CN101446074B - 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 - Google Patents
钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 Download PDFInfo
- Publication number
- CN101446074B CN101446074B CN2008102432220A CN200810243222A CN101446074B CN 101446074 B CN101446074 B CN 101446074B CN 2008102432220 A CN2008102432220 A CN 2008102432220A CN 200810243222 A CN200810243222 A CN 200810243222A CN 101446074 B CN101446074 B CN 101446074B
- Authority
- CN
- China
- Prior art keywords
- arch
- steel
- closure
- internode
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明是钢桁梁桥顶面钢柔性拱的安装及合龙施工方法,用两台80t架梁吊机从铁驳上起吊跨中两个节间的下节吊杆至钢桁梁跨中节点后,立即安装纵横向贝雷梁并装上斜拉设备,形成稳定的框架体系;再起吊上节吊杆与下节吊杆用冲钉和高栓对接,同样上节吊杆安装贝雷梁联结系和斜拉设备,形成稳定结构;后安装拱肋和拱平联,待跨中两个拱节间闭合后,两台架梁吊机各往后退一个节间,循环倒用花兰螺丝和钢丝绳作为斜拉设备架设后一个拱节间,依次类推,直至拱脚的合龙杆件,通过边墩顶落梁调整实现拱脚合龙。优点:结构简单、施工方便,工期缩短,成本低廉,对于连续钢桁梁柔性拱施工中,在水上、高空稳定吊杆及合龙施工提出了简洁实用的理方法。
Description
技术领域
本发明涉及的是钢桁梁桥顶面钢柔性拱的安装及合龙施工方法,它适用于在水中、高空、连续钢桁梁柔性拱结构条件下进行柔性拱施工中,需要建立吊杆间联结系和预设合龙口时,采用贝雷梁联结系辅助架设柔性拱和拱脚设预留合龙口一次合龙的施工方法。属于桥梁施工技术领域。
背景技术
在钢桁梁桥顶面钢柔性拱施工中,由于柔性拱较高,吊杆细长,拱肋杆件较重,且高空风力大,施工平台难以搭建或保持稳定,一般采用桁架或钢管桩作为吊杆联结系和脚手架作为高栓施拧平台,以及跨中拱设预留合龙口,分别存在钢结构加工量大且规格要求高、钢桁梁顶面上安装难度大,跨中合龙无架梁吊机配合施工等问题,给施工带来了一定的困难.
发明内容
本发明的目的在于针对上述不利条件下的柔性拱施工困难,提出贝雷梁联结系辅助架设钢桁梁桥顶面柔性拱和拱脚设预留合龙口一次合龙施工方法。该贝雷梁将吊杆通过新制杆件和普通螺栓联结起来形成框架结构,另加花兰螺丝和钢丝绳将框架结构和钢桁梁对拉作为吊杆辅助稳定结构,跨中对称架设柔性拱直至拱脚一次合龙。
本发明的技术解决方案:两台80t架梁吊机从铁驳上起吊跨中两个节间的下节吊杆至钢桁梁跨中节点后,立即安装纵横向贝雷梁并装上斜拉设备,形成稳定的框架体系;再起吊上节吊杆与下节吊杆用冲钉和高栓对接,同样上节吊杆安装贝雷梁联结系和斜拉设备,形成稳定结构;后安装拱肋和拱平联,待跨中两个拱节间闭合后,两台架梁吊机各往后退一个节间,循环倒用花兰螺丝和钢丝绳作为斜拉设备架设后一个拱节间,依次类推,直至拱脚的合龙杆件,通过边墩顶落梁调整实现拱脚合龙。
钢桁梁桥顶面钢柔性拱的安装及合龙施工方法,包括如下工艺步骤:
(一)钢桁梁合龙后,调整钢梁的中心线位置和各支座高程,同时进行拱梁的预拼,然后用平板车运至码头,通过码头吊机吊装在铁驳上,水运到架设指定区域。
(二)两台80t架梁吊机同时从铁驳上起吊下节吊杆,安装在钢桁梁的跨中节点上,立即安装纵横向贝雷梁,及时装上斜拉设备。
(三)起吊上节吊杆,通过冲钉和高栓与下节吊杆对接,同样在上节吊杆安装贝雷梁联结系和斜拉设备,稳定后安装拱肋和拱平联。
(四)待跨中两个拱节间闭合后,架梁吊机往后退一个节间,架设后一个拱节间,依次类推,直至最后一个拱节间。
(五)根据拱脚合龙口的空间大小,决定钢桁梁边端起重梁的顶落。并按照模拟实际工况,算出钢梁顶落值与合龙口空间位移变化值之间的比例,根据测量确定所需合龙口位移变化的值实施顶落梁操作,直至杆件与结点板孔眼对上,打入冲钉。
本发明的优点:采用贝雷梁作为稳定吊杆的联结系,既能准确定位吊杆又可作为钢桁梁顶面柔性拱架设的施工平台,既施工简单安全又节省钢材,边墩顶落梁便可实现拱脚一次合龙,更符合架梁吊机架设柔性拱流程,对于连续钢桁梁柔性拱施工中,在水上、高空稳定吊杆及合龙施工提出了简洁实用的处理方法,经过适当改进,还可应用于其它柔性拱的施工,具有较大的推广价值。
附图说明
附图1是平台结构总体立面示意图。
图中的A11-A18是连续钢桁梁柔性的下节吊杆,在桥梁运营阶段起传力作用。G3-G9是连续钢桁梁柔性拱的拱节点,吊杆传力到拱节点,拱节点再依次传力至钢桁梁的主桁上。
具体实施方式
本发明包括如下工艺步骤:
(一)钢桁梁合龙后,调整钢梁的中心线位置和各支座高程,同时进行拱梁的预拼,然后用平板车运至码头,通过码头吊机吊装在铁驳上,水运到架设指定区域。
(二)两台80t架梁吊机同时从铁驳上起吊下节吊杆,安装在钢桁梁的跨中节点上,立即安装纵横向贝雷梁,及时装上斜拉设备。
(三)起吊上节吊杆,通过冲钉和高栓与下节吊杆对接,同样在上节吊杆安装贝雷梁联结系和斜拉设备,稳定后安装拱肋和拱平联。
(四)待跨中两个拱节间闭合后,架梁吊机往后退一个节间,架设后一个拱节间,依次类推,直至最后一个拱节间。
(五)根据拱脚合龙口的空间大小,决定钢桁梁边端起重梁的顶落。并按照模拟实际工况,算出钢梁顶落值与合龙口空间位移变化值之间的比例,根据测量确定所需合龙口位移变化的值实施顶落梁操作,直至杆件与结点板孔眼对上,打入冲钉。
Claims (1)
1.钢桁梁桥顶面钢柔性拱的安装及合龙施工方法,其特征是该方法包括如下步骤:
(一)钢桁梁合龙后,调整钢桁梁的中心线位置和各支座高程,同时进行拱梁的预拼,然后用平板车运至码头,通过码头吊机吊装在铁驳上,水运到架设指定区域;
(二)两台80t架梁吊机同时从铁驳上起吊下节吊杆,安装在钢桁梁的跨中节点上,立即安装纵横向贝雷梁,及时装上斜拉设备;
(三)起吊上节吊杆,通过冲钉和高栓与下节吊杆对接,同样在上节吊杆安装贝雷梁联结系和斜拉设备,稳定后安装拱肋和拱平联;
(四)待跨中两个拱节间闭合后,架梁吊机往后退一个节间,架设后一个拱节间,依次类推,直至最后一个拱节间;
(五)根据拱脚合龙口的空间大小,决定钢桁梁边端起重梁的顶落,并按照模拟实际工况,算出钢桁梁顶落值与合龙口空间位移变化值之间的比例,根据测量确定所需合龙口位移变化的值实施顶落梁操作,直至杆件与结点板孔眼对上,打入冲钉。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102432220A CN101446074B (zh) | 2008-12-26 | 2008-12-26 | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102432220A CN101446074B (zh) | 2008-12-26 | 2008-12-26 | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101446074A CN101446074A (zh) | 2009-06-03 |
CN101446074B true CN101446074B (zh) | 2010-11-10 |
Family
ID=40741937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102432220A Active CN101446074B (zh) | 2008-12-26 | 2008-12-26 | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101446074B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102091886B (zh) * | 2009-12-14 | 2013-12-04 | 上海市基础工程有限公司 | 大型正交异性结合钢桁架桥整体焊接合龙方法 |
CN102108676B (zh) * | 2009-12-29 | 2015-02-04 | 上海市政工程设计研究总院 | 一种结合梁-钢拱组合体系拱桥施工方法 |
CN102619170B (zh) * | 2012-03-20 | 2014-09-10 | 中铁四局集团钢结构有限公司 | 大跨度柔性拱拱脚合龙施工方法 |
CN103821088B (zh) * | 2014-02-13 | 2015-12-30 | 中铁四局集团第四工程有限公司 | 铁路长大拱肋定位智能测量施工方法 |
CN104612058B (zh) * | 2014-12-26 | 2016-05-25 | 中铁大桥勘测设计院集团有限公司 | 一种刚性梁柔性拱桥的施工方法 |
CN104790297A (zh) * | 2015-04-20 | 2015-07-22 | 中国铁建大桥工程局集团有限公司 | 一种钢桁梁柔性拱拼装方法 |
CN105200925B (zh) * | 2015-10-21 | 2017-01-11 | 杭州江润科技有限公司 | 高寒区大跨度空腹式拱桥超宽主拱圈施工方法 |
CN105970814A (zh) * | 2016-05-20 | 2016-09-28 | 中建三局基础设施工程有限公司 | 一种跨铁路既有线平转桥梁合龙段施工方法 |
CN107059644B (zh) * | 2017-06-09 | 2018-12-18 | 中交第一公路工程局有限公司 | 一种柔性拱非对称无支架的安装方法 |
-
2008
- 2008-12-26 CN CN2008102432220A patent/CN101446074B/zh active Active
Non-Patent Citations (6)
Title |
---|
宋晖,叶梅新.重庆菜园坝长江大桥提篮钢箱拱施工工艺.桥梁建设.2005,(06), |
宋晖,叶梅新.重庆菜园坝长江大桥提篮钢箱拱施工工艺.桥梁建设.2005,(06). * |
李芳军,赵志尚,朱鹏飞.万州长江大桥钢桁拱梁合龙技术.桥梁建设.2006,(01), |
李芳军,赵志尚,朱鹏飞.万州长江大桥钢桁拱梁合龙技术.桥梁建设.2006,(01). * |
耿增现,骆双全,沈庆龙,万方.缅甸曼德勒大桥钢梁架设.桥梁建设.2007,(S1), |
耿增现,骆双全,沈庆龙,万方.缅甸曼德勒大桥钢梁架设.桥梁建设.2007,(S1). * |
Also Published As
Publication number | Publication date |
---|---|
CN101446074A (zh) | 2009-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101446074B (zh) | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 | |
CN108532465B (zh) | 一种下承式钢箱拱桥的主桥的施工方法 | |
CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
CN108374347A (zh) | 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法 | |
CN102425117B (zh) | 多联连续梁或多联刚构梁边跨非悬臂段的施工方法 | |
CN203768811U (zh) | 一种嵌入型钢锚梁组合索塔锚固结构 | |
CN102912730B (zh) | 一种大跨度钢筋混凝土拱桥单肋合龙缆索吊装施工方法 | |
CN103882812B (zh) | 斜拉索桥中跨主梁的施工方法 | |
CN108265628A (zh) | 一种骑索式桥面吊机吊装斜拉桥钢梁及桥面板施工方法 | |
CN207919363U (zh) | 一种钢管混凝土拱桥拱肋低位拼装提升系统 | |
CN102561191A (zh) | 一种拱桥拱肋的整体提升系统及施工方法 | |
CN105088970B (zh) | 一种波形钢腹板pc箱梁斜拉桥的施工方法 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN103911956A (zh) | 一种大跨度斜拉桥钢桁梁安装方法 | |
CN105256728B (zh) | 一种斜拉桥中华伦式钢桁梁的悬臂架设方法 | |
CN102367650A (zh) | 一种钢管拱桥的施工方法 | |
WO2023016573A1 (zh) | 一种斜拉桥钢混主梁的施工方法 | |
CN101818479B (zh) | 移动模架空中退行解体拆除施工工艺 | |
CN107476195B (zh) | 一种悬索桥运送加劲梁的运梁滑车系统 | |
CN103510466B (zh) | T形梁桥面系湿接缝施工方法 | |
CN102979033A (zh) | 一种钢桁梁全焊桁片及其施工方法 | |
CN207987749U (zh) | 骑索式桥面吊机 | |
CN107022958A (zh) | 使用缆索吊机安装斜拉桥的中跨主梁的方法 | |
CN104120659A (zh) | 下行式挂篮 | |
CN212834992U (zh) | 一种基于狭长山涧地形的悬索桥 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |