CN107220749A - A kind of method and system of emergency resources fast dispatch - Google Patents

A kind of method and system of emergency resources fast dispatch Download PDF

Info

Publication number
CN107220749A
CN107220749A CN201710329024.5A CN201710329024A CN107220749A CN 107220749 A CN107220749 A CN 107220749A CN 201710329024 A CN201710329024 A CN 201710329024A CN 107220749 A CN107220749 A CN 107220749A
Authority
CN
China
Prior art keywords
emergency resources
emergency
destination
information
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710329024.5A
Other languages
Chinese (zh)
Inventor
陈征宇
黄河
林文国
丘韫昕
黄炳裕
戴文艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Evecom Information Technology Development Co Ltd
Original Assignee
Evecom Information Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Evecom Information Technology Development Co Ltd filed Critical Evecom Information Technology Development Co Ltd
Priority to CN201710329024.5A priority Critical patent/CN107220749A/en
Publication of CN107220749A publication Critical patent/CN107220749A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Navigation (AREA)
  • Traffic Control Systems (AREA)

Abstract

The present invention relates to emergency resources scheduling field, a kind of method and system of emergency resources fast dispatch are disclosed, the method for the emergency resources fast dispatch includes step:The spot of event is set to the destination of emergency resources scheduling;According to the type and scale of event, it is determined that the type and quantity of required emergency resources;Obtain the distribution situation of destination periphery emergency resources and show on the electronic map;The schedule information of each emergency resources required for generation is simultaneously sent to corresponding storage repository, and storage repository allocates and transports emergency resources according to schedule information toward destination.The present invention determines the type and quantity of emergency resources by the type of event with scale, and obtain emergency resources distribution situation, and the transfer route of generation emergency resources, and show on the electronic map, each emergency resources warehouse can carry out emergency resources allocation and transportation according to the allocation and transportation route received, so as to effectively shorten the time that emergency resources are transported to.

Description

A kind of method and system of emergency resources fast dispatch
Technical field
The present invention relates to emergency resources scheduling field, the method for more particularly to a kind of emergency resources fast dispatch and it is System.
Background technology
Emergency resources refer to the various relief resources of the preparation for reply burst thing or emergency.Common burst thing Feelings or emergency include earthquake, tsunami and flood, mud-rock flow, snow disaster etc. caused by harsh weather.Common emergent money Source includes drinking water, grain, cotton-wadded quilt, Medicines etc..Under normal conditions, emergency resources are stored in a warehouse in each emergency resources storehouse In storehouse, when occurring unpredictalbe burst thing or emergency, the various emergency resources of scheduling are at this time needed to be sent to incident Ground.Wherein, emergency resources are to be stored in a warehouse by different classifications in the warehouse of different geographical, and a class or several is only stored in a warehouse The emergency resources of class, each warehouse uploads resource data to administrative center, realizes resource-sharing.Therefore need to formulate in scheduling and answer The scheduling scheme of anxious resource, transports emergency resources to spot.
During the present invention is realized, inventor has found that there are the following problems in the prior art, existing emergency resources It is to be stored in by classification is scattered in the warehouse of different geographical, it is impossible to the storage position of various emergency resources is known within the very first time Put, and the quantity stored, it is therefore desirable to spend longer time to work out rational scheduling scheme, dispatching efficiency is low, so that It is difficult to ensure that emergency resources transport to spot within the very first time.
The content of the invention
For this reason, it may be necessary to a kind of method and system of emergency resources fast dispatch be provided, for solving to meet an urgent need in the prior art Time-consuming for scheduling of resource, and dispatching efficiency is low, it is difficult to the problem of transporting to spot in time.
To achieve the above object, a kind of method of emergency resources fast dispatch is inventor provided, is comprised the following steps:
The spot of event is set to the destination of emergency resources scheduling;And the destination is shown on the electronic map;
According to the type and scale of event, it is determined that the type and quantity of required emergency resources;
The distribution situation of destination periphery emergency resources is obtained, and shows the distribution situation on the electronic map, Distribution situation includes species, distributing position and the stored number of emergency resources;
The schedule information of each emergency resources required for generation is simultaneously sent to corresponding storage repository, the schedule information bag The quantity and distributing position of each emergency resources required for including are to the allocation and transportation route of the destination, and storage repository is according to described Schedule information allocates and transports emergency resources toward destination.
Further, it is described the spot of event is set to the destination of emergency resources scheduling before, in addition to step:
Obtain schedule information in real time, and extract from schedule information event information, the schedule information include climatic information, Traffic information and water wave information;The event information extracted includes the species and scale of emergency.
Further, it is described the spot of event is set to the destination of emergency resources scheduling before, in addition to step:
According to the type and scale of event, formulate in the emergency preplan of event, emergency preplan and include generation inhomogeneity The type and quantity of emergency resources needed for the emergency of type and scale.
Further, the allocation and transportation route in the schedule information is generated by following steps:
Each emergency resources distributing position is obtained in real time towards the traffic information of the route of the destination, the road conditions Whether information includes path length, road video record, can pass through, and the current passage rate of road;
Each route is estimated to the transit time of destination according to the traffic information of the route, selection transit time is most Short road is allocation and transportation route.
Further, after the storage repository allocates and transports emergency resources according to the schedule information toward destination, also wrap Include following steps:
The traffic information of the allocation and transportation route is monitored in real time, is analyzed according to the traffic information and is allocated and transported the current of route Speed;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, It is concurrent to be performed by allocation and transportation route administrative department.
In order to solve the above technical problems, inventor additionally provides another technical scheme:A kind of emergency resources fast dispatch System, including:Determining unit, acquiring unit and scheduling unit;
The determining unit is used for the destination that the spot of event is set to emergency resources scheduling;And on the electronic map Show the destination;And according to the type and scale of event, it is determined that the type and quantity of required emergency resources;
The acquiring unit is used for the distribution situation for obtaining destination periphery emergency resources, and shows on the electronic map Show the distribution situation, distribution situation includes species, distributing position and the stored number of emergency resources;
The schedule information for each emergency resources that the scheduling unit is used for required for generating simultaneously is sent to corresponding storage silo Storehouse, the schedule information includes the quantity and distributing position of required each emergency resources to the allocation and transportation road of the destination Line, storage repository allocates and transports emergency resources according to the schedule information toward destination.
Further, the system of the anxious resource fast dispatch also includes extraction unit;
The extraction unit is used to obtain schedule information in real time, and extracts from schedule information event information, the advance notice Information includes climatic information, traffic information and water wave information;The event information extracted includes the species of emergency And scale.
Further, the system of the anxious resource fast dispatch also includes prediction scheme unit;
The prediction scheme unit is used for type and scale according to event, formulates in the emergency preplan of event, emergency preplan Include the type and quantity of the emergency resources needed for the emergency for occurring different type and scale.
Further, the scheduling unit includes route formulation unit;
The route, which formulates unit, is used to obtain each emergency resources distributing position in real time towards the route of the destination Whether traffic information, the traffic information include path length, road video record, can pass through, and road is current Passage rate;And
Each route is estimated to the transit time of destination according to the traffic information of the route, selection transit time is most Short road is allocation and transportation route.
Further, the system of the anxious resource fast dispatch also includes route control unit;
The route control unit is used for, and is provided in the storage repository according to the schedule information toward destination allocation and transportation are emergent After source, the traffic information of the allocation and transportation route is monitored in real time, is analyzed according to the traffic information and allocates and transports the current of route Speed;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, It is concurrent to be performed by allocation and transportation route administrative department.
Be different from prior art, above-mentioned technical proposal by setting the destination that emergency resources are dispatched on the electronic map, And the type according to event determines the type and quantity of required emergency resources with scale, and obtain answering for destination periphery Anxious resource distribution situation is simultaneously shown on the electronic map, so as to quickly reasonably make schedule information i.e. scheduling scheme, is being adjusted Degree information includes the quantity and distributing position of required each emergency resources to the allocation and transportation route of the destination, each emergent Resource storage repository can be transported according to the quantity and allocation and transportation route of the emergency resources in the schedule information received toward destination Emergency resources, so as to effectively shorten the time that emergency resources are transported to.
Brief description of the drawings
Fig. 1 is the emergency disaster relief maneuvering platform module frame chart involved by embodiment;
Fig. 2 is the method flow diagram of emergency resources fast dispatch described in embodiment;
Fig. 3 is the module frame chart of the system of emergency resources fast dispatch described in embodiment.
Description of reference numerals:
10th, determining unit;
20th, acquiring unit;
30th, scheduling unit.
Embodiment
To describe the technology contents of technical scheme in detail, feature, the objects and the effects being constructed, below in conjunction with specific reality Apply example and coordinate accompanying drawing to be explained in detail.
Fig. 1 to Fig. 3 is referred to, a kind of method of emergency resources fast dispatch is present embodiments provided, the emergency resources are fast The method of velocity modulation degree is used to each emergency resources required for emergency disaster relief timely transporting to destination.The fast velocity modulation of the emergency resources The method of degree is realized based on emergency disaster relief maneuvering platform, in case of emergency quickly real by emergency disaster relief maneuvering platform It is existing, the acquisition of emergency resources distributed intelligence, the formulation of schedule information and the allocation and transportation of resource.
The emergency disaster relief maneuvering platform is to be based on modern the Internet technology, with 4G, wired network and all kinds of private network technologies Fusion, can be achieved the monitoring, display, application of various information, and complete different zones or departmental staff's Unified Communication commander, real The system of existing crew's communication for coordination and resource GIS management and control.Wherein, the GIS is Geographic Information System Or Geo-Information system abbreviation, Chinese is:GIS-Geographic Information System or GeoscienceInformation System, are in meter Under calculation machine hardware and software system is supported, the relevant geographic distribution data in epigeosphere (including atmosphere) space is acquired, Storage, management, computing, the technological system analyzed, be shown and described.
As shown in figure 1, the emergency disaster relief maneuvering platform includes:GIS modules, central decision module and communication interconnection Module;Contain electronic map information in the GIS modules, and each emergency resources distributed intelligence, distributed intelligence includes emergent Distribution of resource position, species and quantity, therefore can be searched for by the GIS modules on electronically and show emergent money The distribution situation in source.
Emergency disaster relief maneuvering platform is connected by the system of the communication interconnection module and all departments, and is therefrom obtained related Information data, and for being write to each other with all departments.Such as emergency disaster relief maneuvering platform is connected by the interconnection module that communicates It is connected to climate monitoring system, the connection of traffic route monitoring network and keeps communicating to connect with each emergency resources storage repository;So as to Climatic data, traffic route video data etc. can be therefrom obtained, and every money can be sent to each emergency resources storage repository Source schedule information.
Specifically, referring to Fig. 2, the method for the emergency resources fast dispatch comprises the following steps:
S110, the destination that the spot of event is set to emergency resources scheduling;And the mesh is shown on the electronic map Ground.Wherein, the event refers to all kinds of emergencies for needing emergency resources to support, such as earthquake, pestilence, climate damage The spot of event, on the electronic map incoming event, and it is labeled as destination.Wherein, can be by inputting on the electronic map The title of venue location is retrieved, so that it is determined that destination locations, also can be by the side of manual reconnaissance on the electronic map Formula, determines the position of destination.
S120, type and scale according to event, it is determined that the type and quantity of required emergency resources.Due to difference The species of emergency resources required for emergency is different, for example, when occurring pestilence, the medical treatment such as medicine, disinfection drug Goods and materials are then main emergency resources, and when occurring snow disaster, the warming article such as food and cotton-wadded quilt is then main emergency resources; And different according to the scale of emergency, its coverage and the disaster-stricken number caused are also different, therefore required The quantity of emergency resources be also different.Therefore, it is necessary to obtain the urgent thing occurred before emergency resources scheduling is formulated The type and scale of part.It is determined that required emergency resources type and quantity when, can be set in advance for all kinds of emergencies Include different event scale in emergency preplan, emergency preplan, the type and quantity of required emergency resources;The emergent money The type and quantity in source, the type and quantity that may further reference the emergency resources in historical data used in same or like event come true It is fixed;Certainly adjustment that can also be according to the concrete condition of event to the type and quantity of emergency resources.
It should be noted that although above-mentioned steps S120 is placed in after step S110, but this is not intended that, step S120 Must after step silo, above-mentioned steps S110 and S120 do not have in obvious precedence relationship, specific implementation process, Step S110 and S120 can be carried out simultaneously, or step S120 can also be carried out prior to S110.Complete above-mentioned steps S110 and S120 Enter step S130 afterwards.
S130, the distribution situation for obtaining destination periphery emergency resources, and the distribution is shown on the electronic map Situation, distribution situation includes species, distributing position and the stored number of emergency resources.It is preferential to obtain in the technical program The emergency resources distribution situation on venue location periphery, so as to preferentially cross allocation and transportation emergency resources from spot week, shortens allocation and transportation Distance and haulage time.Obtain emergency resources distribution situation when, the emergency resources on periphery can be screened, only obtain with The distribution situation of emergency resources required for showing on the electronic map, rather than this time the resource required for event is then screened out.
The distribution situation of destination periphery emergency resources is being obtained, and is showing the distribution situation on the electronic map When, can point destination-centric, from the close-by examples to those far off the emergency resources to periphery retrieved and shown;Can also be by electricity Sub- map upper ledge favored area, and retrieving emergency distribution of resource situation and shown in the region of institute frame choosing.Pass through difference Mode obtains the distribution situation with display emergency resources, can improve the flexibility of scheduling of resource.Getting point of emergency resources Enter step 140 after cloth situation.
The schedule information of each emergency resources required for S140, generation is simultaneously sent to corresponding storage repository, the scheduling The quantity and distributing position of information including required each emergency resources are to the allocation and transportation route of the destination, storage repository root According to the schedule information emergency resources are allocated and transported toward destination.In schedule information, it is necessary to which warehouse emergency resources are provided, it is necessary to According to the type and scale of emergency, and depending on the distribution situation of each emergency resources.Specifically, smaller in some scales Emergency in, the type and quantity of required emergency resources are all less, therefore can be according to nearby principle, from neighbouring one Allocate and transport emergency resources in warehouse.Now, the schedule information need to only write exactly the emergency resources provided needed for the warehouse species and Quantity, and the warehouse to destination allocation and transportation route, wherein, allocation and transportation route can be with can in electronic navigation system directly The electronic navigation information of opening.And, it is necessary to the various emergency money of substantial amounts in the larger emergency of some coverages Source, and the emergency resources stored in a warehouse are generally inadequate what is used, it is therefore desirable to multiple warehouse joints are provided should Anxious resource, now, schedule information should include the species and quantity with regard to emergency resources that each warehouse should be provided, and each storehouse The allocation and transportation route of storehouse to destination, and send it to corresponding warehouse.Therefore each storage repository is past according to the schedule information Allocate and transport emergency resources in destination.
In the above-mentioned technical solutions, by the destination for setting emergency resources to dispatch on the electronic map, and according to thing The type of part determines the type and quantity of required emergency resources with scale, and obtains the emergency resources distribution on destination periphery Situation is simultaneously shown on the electronic map, so as to quickly reasonably make schedule information i.e. scheduling scheme, is wrapped in schedule information The quantity and distributing position of each emergency resources required for including are to the allocation and transportation route of the destination, each emergency resources storage silo Storehouse toward destination can transport emergency resources according to the quantity of the emergency resources in the schedule information received and allocation and transportation route, from And effectively shorten the time that emergency resources are transported to.
In some embodiments, the spot of event is set to the destination of emergency resources scheduling in above-mentioned steps S110 Before, it may also include step:
The schedule information of each administrative department is obtained in real time, and extracts from schedule information event information, the schedule information Including climatic information, traffic information and water wave information;The event information extracted includes species and the rule of emergency Mould.The event information extracted may be directly applied in step S110, so as to the very first time occurred in emergency, enter Row should strive the scheduling of resource.Supervised for example, emergency disaster relief maneuvering platform can connect the meteorological of meteorological department by the interconnection module that communicates Examining system, when therefrom obtaining the weather event occurred, such as heavy showers occurs for somewhere, has exceeded in 2 hours precipitation many It is few, occur mountain torrents, mud-stone flow disaster, caused great influence etc., then immediately according to the information of the heavy showers, rapid tissue institute The scheduling of the emergency disaster relief resource needed.Emergency disaster relief maneuvering platform also obtains the weather data of meteorological department, and according to obtaining The weather data taken carries out anticipation, and the accident that may occur is prepared in advance.For example according to meteorology prison Data are surveyed, how many hours interior in future, somewhere is likely to occur precipitation, can now shift to an earlier date the emergency resources to this area periphery Warehouse sends warning information, it is desirable to carry out disaster relief supplies preparation in advance in each warehouse.
During the present invention is realized, inventor is had found under emergency or emergency circumstances, emergency resources energy It is no to transport to incident destination on time, not only with distance dependent of the emergency resources warehouse location away from destination, also with transport routes Real-time road is closely connected.Inventor has found that under emergency or emergency circumstances, the road towards incident destination can Can occur various unpredictable situations, so as to influence emergency resources to transport to destination.For example, in heavy showers situation, leading to Some roads of destination may have occurred and that landslide, it is impossible to current;Or public vehicles mainly entered by certain road or Departure event spot, causes the road traffic drastically upper, influences vehicle pass-through speed.Therefore, in one embodiment, In order that emergency resources can transport to destination in time, it is to avoid the various uncertain factors under emergency or emergency circumstances Influence, generate emergency resources schedule information in allocation and transportation route when, each emergency resources distributing position can be obtained in real time and is led to Whether the traffic information of the route of the destination, the traffic information includes path length, road video record, can lead to OK, and the current passage rate of road;And each route leading to destination is estimated according to the traffic information of the route Row time, selection transit time most short road is allocation and transportation route.Wherein, the estimation of transit time can be carried out rule of thumb artificially Estimation, can also set up correlation data model estimated.
Because in some emergencies or emergency circumstances, such as in the case of violent typhoon, heavy showers, communication apparatus is easy Destroyed, so as to cause disaster area communication disruption, it is impossible to contact with the external world, and be now also easiest to produce rumour, so that Substantial amounts of social personnel and vehicle is poured in disaster area, cause the traffic jam towards disaster area, emergency materials are stranded In on road, it is impossible to transport to disaster area.In the embodiment above, it is logical for the allocation and transportation route of emergency resources that ensures to have selected Freely, it is further comprising the steps of after the storage repository allocates and transports emergency resources according to the schedule information toward destination:
The traffic information of the allocation and transportation route is monitored in real time, is analyzed according to the traffic information and is allocated and transported the current of route Speed;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, It is concurrent to be performed by allocation and transportation route administrative department, such as traffic.Therefore in this embodiment, by allocating and transporting route management department Door, can control the traffic volume of the transfer route, so as to reduce the public vehicles influence unobstructed to allocation and transportation route.
Referring to Fig. 3, embodiment provides a kind of system of emergency resources fast dispatch, the emergency resources fast dispatch System includes:Determining unit 10, acquiring unit 20 and scheduling unit 30;
The determining unit 10 is used for the destination that the spot of event is set to emergency resources scheduling;And in electronic map The upper display destination;And according to the type and scale of event, it is determined that the type and quantity of required emergency resources. Wherein, the event refers to need all kinds of emergencies that emergency resources are supported, the event such as earthquake, pestilence, climate damage, The spot of incoming event, and be labeled as destination on the electronic map.Wherein, it can be sent out by incoming event on the electronic map The title of the dried rhizome of rehmannia is retrieved, so that it is determined that destination locations, also can by way of manual reconnaissance on the electronic map, it is determined that The position of destination.The system of the emergency resources fast dispatch may also include prediction scheme unit;The prediction scheme unit is used for basis The type and scale of event, formulate the emergency preplan of event, include in emergency preplan and occur different type and scale The type and quantity of emergency resources needed for emergency.It is determined that required emergency resources type and quantity when, can join The type and quantity of the emergency resources provided according to prediction scheme unit.The type and quantity of the emergency resources, may further reference history number The type and quantity of emergency resources in used in same or like event are determined;Certainly can also be according to the concrete condition of event Adjustment to the type and quantity of emergency resources.
The acquiring unit 20 is used for the distribution situation for obtaining destination periphery emergency resources, and on the electronic map The distribution situation is shown, distribution situation includes species, distributing position and the stored number of emergency resources.Wherein it is possible to Point centered on destination, from the close-by examples to those far off the emergency resources to periphery retrieved and shown;Can also be by the electronic map Frame favored area, and retrieving emergency distribution of resource situation and shown in the region of institute frame choosing.Obtained by different modes Distribution situation with showing emergency resources, can improve the flexibility of scheduling of resource.
The schedule information for each emergency resources that the scheduling unit 30 is used for required for generating simultaneously is sent to corresponding storage Warehouse, the schedule information includes the quantity and distributing position of required each emergency resources to the allocation and transportation road of the destination Line, storage repository allocates and transports emergency resources according to the schedule information toward destination.In the less emergency of some scales, institute The type and quantity of the emergency resources needed are all less, therefore can be according to nearby principle, from the neighbouring emergent money of warehouse allocation and transportation Source.Now, the type and quantity of the emergency resources provided needed for the warehouse, and the warehouse need to only be write exactly in the schedule information To the allocation and transportation route of destination, wherein, allocation and transportation route can be the electronic navigation can directly be opened in electronic navigation system Information.And, it is necessary to the various emergency resource of substantial amounts in the larger emergency of some coverages, and in a warehouse Middle stored emergency resources are generally inadequate what is used, it is therefore desirable to which multiple warehouse joints provide emergency resources, now, scheduling Information should include the species and quantity with regard to emergency resources that each warehouse should be provided, and each warehouse to destination allocation and transportation Route, and send it to corresponding warehouse.Therefore each storage repository is provided according to the schedule information toward destination allocation and transportation are emergent Source.
In one embodiment, the system of the emergency resources fast dispatch also includes extraction unit;
The extraction unit is used to obtain schedule information in real time, and extracts from schedule information event information, the advance notice Information includes climatic information, traffic information and water wave information;The event information extracted includes the species of emergency And scale.The event information extracted may be directly applied in determining unit, so as to occur in emergency first when Between, progress should strive the scheduling of resource.The extraction unit can be additionally used in the Monitoring Data for extracting all departments, and according to Monitoring Data Emergency anticipation is carried out, and can be shifted to an earlier date to corresponding emergency resources warehouse transmission warning information, it is desirable to is carried out in advance in each warehouse Disaster relief supplies preparation.
In one embodiment, in order that emergency resources can transport to destination in time, it is to avoid in emergency or burst The influence of various uncertain factors under situation, the scheduling unit includes route and formulates unit;The route formulates unit For obtaining each emergency resources distributing position in real time towards the traffic information of the route of the destination, the traffic information Including path length, road video record, whether can pass through, and the current passage rate of road;And according to the route Traffic information estimate each route to the transit time of destination, selection transit time most short road is allocation and transportation route. Wherein, the estimation of transit time can rule of thumb carry out artificial estimation, and the data model that can also set up correlation is estimated.
In some embodiments, the system of the emergency resources fast dispatch may also include route control unit;
The route control unit is used for, and is provided in the storage repository according to the schedule information toward destination allocation and transportation are emergent After source, the traffic information of the allocation and transportation route is monitored in real time, is analyzed according to the traffic information and allocates and transports the current of route Speed;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, It is concurrent to be performed by allocation and transportation route administrative department.By allocating and transporting route administrative department, the traffic volume of the transfer route is can control, so that Reduce the public vehicles influence unobstructed to allocation and transportation route.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or terminal device including a series of key elements not only include those Key element, but also other key elements including being not expressly set out, or also include being this process, method, article or end The intrinsic key element of end equipment.In the absence of more restrictions, limited by sentence " including ... " or " including ... " Key element, it is not excluded that also there is other key element in the process including the key element, method, article or terminal device.This Outside, herein, " being more than ", " being less than ", " exceeding " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand It is to include this number.
It should be understood by those skilled in the art that, the various embodiments described above can be provided as method, device or computer program production Product.These embodiments can be using the embodiment in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Form.All or part of step in the method that the various embodiments described above are related to can be instructed by program correlation hardware come Complete, described program can be stored in the storage medium that computer equipment can be read, for performing the various embodiments described above side All or part of step described in method.The computer equipment, includes but is not limited to:Personal computer, server, general-purpose computations Machine, special-purpose computer, the network equipment, embedded device, programmable device, intelligent mobile terminal, intelligent home device, Wearable Smart machine, vehicle intelligent equipment etc.;Described storage medium, includes but is not limited to:RAM, ROM, magnetic disc, tape, CD, sudden strain of a muscle Deposit, USB flash disk, mobile hard disk, storage card, memory stick, webserver storage, network cloud storage etc..
The various embodiments described above are with reference to method, equipment (system) and the computer program product according to embodiment Flow chart and/or block diagram are described.It should be understood that can be by every in computer program instructions implementation process figure and/or block diagram One flow and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computers can be provided Programmed instruction is to the processor of computer equipment to produce a machine so that pass through the finger of the computing device of computer equipment Order, which is produced, to be used to realize what is specified in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames The device of function.
These computer program instructions may be alternatively stored in the computer that computer equipment can be guided to work in a specific way and set In standby readable memory so that the instruction being stored in the computer equipment readable memory, which is produced, includes the manufacture of command device Product, the command device is realized to be referred in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames Fixed function.
These computer program instructions can be also loaded into computer equipment so that performed on a computing device a series of Operating procedure is to produce computer implemented processing, so that the instruction performed on a computing device is provided for realizing in flow The step of function of being specified in one flow of figure or multiple flows and/or one square frame of block diagram or multiple square frames.
Although the various embodiments described above are described, those skilled in the art once know basic wound The property made concept, then can make other change and modification to these embodiments, so embodiments of the invention are the foregoing is only, Not thereby the scope of patent protection of the present invention, the equivalent structure that every utilization description of the invention and accompanying drawing content are made are limited Or equivalent flow conversion, or other related technical fields are directly or indirectly used in, similarly it is included in the patent of the present invention Within protection domain.

Claims (10)

1. a kind of method of emergency resources fast dispatch, it is characterised in that comprise the following steps:
The spot of event is set to the destination of emergency resources scheduling;And the destination is shown on the electronic map;
According to the type and scale of event, it is determined that the type and quantity of required emergency resources;
The distribution situation of destination periphery emergency resources is obtained, and shows the distribution situation on the electronic map, is distributed Situation includes species, distributing position and the stored number of emergency resources;
The schedule information of each emergency resources required for generation is simultaneously sent to corresponding storage repository, and the schedule information includes institute The quantity and distributing position of each emergency resources needed are to the allocation and transportation route of the destination, and storage repository is according to the scheduling Information allocates and transports emergency resources toward destination.
2. the method for emergency resources fast dispatch according to claim 1, it is characterised in that in the generation by event Ground is set to before the destination of emergency resources scheduling, in addition to step:
Schedule information is obtained in real time, and extracts from schedule information event information, and the schedule information includes climatic information, traffic Traffic information and water wave information;The event information extracted includes the species and scale of emergency.
3. the method for emergency resources fast dispatch according to claim 1, it is characterised in that in the generation by event Ground is set to before the destination of emergency resources scheduling, in addition to step:
According to the type and scale of event, formulate include in the emergency preplan of event, emergency preplan generation different type with And the type and quantity of the emergency resources needed for the emergency of scale.
4. the method for emergency resources fast dispatch according to claim 1, it is characterised in that the tune in the schedule information Fortune route is generated by following steps:
Each emergency resources distributing position is obtained in real time towards the traffic information of the route of the destination, the traffic information Including path length, road video record, whether can pass through, and the current passage rate of road;
Each route is estimated to the transit time of destination according to the traffic information of the route, selection transit time is most short Road is allocation and transportation route.
5. the method for emergency resources fast dispatch according to claim 4, it is characterised in that the storage repository according to The schedule information is allocated and transported toward destination after emergency resources, further comprising the steps of:
The traffic information of the allocation and transportation route is monitored in real time, and the current speed for allocating and transporting route is analyzed according to the traffic information Degree;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, concurrently Performed by allocation and transportation route administrative department.
6. a kind of system of emergency resources fast dispatch, it is characterised in that including:Determining unit, acquiring unit and scheduling unit;
The determining unit is used for the destination that the spot of event is set to emergency resources scheduling;And show on the electronic map The destination;And
According to the type and scale of event, it is determined that the type and quantity of required emergency resources;
The acquiring unit is used for the distribution situation for obtaining destination periphery emergency resources, and shows institute on the electronic map Distribution situation is stated, distribution situation includes species, distributing position and the stored number of emergency resources;
The schedule information for each emergency resources that the scheduling unit is used for required for generating simultaneously is sent to corresponding storage repository, institute Quantity and distributing position of the schedule information including required each emergency resources are stated to the allocation and transportation route of the destination, is stored Warehouse emergency resources are allocated and transported toward destination according to the schedule information.
7. the system of emergency resources fast dispatch according to claim 6, it is characterised in that also including extraction unit;
The extraction unit is used to obtain schedule information in real time, and extracts from schedule information event information, the schedule information Including climatic information, traffic information and water wave information;The event information extracted includes species and the rule of emergency Mould.
8. the system of emergency resources fast dispatch according to claim 6, it is characterised in that also including prediction scheme unit;
The prediction scheme unit is used for type and scale according to event, formulates the emergency preplan of event, and emergency preplan includes There are the type and quantity of the emergency resources needed for the emergency for occurring different type and scale.
9. the system of emergency resources fast dispatch according to claim 6, it is characterised in that the scheduling unit includes road Line formulates unit;
The route, which formulates unit, is used to obtain each emergency resources distributing position in real time towards the traffic of the route of the destination Whether traffic information, the traffic information includes path length, road video record, can pass through, and road currently current Speed;And
Each route is estimated to the transit time of destination according to the traffic information of the route, selection transit time is most short Road is allocation and transportation route.
10. the system of emergency resources fast dispatch according to claim 9, it is characterised in that also including route management and control list Member;
The route control unit is used for, the storage repository according to the schedule information toward destination allocate and transport emergency resources it Afterwards, the traffic information of the allocation and transportation route is monitored in real time, and the passage rate for allocating and transporting route is analyzed according to the traffic information;
Judge whether the passage rate is less than preset value, if so, the then road management and control information of generation limitation vehicle pass-through, concurrently Performed by allocation and transportation route administrative department.
CN201710329024.5A 2017-05-11 2017-05-11 A kind of method and system of emergency resources fast dispatch Pending CN107220749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710329024.5A CN107220749A (en) 2017-05-11 2017-05-11 A kind of method and system of emergency resources fast dispatch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710329024.5A CN107220749A (en) 2017-05-11 2017-05-11 A kind of method and system of emergency resources fast dispatch

Publications (1)

Publication Number Publication Date
CN107220749A true CN107220749A (en) 2017-09-29

Family

ID=59944101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710329024.5A Pending CN107220749A (en) 2017-05-11 2017-05-11 A kind of method and system of emergency resources fast dispatch

Country Status (1)

Country Link
CN (1) CN107220749A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109783068A (en) * 2018-12-18 2019-05-21 南京宽慧无线网络通信有限公司 One kind being based on MVC framework mode comprehensive resources dispatcher system
CN109992622A (en) * 2018-11-21 2019-07-09 北京域天科技有限公司 A kind of shared exchange system of emergency resources
CN110046816A (en) * 2019-04-12 2019-07-23 山东开创云软件有限公司 A kind of goods and materials concocting method and device, equipment, medium based on cloud platform
CN110175754A (en) * 2019-04-30 2019-08-27 华中科技大学 A kind of emergency resources allocation and transportation mission planning method and system based on HTN planning
CN111368220A (en) * 2020-03-04 2020-07-03 中科全维科技(苏州)有限公司 WebGIS-based self-adaptive display method and system for emergency rescue resources
CN111815104A (en) * 2020-05-18 2020-10-23 深圳市第一反应信息科技有限公司 Method and equipment for scheduling emergency response resources
CN111832933A (en) * 2020-07-10 2020-10-27 陕西金合信息科技股份有限公司 Emergency resource scheduling method and device
CN113554369A (en) * 2020-04-23 2021-10-26 中国石油化工股份有限公司 Method and device for allocating rescue teams for dangerous chemical transport accidents
CN113642927A (en) * 2021-08-31 2021-11-12 平安医疗健康管理股份有限公司 Emergency resource management method, device, equipment and storage medium
CN116167561A (en) * 2022-12-02 2023-05-26 广东铭太信息科技有限公司 Emergency alarm-out equipment scheduling method, device and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252627A (en) * 2008-04-15 2008-08-27 北京航空航天大学 Emergency tow car scheduling command system facing to airport
CN103337162A (en) * 2013-07-16 2013-10-02 四川大学 Real-time planning and dynamic scheduling system for urban emergency rescue channel
CN105320712A (en) * 2014-09-04 2016-02-10 国网山东省电力公司应急管理中心 GIS map based dynamic situation plotting system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252627A (en) * 2008-04-15 2008-08-27 北京航空航天大学 Emergency tow car scheduling command system facing to airport
CN103337162A (en) * 2013-07-16 2013-10-02 四川大学 Real-time planning and dynamic scheduling system for urban emergency rescue channel
CN105320712A (en) * 2014-09-04 2016-02-10 国网山东省电力公司应急管理中心 GIS map based dynamic situation plotting system and method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109992622A (en) * 2018-11-21 2019-07-09 北京域天科技有限公司 A kind of shared exchange system of emergency resources
CN109783068A (en) * 2018-12-18 2019-05-21 南京宽慧无线网络通信有限公司 One kind being based on MVC framework mode comprehensive resources dispatcher system
CN110046816A (en) * 2019-04-12 2019-07-23 山东开创云软件有限公司 A kind of goods and materials concocting method and device, equipment, medium based on cloud platform
CN110175754A (en) * 2019-04-30 2019-08-27 华中科技大学 A kind of emergency resources allocation and transportation mission planning method and system based on HTN planning
CN111368220A (en) * 2020-03-04 2020-07-03 中科全维科技(苏州)有限公司 WebGIS-based self-adaptive display method and system for emergency rescue resources
CN113554369A (en) * 2020-04-23 2021-10-26 中国石油化工股份有限公司 Method and device for allocating rescue teams for dangerous chemical transport accidents
CN111815104A (en) * 2020-05-18 2020-10-23 深圳市第一反应信息科技有限公司 Method and equipment for scheduling emergency response resources
CN111832933A (en) * 2020-07-10 2020-10-27 陕西金合信息科技股份有限公司 Emergency resource scheduling method and device
CN113642927A (en) * 2021-08-31 2021-11-12 平安医疗健康管理股份有限公司 Emergency resource management method, device, equipment and storage medium
CN116167561A (en) * 2022-12-02 2023-05-26 广东铭太信息科技有限公司 Emergency alarm-out equipment scheduling method, device and system

Similar Documents

Publication Publication Date Title
CN107220749A (en) A kind of method and system of emergency resources fast dispatch
Acosta-Coll et al. Real-time early warning system design for pluvial flash floods—A review
An et al. Location planning for transit-based evacuation under the risk of service disruptions
Munawar et al. Disruptive technologies as a solution for disaster risk management: A review
Acheampong et al. Quantifying the spatio-temporal patterns of settlement growth in a metropolitan region of Ghana
US9726782B2 (en) Methods, systems and computer program storage devices for generating a response to flooding
Hogan et al. Concepts and applications of backup coverage
Amini et al. Sustainable smart cities through the lens of complex interdependent infrastructures: panorama and state-of-the-art
Janani et al. IoT in smart cities: A contemporary survey
Ye et al. Methodology and its application for community-scale evacuation planning against earthquake disaster
CN106251578A (en) Artificial abortion's early warning analysis method and system based on probe
CN107729413A (en) Regional traffic intelligent management system based on big data
US20130273901A1 (en) Scalable Common Infrastructure for Information Collection from Networked Devices
CN103810528A (en) Internet of Things smart city method and device
CN104657815A (en) Expressway integrated incident processing and emergency scheduling system and method
CN106681246A (en) Remote monitoring system of coal transfer terminal
Tomsen et al. Evacuation planning in the Auckland Volcanic Field, New Zealand: a spatio-temporal approach for emergency management and transportation network decisions
CN112418556B (en) Gridding service system based on Internet sharing platform
CN112785174A (en) Material scheduling method and system for major sanitary event isolation area and readable storage medium
CN106845780A (en) A kind of generating set operating condition analysis system and its analysis method
Bhanumurthy et al. Defining a framework for integration of geospatial technologies for emergency management
CN111639786A (en) Resource allocation method, device, storage medium and computer equipment
Yang et al. An Internet of Things based material delivery model for disaster management in libraries
Chaurasia et al. An overview of smart city: observation, technologies, challenges and blockchain applications
Kansal et al. Flood management issues in hilly regions of Uttarakhand (India) under changing climatic conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929