill center respectively through Internet, confirm that work is completed, Without leftover problem, distribution rush repair job note and troubleshooting situation are filled in by on-site terminal;Safety supervision module checks are rushed to repair Trouble point in operation process, safety measure arrangement situation, operation process picture, distribution rush repair job note fill in situation and Troubleshooting situation, confirm no leftover problem, repair information is filed, fault clearance, and maintenance personal gives back instrument, work termination.
If prejudging bug, judged by maintenance personal scene, and failure is uploaded into raw skill center through on-site terminal, by Maintenance program and feedback scheduling center are drafted in raw skill center again, and new command is assigned according to failure to on-site terminal by control centre, And scheduling maintenance personnel again, maintenance personal change or applied for another after receiving new command instrument, the scene of again returning to is repaired, New safety measure and maintenance instructions are re-executed according to new distribution rush repair job note;Safety is removed after the completion of maintenance to arrange Apply, floor photo, and remote terminal is uploaded to by on-site terminal, be sent to server archive, while through Internet Power supply module, safety supervision module, control centre and raw skill center are fed back to respectively, confirm that work is completed, no leftover problem, by existing Field terminal fills in distribution rush repair job note and troubleshooting situation;Failure in safety supervision module checks repairing operation process Point, safety measure arrangement situation, operation process picture, distribution rush repair job note fill in situation and troubleshooting situation, really Recognize no leftover problem, repair information is filed, fault clearance, and maintenance personal gives back instrument, work termination.
Embodiment two
Rush to repair operation
Scene is broken down, and control centre's seat personnel is connected to user's repair call, or remote terminal reception to it is live eventually Hold the fault-signal sent, remote terminal or seat personnel by 3G or 4G signals by information be separately sent to master server and Internet, fault-signal are delivered to power supply module, safety supervision module, control centre and raw skill center by Internet respectively; Safety supervision module carries out failure anticipation, and will the raw skill center of anticipation failure feedback;Formulate Rush Repair Scheme and feedback scheduling in raw skill center Center, control centre communicates information to power supply module according to anticipation failure and maintenance program, while Rush Repair Scheme is sent to On-site terminal, power supply module control the power supply of temporary transient outage area power grid, and by feedback of the information safety supervision module and control centre, Human hand is dispatched to scene rush to repair in control centre;Maintenance personal receive instruction after carry out repairing and safety prepare, and according to anticipation therefore Barrier gets instrument and goes to scene, shoots fault in-situ photo, shoots fault in-situ photo, calls distribution urgent by on-site terminal Job note is rushed to repair, and prepares one by one by repairing field requirement and chooses risk control measure, safe preparation before fulfiling assignment.
If it is correct to prejudge failure, directly enter to rob according to the Rush Repair Scheme of on-site terminal distribution rush repair job note Repair, safety measure, floor photo are removed after the completion of repairing, and remote terminal is uploaded to by on-site terminal, be sent to clothes Business device achieves, while feeds back to power supply module, safety supervision module, control centre and raw skill center respectively through Internet, confirms work Complete, no leftover problem, distribution rush repair job note and troubleshooting situation are filled in by on-site terminal;Safety supervision module core Trouble point in repairing operation process, safety measure arrangement situation, operation process picture, distribution rush repair job note are filled in Situation and troubleshooting situation, confirm no leftover problem, repair information filing, and fault clearance, maintenance personal gives back instrument, worked Power supply is restarted in termination, power supply module control.
If prejudging bug, judged by maintenance personal scene, and failure is uploaded into raw skill center through on-site terminal, by Maintenance program and feedback scheduling center are drafted in raw skill center again, and new command is assigned according to failure to on-site terminal by control centre, And scheduling maintenance personnel again, maintenance personal change or applied for another after receiving new command instrument, the scene of again returning to is rushed to repair, New safety measure and maintenance instructions are re-executed according to new distribution rush repair job note;Safety is removed after the completion of repairing to arrange Apply, floor photo, and remote terminal is uploaded to by on-site terminal, be sent to server archive, while through Internet Power supply module, safety supervision module, control centre and raw skill center are fed back to respectively, confirm that work is completed, no leftover problem, by existing Field terminal fills in distribution rush repair job note and troubleshooting situation;Failure in safety supervision module checks repairing operation process Point, safety measure arrangement situation, operation process picture, distribution rush repair job note fill in situation and troubleshooting situation, really Recognize no leftover problem, repair information is filed, fault clearance, and maintenance personal gives back instrument, work termination, and power supply module control is restarted Power supply.
By the technical program, from being connected to repairing task, site inspection situation, Analysis about Dangerous Point and risk control, scheduling License, site safety measure execution, first-aid repair construction promote produced on-site personnel rigid until end-of-job overall process monitors in real time Perform and workflow and fill in list, realize closed loop management, the whole maintenance flow of specification.

Claims (1)

1. a kind of operational method based on electric power first-aid operation safe monitoring system, the electric power first-aid operation safe monitoring system Including remote terminal, signal receive tower, server, Internet, power supply module, safety supervision module, control centre, raw skill center with And some on-site terminals, the on-site terminal and remote terminal wireless connection, between remote terminal and server by 3G or 4G without Line network signal is connected, and the data that server receives are respectively transmitted in power supply module, safety supervision equipment, scheduling through Internet The heart and raw skill center, can be achieved between the power supply module, safety supervision module, control centre and raw skill center horizontal information sharing or Mutually pass, and instruction can be assigned to on-site terminal;Failure detection sensor and tool of the on-site terminal for installation at the scene Standby signal is received, uploaded, the mobile terminal or smart mobile phone of display function, there is provided takes pictures and camera function, it is real for safety supervision module On-site supervision is applied, and Internet inside 3G or 4G network connections can be passed through;
Characterized in that, the above-mentioned operational method based on electric power first-aid operation safe monitoring system, its step are:
1) failure prejudges:On-site terminal receives the fault-signal that on-site terminal detects, fault-signal is distinguished by wireless signal Server and Internet are sent to, is assigned to simultaneously through Internet in power supply module, safety supervision module, control centre, raw skill The heart, safety supervision module carry out failure anticipation, and will the raw skill center of anticipation failure transmission;
2) staff dispatches:Maintenance program is worked out at raw skill center, and maintenance program is sent into control centre, control centre's scheduling Human hand is sent to on-site terminal to site examining and repairing, while by maintenance program;
3) safety prepares:Maintainer carries out maintenance preparation and safety prepares, and the instrument of getting goes to scene, and maintainer passes through existing Field terminal calls distribution rush repair job note, and prepares one by one by repairing field requirement and choose risk control measure, completes Safe preparation before operation;
4) overhaul:If it is correct to prejudge failure, maintenance process performs fully according to on-site terminal distribution rush repair job note, and Operation field is taken pictures and uploaded onto the server and Internet, for achieving and checking;If prejudging bug, need to be showed Failure is reported into raw skill center through on-site terminal after checking, scheduled center again is worked out after maintenance program at raw skill center again Maintenance instructions are issued to on-site terminal, maintenance personal re-executes new safety measure according to new distribution rush repair job note And maintenance instructions;, need to be real according to the maintenance program at raw skill center by power supply module if involved failure belongs to non-low pressure family table class It can implement to rush to repair after applying power-off, and can restart power transmission after instruction is completed in the work for receiving on-site terminal;
5) work termination:After the completion of maintenance or repairing, safety measure is removed, floor photo, is uploaded by wireless signal remote Journey terminal, is sent in server and achieves, while uploads to control centre, safety supervision module, power supply module and life through Internet Skill center, confirm that work is completed, no leftover problem, distribution rush repair job note and troubleshooting feelings are filled in by on-site terminal Condition;Trouble point, safety measure arrangement situation in safety supervision module checks repairing operation process, operation process picture, distribution are urgent Repairing job note fills in situation and troubleshooting situation, confirms no leftover problem, repair information filing, work termination.
CN201510053010.6A 2015-02-02 2015-02-02 A kind of electric power first-aid operation safe monitoring system and the operational method based on the system Expired - Fee Related CN104678962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510053010.6A CN104678962B (en) 2015-02-02 2015-02-02 A kind of electric power first-aid operation safe monitoring system and the operational method based on the system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510053010.6A CN104678962B (en) 2015-02-02 2015-02-02 A kind of electric power first-aid operation safe monitoring system and the operational method based on the system

Publications (2)

Publication Number Publication Date
CN104678962A CN104678962A (en) 2015-06-03
CN104678962B true CN104678962B (en) 2018-03-20

Family

ID=53314193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510053010.6A Expired - Fee Related CN104678962B (en) 2015-02-02 2015-02-02 A kind of electric power first-aid operation safe monitoring system and the operational method based on the system

Country Status (1)

Country Link
CN (1) CN104678962B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106027983A (en) * 2016-06-24 2016-10-12 国网安徽省电力公司黄山供电公司 Method for monitoring, maintaining and managing grid lines
CN106326991A (en) * 2016-09-06 2017-01-11 西安华瑞网电设备有限公司 User power distribution and utilization system flexible rush repair service platform and method based on Internet +
CN106447531A (en) * 2016-09-09 2017-02-22 国家电网公司 Communication operation method
CN107037766A (en) * 2017-04-05 2017-08-11 西北工业大学 A kind of solar collector monitoring system
CN107390087A (en) * 2017-07-12 2017-11-24 国网青海省电力公司海南供电公司 Platform is supported in a kind of power network repairing operation
CN107578109A (en) * 2017-08-31 2018-01-12 成都英孚克斯科技有限公司 A kind of monitoring station maintaining method of standard
CN108171346B (en) * 2018-01-25 2022-03-29 中广核核电运营有限公司 Method and device for processing instrument control maintenance data of nuclear power plant and computer equipment
CN108394844A (en) * 2018-03-02 2018-08-14 国网山东省电力公司泗水县供电公司 A kind of multifunction power repairing platform
CN109299855B (en) * 2018-08-24 2021-08-20 国网天津市电力公司 Power information communication scheduling system and scheduling method thereof
CN109450090B (en) * 2018-11-14 2022-03-15 遵义华正电缆桥架有限公司 Lack department operation safety protection system
CN111083207A (en) * 2019-12-03 2020-04-28 国家电网有限公司 System and method for emergency repair scheduling based on ubiquitous power Internet of things
CN112162531B (en) * 2020-08-27 2021-09-10 南京市晨枭软件技术有限公司 Industrial system process monitoring and adjusting system based on Internet of things
CN113435724A (en) * 2021-06-18 2021-09-24 云南电网有限责任公司临沧供电局 System and method for remote monitoring and management of distribution network operation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102495549A (en) * 2011-11-22 2012-06-13 中联重科股份有限公司 Remote maintenance decision system of engineering machinery and method thereof
CN102708674A (en) * 2012-04-28 2012-10-03 深圳市领华卫通数码科技有限公司 Method and system of vehicle intelligent services
CN203278198U (en) * 2013-05-08 2013-11-06 青岛数能电气工程有限公司 Motor fault predetermination protective device

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081399B (en) * 2011-01-24 2013-02-20 深圳市赛远自动化系统有限公司 Remote monitoring maintenance method and system based on 3G and wind-solar complementary power supply technology
CN102376147A (en) * 2011-11-07 2012-03-14 天津银箭科技有限公司 Electric power security monitoring and commanding system
KR101263244B1 (en) * 2011-11-14 2013-05-16 (주)아이블포토닉스 Off-site safety surveilance system in electric power network or utilities
CN103490523B (en) * 2011-12-04 2015-05-13 江苏省电力公司南京供电公司 Intelligent power distribution network fault treatment system
CN103389690B (en) * 2012-05-08 2015-09-02 邬彬 Supervisory system, Monitor And Control Subsystem, monitor node equipment, control center's equipment
CN102968101A (en) * 2012-11-08 2013-03-13 合肥工大高科信息科技股份有限公司 Mine multiple-system linkage control system based on imaging and control method thereof
CN103886511A (en) * 2012-12-19 2014-06-25 重庆市电力公司南岸供电局 Real-time command system for power distribution network fault repair
CN203070068U (en) * 2013-01-23 2013-07-17 中禹环境工程(北京)有限公司 Perception transmission equipment
CN103279830A (en) * 2013-05-28 2013-09-04 中国南方电网有限责任公司超高压输电公司广州局 Transformer substation or converter station accident handling cloud terminal remote support decision-making method and system
CN103473626A (en) * 2013-08-20 2013-12-25 国家电网公司 Security protection method based on integrated dispatching data network operation and maintenance system
CN104157021B (en) * 2014-08-12 2017-03-15 广州中国科学院沈阳自动化研究所分所 Intelligent inspection system and intelligent polling method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102495549A (en) * 2011-11-22 2012-06-13 中联重科股份有限公司 Remote maintenance decision system of engineering machinery and method thereof
CN102708674A (en) * 2012-04-28 2012-10-03 深圳市领华卫通数码科技有限公司 Method and system of vehicle intelligent services
CN203278198U (en) * 2013-05-08 2013-11-06 青岛数能电气工程有限公司 Motor fault predetermination protective device

Also Published As

Publication number Publication date
CN104678962A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104678962B (en) A kind of electric power first-aid operation safe monitoring system and the operational method based on the system
CN107200248B (en) A kind of elevator Internet of Things operation real-time monitoring system based on cloud platform
CN103903184A (en) Method for processing information between power distribution network first-aid repair command platform and mobile terminal
CN102819249B (en) Linkage control system and control method for power tunnel
CN103955185B (en) Power distribution fault handling method of immediate power distribution fault handling information interaction terminal based on mobile operation technique
CN106829668B (en) A kind of elevator long distance adjustment method and device
CN103441570A (en) One-button type sequential control operation control method based on integrated information platform
CN112366823B (en) Distribution network power cut and supply automatic regulation and control system and method
CN108964264A (en) The wireless realization of debugging method of intelligent substation site device
CN104954235A (en) WeChat platform based interactive intelligent monitoring method for transmission line passage ways
CN103606055A (en) Intelligent interaction platform for power fault rush repair
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN102945028A (en) Cloud technology application smart home with intelligent house grid control function
CN110969341A (en) Intelligent maintenance method, device and system for power distribution terminal
CN108574696A (en) A kind of command dispatching system and working method based on GIS map
CN104953707A (en) Intelligent error prevention method and system for monitoring operation order
CN101562357A (en) Method for realizing quick response to faults of electric power system
CN104076777A (en) Asphalt mixing plant wireless scheduling system and method based on terminals
CN209267610U (en) A kind of electric field inspection remote supervisory and control(ling) equipment
CN109510314B (en) Method for scheduling interaction between intelligent command DICP system and inspection robot system
CN109327434B (en) System and method for hybrid management of security policy
CN105260220A (en) Remote rebooting system and method for comprehensive automatic system protocol conversion device
CN205121640U (en) Distribution fault handling information interaction terminal based on remove operation technology
CN104102202A (en) Modernized smart grid-based regulation and control emergency command handling method
CN105007174B (en) A kind of automatic acceptance method of dispatching automation main website down order

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180320

Termination date: 20190202

CF01 Termination of patent right due to non-payment of annual fee