CN108539856A - Power distribution network complete perception operation monitoring power distribution rush-repair system - Google Patents
Power distribution network complete perception operation monitoring power distribution rush-repair system Download PDFInfo
- Publication number
- CN108539856A CN108539856A CN201810398032.XA CN201810398032A CN108539856A CN 108539856 A CN108539856 A CN 108539856A CN 201810398032 A CN201810398032 A CN 201810398032A CN 108539856 A CN108539856 A CN 108539856A
- Authority
- CN
- China
- Prior art keywords
- power distribution
- module
- monitoring
- distribution network
- control layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 76
- 230000008447 perception Effects 0.000 title claims abstract description 20
- 230000007246 mechanism Effects 0.000 claims abstract description 35
- 238000012545 processing Methods 0.000 claims abstract description 29
- 230000001105 regulatory effect Effects 0.000 claims abstract description 19
- 230000003993 interaction Effects 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 28
- 238000012423 maintenance Methods 0.000 claims description 14
- 230000004044 response Effects 0.000 claims description 6
- 238000013024 troubleshooting Methods 0.000 claims description 6
- 230000005611 electricity Effects 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 230000008439 repair process Effects 0.000 description 15
- 230000008901 benefit Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000012552 review Methods 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 206010003830 Automatism Diseases 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- H02J13/0006—
Abstract
The invention discloses a kind of power distribution network complete perceptions to run monitoring power distribution rush-repair system, including control layer, with the equipment condition monitoring mechanism of control layer signal interconnection, matched with equipment condition monitoring mechanism and with the electric network state regulatory agencies of control layer signal interconnection, and with control layer signal interconnect and be used to execute the automated execution mechanism of equipment condition monitoring mechanism and electric network state regulatory agencies corresponding operating;Control layer includes data processing module, with the display module of data processing module signal interconnection, with the data interaction module of data processing module signal interconnection, the mobile intelligent terminal with the interconnection of data exchange module signal, and the repairing info push module with the interconnection of data processing module signal.The present invention is capable of the equipment state and circuit operating status of complete perception power distribution network, and fault message is sent to power distribution rush-repair center responsible person person in time, in order to relevant personnel's timely processing failure, shortens power off time, improves power supply reliability.
Description
Technical field
The invention belongs to distribution intelligent monitoring technology fields, match more particularly, to a kind of operation monitoring of power distribution network complete perception
Electric repairing system.
Background technology
Power distribution network is by overhead transmission line, cable, shaft tower, distribution transformer, disconnecting switch, reactive-load compensator and some are attached
The compositions such as facility, to distribute the network of electric energy effect in the lifting of electric power hairnet.Due to power distribution network be an important user with
The link that electric system is connected directly, the running environment are comparable complexity, its own operational safety level will look forward to electric power
Industry economic benefit has a direct impact.Distribution Network Failure rate is to reflect one of the important indicator of power supply enterprise's distribution management level, is matched
Net failure rate height not only has a major impact power supply reliability, is also related to the social image and economic benefit of enterprise.Therefore,
It has to improve the attention to power distribution network safe operation, carries out the sound of distribution network system, ensure having for its daily power failure
Effect is eliminated, and the stable operation of the power supply link of enterprise is promoted.
The pattern of breakdown repair work order is at present:Seat personnel distributes work order, after repair personnel to scene rush to repair, returns
Go to fill in work order information again, cause the information that work order is filled in that cannot timely feedback to seat personnel, cause work order repairing duration compared with
It is long;Meanwhile because repair personnel cannot grasp real-time weather and road conditions, repairing, which tends not to reach rapidly, reports scene for repairment, causes to rob
Time lengthening is repaiied, customer satisfaction with services is not high.
Therefore, it is necessary to research and develop a new distribution network operation to monitor power distribution rush-repair system.
Application publication number is that the application for a patent for invention of 105139118 A of CN discloses a kind of network distributing failure emergency repair power failure letter
Breath reporting system and method, technical solution are:95598 remote work stations, DMS distribution automation systems, OMS scheduling pipes
Reason system respectively by information interactive bus connect data supporting platform, the data supporting platform include application server,
Data server, storage device, load equalizer, interchanger and fire wall, connect between application server and data server
Load equalizer, application server and data server connect storage device, and data supporting platform is remote by fire wall and 95598
Journey work station, DMS distribution automation systems and control computer carry out information exchange;Advantageous effect is:Monitor operation of power networks in real time
Situation finds power-off event in time, and 95598 fault ticket process flows are become active process from passively receiving, actively to
Power supply interrupted district client sends power failure short message, merges same power-off event fault ticket, shortens and calls time in outage information, improves
Working efficiency realizes good service.However, the patent application can not complete perception power distribution network operating status.
Application publication number discloses a kind of distribution repairing managing and control system for the application for a patent for invention of CN107480855A, including
It arranges an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing manoeuvre management module, basic management mould
Block, central processing unit, database, the central processing unit respectively with arrange an order according to class and grade and duty management module, repairing management and control module, repairing
After-action review module, repairing manoeuvre management module, basic management module, database are connected.Distribution repairing described in the invention
Managing and control system, which incorporates, arranges an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing manoeuvre management mould
The function of block, basic management module can understand personnel's situation on duty in time, be carried out to repairing resource convenient for command centre personnel
Scheduling in time, and then effectively improve troubleshooting speed.However, the patent application can not complete perception power distribution network operation shape
State.
Invention content
In view of this, in view of the deficiencies of the prior art, it is an object of the present invention to provide a kind of operations of power distribution network complete perception
Power distribution rush-repair system is monitored, is capable of the equipment state and circuit operating status of complete perception power distribution network, and in time by fault message
It is sent to power distribution rush-repair center responsible person person, in order to relevant personnel's timely processing failure, shortens power off time, improves and supply
Electric reliability.
In order to achieve the above objectives, the present invention uses following technical scheme:
Power distribution network complete perception operation monitoring power distribution rush-repair system, including control layer, the equipment with the control layer signal interconnection
Status monitoring mechanism, the electric network state management and control for matching with the equipment condition monitoring mechanism and being interconnected with the control layer signal
Mechanism, and interconnected with the control layer signal and be used to execute the equipment condition monitoring mechanism and electric network state regulatory agencies
The automated execution mechanism of corresponding operating;
The control layer includes data processing module, the display module with data processing module signal interconnection, with the number
According to the data interaction module that processing module signal interconnects, the mobile intelligent terminal with data exchange module signal interconnection, with
And the repairing info push module with data processing module signal interconnection, the repairing info push module are used for failure
Information and troubleshooting strategy are sent to dispatcher and power distribution rush-repair center in time;
The equipment condition monitoring mechanism, for monitoring the running environment of power distribution network, the equipment running status of power distribution station in real time
With the operating status of circuit;
The electric network state regulatory agencies, for the maintenance power failure operation of management and control power distribution network, fault outage operation and single-phase earthing
Fault outage operates.
Further, the equipment condition monitoring mechanism include running environment monitoring modular, power distribution station monitoring modular and
Circuit operational monitoring module, running environment of the running environment monitoring modular for monitoring power distribution network in real time, the allocated radio
Equipment running status of area's monitoring modular for monitoring power distribution station in real time, the circuit operational monitoring module for monitoring in real time
The operating status of circuit.
Further, the electric network state regulatory agencies include maintenance power failure module, fault outage module and single-phase earthing
Whether fault outage module, the maintenance power failure module need to carry out maintenance power failure operation, the failure for management and control power distribution network
Whether power failure module needs to carry out fault outage operation for management and control power distribution network, and the singlephase earth fault power failure module is for managing
Whether control power distribution network needs to carry out singlephase earth fault power failure operation.
Further, the automated execution mechanism includes breaker, disconnecting switch and fuse.
Further, further include the operation of power networks state prediction module interconnected with the control layer signal, by monitoring
The analysis of data and the network equipment is made prediction to the operating status in low and medium voltage distribution network future, is done to the risk being likely to occur
Go out prompt, takes timely measure, prevent trouble before it happens convenient for operations staff.
Further, further include the emergency policy library interconnected with the control layer signal, matched by statistical analysis mesolow
The reason of grid collapses, classification formulate corresponding response policy for various types of failures, form emergency policy library,
Formulate corresponding response scheme according to emergency policy library when control layer software monitors to failure occur, be supplied to dispatcher and
Power distribution rush-repair center responsible person person.
Further, further include customizing service module with the user of the control layer signal interconnection, according to user data
Displaying demand graphically customizes the data target that displaying user is concerned about the most, and can key generation corresponding report.
The beneficial effects of the invention are as follows:
The present invention is for the pattern of current breakdown repair work order:Seat personnel distributes work order, and repair personnel is complete to scene rush to repair
Bi Hou goes back to fill in work order information again, causes the information that work order is filled in that cannot timely feedback to seat personnel, work order is caused to repair
Duration is longer;Meanwhile because repair personnel cannot grasp real-time weather and road conditions, repairing, which tends not to reach rapidly, reports scene for repairment,
Emergency repair time is caused to extend, the not high problem of customer satisfaction with services provides a kind of power distribution network complete perception operation monitoring distribution
Repairing system, including control layer, the equipment condition monitoring mechanism with control layer signal interconnection, with the equipment condition monitoring mechanism
The electric network state regulatory agencies for matching and being interconnected with the control layer signal, and interconnect and be used for the control layer signal
Execute the automated execution mechanism of the equipment condition monitoring mechanism and electric network state regulatory agencies corresponding operating;The control layer
Including data processing module, the display module with data processing module signal interconnection, with the data processing module signal
The data interaction module of interconnection, with the data exchange module signal interconnection mobile intelligent terminal, and at the data
The repairing info push module of module by signal interconnection is managed, the repairing info push module is used for fault message and troubleshooting
Strategy is sent to dispatcher and power distribution rush-repair center in time, in order to relevant personnel's timely processing failure, shortens power off time,
Improve power supply reliability;The equipment condition monitoring mechanism, for monitoring the running environment of power distribution network in real time, power distribution station is set
The operating status of standby operating status and circuit, avoids that because of repair personnel real-time weather and road conditions cannot be grasped, causes emergency repair time
Extend, the not high problem of customer satisfaction with services;The electric network state regulatory agencies, the maintenance for management and control power distribution network, which has a power failure, grasps
Make, fault outage operates and singlephase earth fault power failure operation.
The application of the present invention can greatly mitigate the labor intensity of staff, shorten power off time, reduce electricity consumption damage
It loses, improves power supply reliability, improve operation automation, the level of IT application.It can accomplish convenient and efficient lookup fault point, avoid thing
Therefore further expansion;The labor intensity for greatly alleviating staff, saves a large amount of human and material resources;When shortening power failure
Between, reduce and uses electric loss;Power supply reliability is improved, is automated, the level of IT application.
The present invention will have a very important significance after promoting:
(1)Low and medium voltage distribution network power supply quality can be greatly improved, is mainly reflected in:Power supply reliability can be greatly improved;It can
Accomplish to ensure the timeliness of user power utilization;Meet the requirement of industrial technology equipment and household electrical appliance to power quality;Power distribution network is sent out
After raw failure can quickly resume power supply, reduce power failure area, reduce user's power failure probability.
(2)The modern management for being conducive to improve electric company is horizontal, is mainly reflected in:It can accomplish to monitor power distribution network in real time
Operating condition optimizes the power distribution network method of operation;Operation loss of power grids can be reduced simultaneously;It can quickly judge simultaneously automatism isolation power grid
Failure;Due to the raising of automatization level, the labor intensity of staff can be mitigated, improved labor efficiency;Reasonable distribution electricity consumption
Load improves equipment service efficiency;Also meter reading note that can be promptly and accurately is taken, it is ensured that Business Economic Benefit.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification
It obtains it is clear that understand through the implementation of the invention.The purpose of the present invention and other advantages can be by the explanations write
Specifically noted structure is realized and is obtained in book, claims and attached drawing.
Description of the drawings
Fig. 1 is the structure diagram of the first embodiment of the invention;
Fig. 2 is the structure diagram of second of embodiment of the invention;
Fig. 3 is the structure diagram of the third embodiment of the invention;
Fig. 4 is the structure diagram of the 4th kind of embodiment of the invention.
Specific implementation mode
Embodiments of the present invention are described below in detail, the example of the embodiment is shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, and is only used for explaining the present invention, and is not construed as limiting the claims.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singulative " one " used herein, " one
It is a ", " described " and "the" may also comprise plural form.It is to be further understood that is used in the specification of the present invention arranges
It refers to there are the feature, integer, step, operation, element and/or component, but it is not excluded that presence or addition to take leave " comprising "
Other one or more features, integer, step, operation, element, component and/or their group.It should be understood that when we claim member
Part is " connected " or when " coupled " to another element, it can be directly connected or coupled to other elements, or there may also be
Intermediary element.In addition, " connection " used herein or " coupling " may include being wirelessly connected or coupling.Wording used herein
"and/or" includes any cell of one or more associated list items and all combines.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technology art
Language and scientific terminology) there is meaning identical with the general understanding of the those of ordinary skill in fields of the present invention.Should also
Understand, those terms such as defined in the general dictionary, which should be understood that, to be had and the meaning in the context of the prior art
The consistent meaning of justice, and unless defined as here, will not be with idealizing or the meaning of too formal be explained.It should manage
Solution, in order to enable technical solution is definitely, " front, back, left, right, up, down " used herein etc. indicates that the term in orientation is
Relative to the term position of Fig. 1, not because of the conversion changing location form of presentation of view.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
Attached drawing, the technical solution of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is this hair
Bright a part of the embodiment, instead of all the embodiments.Based on described the embodiment of the present invention, ordinary skill
The every other embodiment that personnel are obtained, shall fall within the protection scope of the present invention.
Embodiment 1
As shown in Figure 1, power distribution network complete perception operation monitoring power distribution rush-repair system, including control layer 1, believe with the control layer 1
Number interconnection equipment condition monitoring mechanism 2, matched with the equipment condition monitoring mechanism 2 and mutual with 1 signal of the control layer
The electric network state regulatory agencies 3 of connection, and interconnected with 1 signal of the control layer and be used to execute the equipment condition monitoring mechanism
2 and 3 corresponding operating of electric network state regulatory agencies automated execution mechanism 4.
The control layer 1 includes data processing module 11, the display module with the interconnection of 11 signal of the data processing module
12, the data interaction module 13 with the interconnection of 11 signal of the data processing module is interconnected with 13 signal of the data interaction module
Mobile intelligent terminal 14, and with 11 signal of the data processing module interconnection repairing info push module 15, it is described to rob
Info push module 15 is repaiied for fault message and troubleshooting strategy to be sent to dispatcher and power distribution rush-repair center in time.
The equipment condition monitoring mechanism 2, running environment, the operation of the equipment of power distribution station for monitoring power distribution network in real time
The operating status of state and circuit.
The electric network state regulatory agencies 3 operate and single-phase for the maintenance power failure operation of management and control power distribution network, fault outage
Earth fault power failure operation.
The equipment condition monitoring mechanism 2 includes running environment monitoring modular 21, power distribution station monitoring modular 22 and circuit
Operational monitoring module 23, running environment of the running environment monitoring modular 21 for monitoring power distribution network in real time, the allocated radio
Equipment running status of the area's monitoring modular 22 for monitoring power distribution station in real time, the circuit operational monitoring module 23 is for real-time
Monitor the operating status of circuit.
The electric network state regulatory agencies 3 include maintenance power failure module 31, fault outage module 32 and singlephase earth fault
Whether power failure module 33, the maintenance power failure module 31 need to carry out maintenance power failure operation, the failure for management and control power distribution network
Whether power failure module 32 needs to carry out fault outage operation for management and control power distribution network, and the singlephase earth fault power failure module 33 is used
Whether need to carry out singlephase earth fault power failure operation in management and control power distribution network.
The automated execution mechanism 4 includes breaker 41, disconnecting switch 42 and fuse 43.
In the embodiment, a kind of power distribution network complete perception operation monitoring power distribution rush-repair system, including control layer are provided, with control
Preparative layer signal interconnection equipment condition monitoring mechanism, matched with the equipment condition monitoring mechanism and with the control layer signal
The electric network state regulatory agencies of interconnection, and interconnected with the control layer signal and be used to execute the equipment condition monitoring mechanism
With the automated execution mechanism of electric network state regulatory agencies corresponding operating;The control layer includes data processing module, and described
The display module of data processing module signal interconnection, the data interaction module with data processing module signal interconnection, with institute
State the mobile intelligent terminal of data exchange module signal interconnection, and the repairing information with data processing module signal interconnection
Pushing module, the repairing info push module be used for by fault message and troubleshooting strategy be sent in time dispatcher and
Power off time is shortened in power distribution rush-repair center in order to relevant personnel's timely processing failure, improves power supply reliability;The equipment
Status monitoring mechanism, the operation for monitoring the running environment of power distribution network, the equipment running status and circuit of power distribution station in real time
State avoids that because of repair personnel real-time weather and road conditions cannot be grasped, causes emergency repair time to extend, customer satisfaction with services is not high
The problem of;The electric network state regulatory agencies are operated for the maintenance power failure operation of management and control power distribution network, fault outage and single-phase are connect
Earth fault power failure operation.
The application of the present invention can greatly mitigate the labor intensity of staff, shorten power off time, reduce electricity consumption damage
It loses, improves power supply reliability, improve operation automation, the level of IT application.It can accomplish convenient and efficient lookup fault point, avoid thing
Therefore further expansion;The labor intensity for greatly alleviating staff, saves a large amount of human and material resources;When shortening power failure
Between, reduce and uses electric loss;Power supply reliability is improved, is automated, the level of IT application.
Embodiment 2
As shown in Fig. 2, its with embodiment 1 difference lies in:It further include the operation of power networks state interconnected with 1 signal of the control layer
Prediction module 5 is made the operating status in low and medium voltage distribution network future pre- by the analysis to monitoring data and the network equipment
It surveys, prompt is made to the risk being likely to occur, takes timely measure, prevents trouble before it happens convenient for operations staff.
Embodiment 3
As shown in figure 3, itself the difference from example 2 is that:Further include the emergency policy library 6 interconnected with 1 signal of the control layer,
The reason of being broken down by statistical analysis low and medium voltage distribution network, classification formulate corresponding response for various types of failures
Strategy forms emergency policy library, and corresponding response is formulated according to emergency policy library when control layer software monitors to failure occur
Scheme is supplied to dispatcher and power distribution rush-repair center responsible person person.
Embodiment 4
As shown in figure 4, its with embodiment 3 difference lies in:Further include that the user interconnected with 1 signal of the control layer customizes clothes
Business module 7 shows that demand graphically customizes the data target that displaying user is concerned about the most according to user data, and can key life
At corresponding report.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, this field is common
Other modifications or equivalent replacement that technical staff makes technical scheme of the present invention, without departing from technical solution of the present invention
Spirit and scope, be intended to be within the scope of the claims of the invention.
Claims (7)
1. power distribution network complete perception operation monitoring power distribution rush-repair system, it is characterised in that:Including control layer, believe with the control layer
Number interconnection equipment condition monitoring mechanism, matched with the equipment condition monitoring mechanism and with it is described control layer signal interconnection
Electric network state regulatory agencies, and interconnected with the control layer signal and be used to execute the equipment condition monitoring mechanism and power grid
The automated execution mechanism of state regulatory agencies corresponding operating;
The control layer includes data processing module, the display module with data processing module signal interconnection, with the number
According to the data interaction module that processing module signal interconnects, the mobile intelligent terminal with data exchange module signal interconnection, with
And the repairing info push module with data processing module signal interconnection, the repairing info push module are used for failure
Information and troubleshooting strategy are sent to dispatcher and power distribution rush-repair center in time;
The equipment condition monitoring mechanism, for monitoring the running environment of power distribution network, the equipment running status of power distribution station in real time
With the operating status of circuit;
The electric network state regulatory agencies, for the maintenance power failure operation of management and control power distribution network, fault outage operation and single-phase earthing
Fault outage operates.
2. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 1, it is characterised in that:It is described to set
Standby status monitoring mechanism includes running environment monitoring modular, power distribution station monitoring modular and circuit operational monitoring module, the fortune
Running environment of the row environment monitoring module for monitoring power distribution network in real time, the power distribution station monitoring modular are matched for monitoring in real time
The equipment running status of radio area, operating status of the circuit operational monitoring module for monitoring circuit in real time.
3. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 2, it is characterised in that:The electricity
Net state regulatory agencies include that maintenance power failure module, fault outage module and singlephase earth fault power failure module, the maintenance stop
Whether electric module needs to carry out maintenance power failure operation for management and control power distribution network, and the fault outage module is for management and control power distribution network
No to need to carry out fault outage operation, it is single-phase whether the singlephase earth fault power failure module needs to carry out for management and control power distribution network
Earth fault power failure operation.
4. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 3, it is characterised in that:It is described from
Dong Hua executing agencies include breaker, disconnecting switch and fuse.
5. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 4, it is characterised in that:Further include
It is right by the analysis to monitoring data and the network equipment with the operation of power networks state prediction module of the control layer signal interconnection
The operating status in low and medium voltage distribution network future is made prediction, and prompt is made to the risk being likely to occur, timely convenient for operations staff
It takes measures, prevents trouble before it happens.
6. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 5, it is characterised in that:Further include
With the emergency policy library of the control layer signal interconnection, the reason of being broken down by statistical analysis low and medium voltage distribution network, classification,
Corresponding response policy is formulated for various types of failures, forms emergency policy library, when control layer software monitors to failure are sent out
Corresponding response scheme is formulated according to emergency policy library when raw, is supplied to dispatcher and power distribution rush-repair center responsible person
Member.
7. power distribution network complete perception operation monitoring power distribution rush-repair system according to claim 6, it is characterised in that:Further include
Service module is customized with the user of the control layer signal interconnection, shows that demand graphically customizes displaying according to user data
The data target that user is concerned about the most, and can key generation corresponding report.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810398032.XA CN108539856A (en) | 2018-04-28 | 2018-04-28 | Power distribution network complete perception operation monitoring power distribution rush-repair system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810398032.XA CN108539856A (en) | 2018-04-28 | 2018-04-28 | Power distribution network complete perception operation monitoring power distribution rush-repair system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108539856A true CN108539856A (en) | 2018-09-14 |
Family
ID=63473689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810398032.XA Pending CN108539856A (en) | 2018-04-28 | 2018-04-28 | Power distribution network complete perception operation monitoring power distribution rush-repair system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108539856A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111262344A (en) * | 2020-03-30 | 2020-06-09 | 佛山科学技术学院 | Power grid monitoring emergency system |
CN111817434A (en) * | 2020-05-25 | 2020-10-23 | 国网河北省电力有限公司衡水市桃城区供电分公司 | Intelligent monitoring system for distribution network line |
CN112701783A (en) * | 2020-12-14 | 2021-04-23 | 广东电网有限责任公司 | Distribution network operation and maintenance monitoring equipment and monitoring method |
CN112966843A (en) * | 2021-04-01 | 2021-06-15 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | Public transformer area fault perception management and control system based on Internet of things |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0430653A (en) * | 1990-05-24 | 1992-02-03 | Yamatake Honeywell Co Ltd | Central control supervisory system |
JPH06121474A (en) * | 1992-10-08 | 1994-04-28 | Toshiba Corp | Patrol and inspection support device for electric station |
CN102097861A (en) * | 2010-12-13 | 2011-06-15 | 山东电力集团公司泰安供电公司 | Electrical intelligent emergency repair terminal |
CN102570602A (en) * | 2011-12-04 | 2012-07-11 | 江苏省电力公司南京供电公司 | Fault comprehensive processing platform and method of distribution network |
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitoring system of power grid breakdown first-aid repair |
CN103259335A (en) * | 2013-04-11 | 2013-08-21 | 国家电网公司 | Intelligent demand response and demand side optimizing operation system |
CN104124756A (en) * | 2013-04-27 | 2014-10-29 | 国家电网公司 | Province-level power distribution network operation monitoring system based on network-wide data |
CN104218485A (en) * | 2014-09-23 | 2014-12-17 | 国网河南省电力公司周口供电公司 | Power grid quick rush-repair control system and using method thereof |
CN106026096A (en) * | 2016-06-29 | 2016-10-12 | 南京软核科技有限公司 | SVG-based multi-level coordination energy-saving optimization control system for distribution network |
CN107506849A (en) * | 2017-07-24 | 2017-12-22 | 国网江西省电力公司电力科学研究院 | A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system |
CN107707029A (en) * | 2017-10-23 | 2018-02-16 | 珠海许继芝电网自动化有限公司 | Low and medium voltage distribution network integrated monitoring and management system |
-
2018
- 2018-04-28 CN CN201810398032.XA patent/CN108539856A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0430653A (en) * | 1990-05-24 | 1992-02-03 | Yamatake Honeywell Co Ltd | Central control supervisory system |
JPH06121474A (en) * | 1992-10-08 | 1994-04-28 | Toshiba Corp | Patrol and inspection support device for electric station |
CN102097861A (en) * | 2010-12-13 | 2011-06-15 | 山东电力集团公司泰安供电公司 | Electrical intelligent emergency repair terminal |
CN102570602A (en) * | 2011-12-04 | 2012-07-11 | 江苏省电力公司南京供电公司 | Fault comprehensive processing platform and method of distribution network |
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitoring system of power grid breakdown first-aid repair |
CN103259335A (en) * | 2013-04-11 | 2013-08-21 | 国家电网公司 | Intelligent demand response and demand side optimizing operation system |
CN104124756A (en) * | 2013-04-27 | 2014-10-29 | 国家电网公司 | Province-level power distribution network operation monitoring system based on network-wide data |
CN104218485A (en) * | 2014-09-23 | 2014-12-17 | 国网河南省电力公司周口供电公司 | Power grid quick rush-repair control system and using method thereof |
CN106026096A (en) * | 2016-06-29 | 2016-10-12 | 南京软核科技有限公司 | SVG-based multi-level coordination energy-saving optimization control system for distribution network |
CN107506849A (en) * | 2017-07-24 | 2017-12-22 | 国网江西省电力公司电力科学研究院 | A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system |
CN107707029A (en) * | 2017-10-23 | 2018-02-16 | 珠海许继芝电网自动化有限公司 | Low and medium voltage distribution network integrated monitoring and management system |
Non-Patent Citations (3)
Title |
---|
A. R. COOPER: ""Load dispatching and the reasons for it, with special reference to the British grid system"", 《JOURNAL OF THE INSTITUTION OF ELECTRICAL ENGINEERS》 * |
史宏伟: "大面积自然灾害环境下的电力抢修调度指挥综合研究", 《油气、地矿、电力设备管理与技术》 * |
王国胜: "电力智能抢修调度系统的设计", 《内蒙古电力技术》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111262344A (en) * | 2020-03-30 | 2020-06-09 | 佛山科学技术学院 | Power grid monitoring emergency system |
CN111817434A (en) * | 2020-05-25 | 2020-10-23 | 国网河北省电力有限公司衡水市桃城区供电分公司 | Intelligent monitoring system for distribution network line |
CN112701783A (en) * | 2020-12-14 | 2021-04-23 | 广东电网有限责任公司 | Distribution network operation and maintenance monitoring equipment and monitoring method |
CN112701783B (en) * | 2020-12-14 | 2024-02-13 | 广东电网有限责任公司 | Distribution network operation and maintenance monitoring equipment and monitoring method |
CN112966843A (en) * | 2021-04-01 | 2021-06-15 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | Public transformer area fault perception management and control system based on Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102646230B (en) | A kind of infosystem realizing the management of distribution network failure fast power restoration | |
CN108539856A (en) | Power distribution network complete perception operation monitoring power distribution rush-repair system | |
CN103797464B (en) | Fault Isolation and service recovery in power network | |
CN103065270A (en) | Visual monitoring system of power grid breakdown first-aid repair | |
US20080231114A1 (en) | System and Method for Adaptive Islanding for Stored/Distributed Energy Devices | |
CN102025195B (en) | Distribution network simulation dispatching and management system | |
CN104124756A (en) | Province-level power distribution network operation monitoring system based on network-wide data | |
KR20130063555A (en) | Outage schedule management apparatus and method in ems | |
Merdan et al. | Multi-Agent system for self-optimizing power distribution grids | |
CN113159598A (en) | Method and device for rush repair and scheduling of transformer area faults and terminal equipment | |
CN103400205A (en) | System and method for managing energy efficiency of power distribution network on basis of reactive optimized coordination control | |
CN201466793U (en) | Automatic control system for substation | |
CN112308246A (en) | Power failure notification method and system | |
CN104237735A (en) | Modeling and fault analysis method combining fault indicator and power distribution terminal | |
CN204408024U (en) | A kind of 10kV circuit operation information acquisition system | |
CN114139742A (en) | Power distribution network management and control system and management and control method | |
WO2014058969A2 (en) | Use of a demand response to enable improved power supply restoration planning | |
CN106655520B (en) | Ensure the method that relay protection remote operation securely and reliably executes | |
CN103545805B (en) | Modeling-based railway power supply arm monitoring method | |
CN105389667B (en) | Support that the distribution system framework of integration is robbed in allotment | |
CN201466794U (en) | Unmanned control system for substation | |
CN103296756A (en) | Managing and monitoring system for transformer substation | |
CN116054403A (en) | Power grid dispatching measurement and monitoring method based on national network big data platform | |
CN206282343U (en) | Intelligence matches somebody with somebody power information Integrated System Architecture | |
JP2011019301A (en) | System for operating power distribution system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |