CN106771864A - The early warning system and transmission line of electricity of transmission line of electricity - Google Patents
The early warning system and transmission line of electricity of transmission line of electricity Download PDFInfo
- Publication number
- CN106771864A CN106771864A CN201611141281.8A CN201611141281A CN106771864A CN 106771864 A CN106771864 A CN 106771864A CN 201611141281 A CN201611141281 A CN 201611141281A CN 106771864 A CN106771864 A CN 106771864A
- Authority
- CN
- China
- Prior art keywords
- transmission line
- electricity
- fault
- module
- potential faults
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/085—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses the early warning system and transmission line of electricity of a kind of transmission line of electricity.Wherein, the early warning system of the transmission line of electricity includes:Message processing module, for typing and/or the essential information and operational factor of renewal transmission line of electricity;Fault pre-alarming module, it is connected with message processing module, for obtaining potential faults event according to the fault type and the essential information and operational factor of transmission line of electricity that prestore, wherein, potential faults event is used to indicate transmission line of electricity of the matching degree more than predetermined threshold value with any one fault type;Wherein, fault pre-alarming module is additionally operable to be indicated in default three-dimensional map background the position of the transmission line of electricity indicated by potential faults event.The present invention is solved in the prior art to can only carry out achieving the technical problem for causing can not intuitively to determine hidden danger to the hidden danger that transmission line of electricity finds.
Description
Technical field
The present invention relates to field of power communication, in particular to the early warning system and transmission line of electricity of a kind of transmission line of electricity.
Background technology
At present, in the market there is no the three dimension system management system platform for being applied to transmission of electricity specialty.To transmission of electricity specialty shaft tower,
The information such as insulator, wire are mainly passed on by written information, and information needed for job applications is by multidisciplinary offer, Yi Zao
Into using inconvenience, it is more easy to go wrong.And institute's application system is only capable of being achieved to scenting a hidden danger at present, does not have formation to open up
Timberline road and the visual intuitive platform of hidden danger contradiction.Therefore do not formed and supported and supervision with the interactive of operation field,
It is not carried out the technological means that early warning pre-control in advance is mutually supported with the production decision in long term.
For in the prior art to can only carry out archive and cause intuitively to determine to the hidden danger that transmission line of electricity finds
The problem of hidden danger, not yet proposes effective solution at present.
The content of the invention
The early warning system and transmission line of electricity of a kind of transmission line of electricity are the embodiment of the invention provides, at least to solve prior art
In to only can to transmission line of electricity find hidden danger carry out achieving the technical problem for causing can not intuitively to determine hidden danger.
A kind of one side according to embodiments of the present invention, there is provided early warning system of transmission line of electricity, including:Information processing
Module, for typing and/or the essential information and operational factor of the renewal transmission line of electricity;Fault pre-alarming module, with the letter
Breath processing module is connected, for being obtained according to the fault type and the essential information and operational factor of the transmission line of electricity that prestore
Potential faults event, wherein, the potential faults event is used for the matching degree of the fault type that instruction prestores with any one
More than the transmission line of electricity of predetermined threshold value;Wherein, the fault pre-alarming module is additionally operable to be indicated in default three-dimensional map background
The position of the transmission line of electricity indicated by the potential faults event.
Another aspect according to embodiments of the present invention, additionally provides a kind of transmission line of electricity, including:Above-mentioned any one transmission of electricity
The early warning system of circuit.
In embodiments of the present invention, the essential information and fortune of the transmission line of electricity for collecting are obtained by message processing module
Line parameter, and realize modification and inquiry to essential information and operational factor;Potential faults event is carried out by warning module
Early warning, and shown by unit map background, so as to more intuitively determine potential faults from three-dimensional map excessively
The position that event occurs, and then can in advance prepare corresponding prediction scheme, solve in the prior art to only can be to transmission line of electricity
It was found that hidden danger carry out achieving the technical problem for causing can not intuitively to determine hidden danger.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of structural representation of the early warning system of transmission line of electricity according to embodiments of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only
The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection
Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing
Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using
Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or
Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover
Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to
Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product
Or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the early warning system of transmission line of electricity, Fig. 1 is according to the present invention
The structural representation of the early warning system of a kind of transmission line of electricity of embodiment, as shown in figure 1, the system includes:
Message processing module 10, for typing and/or the essential information and operational factor of renewal transmission line of electricity.
In a kind of optional embodiment, said system can, modification newly-built by message processing module, inquiry power transmission line
The essential information of circuit and shaft tower involved by road, for example:Equipment account, defect, hidden danger account, trilinear chart sheet, scissors crossing,
The information such as line alignment,
The typing of above- mentioned information does not limit the form of typing, can be word, image, form, or various forms
Mixing, for example, tree line measures typing apart from point-to-point, the information such as insulator, wire, ground wire, steel tower can be with figure
Typing.
Fault pre-alarming module 12, is connected with message processing module, for according to the fault type and transmission line of electricity for prestoring
Essential information and operational factor obtain potential faults event, wherein, potential faults event be used for indicate prestored with any one
Fault type matching degree more than predetermined threshold value transmission line of electricity;Wherein, fault pre-alarming module is additionally operable to default three
The position of the transmission line of electricity indicated by potential faults event is indicated on dimension map background.
In a kind of optional embodiment, the type of the above-mentioned advance typing hidden danger of fault pre-alarming module, and transmission line of electricity
The information such as shaft tower type, arboreal growth speed, local meteorological condition, conducting wire sag draw the potential faults event of circuit, and
It is automatic in three-dimensional map background to release circuit hidden danger position and hidden danger species.
Herein it should be noted that such scheme can improve the accuracy rate and operating efficiency of transmission line information typing,
Quickly can be believed to the related machine account that accident circuit has occurred localized accident district occurred frequently by transmission line of electricity hidden danger early warning system simultaneously
Breath, improves the operating efficiency that transmission of electricity is maked an inspection tour, and facilitates all information that production run personnel understand circuit in time;Simultaneously by pre-
Alert system provides potential faults event in time, it is ensured that power supply reliability.
From the foregoing, it will be observed that the application such scheme obtains the basic letter of the transmission line of electricity for collecting by message processing module
Breath and operational factor, and realize modification and the inquiry to essential information and operational factor;Failure is carried out by warning module hidden
Suffer from the early warning of event, and shown by unit map background, so as to more intuitively determine event from three-dimensional map excessively
The position that barrier hidden danger event occurs, and then can in advance prepare corresponding prediction scheme, solves in the prior art to only can be to defeated
The hidden danger that electric line finds carries out achieving the technical problem for causing can not intuitively to determine hidden danger.
Optionally, according to the above embodiments of the present application, fault pre-alarming module is additionally operable to be classified potential faults event.
Optionally, according to the above embodiments of the present application, fault pre-alarming module is additionally operable to according to each potential faults event
Rank is alerted in the corresponding scope of rank of potential faults event.
Hidden danger event can be carried out classification deciding grade and level by said system, be distinctly displayed.System can be slow according to the weight of hidden danger event
It is anxious that different advice range and contents of announcement are set.
Optionally, according to the above embodiments of the present application, said system also includes:Fault pre-alarming module is additionally operable to according to failure
The corresponding prediction scheme information of hidden danger event type search.
In a kind of optional embodiment, the corresponding prediction scheme content of potential faults event, including potential faults can be inquired about
Type residing for event, line fault form etc. may be caused.Further, can also be to the corresponding prediction scheme of potential faults event
Content carries out typing and change.
Optionally, according to the above embodiments of the present application, said system also includes:
Fault detection module, is connected with message processing module, for essential information and operational factor according to transmission line of electricity
Determine the fault parameter of failure, wherein, fault parameter includes:Fault type and abort situation.
Said system after fault parameter is detected, inquiry and display that can be with event to fault parameter.
Optionally, according to the above embodiments of the present application, said system also includes:
Fault processing module, is connected with fault detection module, for determining troubleshooting scheme according to fault parameter.
In a kind of optional embodiment, system can be in circuit pre-burst significant problem, such as mountain torrents, extra torrential rain, snow
Calamity, fire, earthquake, blast etc. cause personnel to reach the spot the very first time, when obtaining site environment, and geography information and tie
Close, and the current fault message of instantaneous acquiring carries out sand table preview in advance, many set Rush Repair Schemes of customization is assisted, so as to improve scheme
Formulate accuracy.And by the information sharing of mobile terminal feasible system and field failure emergency personnel.
Optionally, according to the above embodiments of the present application, said system also includes:
First d GPS locating module, is connected with message processing module, for the basic of message processing module typing transmission line of electricity
The positional information of shaft tower in information.
Second d GPS locating module, the positional information for determining destination object, and it is true according to the positional information of destination object
Set the goal the running orbit of object.
Specifically, above-mentioned destination object can be the tour personnel of transmission line of electricity, system is automatically by patrolling transmission line
Second d GPS locating module of personnel obtains the information of tour personnel, can also be with the first GPS module of input system, and line
The shaft tower position of line pole tower GPS module detection is associated, automatic record tour personnel's working trajectory, visual query tour work
Situation in place.
Optionally, according to the above embodiments of the present application, the essential information of transmission line of electricity includes circuit essential information and shaft tower
Essential information, circuit essential information includes:Conducting wire sag, line alignment and trilinear chart sheet;The essential information of shaft tower includes:If
Standby account and hidden danger account.
Optionally, according to the above embodiments of the present application, said system also includes:
Three-dimensional visualization module, is connected, for by three-dimensional with described information processing module and the fault pre-alarming module
Pattern shows the essential information and operational factor and the potential faults event of the transmission line of electricity.
Such scheme realizes that failure completes the visualization of overall process from occurring to processing by three-dimensional visualization module, more directly
See the information for showing system typing or generation, it is ensured that troubleshooting it is controllable, can control, controlling.
Embodiment 2
According to embodiments of the present invention, any one transmission of electricity in a kind of transmission line of electricity, including above-described embodiment 1 is additionally provided
The early warning system of circuit.
The early warning system of the transmission line of electricity that above-mentioned transmission line of electricity includes obtains collect defeated by message processing module
The essential information and operational factor of electric line, and realize modification and inquiry to essential information and operational factor;By early warning
Module carries out the early warning of potential faults event, and is shown by unit map background, so as to excessively more intuitively from three
The position that potential faults event occurs is determined on dimension map, and then can in advance prepare corresponding prediction scheme, solve prior art
In to only can to transmission line of electricity find hidden danger carry out achieving the technical problem for causing can not intuitively to determine hidden danger.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment
The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other
Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei
A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces
Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use
When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially
The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer
Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or
Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes
Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of early warning system of transmission line of electricity, it is characterised in that including:
Message processing module, for typing and/or the essential information and operational factor of the renewal transmission line of electricity;
Fault pre-alarming module, is connected with described information processing module, for according to the fault type and the power transmission line for prestoring
The essential information and operational factor on road obtain potential faults event, wherein, the potential faults event be used for indicate with it is any one
Transmission line of electricity of the matching degree of the fault type prestored described in kind more than predetermined threshold value;
Wherein, the fault pre-alarming module is additionally operable to indicate the potential faults event signified in default three-dimensional map background
The position of the transmission line of electricity for showing.
2. system according to claim 1, it is characterised in that the fault pre-alarming module is additionally operable to the potential faults
Event is classified.
3. system according to claim 2, it is characterised in that the fault pre-alarming module be additionally operable to according to each it is described therefore
The rank for hindering hidden danger event is alerted in the corresponding scope of rank of the potential faults event.
4. system according to claim 3, it is characterised in that the system also includes:The fault pre-alarming module is also used
According to the corresponding prediction scheme information of the potential faults event type search.
5. system according to claim 1, it is characterised in that the system also includes:
Fault detection module, is connected with described information processing module, for the essential information according to the transmission line of electricity and operation
The fault parameter of parameter determination failure, wherein, the fault parameter includes:Fault type and abort situation.
6. system according to claim 5, it is characterised in that the system also includes:
Fault processing module, is connected with the fault detection module, for determining troubleshooting scheme according to the fault parameter.
7. system according to claim 3, it is characterised in that the system also includes:
First d GPS locating module, is connected with described information processing module, for power transmission line described in described information processing module typing
The positional information of shaft tower in the essential information on road;
Second d GPS locating module, the positional information for determining destination object, and it is true according to the positional information of the destination object
The running orbit of the fixed destination object.
8. system according to claim 1, it is characterised in that the essential information of the transmission line of electricity is believed substantially including circuit
The essential information of breath and shaft tower, the circuit essential information includes:Conducting wire sag, line alignment and trilinear chart sheet;The shaft tower
Essential information include:Equipment account and hidden danger account.
9. system according to claim 1, it is characterised in that the system also includes:
Three-dimensional visualization module, is connected, for by three dimensional pattern with described information processing module and the fault pre-alarming module
Show the essential information and operational factor and the potential faults event of the transmission line of electricity.
10. a kind of transmission line of electricity, it is characterised in that the early warning including the transmission line of electricity described in any one in claim 1 to 9
System.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611141281.8A CN106771864A (en) | 2016-12-12 | 2016-12-12 | The early warning system and transmission line of electricity of transmission line of electricity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611141281.8A CN106771864A (en) | 2016-12-12 | 2016-12-12 | The early warning system and transmission line of electricity of transmission line of electricity |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106771864A true CN106771864A (en) | 2017-05-31 |
Family
ID=58880373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611141281.8A Pending CN106771864A (en) | 2016-12-12 | 2016-12-12 | The early warning system and transmission line of electricity of transmission line of electricity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106771864A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106846168A (en) * | 2016-12-09 | 2017-06-13 | 国网北京市电力公司 | The processing unit and system of transmission line of electricity scissors crossing |
CN108693445A (en) * | 2018-05-23 | 2018-10-23 | 广东电网有限责任公司 | Power transmission cable Fault Locating Method and device |
CN109583735A (en) * | 2018-11-21 | 2019-04-05 | 北京国网富达科技发展有限责任公司 | Patrolling transmission line method, system, mobile terminal and fortune inspection control platform |
CN111238353A (en) * | 2018-11-28 | 2020-06-05 | 千寻位置网络有限公司 | Cable height monitoring method and system |
CN112419680A (en) * | 2020-11-19 | 2021-02-26 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Power transmission line potential safety hazard classification and identification method and system |
CN112822652A (en) * | 2020-12-29 | 2021-05-18 | 国家电网有限公司 | Power transmission line multi-state perception early warning system |
CN116317171A (en) * | 2023-05-24 | 2023-06-23 | 深圳市凌祺实业有限公司 | Electric quantity and non-electric quantity internet of things monitoring device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101419267A (en) * | 2008-12-03 | 2009-04-29 | 中国电力科学研究院 | Electric network fault on-line rapid diagnosis and analysis method |
CN101819245A (en) * | 2010-05-19 | 2010-09-01 | 山西省电力公司超(特)高压输变电分公司 | Monitoring method and system of transmission line |
CN102118021A (en) * | 2010-01-05 | 2011-07-06 | 华北电力科学研究院有限责任公司 | Transmission line three-dimensional panoramic model-based fault processing method and system |
CN103150598A (en) * | 2011-12-06 | 2013-06-12 | 国家电网公司 | Processing system and method for sudden failure of power transmission network |
CN103645423A (en) * | 2013-12-23 | 2014-03-19 | 国家电网公司 | Fault location method and system for transmission network |
CN103698659A (en) * | 2013-12-27 | 2014-04-02 | 广东电网公司江门供电局 | Simulation early warning platform and monitoring system for dark spots on electric transmission line |
CN104122488A (en) * | 2014-08-13 | 2014-10-29 | 国家电网公司 | Fault check and diagnosis method for power transmission line |
CN105158642A (en) * | 2015-09-21 | 2015-12-16 | 山东海兴电力科技有限公司 | Automatic transmission line fault diagnosis and fault positioning method and system |
CN106017551A (en) * | 2016-05-16 | 2016-10-12 | 国网河南省电力公司电力科学研究院 | Intelligent transmission line integrated monitoring analysis and early warning method |
-
2016
- 2016-12-12 CN CN201611141281.8A patent/CN106771864A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101419267A (en) * | 2008-12-03 | 2009-04-29 | 中国电力科学研究院 | Electric network fault on-line rapid diagnosis and analysis method |
CN102118021A (en) * | 2010-01-05 | 2011-07-06 | 华北电力科学研究院有限责任公司 | Transmission line three-dimensional panoramic model-based fault processing method and system |
CN101819245A (en) * | 2010-05-19 | 2010-09-01 | 山西省电力公司超(特)高压输变电分公司 | Monitoring method and system of transmission line |
CN103150598A (en) * | 2011-12-06 | 2013-06-12 | 国家电网公司 | Processing system and method for sudden failure of power transmission network |
CN103645423A (en) * | 2013-12-23 | 2014-03-19 | 国家电网公司 | Fault location method and system for transmission network |
CN103698659A (en) * | 2013-12-27 | 2014-04-02 | 广东电网公司江门供电局 | Simulation early warning platform and monitoring system for dark spots on electric transmission line |
CN104122488A (en) * | 2014-08-13 | 2014-10-29 | 国家电网公司 | Fault check and diagnosis method for power transmission line |
CN105158642A (en) * | 2015-09-21 | 2015-12-16 | 山东海兴电力科技有限公司 | Automatic transmission line fault diagnosis and fault positioning method and system |
CN106017551A (en) * | 2016-05-16 | 2016-10-12 | 国网河南省电力公司电力科学研究院 | Intelligent transmission line integrated monitoring analysis and early warning method |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106846168A (en) * | 2016-12-09 | 2017-06-13 | 国网北京市电力公司 | The processing unit and system of transmission line of electricity scissors crossing |
CN108693445A (en) * | 2018-05-23 | 2018-10-23 | 广东电网有限责任公司 | Power transmission cable Fault Locating Method and device |
CN109583735A (en) * | 2018-11-21 | 2019-04-05 | 北京国网富达科技发展有限责任公司 | Patrolling transmission line method, system, mobile terminal and fortune inspection control platform |
CN109583735B (en) * | 2018-11-21 | 2021-10-01 | 北京国网富达科技发展有限责任公司 | Power transmission line inspection method and system, mobile terminal and operation inspection management and control platform |
CN111238353A (en) * | 2018-11-28 | 2020-06-05 | 千寻位置网络有限公司 | Cable height monitoring method and system |
CN112419680A (en) * | 2020-11-19 | 2021-02-26 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Power transmission line potential safety hazard classification and identification method and system |
CN112822652A (en) * | 2020-12-29 | 2021-05-18 | 国家电网有限公司 | Power transmission line multi-state perception early warning system |
CN116317171A (en) * | 2023-05-24 | 2023-06-23 | 深圳市凌祺实业有限公司 | Electric quantity and non-electric quantity internet of things monitoring device |
CN116317171B (en) * | 2023-05-24 | 2023-08-18 | 深圳市凌祺实业有限公司 | Electric quantity and non-electric quantity internet of things monitoring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106771864A (en) | The early warning system and transmission line of electricity of transmission line of electricity | |
US20200218483A1 (en) | Methods for assessing reliability of a utility company's power system | |
CN106846168A (en) | The processing unit and system of transmission line of electricity scissors crossing | |
CN107264286A (en) | Electric automobile during traveling fault handling method, device and its equipment | |
CN107657677A (en) | Substation inspection monitoring method, device and electronic equipment | |
TW201234292A (en) | Hazard detection for asset management | |
CN110020733A (en) | Replacing options, system, equipment and the medium of vehicle maintenance consumptive material | |
CN110347694A (en) | A kind of apparatus monitoring method based on Internet of Things, apparatus and system | |
CN105261233B (en) | A kind of garage air navigation aid and mobile terminal | |
CN108810850A (en) | Vehicle mounted failure broadcasting system, method, equipment and storage medium | |
CN106886517A (en) | Business site selecting method, device and system | |
CN112907157A (en) | Power grid risk visualization method and system based on meteorological early warning | |
CN105445592A (en) | Novel intelligent bus management system | |
CN114638938A (en) | Optical cable monitoring method, device, system, electronic equipment and storage medium | |
JP4623743B2 (en) | Distributed supervisory control system and data update method for supervisory control system | |
CN110472752A (en) | Handle the method and device of data | |
CN112307534A (en) | Park weak current scheme online design method and device based on electronic map | |
CN114583671A (en) | Power distribution network protection system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |