CN110288176A - Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS - Google Patents

Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS Download PDF

Info

Publication number
CN110288176A
CN110288176A CN201910386451.6A CN201910386451A CN110288176A CN 110288176 A CN110288176 A CN 110288176A CN 201910386451 A CN201910386451 A CN 201910386451A CN 110288176 A CN110288176 A CN 110288176A
Authority
CN
China
Prior art keywords
information
module
repairing
analysis
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910386451.6A
Other languages
Chinese (zh)
Inventor
张延辉
朱莉
武绍斌
翟徳红
季国剑
左杨
李靖
李�远
蔡裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch, State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
Priority to CN201910386451.6A priority Critical patent/CN110288176A/en
Publication of CN110288176A publication Critical patent/CN110288176A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The distribution monitoring analysis that the invention discloses a kind of based on power grid GIS and repairing maneuvering platform, controlling terminal is connect by positive physical isolation device and reversed physical isolation apparatus with information interactive bus, the information interactive bus is connect using SOA framework with power information acquisition system, 95598 systems, PMS system, generalized information system, EMS system, electrical power distribution automatization system, information of vehicles, material information and marketing system, and the controlling terminal includes basic platform module, production commander module, has a power failure and study and judge module, repairing commander's module and analysis decision module;By integrating on the basis of existing power grid GIS and detection operational module to various detection informations, realize that unified detection management, optimization repairing step are reduced because of the unsmooth reduction emergency reaction efficiency of information.

Description

Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
Technical field:
The present invention relates to a kind of power transmission and transformation to overhaul field, analyzes and robs more particularly to a kind of distribution monitoring based on power grid GIS Repair maneuvering platform.
Background technique:
Electric system is the foundation leg of the national economic development, the normal relations of production of the safety of power grid enterprises to national security, society Can stablize with people's property safety, guarantee that the normal table operation of power grid is the working centre of electric power enterprise, efficient electric power therefore Barrier repairing is the important guarantee of electric power enterprise safety in production.
But distribution network line quantity is more, equipment is multi-point and wide-ranging, distributional environment is complicated, when Distribution Network Failure occurs, for some reason Barrier point is not apparent, and controller switching equipment operational management personnel generally require to make an inspection tour whole route to search fault point, and time-consuming, send Breakdown gang 5 is not necessarily the optimal selection nearest from faulty line, and repairing resource allocation is unreasonable.And it is integrated due to lacking Production repairing information support, network distributing failure emergency repair process is not smooth, causes breakdown repair field operation information feedback lag, failure It is slow to dispose response speed.
Summary of the invention:
The technical problems to be solved by the present invention are: overcome the deficiencies of the prior art and provide it is a kind of by existing power grid GIS and Various detection informations are integrated on the basis of detection operational module, realize that unified detection management, optimization repairing step subtract 6 Few distribution monitoring based on power grid GIS that emergency reaction efficiency is reduced because information is unsmooth is analyzed and repairing maneuvering platform.
The technical scheme is that a kind of distribution monitoring analysis based on power grid GIS and repairing maneuvering platform, feature Be: controlling terminal is connect by positive physical isolation device and reversed physical isolation apparatus with information interactive bus, the information Interaction bus is using SOA framework and power information acquisition system, 95598 systems, PMS system, generalized information system, EMS system, distribution Automated system, information of vehicles, material information are connected with marketing system, and the controlling terminal includes basic platform module, production Commander's module has a power failure and studies and judges module, repairing commander's module and analysis decision module;
Basic platform module: rights management, log management, system pipes are realized by the human-computer interaction device connecting with primary processor Reason, artwork depositary management reason, report management, visualized management, multimedia application management;
Production commander's module: pass through auxiliary processor and the information realization scheduled outage received from information interactive bus analysis, event Hinder program management, protect fulgurite reason, Risk-warning analysis, equipment on-line monitoring early warning, power failure planning optimization aid decision;
Module is studied and judged in power failure: passing through auxiliary processor and the information realization customer trouble received from information interactive bus guarantee point Analysis, power information acquisition system accident analysis, fault identification analysis;
Repairing commander's module: management and running are repaired by auxiliary processor and the information realization received from information interactive bus, are showed Field repairing terminal applies, production information situation map, video monitoring, repairing resource allocation optimize aid decision;
Analysis decision module: it is examined by auxiliary processor and the information realization electrical power distribution automatization system received from information interactive bus Core Monitoring Indexes, reliability index monitoring, repairing comprehensive index analysis, rate of qualified voltage monitoring, statistical report form analysis.
Further, the human-computer interaction device includes keyboard, mouse, display, loudspeaker, printer and scanner.
Further, the primary processor and auxiliary processor are host computer, are provided with and human-computer interaction device, pair The interface that processor is connected with interexchange bus passes through LAN connection between the primary processor and auxiliary processor.
The beneficial effects of the present invention are: the present invention establishes the distribution basic data dynamic updating maintenance machine of battalion's auxiliary tone perforation System, build source maintenance distribution electrical connections figure management tool, make full use of power distribution network operation need relevant device information, Electric network model and spatial information, deepen power distribution network operational management, technically promote power distribution network artwork management, operation monitoring and it is on duty The standardized management of log improves the working level of distribution operational management comprehensively, realizes that the various thematic maps of power distribution network are checked, in real time The core function of the distributions regulation and controlling of information such as data monitoring, figure set and topology coloring, carry out distribution graphic operation with it is on duty The linkage management of record tentatively solves the problems, such as power distribution network " blind tune " that the informationization of General Promotion power distribution network regulation visualizes water It is flat.
Specific embodiment:
Embodiment:
Distribution monitoring based on power grid GIS is analyzed and repairs maneuvering platform, and controlling terminal is by positive physical isolation device and instead Connect to physical isolation apparatus with information interactive bus, information interactive bus using SOA framework and power information acquisition system, 95598 systems, PMS system, generalized information system, EMS system, electrical power distribution automatization system, information of vehicles, material information and marketing system It connects, controlling terminal includes basic platform module, production commander module, has a power failure and study and judge module, repair and module and analysis is commanded to determine Plan module;
Basic platform module: rights management, log management, system pipes are realized by the human-computer interaction device connecting with primary processor Reason, artwork depositary management reason, report management, visualized management, multimedia application management;
Production commander's module: pass through auxiliary processor and the information realization scheduled outage received from information interactive bus analysis, event Hinder program management, protect fulgurite reason, Risk-warning analysis, equipment on-line monitoring early warning, power failure planning optimization aid decision;
Module is studied and judged in power failure: passing through auxiliary processor and the information realization customer trouble received from information interactive bus guarantee point Analysis, power information acquisition system accident analysis, fault identification analysis;
Repairing commander's module: management and running are repaired by auxiliary processor and the information realization received from information interactive bus, are showed Field repairing terminal applies, production information situation map, video monitoring, repairing resource allocation optimize aid decision;
Analysis decision module: it is examined by auxiliary processor and the information realization electrical power distribution automatization system received from information interactive bus Core Monitoring Indexes, reliability index monitoring, repairing comprehensive index analysis, rate of qualified voltage monitoring, statistical report form analysis.
Further, human-computer interaction device includes keyboard, mouse, display, loudspeaker, printer and scanner.
Further, primary processor and auxiliary processor are host computer, are provided with and human-computer interaction device, vice processing The interface that device is connected with interexchange bus passes through LAN connection between the primary processor and auxiliary processor.
Primary processor is bi-directionally connected by interexchange bus and each system, is adopted to corresponding data information While collection is integrated, also progress data analysis and transmission, and corresponding control operation is completed by human-computer interaction device.
The function of generating and check distribution electronic chart by generalized information system in the monitoring of figure real time data, figure set, is opened up Flutter coloring, data unusual fluctuation management promotes distribution scheduling operation and management level conscientiously:
One, graphic and model integration tool
It is changed for generalized information system, realizes the incremental update maintenance of existing figure, reduce data unusual fluctuation bring figure and adjust work Amount.
Two, incremental update function
It is main to be carried out by three aspects, first is that showing newly-increased, reduction equipment account information by table;Second is that will be automatically new The equipment of increasing is plotted on figure, carries out local directed complete set by operator;Third is that being deleted in figure using different color identifiers, being new Add it is standby, for compare display, if operator confirm more new model, will no longer retain sweep equipment data.
Three, automatic mapping algorithm
Automatic mapping requires the CIM data that GIS nets in state can be translates directly into the line chart of route or interior primary connection figure etc. of standing Function, and make following several pieces of function optimizations and adjustment;First is that primary connection figure automatic mapping in standing, which can be by state's net GIS device is marked, and combines pel function, draws out pattern automatically, wherein the pattern drawn needs to retain in former state's net GIS Bus, terminals type information, while being also required to retention plate information etc..Second is that line chart succeeds automatically, it is primary in combining station Wiring diagram and overhead transmission line are not overlapped reason according to bifurcated and draw, while also needing to consider that crossing instances occur, and need Retain interconnection switch in line chart, and the information such as outlet title got in touch with.Third is that administrative division map, looped network figure adopt the more single line Figure automatic mapping function is drawn.Fourth is that the whole network figure needs to carry out specially treated, wherein the whole network CIM model simplify, liaison station Room, Switch equipment are simplified needs and are expended compared with large resource.
It specifically needs to optimize part as follows: dynamic primitive adjustment, interior graphics-optimized of standing, the combination of end equipment, overlapping algorithm Optimization, mother modeling rendering, contact modeling rendering, straight line pole optimization, the adjustment of drawing print algorithms, station draw change, data Obtain rule adjustment, do not draw device prompts, motif algorithm adjustment, the adjustment of bus Node Algorithm etc..
Four, graphic drawing function
(1) function is drawn on basis
Pattern draws function, and the network topology data of GIS can be netted based on state, and creation pel carries out drafting pattern, the functional module It specifically works comprising following perfect in shape and function: first is that topological data converts pattern data function, according to GIS data, automatically by equipment It is converted into visual primitive data, and the relevant informations such as title for being shown in equipment column, while needing to show equipment; Second is that newly-built, editor, save, delete the pattern drawn, it is settable draw pattern type (the whole network figure, looped network figure, line chart, Primary connection figure etc. in standing), pattern size, background color, auxiliary grid, the information such as scale;Third is that the intelligence of graphical symbol is closed Connection, scaling, mobile, intelligent selection (Quan Xuan, single choice, multiselect, frame choosing, accurate positioning selection, anti-choosing etc.), convenience operation (are schemed First alignment, pel overturning, automatic and intelligent Drawing of special pel etc.) function, and need to have intelligence unified pel, character size Size, more pel editors, selection, combination, dismantling etc., the functions such as intelligent wiring;Fourth is that figure layer control management, it can be by same type Pel merges into same figure layer, convenient for operation, such as character layer, real-time measuring point layer, while can control each business level when editing Between display function, export also need similar functions.
(2) dynamic graphical component management
Pel symbol is finely tuned, the relevant informations such as the corresponding equipment of pel can be configured, primitive information is adjusted by patterning interface Deng, and can obtain automatically and update the newest pel of state's net.
Dynamic graphical component function is to refer to will to be related in operation system to obtain controller switching equipment, transformer equipment and potential defeated Electric equipment carries out pel according to state's net written standards, has both converted the data into visual graphical symbol, for example terminals, disconnected Road device, on-load switch etc. are divided into simple pel and combination pixel, XML configuration file or database form are used when system designs The organization and administration of information are carried out, and keep unique in deployed environment, i.e., when graphic and model integration tool is disposed in many ways, are protected always The uniqueness of pel configuration is demonstrate,proved, convenient for the maintenance management and consistency of pel configuration information.Here pel library, also referred to as Equipment account.Pel function should support automatically updating function, pel editting function simultaneously.
Five, electronic chart is checked
(1) the whole network geographical wiring diagram is checked
The whole network geographical wiring diagram shows the geographical location connection relationship of whole distribution lines on geographical background, and supports to all The fast search and positioning of distribution line, equipment on geographical location.It is supported on the whole network wiring diagram real to Switch apparatus bound When data, with realize match Running State real-time monitoring.
(2) line chart, stand inscribed line chart, looped network figure (region communication chart) are checked
Line chart, stand inscribed line chart, looped network figure can be clicked by index list, the whole network geographical wiring diagram and the whole network system schematic It checks, figure can bind automated system real time data, real-time display telemetering, remote signalling data.
(3) distributing electronic figure management
Using tree display function, shown by substation's mode;It simultaneously can be according to line status (outlet switch opening and closing shape State), load height sorts, and can directly put burst at the seams road line chart and route satellite information (operation, account), while can be in GIS On positioned, and route real time data information can be directly displayed.Each equipment corresponds to multiple figures, and can be managed to figure, Check map releasing data, date, and the operation such as energy preview, deletion.
Six, figure set and topology coloring
Operating analysis function mainly includes switch set under run mode, listed, outage analysis, power supply point tracking, radius of electricity supply The functions such as analysis.
(1) set and listing operation are switched
Can be corresponding to update switch open and-shut mode according to the real-time remote signalling data of automated system, it can also be by manually carrying out setting by hand Bit manipulation, and shown by graphics mode and switch current open and-shut mode and listed situation.
(2) operation of power networks topology coloring
Power supply interrupted district can be automatically analyzed according to adjusting data is matched, in conjunction with switch changed position information, automatically analyze route electrification situation The current method of operation, and operation of power networks state is shown by different colours, red are electriferous state, green be power failure, Carmetta is anomalous mode, and yellow is looped network state.
(3) power supply point tracking
Supply path tracking function is provided to individual equipment, and shows the trend of electric current by graphic animations mode.
(4) radius of electricity supply is analyzed
Subordinate equipment analysis is provided to individual equipment, analyzes junior's route of the equipment institute band and the range of equipment.
Sunykatuib analysis
Can with the whole network figure, administrative division map, line chart carry out sunykatuib analysis, Switch equipment can both be carried out simulation pull open, Closed procedure is superimposed d5000 in figure, adopts real time data with oneself, electricity, while using different symbols to current switch open and-shut mode Number display, can be arranged Switch and carry out pressure set, the simulation operation such as set, analyze the result after operation, will The information such as the user that influence area route is shown using flashing mode, while being shown influence with list mode.
Seven, failure is studied and judged
(1) report work order and outage information for repairment to link: client reports work order for repairment when being sent to platform is robbed, automatically according to number looking into every family Judge whether to be caused by middle pressure failure to platform area, and according to outage information, while to the successful information of decision logic on interface It is associated display, and informs that client has a power failure and falls in known outage information.
(2) customer trouble section auxiliary positioning: access with adopt, route real time data, auxiliary positioning client reports faulty section for repairment Domain obtains the information such as platform area current electric current, power by judging platform area described in user in real time, to determine whether being middle pressure event Barrier, while outage information, the middle pressure failure etc. that result has generated judge whether to be caused by middle pressure failure, and by judging result It is shown with GIS.
Eight, repairing commander
It is positioned by GPS Beidou, realizes the visual scheduling to recovery vehicle and repairing process.Comprehensively consider repairing scheduling of resource Many factors, indicated by vehicle location, assign repairing task nearby, improve first-aid repair efficiency.Commanding point is repaired in help Analysis arranges and coordinates breakdown gang 5, to complete the repairing task of most critical as soon as possible, improves working efficiency.
(1) repairing teams and groups scheduling: according to repairing task urgency level, repairing teams and groups' qualification (profession aspect), repairing teams and groups Compass of competency, reaches many factors such as live optimal path at repairing teams and groups workload on duty, realizes repairing teams and groups' Optimized Operation.
Clearly repair the overall principle of teams and groups' optimal scheduling: 1) ability for handling the task must be had by repairing teams and groups.
2) the repairing task of " urgent " is preferential.
3) it to reach the live shortest time as criterion, increases customer satisfaction degree.
(2) it repairs factors quantization: defining the priority level of many factors, and the factors quantizations that various influences are repaired, According to optimal scheduling principle, repairing teams and groups' current task state, the live shortest distance of arrival are quantified as waiting time, provided excellent Change teams and groups send scheme and are total to commanding's selection.
Recovery vehicle scheduling: in conjunction with power grid GIS figure and vehicle GPS/Beidou information collection, recovery vehicle is provided intuitive Management and scheduling meet the needs of repairing work is for vehicle application, it is ensured that recovery vehicle high-efficiency operation, realization vehicle location, The functions such as trace playback.System can provide the position current to the recovery vehicle of global, a certain office, area, a certain power supply station, and connect Scheduled personnel instruction, analyzes the linear distance of vehicle location and fault point, and repairing commanding is assisted to select vehicle Decision.
3G video monitoring: by outer net 3G video information, the visual scheduling to recovery vehicle and repairing process is realized.? Scene rush to repair situation and fault condition are passed back to client by scene rush to repair vehicle 3G video capture and sending module in real time Command centre is serviced, realizes remote monitoring, is conveniently matched and is robbed commander's understanding fault point, grasps repairing progress.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, it is all It is any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, still falls within In the range of technical solution of the present invention.

Claims (3)

1. a kind of distribution monitoring analysis based on power grid GIS and repairing maneuvering platform, it is characterized in that: controlling terminal passes through positive object Reason isolating device and reversed physical isolation apparatus connect with information interactive bus, the information interactive bus use SOA framework and Power information acquisition system, 95598 systems, PMS system, generalized information system, EMS system, electrical power distribution automatization system, information of vehicles, object Standing breath connect with marketing system, the controlling terminal include basic platform module, production command module, power failure study and judge module, Repairing commander's module and analysis decision module;
Basic platform module: rights management, log management, system pipes are realized by the human-computer interaction device connecting with primary processor Reason, artwork depositary management reason, report management, visualized management, multimedia application management;
Production commander's module: pass through auxiliary processor and the information realization scheduled outage received from information interactive bus analysis, event Hinder program management, protect fulgurite reason, Risk-warning analysis, equipment on-line monitoring early warning, power failure planning optimization aid decision;
Module is studied and judged in power failure: passing through auxiliary processor and the information realization customer trouble received from information interactive bus guarantee point Analysis, power information acquisition system accident analysis, fault identification analysis;
Repairing commander's module: management and running are repaired by auxiliary processor and the information realization received from information interactive bus, are showed Field repairing terminal applies, production information situation map, video monitoring, repairing resource allocation optimize aid decision;
Analysis decision module: it is examined by auxiliary processor and the information realization electrical power distribution automatization system received from information interactive bus Core Monitoring Indexes, reliability index monitoring, repairing comprehensive index analysis, rate of qualified voltage monitoring, statistical report form analysis.
2. the distribution monitoring analysis according to claim 1 based on power grid GIS and repairing maneuvering platform, it is characterized in that: institute Stating human-computer interaction device includes keyboard, mouse, display, loudspeaker, printer and scanner.
3. the distribution monitoring analysis according to claim 1 based on power grid GIS and repairing maneuvering platform, it is characterized in that: institute Stating primary processor and auxiliary processor is host computer, is provided with total with human-computer interaction device, auxiliary processor and information exchange The interface of line connection, passes through LAN connection between the primary processor and auxiliary processor.
CN201910386451.6A 2019-05-09 2019-05-09 Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS Pending CN110288176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910386451.6A CN110288176A (en) 2019-05-09 2019-05-09 Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910386451.6A CN110288176A (en) 2019-05-09 2019-05-09 Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS

Publications (1)

Publication Number Publication Date
CN110288176A true CN110288176A (en) 2019-09-27

Family

ID=68001438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910386451.6A Pending CN110288176A (en) 2019-05-09 2019-05-09 Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS

Country Status (1)

Country Link
CN (1) CN110288176A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110807287A (en) * 2019-11-05 2020-02-18 广东电网有限责任公司 Construction method for dividing service grids in emergency repair point arrangement scene based on finite element grids
CN110889237A (en) * 2019-12-05 2020-03-17 中国南方电网有限责任公司 Ring network diagram management method and device, computer equipment and storage medium
CN110929998A (en) * 2019-11-07 2020-03-27 深圳供电局有限公司 Distribution network fault log management system
CN111650474A (en) * 2020-06-10 2020-09-11 国网河南省电力公司郑州供电公司 Power distribution network interphase short circuit fault section positioning method based on multi-system fusion
CN112214344A (en) * 2020-10-22 2021-01-12 国网福建省电力有限公司 Method and device for guaranteeing high availability of service system based on asynchronous cache and write-back
CN112561090A (en) * 2020-12-14 2021-03-26 新奥数能科技有限公司 Device life cycle management method and device, readable storage medium and electronic device
CN115841221A (en) * 2022-10-26 2023-03-24 国网吉林省电力有限公司长春供电公司 Emergency aid decision-making system based on intranet

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105320712A (en) * 2014-09-04 2016-02-10 国网山东省电力公司应急管理中心 GIS map based dynamic situation plotting system and method
CN105894217A (en) * 2016-05-25 2016-08-24 国网浙江省电力公司 Power marketing multi-business system data center construction method
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN106682826A (en) * 2016-12-22 2017-05-17 海南电网有限责任公司 Emergency repair command platform for distribution network
CN107292760A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 Grid equipment running status assessment system based on power network PMS and EMS
CN107330062A (en) * 2017-06-29 2017-11-07 广西电网有限责任公司 Management and running panorama display systems based on GIS

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105320712A (en) * 2014-09-04 2016-02-10 国网山东省电力公司应急管理中心 GIS map based dynamic situation plotting system and method
WO2016034140A1 (en) * 2014-09-04 2016-03-10 国家电网公司 Gis map-based dynamic status plotting system and method
CN107292760A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 Grid equipment running status assessment system based on power network PMS and EMS
CN105894217A (en) * 2016-05-25 2016-08-24 国网浙江省电力公司 Power marketing multi-business system data center construction method
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN106682826A (en) * 2016-12-22 2017-05-17 海南电网有限责任公司 Emergency repair command platform for distribution network
CN107330062A (en) * 2017-06-29 2017-11-07 广西电网有限责任公司 Management and running panorama display systems based on GIS

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于海: "配网抢修指挥平台的设计与实现", 《中国优秀硕士学位论文全文数据库》 *
季斌等: "配网生产抢修指挥平台的开发与应用", 《智能电网》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110807287A (en) * 2019-11-05 2020-02-18 广东电网有限责任公司 Construction method for dividing service grids in emergency repair point arrangement scene based on finite element grids
CN110929998A (en) * 2019-11-07 2020-03-27 深圳供电局有限公司 Distribution network fault log management system
CN110889237A (en) * 2019-12-05 2020-03-17 中国南方电网有限责任公司 Ring network diagram management method and device, computer equipment and storage medium
CN111650474A (en) * 2020-06-10 2020-09-11 国网河南省电力公司郑州供电公司 Power distribution network interphase short circuit fault section positioning method based on multi-system fusion
CN112214344A (en) * 2020-10-22 2021-01-12 国网福建省电力有限公司 Method and device for guaranteeing high availability of service system based on asynchronous cache and write-back
CN112561090A (en) * 2020-12-14 2021-03-26 新奥数能科技有限公司 Device life cycle management method and device, readable storage medium and electronic device
CN115841221A (en) * 2022-10-26 2023-03-24 国网吉林省电力有限公司长春供电公司 Emergency aid decision-making system based on intranet
CN115841221B (en) * 2022-10-26 2023-11-21 国网吉林省电力有限公司长春供电公司 Emergency auxiliary decision-making system based on intranet

Similar Documents

Publication Publication Date Title
CN110288176A (en) Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN106685074B (en) A kind of electric command system of guarantor and method
CN112765258B (en) Power distribution network graph model checking management system and method thereof
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN103264717B (en) A kind of track traffic synthetic monitoring and scheduling is worked in coordination with and O&M information system
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104678960B (en) It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method
CN104494653B (en) A kind of track traffic synthetic monitoring system
CN104091231A (en) Distribution network fault repairing commanding and processing system and method
CN103441571A (en) Integrated monitoring system information platform for transformer substation
CN102956021A (en) Power grid comprehensive visualization method based on multi-service system information fusion
CN111232024A (en) Intelligent running scheduling system and method for high-speed railway
WO2021114856A1 (en) Multisource data-based uninterruptible power supply system
CN105184442A (en) Power distribution network dispatching management statistical analysis system
CN109447284B (en) Distribution network fault information sending method and system for power supply service command platform
CN102025195B (en) Distribution network simulation dispatching and management system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN107948008A (en) A kind of modeling method for low-voltage network monitoring system
CN106780153A (en) It is a kind of in real time multi-functional back brake, patrol and examine operation note system
CN101364733A (en) Electric power digital integrated management system
CN106789194B (en) The energy communication service automatic fault diagnosis localization method of multi-disciplinary collaboration
CN106776750B (en) Graph-mode integrated digital preplan system for power distribution network
Wang et al. Conceptual design and the future development for operation smart system in China southern power grid
CN109193946B (en) Urgent repair information release system for power consumer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927

RJ01 Rejection of invention patent application after publication