CN103150598A CN2011104024247A CN201110402424A CN103150598A CN 103150598 A CN103150598 A CN 103150598A CN 2011104024247 A CN2011104024247 A CN 2011104024247A CN 201110402424 A CN201110402424 A CN 201110402424A CN 103150598 A CN103150598 A CN 103150598A
Authority
CN
China
Prior art keywords
information
catastrophic failure
power transmission
line
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104024247A
Other languages
Chinese (zh)
Other versions
CN103150598B (en
Inventor
马建
杨志
张雷
石工
邹跃中
施翔
孟凡风
董广哲
张建军
钱萌
王屹
李小青
王国龙
郭轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201110402424.7A priority Critical patent/CN103150598B/en
Publication of CN103150598A publication Critical patent/CN103150598A/en
Application granted granted Critical
Publication of CN103150598B publication Critical patent/CN103150598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a processing system and a method for a sudden failure of a power transmission network. The processing system of the sudden failure of the power transmission network comprises a first receiving module, a first obtaining module, a confirming module and a first display module. The first receiving module is used for receiving information of the sudden failure of the power transmission network, wherein the information of the sudden failure of the power transmission network is input by a user and comprises time, types and a corresponding physical region of the sudden failure. The first obtaining module is used for obtaining basic information of all power transmission lines in the physical region. The confirming module is used for confirming a failure line according to the information of the sudden failure and the basic information of all the power transmission lines. The first display module is used for displaying the failure line on a pre-stored line map of the power transmission network. Through the processing system and the method for the sudden failure of the power transmission network, the sudden failure of the power transmission network is enabled to be associated with the basic information of the power transmission lines in the corresponding physical region, the failure line is confirmed timely and is displayed on the map, so that maintenance staff of the power transmission network can carry out processing timely and accurately, and manpower and material resources are saved.

Description

Power transmission network catastrophic failure disposal system and method
Technical field
The present invention relates to power domain, in particular to a kind of power transmission network catastrophic failure disposal system and method.
Background technology
In the management maintenance of power transmission network, usually former due to accident, anomalous weather etc. thereby cause the catastrophic failure of power transmission network to produce.When processing this type of catastrophic failure, need by the faulty circuit in artificial investigation transmission line of electricity, and can not be associated with the information such as hidden danger account of transmission line of electricity, expend a large amount of manpower and materials.
Can not be associated, cause the problem of human and material resources waste with the hidden danger account information of transmission line of electricity when processing the power transmission network catastrophic failure in correlation technique, not yet propose at present effective solution.
Summary of the invention
Fundamental purpose of the present invention is to provide a kind of power transmission network catastrophic failure disposal system and method, when processing the power transmission network catastrophic failure to solve, can not be associated, cause with the hidden danger account information of transmission line of electricity the problem of human and material resources waste.
To achieve these goals, according to an aspect of the present invention, provide a kind of power transmission network catastrophic failure disposal system.
Power transmission network catastrophic failure disposal system according to the present invention comprises: the first receiver module, be used for receiving the power transmission network catastrophic failure information that the user inputs, and wherein, catastrophic failure information comprises time, type and the corresponding physical region of catastrophic failure; The first acquisition module is used for obtaining all essential informations of transmission line of electricity of physical region, and wherein, essential information comprises numbering, Unit account of plant information, equipment deficiency information and the hidden danger account information of transmission line of electricity; Determination module is used for determining faulty line according to the essential information of catastrophic failure information and whole transmission lines of electricity at transmission line of electricity; And first display module, be used for showing faulty line on the power transmission network line map that prestores.
Further, this power transmission network catastrophic failure disposal system also comprises: the second acquisition module, be used for obtaining meteorology and the thunder and lightning positioning information of physical region, wherein, determination module also is used for according to catastrophic failure information, all the essential information of transmission lines of electricity and meteorology and thunder and lightning positioning information are determined faulty line at transmission line of electricity.
Further, this power transmission network catastrophic failure disposal system also comprises: the 3rd acquisition module, for the monitoring management personnel's that obtain faulty line communication mode; And sending module, being used for that the faulty line information exchange is crossed this communication mode and sending to the monitoring management personnel, faulty line information comprises the numbering of time, type and the faulty line of catastrophic failure.
Further, this power transmission network catastrophic failure disposal system also comprises: remote communication module is used for communicating with the video equipment at faulty line scene; And second display module, be used for showing the video information at faulty line scene.
Further, this power transmission network catastrophic failure disposal system also comprises: the second receiver module is used for receiving the authority information that the user inputs; And the authority judge module, be used for judging whether authority information satisfies the default access condition, wherein, the first display module is used for showing faulty line when authority information satisfies the default access condition.
Further, this power transmission network catastrophic failure disposal system also comprises: memory module is used for after authority information satisfies the default access condition storage authority information.
Further, power transmission network catastrophic failure information also comprises the fault rank of catastrophic failure, and the first display module also is used for showing the fault rank when showing faulty line.
To achieve these goals, according to an aspect of the present invention, provide a kind of power transmission network catastrophic failure disposal route.
Power transmission network catastrophic failure disposal route according to the present invention comprises: receive the power transmission network catastrophic failure information of user's input, wherein, catastrophic failure information comprises time, type and the corresponding physical region of catastrophic failure; Obtain the essential information of whole transmission lines of electricity in physical region, wherein, essential information comprises numbering, Unit account of plant information, equipment deficiency information and the hidden danger account information of transmission line of electricity; Determine faulty line according to the essential information of catastrophic failure information and whole transmission lines of electricity in transmission line of electricity; And show faulty line on the power transmission network line map that prestores.
Further, after the power transmission network catastrophic failure information that receives user's input, the method also comprises: the meteorology and the thunder and lightning positioning information that obtain physical region, wherein, determine that according to the essential information of catastrophic failure information and whole transmission lines of electricity faulty line comprises in transmission line of electricity: according to essential information and meteorology and thunder and lightning positioning information definite faulty line in transmission line of electricity of catastrophic failure information, whole transmission lines of electricity.
Further, after determining faulty line, the method also comprises: the communication mode that obtains the monitoring management personnel of faulty line; And the faulty line information exchange is crossed communication mode send to the monitoring management personnel, wherein, faulty line information comprises the numbering of time, type and the faulty line of catastrophic failure.
By the present invention, employing comprises the power transmission network catastrophic failure disposal system of following part: the first receiver module, be used for receiving the power transmission network catastrophic failure information of user's input, wherein, catastrophic failure information comprises time, type and the corresponding physical region of catastrophic failure; The first acquisition module is used for obtaining all essential informations of transmission line of electricity of physical region, and wherein, essential information comprises numbering, Unit account of plant information, equipment deficiency information and the hidden danger account information of transmission line of electricity; Determination module is used for determining faulty line according to the essential information of catastrophic failure information and whole transmission lines of electricity at transmission line of electricity; And first display module, be used for showing faulty line on the power transmission network line map that prestores, transmission line of electricity essential information in power transmission network catastrophic failure physical region corresponding to it is associated, in time determine faulty circuit and show on map, solved when processing the power transmission network catastrophic failure and can not be associated, cause with the hidden danger account information of transmission line of electricity the problem of human and material resources waste, and then reached and facilitated power transmission network maintainer processing promptly and accurately, the effect that uses manpower and material resources sparingly.
Description of drawings
The accompanying drawing that consists of the application's a part is used to provide a further understanding of the present invention, and illustrative examples of the present invention and explanation thereof are used for explaining the present invention, do not consist of improper restriction of the present invention.In the accompanying drawings:
Fig. 1 is the block diagram according to the power transmission network catastrophic failure disposal system of the embodiment of the present invention; And
Fig. 2 is the process flow diagram according to the power transmission network catastrophic failure disposal system of the embodiment of the present invention.
Embodiment
Need to prove, in the situation that do not conflict, embodiment and the feature in embodiment in the application can make up mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the present invention in detail.
Fig. 1 is that as shown in Figure 1, this system comprises according to the block diagram of the power transmission network catastrophic failure disposal system of the embodiment of the present invention: the first receiver module 10, the first acquisition modules 30, determination module 50 and the first display module 70.
The user by the first receiver module 10 with power transmission network catastrophic failure input information to system, wherein, the power transmission network fault that catastrophic failure produces when referring to occur the disaster such as transmission line of electricity catastrophic failure, accident, anomalous weather, catastrophic failure information comprises time, type and the corresponding physical region of catastrophic failure.
After the user inputs power transmission network catastrophic failure information, the first acquisition module 30 obtains in the physical region that this catastrophic failure relates to all essential informations of transmission lines of electricity, wherein, essential information comprises the information such as numbering, Unit account of plant information, equipment deficiency information, hidden danger account information, trilinear chart basis, scissors crossing, line alignment of transmission line of electricity.Alternatively, in power transmission network, the essential information of all transmission lines of electricity all is pre-stored in this system, and can physical region be that condition stub obtains, the first acquisition module 30 realizes obtaining the essential information of the transmission line of electricity in the physical region that catastrophic failure relates to from all power transmission network transmission lines of electricity.
Determination module 50 is determined faulty line according to the essential information of catastrophic failure information and whole transmission lines of electricity in transmission line of electricity.Wherein, determination module 50 carries out analysis-by-synthesis according to relevant informations such as faulty line and device name, fault-time, fault type, substation accident resultant signal, protection action situation, protection fault localizations and calculates, and draws faulty line and possible reason and position.
The first display module 70 is used for showing faulty line on the power transmission network line map that prestores.Preferably, when power transmission network catastrophic failure information comprised the fault rank of catastrophic failure, the first display module 70 showed the fault rank when showing faulty line.Preferably, catastrophic failure is divided into Huang, orange, red three kinds by the fault rank on the power transmission network line map, carries out visualization display by minute color on map, prompting the operator on duty note, simultaneously, according to the catastrophic failure of different brackets, system can start different emergent flow processs.Preferably, the first display module 70 can show automatically in two dimension, on the three-dimensional map background faulty line position further, also can show the power system operating mode after fault occurs.
In this embodiment, receive the power transmission network catastrophic failure information of user's input by the first receiver module 10, whole essential information of transmission lines of electricity in the physical region that the first acquisition module 30 relates to according to this power transmission network catastrophic failure acquisition of information catastrophic failure, determination module 50 is determined faulty line according to the essential information of catastrophic failure information and transmission line of electricity, and the first display module 70 shows faulty line faulty line in real time on the power transmission network line map.Adopt this embodiment, the transmission line of electricity essential information in power transmission network catastrophic failure physical region corresponding to it can be associated, thereby in time determine faulty circuit and show on map, facilitate power transmission network maintainer processing promptly and accurately, use manpower and material resources sparingly.
Preferably, this power transmission network catastrophic failure disposal system also comprises: the second acquisition module, be used for obtaining meteorology and the thunder and lightning positioning information of physical region, alternatively, this power transmission network catastrophic failure disposal system communicates with the electrical network Meteorological Information System of special use, obtains meteorology and the thunder and lightning positioning information of specific physical region by the electrical network Meteorological Information System.Determination module 30 just can be according to essential information and meteorology and thunder and lightning positioning information definite faulty line in transmission line of electricity of catastrophic failure information, whole transmission lines of electricity.Adopt this preferred implementation, catastrophic failure is associated with meteorological and lightning information, increased the accuracy of definite faulty line.
wherein, lightning information can be by communicating by letter with the lightning location system of power transmission network special use, obtain number of lightning strokes and corresponding lightning strike spot information in fixed time and spatial dimension by lightning location system, comprise the time that lightning strike spot occurs, position (longitude and latitude), size of current, participate in the acquisition station quantity of location etc., and can be further to the statistical study of lightning parameter, add up various lightning parameters and dodge density with comprising, the amplitude of lightning current cumulative probability distributes, fight back number of times, the positive polarity ratio, average current, amplitude of lightning current cumulative probability curve, amplitude of lightning current is than rate curve etc., and the thunder and lightning density map of circuit or shaft tower.
Wherein, weather information can be by communicating by letter with the electrical network Meteorological Information System of power transmission network special use, comprises the parameters such as wind speed, wind direction, temperature, humidity, rainfall, air pressure and optical radiation with the microclimate information of obtaining meteorological on-line monitoring equipment and the weather information of data center.When the exceedingly odious weather conditions such as strong wind, icing, typhoon, heavy rain, sand and dust occurring, can in time carry out visualization display according to kind, the scale of disaster on map background.
Preferably, this power transmission network catastrophic failure disposal system also comprises: the 3rd acquisition module, for the monitoring management personnel's that obtain faulty line communication mode; And sending module, being used for that the faulty line information exchange is crossed this communication mode and sending to the monitoring management personnel, faulty line information comprises the numbering of time, type and the faulty line of catastrophic failure.Alternatively, store the institutional relevant information of Emergency System in power transmission network catastrophic failure disposal system, comprise the information such as the staff list of Emergency System staff list and contact method thereof, relevant unit and department and contact method.When the 3rd acquisition module gets above-mentioned information, in time notify relevant monitoring management personnel by sending module with faulty line information, make catastrophic failure can access timely and process, the immeasurable serious consequence of avoiding delaying time and causing.Preferably, system also can arrange according to the rank of catastrophic failure different advice range and content of announcement.
Preferably, in order to safeguard the safety of this power transmission network catastrophic failure disposal system, this system also comprises: the second receiver module is used for receiving the authority information that the user inputs; And the authority judge module, be used for judging whether authority information satisfies the default access condition, wherein, the first display module is used for showing faulty line when authority information satisfies the default access condition.Adopt this preferred implementation, maintenance and startup to catastrophic failure emergency command flow process are provided with authority, further preferably, store this authority information by memory module after authority information satisfies the default access condition, make any login system and the information that operates obtains record.
Preferably, line fault for the first display module demonstration, system also comprises the 3rd receiver module, the emergency preplan that is used for the line fault of reception user input, and can carry out the updating maintenance function to this prediction scheme, and according to the type of different catastrophic failures, inquiry and show the emergency preplan content comprises the contents such as personnel, vehicle, Work tool, standby redundancy, technological means, operating process, dangerous point control.Simultaneously, the information such as personnel, vehicle, Work tool, standby redundancy be can also transfer as required and concrete inquiry and demonstration carried out.
Preferably, this power transmission network catastrophic failure disposal system also comprises: remote communication module is used for communicating with the video equipment at faulty line scene; And second display module, be used for showing the video information at faulty line scene.By this remote communication module and the second display module, can the essential information of the essential information of catastrophic failure, on-the-spot emergency repair personnel, vehicle be shown, for example: the vehicle at faulty line scene and personnel's GPS location situation, specific geographic and ambient conditions can be checked, thereby complete the rational allocation of field staff and vehicle.By showing the video information at event circuit scene, the position of that demonstration work is in real time carried out on line map progress, state and personnel's vehicle.
Preferably, in the catastrophic failure processing procedure, system can by logging modle with the order of catastrophic failure assign, the information such as tasks carrying, process processing, comprise that the relevant informations such as video, picture, voice, data carry out record, after catastrophic failure is processed, deliver to fixed system on relevant information is automatic, so that the result of catastrophic failure is in time understood by administrative authority.Further preferably, this power transmission network catastrophic failure disposal system is by carrying out record to aspects such as response time of each link in the catastrophic failure treatment scheme and response speeds, but according to recording the result Direct Analysis and summing up problem and shortage in catastrophic failure treatment scheme process.
Fig. 2 is the process flow diagram according to the power transmission network catastrophic failure disposal system of the embodiment of the present invention, and as shown in Figure 2, the method comprises that following step S102 is to step S108.
Step S102: receive the power transmission network catastrophic failure information of user's input, wherein, catastrophic failure information comprises time, type and the corresponding physical region of catastrophic failure.
Step S104: obtain in physical region all essential informations of transmission lines of electricity, wherein, essential information comprises the information such as the numbering, Unit account of plant information, equipment deficiency information, hidden danger account information, trilinear chart basis, scissors crossing, line alignment of transmission line of electricity.
Step S106: determine faulty line according to the essential information of catastrophic failure information and whole transmission lines of electricity in transmission line of electricity.Wherein, this step can be carried out analysis-by-synthesis according to relevant informations such as faulty line and device name, fault-time, fault type, substation accident resultant signal, protection action situation, protection fault localizations and calculated, and draws faulty line and possible reason and position.
Preferably, after step S102, the method also comprises: the meteorology and the thunder and lightning positioning information that obtain physical region, after getting the meteorology of physical region and thunder and lightning location, step S106 is: according to catastrophic failure information, all the essential information of transmission lines of electricity and meteorology and thunder and lightning positioning information are determined faulty line in transmission line of electricity.
Preferably, after determining faulty line, the method also comprises: the communication mode that obtains the monitoring management personnel of faulty line; And the faulty line information exchange is crossed communication mode send to the monitoring management personnel, wherein, faulty line information comprises the numbering of time, type and the faulty line of catastrophic failure.
Step S108: show faulty line on the power transmission network line map that prestores.Preferably, when power transmission network catastrophic failure information comprises the fault rank of catastrophic failure, show the fault rank when showing faulty line.For example catastrophic failure is divided into Huang, orange, red three kinds on the power transmission network line map by the fault rank, carry out visualization display by minute color on map, prompting the operator on duty note, simultaneously, according to the catastrophic failure of different brackets, system can start different emergent flow processs.
In this embodiment, receive the power transmission network catastrophic failure information of user's input by step S102, step S104: whole essential information of transmission lines of electricity in the physical region that relates to according to this power transmission network catastrophic failure acquisition of information catastrophic failure, step S106 determines faulty line according to the essential information of catastrophic failure information and transmission line of electricity, and step S108 shows faulty line faulty line in real time on the power transmission network line map.Adopt this embodiment, the transmission line of electricity essential information in power transmission network catastrophic failure physical region corresponding to it can be associated, thereby in time determine faulty circuit and show on map, facilitate power transmission network maintainer processing promptly and accurately, use manpower and material resources sparingly.
From above description, can find out, the present invention has realized following technique effect: the transmission line of electricity essential information in power transmission network catastrophic failure physical region corresponding to it is associated, in time determine faulty circuit and show on map, facilitate power transmission network maintainer processing promptly and accurately, use manpower and material resources sparingly.
Need to prove, can carry out in the computer system such as one group of computer executable instructions in the step shown in the process flow diagram of accompanying drawing, and, although there is shown logical order in flow process, but in some cases, can carry out step shown or that describe with the order that is different from herein.
obviously, those skilled in the art should be understood that, above-mentioned each module of the present invention or each step can realize with general calculation element, they can concentrate on single calculation element, perhaps be distributed on the network that a plurality of calculation elements form, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in memory storage and be carried out by calculation element, perhaps they are made into respectively each integrated circuit modules, perhaps a plurality of modules in them or step being made into the single integrated circuit module realizes.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is only the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. a power transmission network catastrophic failure disposal system, is characterized in that, comprising:
The first receiver module is used for receiving the power transmission network catastrophic failure information that the user inputs, and wherein, described catastrophic failure information comprises time, type and the corresponding physical region of described catastrophic failure;
The first acquisition module is used for obtaining all essential informations of transmission line of electricity of described physical region, and wherein, described essential information comprises numbering, Unit account of plant information, equipment deficiency information and the hidden danger account information of described transmission line of electricity;
Determination module is used for determining faulty line according to the essential information of described catastrophic failure information and described whole transmission lines of electricity at described transmission line of electricity; And
The first display module is used for showing described faulty line on the power transmission network line map that prestores.
2. system according to claim 1, is characterized in that, also comprises:
The second acquisition module, for the meteorology and the thunder and lightning positioning information that obtain described physical region,
Wherein, described determination module also is used for determining faulty line according to the essential information of described catastrophic failure information, described whole transmission lines of electricity and described meteorology and thunder and lightning positioning information at described transmission line of electricity.
3. system according to claim 1 and 2, is characterized in that, also comprises:
The 3rd acquisition module is for the monitoring management personnel's that obtain described faulty line communication mode; And
Sending module is used for that described faulty line information exchange is crossed described communication mode and sends to described monitoring management personnel, and wherein, described faulty line information comprises the numbering of time, type and the described faulty line of described catastrophic failure.
4. system according to claim 1, is characterized in that, also comprises:
Remote communication module is used for communicating with the live video equipment of described faulty line; And
The second display module is for the video information that shows described faulty line scene.
5. system according to claim 1, is characterized in that, also comprises:
The second receiver module is used for receiving the authority information that the user inputs; And
The authority judge module is used for judging whether described authority information satisfies the default access condition,
Wherein, described the first display module is used for showing described faulty line when described authority information satisfies described default access condition.
6. system according to claim 5, is characterized in that, also comprises:
Memory module is used for storing described authority information after described authority information satisfies the default access condition.
7. system according to claim 1, is characterized in that, described power transmission network catastrophic failure information also comprises the fault rank of described catastrophic failure, and described the first display module also is used for showing described fault rank when showing described faulty line.
8. a power transmission network catastrophic failure disposal route, is characterized in that, comprising:
Receive the power transmission network catastrophic failure information of user's input, wherein, described catastrophic failure information comprises time, type and the corresponding physical region of described catastrophic failure;
Obtain the essential information of whole transmission lines of electricity in described physical region, wherein, described essential information comprises numbering, Unit account of plant information, equipment deficiency information and the hidden danger account information of described transmission line of electricity;
Determine faulty line according to the essential information of described catastrophic failure information and described whole transmission lines of electricity in described transmission line of electricity; And
Show described faulty line on the power transmission network line map that prestores.
9. method according to claim 8, is characterized in that, after the power transmission network catastrophic failure information that receives user's input, described method also comprises:
Obtain meteorology and the thunder and lightning positioning information of described physical region,
Wherein, determine that according to the essential information of described catastrophic failure information and described whole transmission lines of electricity faulty line comprises in described transmission line of electricity: according to essential information and described meteorology and thunder and lightning positioning information definite faulty line in described transmission line of electricity of described catastrophic failure information, described whole transmission lines of electricity.
10. according to claim 8 or 9 described systems, is characterized in that, after determining described faulty line, described method also comprises:
Obtain the monitoring management personnel's of described faulty line communication mode; And
Described faulty line information exchange is crossed described communication mode send to described monitoring management personnel, wherein, described faulty line information comprises the numbering of time, type and the described faulty line of described catastrophic failure.
CN201110402424.7A 2011-12-06 2011-12-06 Processing system and method for sudden failure of power transmission network Active CN103150598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110402424.7A CN103150598B (en) 2011-12-06 2011-12-06 Processing system and method for sudden failure of power transmission network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110402424.7A CN103150598B (en) 2011-12-06 2011-12-06 Processing system and method for sudden failure of power transmission network

Publications (2)

Publication Number Publication Date
CN103150598A true CN103150598A (en) 2013-06-12
CN103150598B CN103150598B (en) 2017-03-22

Family

ID=48548659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110402424.7A Active CN103150598B (en) 2011-12-06 2011-12-06 Processing system and method for sudden failure of power transmission network

Country Status (1)

Country Link
CN (1) CN103150598B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605044A (en) * 2013-11-01 2014-02-26 航天科工深圳(集团)有限公司 Coding engine realization method based on GIS electric power fault positioning
CN104503405A (en) * 2014-12-12 2015-04-08 国家电网公司 Monitoring method, device and system based on SCADA (Supervisory Control And Data Acquisition) system
CN106251420A (en) * 2016-07-29 2016-12-21 国网山西省电力公司大同供电公司 Electric power equipment inspection system
CN106355254A (en) * 2016-08-31 2017-01-25 易瓦特科技股份公司 Power transmission line management method and system
CN106355357A (en) * 2016-10-12 2017-01-25 深圳供电局有限公司 Power distribution network fault processing method and information processing system
CN106557068A (en) * 2015-09-28 2017-04-05 发那科株式会社 Numerical control system
CN106771864A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 The early warning system and transmission line of electricity of transmission line of electricity
CN107026451A (en) * 2017-05-27 2017-08-08 国网福建省电力有限公司 A kind of distribution net platform region low-voltage catastrophic failure determination methods based on sorting technique

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106271A (en) * 2007-08-03 2008-01-16 西安交通大学 Integrated failure positioning protection system for transfer line
CN101478441A (en) * 2009-02-03 2009-07-08 江西省电力信息通讯有限公司 Electric communication operation support and emergency command system
CN102118021A (en) * 2010-01-05 2011-07-06 华北电力科学研究院有限责任公司 Transmission line three-dimensional panoramic model-based fault processing method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106271A (en) * 2007-08-03 2008-01-16 西安交通大学 Integrated failure positioning protection system for transfer line
CN101478441A (en) * 2009-02-03 2009-07-08 江西省电力信息通讯有限公司 Electric communication operation support and emergency command system
CN102118021A (en) * 2010-01-05 2011-07-06 华北电力科学研究院有限责任公司 Transmission line three-dimensional panoramic model-based fault processing method and system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605044A (en) * 2013-11-01 2014-02-26 航天科工深圳(集团)有限公司 Coding engine realization method based on GIS electric power fault positioning
CN103605044B (en) * 2013-11-01 2016-06-15 航天科工深圳(集团)有限公司 A kind of based on GIS power failure location coding engine realize method
CN104503405A (en) * 2014-12-12 2015-04-08 国家电网公司 Monitoring method, device and system based on SCADA (Supervisory Control And Data Acquisition) system
CN104503405B (en) * 2014-12-12 2017-08-01 国家电网公司 Monitoring method, device and system based on SCADA system
CN106557068A (en) * 2015-09-28 2017-04-05 发那科株式会社 Numerical control system
CN106251420A (en) * 2016-07-29 2016-12-21 国网山西省电力公司大同供电公司 Electric power equipment inspection system
CN106251420B (en) * 2016-07-29 2018-07-20 国网山西省电力公司大同供电公司 Electric power equipment inspection system
CN106355254A (en) * 2016-08-31 2017-01-25 易瓦特科技股份公司 Power transmission line management method and system
CN106355357A (en) * 2016-10-12 2017-01-25 深圳供电局有限公司 Power distribution network fault processing method and information processing system
CN106355357B (en) * 2016-10-12 2021-04-30 深圳供电局有限公司 Power distribution network fault processing method and information processing system
CN106771864A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 The early warning system and transmission line of electricity of transmission line of electricity
CN107026451A (en) * 2017-05-27 2017-08-08 国网福建省电力有限公司 A kind of distribution net platform region low-voltage catastrophic failure determination methods based on sorting technique

Also Published As

Publication number Publication date
CN103150598B (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN103150598A (en) Processing system and method for sudden failure of power transmission network
CN103837796B (en) The transmission line malfunction visualization report method of a kind of sing on web and GIS and system
CN103063255B (en) A kind of communication tower monitoring method and system thereof
CA2974401A1 (en) A self-customizing, multi-tenanted mobile system and method for digitally gathering and disseminating real-time visual intelligence on utility asset damage enabling automated priority analysis and enhanced utility outage response
CN104319893B (en) Electric transmission line GIS based on AGPS and 4G and implementation method
CN106022610A (en) Typhoon prevention and resistance monitoring emergency method for electric power system
CN104950348B (en) The correlating method of a kind of weather data and electrical network facilities and system
CN104517432A (en) Monitoring system based on unmanned aerial vehicle and wireless sensor network
CN107920111A (en) A kind of integral intelligent collecting method and platform based on surface weather observation
CN106443345B (en) A kind of fault location system and method for overhead distribution
CN109858826A (en) A kind of gas operation intelligent and safe managing and control system and method
CN112886468B (en) Power transmission line region fault positioning method and device based on inspection data
CN113674123B (en) Urban emergency command system and method based on big data service
CN106655523A (en) Smart electric service system
CN103544561A (en) Method for realizing dynamic display of power transmission circuits, method for realizing operational maintenance of power transmission circuits and system for realizing management of power transmission circuits
CN106097661B (en) It is a kind of meter and meteorological disaster power equipment method for prewarning risk
CN111221931A (en) Visual management method for big data in GIS software
CN103116364A (en) Antenna attitude monitoring system supporting electric tuning function
CN105573228A (en) Remote monitoring device of seawater desalination system
CN109713789A (en) A kind of transformer and distribution station intelligence real-time graded alarm method based on BIM technology
CN204270491U (en) Based on the supervisory system of unmanned plane and wireless sensor network
CN107358562A (en) For the electric network emergency repairing flattening command system and method under Rainfall Disaster
CN109168173B (en) Base station operation and maintenance management method and device and electronic equipment
CN207627784U (en) Fire hydrant on-line monitoring system
CN107196790A (en) A kind of intelligent grid online detection instrument

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant