CN105320712B - The dynamic posture drawing method of situation automatic plotting system based on GIS map - Google Patents

The dynamic posture drawing method of situation automatic plotting system based on GIS map Download PDF

Info

Publication number
CN105320712B
CN105320712B CN201410449332.8A CN201410449332A CN105320712B CN 105320712 B CN105320712 B CN 105320712B CN 201410449332 A CN201410449332 A CN 201410449332A CN 105320712 B CN105320712 B CN 105320712B
Authority
CN
China
Prior art keywords
module
data
event
situation
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410449332.8A
Other languages
Chinese (zh)
Other versions
CN105320712A (en
Inventor
蒋斌
孙世军
韩洪
张治取
孙为民
田兵
邹旭
杨啸帅
王波
张鹏
程中华
隋灿
孙晓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Emergency Management Center State Grid Shandong Province Electric Power Co
Original Assignee
Emergency Management Center State Grid Shandong Province Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Emergency Management Center State Grid Shandong Province Electric Power Co filed Critical Emergency Management Center State Grid Shandong Province Electric Power Co
Priority to CN201410449332.8A priority Critical patent/CN105320712B/en
Priority to PCT/CN2015/088915 priority patent/WO2016034140A1/en
Publication of CN105320712A publication Critical patent/CN105320712A/en
Application granted granted Critical
Publication of CN105320712B publication Critical patent/CN105320712B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Navigation (AREA)
  • Instructional Devices (AREA)
  • Alarm Systems (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention discloses a kind of dynamic posture plotting system based on GIS map and method, the system is marked and drawed automatically according to event, solve to mark and draw the problem of efficiency is low manually, it is dynamic in GIS map to mark and draw outgoing event source, vehicle or other goods and materials and the route for alloting traveling, the present invention carries out storage statistical analysis to the data reported and submitted, according to the type of event, the hazard rating of event, analyze impacted scope and optimal course, automatically generate emergent situation map, and the arrival time for estimating each troop and vehicle can be visualized, various routes of alloting, which are provided, for emergency disposal assesses selection, with graphical, the abundant plotting language such as symbolism is complete, comprehensively, accurately, timely show repairing situation, issue a notice and instruct in the form of picture to each participation unit personnel, to understand the development of whole situation in time, and implementation center instructs.

Description

The dynamic posture drawing method of situation automatic plotting system based on GIS map
Technical field
The present invention relates to a kind of dynamic posture drawing method of the situation automatic plotting system based on GIS map.
Background technology
Situation plotting is the common function of the application industries such as electric power first-aid, military commanding, forest fire prevention and control, earthquake emergency, is Graphic representation situation analysis, task deployment, the basis cooperated.
For the repairing based on map class, command the application system of class, if it is simple event source or goods and materials to scheme Piece symbol is illustrated on map, it is impossible to if the whole process for the displaying event for enriching image, can not just show system Advantage, so the application system based on GIS map should have the function of marking and drawing.
All contain situation plotting function in general GIS-Geographic Information System, using the image conversion symbol of some vectors according to industry Business demand is shown, but need manually to go it is manual mark event source, troop and goods and materials, goods and materials are drawn according to different situations Allot direction, the course of vehicle.For complicated business, the emergency event of particularly multiple unit cooperative disposals, due to Staffs, vehicle goods and materials quantity are more, and plotting manually is not accurate enough, and can expend considerable time and effort, right It is this kind of need emergent management event system for, efficiency can not significantly meet demand.
Situation plotting system, refers to defined symbol, word and color enter on map or other special Backgrounds Rower is painted, and the core of situation plotting system is the drafting of figure, but these plottings are all that the personnel that are fixed against go drafting.
The content of the invention
The present invention is in order to solve the above problems, it is proposed that a kind of dynamic of the situation automatic plotting system based on GIS map Situation plotting method, the system is marked and drawed automatically according to event, solves to mark and draw the problem of efficiency is low manually, in GIS map It is dynamic to mark and draw outgoing event source, vehicle or other goods and materials and the route for alloting traveling.
To achieve these goals, the present invention is adopted the following technical scheme that:
A kind of situation automatic plotting system based on GIS map, including data acquisition module, data call module, data Statistical module, analysis and processing module, data memory module, monitoring module and situation generation module, wherein, data acquisition module connects Data call module is connect, data acquisition module communicates with data call module with data statistics module, data statistics module is with dividing Processing module communication, analysis and processing module connection data memory module and situation generation module are analysed, monitoring module connection data are deposited Store up module.
The data acquisition module, reports and submits system, weather warning platform and prefectures and cities to power public affairs for gathering emergency information The information of department makes a report on the data of system, passes it to data statistics module;
The data call module, the data message for calling goods and materials database, and the result called is passed into number Module according to statistics;
The data statistics module, for receiving the data that data acquisition module and data calling module are passed over, and It is counted, statistical result is transferred to analysis and processing module;
The analysis and processing module, is the hazard rating of type according to event and event, analyze impacted scope and Optimal course, situation generation module and data memory module are transferred to by result;
The monitoring module, the GPS for vehicle is positioned in real time;
The situation generation module, for by the analysis result of analysis and processing module, emergent situation to be generated in GIS map Figure;
The data memory module, for the result data of analysis and processing module, the peration data of user and vehicle Gps data is stored in database.
Dynamic posture drawing method based on said system, specifically includes following steps:
(1) data acquisition unit collection early warning and failure information, situation generation module automatically generate all kinds of thematic maps and Overall situation map;
(2) data call module carries out calling for data using DBLink mode, the data transfer called to number Module according to statistics;
(3) data statistics module is carried out for the early warning event of data collecting module collected to three systems to event:It is It is no effectively, whether repeat, whether the aspect of emergency guarantee three is counted;
(4) analysis and processing module receives the statistics of data statistics module, according to the group of six major class 22, the event of event Early warning and response grade, the collaboration unit of event the goods and materials type that determines the disaster-stricken scope of event and call, with reference to GIS systems System, selects optimal path;
(5) situation generation module is by the result of analysis and processing module, by calling the Situation-symbol storehouse of standardization, Situation map is intuitively drawn out in GIS map;
(6) analysis result of analysis and processing module is stored in situation table by data memory module, and user is in plotting system On operation be stored in the operation table of situation, the GPS information of vehicle is stored in vehicle historical track table, for rear vehicle The playback of travel route;
(7) monitoring module is responsible for monitoring vehicle location by the GPS device of recovery vehicle, by the information transmission of vehicle to state Gesture plotting system, monitoring module marks and draws vehicle by the real-time coordinate information of vehicle on map and carries out vehicle position in real time The renewal put.
The step (1), specific method is:Three systems of the data source of data collecting module collected point:Emergency information The system of making a report on of system, weather warning platform and electric company of prefectures and cities is reported and submitted, the collection of data is by issue What webservice mode was realized, by externally providing the real time propelling movement that service interface realizes data, data acquisition module handle The data collected in real time are transferred to data statistics module.
The step (2), specific method is:Data call module is to call the database of goods and materials system, the system and thing Resource system belongs to different departments, but the database of the system and goods and materials is online with including, so the data of goods and materials database are adjusted With calling for data is carried out by the way of DBLink, the data transfer called to data statistics module.
In the step (4), the specific division methods of the group of six major class 22 of event are:Type, the divided rank of event It is basis《The overall emergency preplan of Utilities Electric Group Co.'s accident》Come what is determined;Event type specifically includes electric power accident Class, power supply service class, public health event class, natural calamity class, accident class and security incident class, wherein, electric power burst Event class includes electric power accident and large-area power-cuts event;Power supply service class includes electricity shortage time, the electric thing of important guarantor Part and power supply service event;Natural calamity class include bloods and droughts, meteorological disaster, earthquake disaster, geological disaster, Oceanic disasters and Forest fire;Accident class includes fire, road public transport event, power infrastructures accident, communication system accident and environment Contamination accident;Security incident class includes Mass disturbance network and information burst event, casualties event and event concerning foreign affairs.
The specific method of the step (4) is:Analysis and processing module is by the statistics of data statistics module, according to event The group of six major class 22, the early warning of event and response grade, the collaboration unit of event determine the disaster-stricken scope of event and should adjust Goods and materials type;Then the impacted transformer station of the analysis of networks topology of electrical network facilities and transmission line of electricity are called, is sent Some power networks such as corresponding generator car and breakdown van rush to repair resource;In the case where repairing resource class is determined, it is necessary to recall GIS Routing Service, analyzes the road conditions that location of incident and repairing are supported between ground, is calculated and reached according to speed of operation The time of destination, recommend the vehicle in arrival event place at first and optimal driving path automatically.
The specific method of the step (4) is:According to accident geographical position, the geographical position of material depot and road Distribution, calculates the path length between accident, material depot, sets speed as n, 60km/h≤n≤110km/h, meter Calculate running time T1i, i=1,2 ..., m, m is the total quantity of material depot, if the quantity of allocating supplies of the material depot Not enough, it is necessary to calculate the running time T from other warehouse relays2i;Different material depot and accident are calculated successively Between running time T=T1i+T2i, obtain T smaller, then it is assumed that scheme is optimal.
Beneficial effects of the present invention are:
1st, the present invention carries out storage statistical analysis to the data reported and submitted, and goods and materials database is then called, according to event Type, the hazard rating of event analyzes impacted scope and optimal course, automatically generates emergent situation map, and The arrival time for estimating each troop and vehicle can be visualized, providing various routes of alloting for emergency disposal assesses selection;
2nd, the plotting language enriched with graphical, symbolism etc. is complete, comprehensive, accurate, timely show repairing situation;
3rd, the situation map of generation persistently can be cured in database, and situation map is preserved in the form of picture as needed Get up, then issue a notice and instruct in the form of picture to each participation unit personnel, to understand the development of whole situation in time, And implementation center instructs.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Embodiment:
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of situation automatic plotting system based on GIS map, including data acquisition module, data call Module, data statistics module, analysis and processing module, data memory module, monitoring module and situation generation module.
The data acquisition module, reports and submits system, weather warning platform and prefectures and cities to power public affairs for gathering emergency information The information of department makes a report on the data of system, passes it to data statistics module;
The data call module, the data message for calling goods and materials database, and the result called is passed into number Module according to statistics;
The data statistics module, for receiving the data that data acquisition module and data calling module are passed over, and It is counted, statistical result is transferred to analysis and processing module;
The analysis and processing module, is the hazard rating of type according to event and event, analyze impacted scope and Optimal course, situation generation module and data memory module are transferred to by result;
The monitoring module, the GPS for vehicle is positioned in real time.
The situation generation module, for by the analysis result of analysis and processing module, emergent situation to be generated in GIS map Figure;
The data memory module, for the result data of analysis and processing module, the peration data of user and vehicle Gps data is stored in database;
The automatic drawing method of situation based on said system, specifically includes following steps:
1) three systems of the data source of data collecting module collected point:Emergency information reports and submits system, weather warning platform With the system of making a report on of electric company of prefectures and cities, the collection of data is realized by way of issuing webservice, by right Outer to provide the real time propelling movement that service interface realizes data, the data collected in real time are transferred to data statistics by data acquisition module Module.
2) data call module is to call the database of goods and materials system, and the system and goods and materials system belong to different departments, But the database of the system and goods and materials is with online inside, so the data call of goods and materials database is carried out by the way of DBLink Data are called, the data transfer called to data statistics module.
3) whether data statistics module is, to the early warning event of three systems, to have to event data collecting module collected Imitate, whether repeat, whether the preliminary data statistics and examination such as emergency guarantee.
4) analysis and processing module is a most complicated module, the statistics of data statistics module, according to event The group of six major class 22, the early warning of event and response grade, the collaboration unit of event determine the disaster-stricken scope of event and should adjust Goods and materials type.Then the impacted transformer station of the analysis of networks topology of electrical network facilities and transmission line of electricity are called, is sent Some power networks such as corresponding generator car and breakdown van rush to repair resource.In the case where repairing resource class is determined, it is necessary to recall GIS Routing Service, analyzes the road conditions that location of incident and repairing are supported between ground, according to 60km/h's or 90km/h Speed of operation calculates the time arrived at, recommends the vehicle in arrival event place at first and optimal traveling road automatically Footpath.
5) situation generation module is the processing structure of analysis and processing module, by calling the Situation-symbol storehouse of standardization, Situation map is intuitively drawn out in GIS map.
6) data memory module analyzes analysis and processing module the result come and preserved in situation table, and user is in plotting system On the operation such as new travel route marked and drawed, the attribute of the symbol of modification is all stored in the operation table of situation, the GPS of vehicle Information is stored in vehicle historical track table, the playback for later route or travel by vehicle.
7) monitoring module is responsible for monitoring the position of recovery vehicle, is fitted with GPS device on recovery vehicle, can handle in real time The information transmission of vehicle gives situation plotting system, and monitoring module marks and draws vehicle by the real-time coordinate information of vehicle on map And the renewal of vehicle location is carried out in real time.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, not to present invention protection model The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deform still within protection scope of the present invention that creative work can make.

Claims (3)

1. a kind of dynamic posture drawing method of the situation automatic plotting system based on GIS map, the state based on GIS map Gesture automatic plotting system, including data acquisition module, data call module, data statistics module, analysis and processing module, data are deposited Module, monitoring module and situation generation module are stored up, wherein, data acquisition module connection data call module, data acquisition module Communicated with data call module with data statistics module, data statistics module communicates with analysis and processing module, analysis and processing module Connect data memory module and situation generation module, monitoring module connection data memory module;
It is characterized in that:Specifically include following steps:
(1) information of data acquisition unit collection early warning and failure, situation generation module automatically generates all kinds of thematic maps and entirety Situation map;
(2) data call module carries out calling for data using DBLink mode, and the data transfer called is united to data Count module;
(3) data statistics module is carried out for the early warning event of data collecting module collected to three systems to event:Whether have Imitate, whether repeat, whether three aspects of emergency guarantee are counted;
(4) analysis and processing module receive data statistics module statistics, according to the group of six major class 22 of event, event it is pre- The goods and materials type that alert and response grade, the collaboration unit of event determine the disaster-stricken scope of event and called, with reference to generalized information system, choosing Select optimal path;
(5) situation generation module is by the result of analysis and processing module, by calling the Situation-symbol storehouse of standardization, in GIS Situation map is intuitively drawn out on map;
(6) analysis result of analysis and processing module is stored in situation table by data memory module, and user is on plotting system Operation is stored in the operation table of situation, and the GPS information of vehicle is stored in vehicle historical track table, for being travelled with rear vehicle The playback of route;
(7) monitoring module is responsible for monitoring vehicle location by the GPS device of recovery vehicle, and situation mark is given by the information transmission of vehicle System is painted, monitoring module marks and draws vehicle by the real-time coordinate information of vehicle on map and carries out vehicle location in real time Update;
In the step (4), the specific division methods of the group of six major class 22 of event are:Type, the divided rank of event are roots According to《The overall emergency preplan of Utilities Electric Group Co.'s accident》Come what is determined;Event type specifically include electric power accident class, Power supply service class, public health event class, natural calamity class, accident class and security incident class, wherein, electric power accident Class includes electric power accident and large-area power-cuts event;Power supply service class include the electricity shortage time, the electric event of important guarantor and Power supply service event;Natural calamity class includes bloods and droughts, meteorological disaster, earthquake disaster, geological disaster, Oceanic disasters and forest Fire;Accident class includes fire, road public transport event, power infrastructures accident, communication system accident and environmental pollution Accident;Security incident class includes Mass disturbance network and information burst event, casualties event and event concerning foreign affairs;
The specific method of the step (4) is:Analysis and processing module is by the statistics of data statistics module, according to the six of event The group of major class 22, the early warning of event and response grade, the collaboration unit of event determine the disaster-stricken scope of event and should called Goods and materials type;Then the impacted transformer station of the analysis of networks topology of electrical network facilities and transmission line of electricity are called, correspondence is sent Generator car and some power networks repairing resource such as breakdown van;In the case where repairing resource class is determined, it is necessary to recall GIS's Routing Service, analyzes the road conditions that location of incident and repairing are supported between ground, is calculated according to speed of operation up to purpose The time on ground, recommend the vehicle in arrival event place at first and optimal driving path automatically;
The specific method of the step (4) is:According to accident geographical position, the geographical position of material depot and road point Cloth, calculates the path length between accident, material depot, sets speed as n, 60km/h≤n≤110km/h, calculates Go out running time T1i, i=1,2 ..., m, m is the total quantity of material depot, if the material depot allocates supplies quantity not Enough, it is necessary to calculate the running time T from other warehouse relays2i;Calculate successively different material depots and accident it Between running time T=T1i+T2i, obtain T smaller, then it is assumed that scheme is optimal.
2. dynamic posture drawing method as claimed in claim 1, it is characterized in that:The step (1), specific method is:Data Three systems of data source point of acquisition module collection:Emergency information reports and submits system, weather warning platform and prefectures and cities to power public affairs System is made a report on by department, and the collection of data is realized by way of issuing webservice, by externally providing service interface The real time propelling movement of data is realized, the data collected in real time are transferred to data statistics module by data acquisition module.
3. dynamic posture drawing method as claimed in claim 1, it is characterized in that:The step (2), specific method is:Data Calling module is the database for calling goods and materials system, and the system and goods and materials system belong to different departments, but the system and goods and materials Database with online inside, so the data call of goods and materials database carries out calling for data by the way of DBLink, The data transfer called is to data statistics module.
CN201410449332.8A 2014-09-04 2014-09-04 The dynamic posture drawing method of situation automatic plotting system based on GIS map Active CN105320712B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410449332.8A CN105320712B (en) 2014-09-04 2014-09-04 The dynamic posture drawing method of situation automatic plotting system based on GIS map
PCT/CN2015/088915 WO2016034140A1 (en) 2014-09-04 2015-09-02 Gis map-based dynamic status plotting system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410449332.8A CN105320712B (en) 2014-09-04 2014-09-04 The dynamic posture drawing method of situation automatic plotting system based on GIS map

Publications (2)

Publication Number Publication Date
CN105320712A CN105320712A (en) 2016-02-10
CN105320712B true CN105320712B (en) 2017-10-03

Family

ID=55248111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410449332.8A Active CN105320712B (en) 2014-09-04 2014-09-04 The dynamic posture drawing method of situation automatic plotting system based on GIS map

Country Status (2)

Country Link
CN (1) CN105320712B (en)
WO (1) WO2016034140A1 (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760618B (en) * 2016-03-08 2019-02-19 中国人民解放军总参谋部第五十四研究所 Target situation methods of exhibiting based on Virtual process geography GIS
CN106101630B (en) * 2016-06-28 2020-10-02 温州电力设计有限公司 Line becomes intelligent distribution network monitored control system of family integration
CN106384560B (en) * 2016-09-12 2017-12-15 湖南新航动力信息科技有限公司 icon processing method and system based on map
CN106373074A (en) * 2016-10-17 2017-02-01 无锡市日升化工有限公司 Civil air defense geographic management information system
CN106503136A (en) * 2016-10-20 2017-03-15 南京莱斯信息技术股份有限公司 A kind of data acquisition and grading forewarning system system based on WEBGIS
CN107220749A (en) * 2017-05-11 2017-09-29 长威信息科技发展股份有限公司 A kind of method and system of emergency resources fast dispatch
CN107578172B (en) * 2017-09-08 2019-03-08 中国人民解放军海军工程大学 A kind of naval vessels fire-fighting situation information transmission plotting system
CN108549998A (en) * 2018-05-03 2018-09-18 广西师范学院 A kind of dynamic supervision system of the land-sea synthesis towards aquafarm
CN109409823A (en) * 2018-09-26 2019-03-01 中国矿业大学(北京) A kind of multiagent emergency cooperative system based on multi-technical fusion
CN110084730A (en) * 2019-04-28 2019-08-02 中国疾病预防控制中心 A kind of method and system public health emergency processing and shown
CN110288176A (en) * 2019-05-09 2019-09-27 国网河南省电力公司郑州供电公司 Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN110571937B (en) * 2019-10-24 2020-11-17 国网江苏省电力有限公司宿迁供电分公司 Distribution network equipment operation monitoring management system based on internet
CN111047716B (en) * 2019-12-02 2024-03-22 江苏伟岸纵横科技股份有限公司 Three-dimensional scene situation plotting method, computer storage medium and electronic equipment
CN111008776A (en) * 2019-12-02 2020-04-14 天津大海云科技有限公司 Map-based massive emergency resource situation analysis and display system and method
CN111695066A (en) * 2020-05-06 2020-09-22 广东康云科技有限公司 Real-scene 3D GIS map-based warning focusing method and system
CN111696200A (en) * 2020-05-06 2020-09-22 广东康云科技有限公司 Method, system, device and storage medium for displaying alarm situation
CN111598471B (en) * 2020-05-21 2023-11-03 深圳航天智慧城市系统技术研究院有限公司 Method and system for realizing rapid event acceptance and event distribution based on one-seat three-screen
CN113010862B (en) * 2021-04-13 2024-03-29 中国大唐集团科学技术研究总院有限公司 Situation awareness architecture deployment method for industrial control system of power plant
CN113129328B (en) * 2021-04-22 2022-05-17 中国电子科技集团公司第二十九研究所 Target hotspot area fine analysis method
CN114021810B (en) * 2021-11-03 2024-02-09 广东鉴面智能科技有限公司 Digital twin stock ground management system
CN114048623A (en) * 2021-11-23 2022-02-15 中国石油大学(北京) Emergency decision-making method for emergency events of reserve bank and related device
CN114283252B (en) * 2021-12-28 2024-04-05 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time access system for barrage Internet of things sensing equipment data based on three-dimensional scene
CN114283251B (en) * 2021-12-28 2024-04-09 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time access method for data of barracks and Internet of things sensing equipment based on three-dimensional scene
CN115345465B (en) * 2022-08-10 2023-08-01 航天神舟智慧系统技术有限公司 Multicolor level management method and system based on basic level treatment event
CN116136873B (en) * 2023-04-04 2023-06-23 中国电子科技集团公司第十五研究所 Intelligent evaluation device and method for military plotting integrating context and military semantics
CN116596423B (en) * 2023-05-31 2024-05-28 山东省交通运输监测与应急处置中心 Emergency transportation guarantee system, method and equipment based on geographic data
CN117114541B (en) * 2023-10-17 2024-01-09 国网浙江省电力有限公司台州供电公司 Emergency supply method and system for electric power materials

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663959B (en) * 2012-03-01 2014-10-15 南京莱斯信息技术股份有限公司 Comprehensive situation intuitive display system and implementation method thereof based on map label processing
CN103383427A (en) * 2012-05-04 2013-11-06 山西省电力公司阳泉供电公司 Power grid lightning locating and analyzing method and system
CN103824138A (en) * 2012-11-19 2014-05-28 郭志华 Forest fire hazard emergency command decision management GIS three-dimensional platform
CN103605463B (en) * 2013-11-28 2016-06-29 东莞中国科学院云计算产业技术创新与育成中心 Drawing method based on GIS platform and the quick situation plotting system of touch panel device
CN103700054B (en) * 2013-12-10 2017-08-25 中国地质大学武汉 A kind of Sudden Geological Hazards emergency preplan digitization system

Also Published As

Publication number Publication date
WO2016034140A1 (en) 2016-03-10
CN105320712A (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN105320712B (en) The dynamic posture drawing method of situation automatic plotting system based on GIS map
CN105303285B (en) A kind of power emergency is disposed the intellectuality of goods and materials and is alloted method
CN104835085B (en) Tourism runs supervision and safety emergency management interlinked command plateform system
CN103985247B (en) Taxi Transport capacity dispatching system based on city chauffeur demand distribution density
CN103150914B (en) The visual intelligent traffic weather monitoring of sing on web GIS, pre-warning management system
CN105069100B (en) A kind of mobile terminal Collaborative Plotting method based on power grid GIS
CN109670982A (en) A kind of electric service plateform system of fusion fortune inspection intelligence control system
CN105070037A (en) Public traffic information platform for comprehensive management and broadcast and operation control method thereof
CN107491883A (en) A kind of travel information service
WO2021114856A1 (en) Multisource data-based uninterruptible power supply system
CN102208093B (en) Disaster information acquiring and reporting system
CN104951865A (en) Material allocation tracking method and material allocation tracking system based on power grid GIS (geographic information system)
CN103886511A (en) Real-time command system for power distribution network fault repair
CN104217384A (en) A nuclear accident emergency processing and auxiliary decision support system
CN104965854A (en) Automatic plotting method and system for material allocation based on electrical network GIS
CN115063978B (en) Bus arrival time prediction method based on digital twins
CN111309845B (en) Rail transit road network macroscopic situation data display method and system
CN104217582A (en) Intelligent scheduling system of bus
CN103150598A (en) Processing system and method for sudden failure of power transmission network
CN102982407B (en) Electric automobile emergency rescue platform based on natural selection particle swarm optimization (PSO) decision algorithm
CN109993498A (en) A kind of traffic safety facilities managing and control system and method
CN115440076B (en) Intelligent bus arrival information visual dispatching system and method thereof
CN111815106A (en) Power grid emergency method based on multi-source information
CN104463711B (en) Power emergency three-dimensional drawing method and system
Runhua et al. Design scheme of public transport comprehensive dispatching MIS based on MAS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Jiang Bin

Inventor after: Zhang Peng

Inventor after: Cheng Zhonghua

Inventor after: Sui Can

Inventor after: Sun Xiaojie

Inventor after: Sun Shijun

Inventor after: Han Hong

Inventor after: Zhang Zhiqu

Inventor after: Sun Weimin

Inventor after: Tian Bing

Inventor after: Zou Xu

Inventor after: Yang Xiaoshuai

Inventor after: Wang Bo

Inventor before: Jiang Bin

Inventor before: Zhang Peng

Inventor before: Cheng Zhonghua

Inventor before: Sun Shijun

Inventor before: Tian Bing

Inventor before: Han Hong

Inventor before: Chang Yingxian

Inventor before: Zhang Zhiqu

Inventor before: Sun Weimin

Inventor before: Yang Xiaoshuai

Inventor before: Wang Bo

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant