CN104102202A - Modernized smart grid-based regulation and control emergency command handling method - Google Patents
Modernized smart grid-based regulation and control emergency command handling method Download PDFInfo
- Publication number
- CN104102202A CN104102202A CN201410322310.5A CN201410322310A CN104102202A CN 104102202 A CN104102202 A CN 104102202A CN 201410322310 A CN201410322310 A CN 201410322310A CN 104102202 A CN104102202 A CN 104102202A
- Authority
- CN
- China
- Prior art keywords
- data
- regulation
- accident
- emergency command
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a modernized smart grid-based regulation and control emergency command handling method. The modernized smart grid-based regulation and control emergency command handling method includes the following steps that: a collection end collects related equipment account information, telemetry data and remote signaling data through a network and transmits the data to a system server; and a data server and the system server are connected and exchange data with each other to calculate and analyze the data, so as to timely detect accidents in the operation of a power grid and early warning for the accidents, and decide accident handling methods and notify relevant personnel through short messages. With the modernized smart grid-based regulation and control emergency command handling method adopted, regulation and control personnel can grasp key information of the operation of the whole power grid and the development trends of the accidents most comprehensively and accurately in a shortest time period, and therefore, the ability of the regulation and control personnel to master modernized large power grids and the accident handling efficiency of the regulation and control personnel can be improved greatly, and the real-time emergency handling ability of the regulation and control personnel to deal with the accidents of the power grids can be improved greatly.
Description
Technical field
The present invention relates to a kind of power emergency commander method of disposal, relate in particular to a kind of regulation and control emergency command method of disposal based on modernization intelligent grid.
Background technology
Power emergency commander is along with administration of power networks requirement progressively promotes and the new demand of a class that occurs, during being mainly used in that major event occurs, for commanding provides commander's auxiliary support, the auxiliary support of mentioning is here divided into several functions: first: to commanding relevant various information to collect and represent; Second: add up or gather based on these information, history of forming form; The the 3rd: based on the accumulation of historical data, by intelligentized means, these data are excavated and explored, real aid decision making is provided.
The construction period of the power emergency command system of main flow substantially in first stage or subordinate phase, that is: has mainly realized collecting and representing of dispatch control information at present, also only limits to some forms and statistics in decision support aspect.Still place one's entire reliance upon commanding's experience of real event decision-making.
Along with socioeconomic development, modern power industry System Development is swift and violent, power system operating mode is increasingly sophisticated, the system stable operation various factors such as flow point cloth, equipment state, weather condition that make moist, the risk of stabilization of power grids destruction, large-area power-cuts exists all the time, and as the directorial regulation and control of operation of power networks operations staff, after accident occurs, take correlation means to process how in time, accurately, decidedly, play vital effect for the development of power grid accident.Under traditional regulation and control operational mode, regulate and control the method taking subjective experience as master that is still extensive style that operations staff mainly takes in accident treatment process, scattered at platform, the types of applications system that data interaction is poor, in the data such as code regulation, go to search, screening effective information, by technical support sections according to forming trend after operation mode after accident calculated off-line, exert oneself and adjust auxiliary suggestion, this process time is long, subjectivity is strong, systematicness is poor, for power grid accident, development lacks effective anticipation simultaneously, particularly occurring under chain accident conditions, for grid equipment state, accident impact scope, the stable control of trend waited and cannot effectively be grasped fast.Exist network system platform scattered, the present situation that data interaction is poor.
What in electric system at present, adopt about scheduling accident monitor system is mainly that province and district is single server, systemic-function is served multiple departments, there is greater risk in data sharing authority problem, by above analysis, have the shortcoming of following several respects: systemic-function is widely used, but function is meticulous not.Because systemic-function can be served multiple departments, can not consider from the reality of work situation of local traffic department, can only take out the total characteristic in traffic department's work.Draw together that malleability is poor, later maintenance is difficult.The one, systemic-function is served multiple departments, and a little less than data permission, data security is poor, and to secondary function demand, the exhibition of drawing together brings difficulty to such data.The 2nd, a little less than data permission, sharing is high, has increased the difficulty of exploitation again, thereby has brought cost of development, the high equivalent risk of maintenance cost.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, a kind of regulation and control emergency command method of disposal based on modernization intelligent grid is provided, solved in prior art platform scattered, the problem that data interaction is poor.
Technical scheme of the present invention comprises the steps:
Collection terminal is by the terminal control unit to once, on secondary device, relevant device account information, telemetry and remote signalling data are passed through to network collection, send to system server, data server and system server interconnect, data interaction, described data are calculated, analyzed, find in time the accident in operation of power networks and the early warning that accident is produced, decision-making accident handling method is also passed through SMS notification related personnel.
Described collection terminal adopts Socket, Web Service, Data Source technology; Described Socket technology is long connected mode, adopts Socket mode to receive timely the data that interface transmits, and realizes the requirement of real-time property; Described Web Service technology realizes professional platform independence, the cross-system that intersystem interface calls, and realizes the requirement of the interface seamless link between different system; Described Data Source technology is by the connection to disparate databases, can directly read the information of disparate databases.
Described data computational analysis step, the data demand according to dispatching of power netwoks department to accident treatment, filters data, extracts valid data content wherein, for scheduling is played booster action to accident treatment.
Described data computational analysis step, carries out statistics and the analysis of different dimensions to the data of validity, and forms various forms.
Advantageous effect of the present invention is as follows:
Realize the upgrading and transformation of traditional extensive style regulation and control operation and management mode to modernization, intelligentized regulation and control operation and management mode, further improve ability and accident treatment efficiency that regulation and control operations staff controls the large electrical network of modernization, further improve the real-time disposing capacity of electric system reply power grid accident.
This method is by gathering operation of power networks real time data inspecting, grid equipment condition managing, operation of power networks on-line analysis, failure information systems etc. more than 10 overlap different intelligent grid dispatch application institute image data and carry out COMPREHENSIVE CALCULATING, comparison, analyze, power grid accident is carried out to intellectuality, omnibearing comprehensive analysis, and provide in real time accident treatment aid decision making according to operation of power networks situation, make the operations staff can be the most comprehensive within the shortest time, grasp accurately the whole network operation key message and accident developing state, the upgrading and transformation of traditional extensive regulation and control operational mode to intelligent lean regulation and control operational mode are realized, very big ability and the accident treatment efficiency that must improve regulation and control operations staff and control the large electrical network of modernization, the real-time emergency disposal ability of electric system reply power grid accident significantly promotes.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is method flow schematic block diagram of the present invention.
Fig. 2 is schematic block diagram of the present invention.
Embodiment
Embodiment
As shown in Figure 1-2, collection terminal is by the terminal control unit to once, on secondary device, relevant device account information, telemetry and remote signalling data are passed through to network collection, send to system server, data server and system server interconnect, data interaction, described data are calculated, analyzed, find in time the accident in operation of power networks and the early warning that accident is produced, decision-making accident handling method is also passed through SMS notification related personnel.
Described collection terminal adopts Socket, Web Service, Data Source technology; Described Socket technology is long connected mode, adopts Socket mode to receive timely the data that interface transmits, and realizes the requirement of real-time property; Described Web Service technology realizes professional platform independence, the cross-system that intersystem interface calls, and realizes the requirement of the interface seamless link between different system; Described Data Source technology is by the connection to disparate databases, can directly read the information of disparate databases.
Described data computational analysis step, the data demand according to dispatching of power netwoks department to accident treatment, filters data, extracts valid data content wherein, for scheduling is played booster action to accident treatment.
Described data computational analysis step, carries out statistics and the analysis of different dimensions to the data of validity, and forms various forms.
Adopt before and after the inventive method, while there is power grid accident, it is as follows that content contrast is disposed in scheduling emergency command:
? | Electricity net safety stable analytical calculation | Electrical network mode is adjusted, exert oneself in generating plant, load adjustment etc. | Consult the information such as relay protection, small echo range finding, failure information system | Disclose in time the key messages such as accident process, accident treatment progress |
Tradition regulation and control model | Calculated off-line, is undertaken by technical support sections, 15 minutes | Regulation and control operations staff inquires about that code, regulation etc. are rear carries out decision-making according to operating experience, 10 minutes | Regulation and control operations staff have access to sorts of systems and screen effective information, 10 minutes | In accident treatment, need all the time operations staff to report or inform to relevant leader and specialty |
Adopt after this method | Automatically be enabled in line computation and generate result, automatic-prompting electrical network weak link | Automatically generate aid decision making | Automatically generate and show | According to automatically generating in fault coverage and accident treatment process and issuing in system |
The above is specific embodiments of the invention and the know-why used, and any equivalent transformation based on technical solution of the present invention basis, within all belonging to protection scope of the present invention.
Claims (4)
1. the regulation and control emergency command method of disposal based on modernization intelligent grid, it is characterized in that collection terminal passes through the terminal control unit once, on secondary device, relevant device account information, telemetry and remote signalling data are passed through to network collection, send to system server, data server and system server interconnect, data interaction, described data are calculated, analyzed, find in time the accident in operation of power networks and the early warning that accident is produced, decision-making accident handling method is also passed through SMS notification related personnel.
2. the regulation and control emergency command method of disposal based on modernization intelligent grid according to claim 1, is characterized in that described collection terminal adopts Socket, Web Service, Data Source technology; Described Socket technology is long connected mode, adopts Socket mode to receive timely the data that interface transmits, and realizes the requirement of real-time property; Described Web Service technology realizes professional platform independence, the cross-system that intersystem interface calls, and realizes the requirement of the interface seamless link between different system; Described Data Source technology is by the connection to disparate databases, can directly read the information of disparate databases.
3. the regulation and control emergency command method of disposal based on modernization intelligent grid according to claim 1, it is characterized in that described data computational analysis step, data demand according to dispatching of power netwoks department to accident treatment, data are filtered, extract valid data content wherein, for scheduling is played booster action to accident treatment.
4. the regulation and control emergency command method of disposal based on modernization intelligent grid according to claim 1, is characterized in that described data computational analysis step, the data of validity is carried out to statistics and the analysis of different dimensions, and forms various forms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410322310.5A CN104102202A (en) | 2014-07-08 | 2014-07-08 | Modernized smart grid-based regulation and control emergency command handling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410322310.5A CN104102202A (en) | 2014-07-08 | 2014-07-08 | Modernized smart grid-based regulation and control emergency command handling method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104102202A true CN104102202A (en) | 2014-10-15 |
Family
ID=51670423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410322310.5A Pending CN104102202A (en) | 2014-07-08 | 2014-07-08 | Modernized smart grid-based regulation and control emergency command handling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104102202A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105634141A (en) * | 2016-03-30 | 2016-06-01 | 姜山 | Power regulation and control information real-time monitoring and security early warning mobile transmission system and method |
CN105811401A (en) * | 2016-03-21 | 2016-07-27 | 国家电网公司 | Auxiliary decision making method for provincial power grid accident emergency control |
CN107168197A (en) * | 2017-04-22 | 2017-09-15 | 国网浙江省电力公司嘉兴供电公司 | Intelligent grid secondary device remote-control method |
CN111754372A (en) * | 2020-05-13 | 2020-10-09 | 国家电网有限公司 | Hydropower station flooded workshop accident perception decision-making command system based on Internet of things |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102841582A (en) * | 2012-08-08 | 2012-12-26 | 中国电力科学研究院 | Distribution grid self-healing control system and implementation method thereof |
CN203386051U (en) * | 2013-06-27 | 2014-01-08 | 安顺供电局 | Emergency command image monitoring unified platform |
CN103529806A (en) * | 2013-10-28 | 2014-01-22 | 国家电网公司 | Method for implementing multisystem disaster recovery back-up system based on extended CIMXML (common information model/extensible markup language) |
US20140148927A1 (en) * | 2012-11-27 | 2014-05-29 | International Business Machines Corporation | Dynamic power distribution |
-
2014
- 2014-07-08 CN CN201410322310.5A patent/CN104102202A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102841582A (en) * | 2012-08-08 | 2012-12-26 | 中国电力科学研究院 | Distribution grid self-healing control system and implementation method thereof |
US20140148927A1 (en) * | 2012-11-27 | 2014-05-29 | International Business Machines Corporation | Dynamic power distribution |
CN203386051U (en) * | 2013-06-27 | 2014-01-08 | 安顺供电局 | Emergency command image monitoring unified platform |
CN103529806A (en) * | 2013-10-28 | 2014-01-22 | 国家电网公司 | Method for implementing multisystem disaster recovery back-up system based on extended CIMXML (common information model/extensible markup language) |
Non-Patent Citations (1)
Title |
---|
吴文传等: "电网应急指挥技术支持系统设计与关键技术", 《电力系统自动化》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105811401A (en) * | 2016-03-21 | 2016-07-27 | 国家电网公司 | Auxiliary decision making method for provincial power grid accident emergency control |
CN105811401B (en) * | 2016-03-21 | 2018-10-12 | 国家电网公司 | Provincial power network accident emergency controls aid decision-making method |
CN105634141A (en) * | 2016-03-30 | 2016-06-01 | 姜山 | Power regulation and control information real-time monitoring and security early warning mobile transmission system and method |
CN107168197A (en) * | 2017-04-22 | 2017-09-15 | 国网浙江省电力公司嘉兴供电公司 | Intelligent grid secondary device remote-control method |
CN111754372A (en) * | 2020-05-13 | 2020-10-09 | 国家电网有限公司 | Hydropower station flooded workshop accident perception decision-making command system based on Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106026405B (en) | Relay protection in-service monitoring based on EMS system and analysis system | |
CN103278736B (en) | Method for automatically inquiring and diagnosing lightning of trip circuit and issuing diagnosis result | |
CN105305641B (en) | A kind of relay protection information data acquisition and upper delivery method | |
CN103049826B (en) | Automated system is safeguarded in operation of power networks | |
CN106230032B (en) | A kind of wind farm group production scheduling operational system based on power dispatch data network | |
CN202159369U (en) | Information processing device for improving fault repairing work order merging rate of electrical power system | |
CN104182902A (en) | Monitoring method based on centralized operation and maintenance system of dispatching data network | |
CN110414871A (en) | Substation secondary device fault monitoring system and monitoring method based on edge calculations | |
CN106878466B (en) | A kind of Hydropower Unit data management and equipment control unified platform | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN102518553A (en) | Remote real-time monitoring system used for wind power station group | |
CN104931851A (en) | Transmission line lightning fault intelligent analysis platform and analysis method | |
CN103441570A (en) | One-button type sequential control operation control method based on integrated information platform | |
CN105262210A (en) | System and method for analysis and early warning of substation network security | |
CN104102202A (en) | Modernized smart grid-based regulation and control emergency command handling method | |
CN105071376B (en) | Method for implementing integrated framework of main distribution network | |
CN116192601B (en) | Cloud edge end cooperative control system based on electric power Internet of things | |
CN107545519A (en) | A kind of power grid enterprises' fortune inspection management-control method | |
CN113949155A (en) | Panoramic power quality monitoring system with real-time monitoring function | |
CN104156888A (en) | Power system operation risk monitoring method based on comprehensive risk evaluation model | |
CN107966943B (en) | Centralized master control monitoring intelligent data analysis system for multi-stage transformer substation | |
CN106685759A (en) | High-efficiency and zero-error updating and upgrading verification test method for scheduling main station | |
CN109561155A (en) | A kind of monitoring of substation equipment remote centralized and O&M method | |
CN104777824A (en) | Substation computer monitoring remote diagnosis system | |
CN115566803B (en) | Line fault tracing method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141015 |
|
RJ01 | Rejection of invention patent application after publication |