CN102561191A - 一种拱桥拱肋的整体提升系统及施工方法 - Google Patents
一种拱桥拱肋的整体提升系统及施工方法 Download PDFInfo
- Publication number
- CN102561191A CN102561191A CN2011104168614A CN201110416861A CN102561191A CN 102561191 A CN102561191 A CN 102561191A CN 2011104168614 A CN2011104168614 A CN 2011104168614A CN 201110416861 A CN201110416861 A CN 201110416861A CN 102561191 A CN102561191 A CN 102561191A
- Authority
- CN
- China
- Prior art keywords
- arch rib
- whole
- arch
- lifting
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 42
- 239000010959 steel Substances 0.000 claims abstract description 42
- 230000001737 promoting effect Effects 0.000 claims description 16
- 239000000725 suspension Substances 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 6
- 208000034189 Sclerosis Diseases 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 claims description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- 238000009432 framing Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011104168614A CN102561191A (zh) | 2011-12-13 | 2011-12-13 | 一种拱桥拱肋的整体提升系统及施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011104168614A CN102561191A (zh) | 2011-12-13 | 2011-12-13 | 一种拱桥拱肋的整体提升系统及施工方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102561191A true CN102561191A (zh) | 2012-07-11 |
Family
ID=46407676
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011104168614A Pending CN102561191A (zh) | 2011-12-13 | 2011-12-13 | 一种拱桥拱肋的整体提升系统及施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102561191A (zh) |
Cited By (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103061266A (zh) * | 2013-01-11 | 2013-04-24 | 武船重型工程股份有限公司 | 一种在强潮涌海域上的水路运输架设钢箱梁的方法 |
| CN103696372A (zh) * | 2014-01-04 | 2014-04-02 | 中铁二十五局集团第二工程有限公司 | 一种钢管拱桥拱架的架设方法 |
| CN104018680A (zh) * | 2014-06-17 | 2014-09-03 | 中国建筑第二工程局有限公司 | 一种大跨度实腹式弧形梁的提升方法 |
| CN104562936A (zh) * | 2014-12-08 | 2015-04-29 | 中铁六局集团有限公司 | 一种连续系杆钢管拱桥施工方法 |
| CN104846733A (zh) * | 2014-12-05 | 2015-08-19 | 广东省公路勘察规划设计院股份有限公司 | 一种汽车和轻轨同层的中承式系杆拱桥及其施工方法 |
| CN105133505A (zh) * | 2015-08-04 | 2015-12-09 | 贵州桥梁建设集团有限责任公司 | 一种钢拱架整体平移装置及平移方法 |
| CN106012864A (zh) * | 2016-07-27 | 2016-10-12 | 中铁上海工程局集团有限公司 | 一种桥梁拱肋整体提升安装的方法 |
| CN106193604A (zh) * | 2016-07-18 | 2016-12-07 | 广州建筑股份有限公司 | 用于大型钢网壳结构滑移中的稳定施工方法 |
| CN106988224A (zh) * | 2017-05-17 | 2017-07-28 | 广州市市政工程机械施工有限公司 | 桥梁的拱肋安装系统和安装方法 |
| CN108487038A (zh) * | 2018-05-28 | 2018-09-04 | 中交二航局第四工程有限公司 | 用于系杆拱桥拱肋锁定的组合装置及拱桥拆除方法 |
| CN108532465A (zh) * | 2018-04-20 | 2018-09-14 | 中交第三航务工程局有限公司 | 一种下承式钢箱拱桥的施工方法 |
| CN108547223A (zh) * | 2018-03-12 | 2018-09-18 | 中交第二航务工程局有限公司 | 钢混叠合的混合梁桥施工方法 |
| CN108842595A (zh) * | 2018-06-20 | 2018-11-20 | 广西交通科学研究院有限公司 | 预制拼装钢混组合三角刚架拱桥及其施工方法 |
| CN109457620A (zh) * | 2018-12-21 | 2019-03-12 | 中铁九桥工程有限公司 | 一种大跨度钢桁柔性拱桥拱肋整体液压提升施工系统 |
| CN109898421A (zh) * | 2019-02-19 | 2019-06-18 | 广东省交通规划设计研究院股份有限公司 | 用于钢箱拱桥拱肋整体提升的抗风结构及抗风方法 |
| CN112081016A (zh) * | 2020-09-22 | 2020-12-15 | 东南大学 | 一种桥梁拱肋的提升合拢装置 |
| CN112195799A (zh) * | 2020-09-05 | 2021-01-08 | 中交第四公路工程局有限公司 | 一种拱桥拱肋的提升合龙施工方法 |
| WO2021128161A1 (zh) * | 2019-12-26 | 2021-07-01 | 广州建筑股份有限公司 | 一种拱形结构整体提升施工方法及装置 |
| CN113356017A (zh) * | 2021-06-22 | 2021-09-07 | 上海市城市建设设计研究总院(集团)有限公司 | 提升斜拉索预应力效应的刚柔组合拉杆构造 |
| CN113356018A (zh) * | 2021-06-22 | 2021-09-07 | 上海市城市建设设计研究总院(集团)有限公司 | 提升斜拉索预应力效应的刚柔组合拉杆构造的施工方法 |
| CN113481818A (zh) * | 2021-08-23 | 2021-10-08 | 中铁二院工程集团有限责任公司 | 一种适用于超高速铁路的中承式拱桥 |
| CN115506243A (zh) * | 2022-08-30 | 2022-12-23 | 中铁七局集团有限公司 | 大跨度系杆拱桥的施工方法 |
| CN116122167A (zh) * | 2023-02-01 | 2023-05-16 | 浙江精工钢结构集团有限公司 | 一种用于跨航道拱形钢结构的安装方法 |
| CN117166341A (zh) * | 2023-10-17 | 2023-12-05 | 浙江中天恒筑钢构有限公司 | 用于安装跨水域下承式钢箱拱肋系杆拱桥的系统及方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU903465A1 (ru) * | 1980-05-16 | 1982-02-07 | Специальное Конструкторское Бюро Главмостостроя | Способ демонтажа арочно-консольного пролетного строени моста с зат жкой |
| CN200971475Y (zh) * | 2006-07-28 | 2007-11-07 | 中铁工程设计咨询集团有限公司 | 钢拱桥拱肋大节段安装合龙提升系统 |
| CN101117793A (zh) * | 2007-09-05 | 2008-02-06 | 中国建筑第七工程局 | 钢结构管道拱桥浮拖施工方法 |
| CN101935987A (zh) * | 2010-08-27 | 2011-01-05 | 中交一公局桥隧工程有限公司 | 曲线桥大跨度钢管拱整体滑移施工方法 |
| CN102071644A (zh) * | 2010-12-31 | 2011-05-25 | 中铁港航工程局有限公司 | 一种桥梁拱肋整体提升安装方法 |
| CN102094389A (zh) * | 2009-12-14 | 2011-06-15 | 上海市基础工程有限公司 | 分离式大节段桁架梁液压提升装置 |
| CN202380403U (zh) * | 2011-12-13 | 2012-08-15 | 广东省公路勘察规划设计院股份有限公司 | 一种拱桥拱肋的整体提升系统 |
-
2011
- 2011-12-13 CN CN2011104168614A patent/CN102561191A/zh active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU903465A1 (ru) * | 1980-05-16 | 1982-02-07 | Специальное Конструкторское Бюро Главмостостроя | Способ демонтажа арочно-консольного пролетного строени моста с зат жкой |
| CN200971475Y (zh) * | 2006-07-28 | 2007-11-07 | 中铁工程设计咨询集团有限公司 | 钢拱桥拱肋大节段安装合龙提升系统 |
| CN101117793A (zh) * | 2007-09-05 | 2008-02-06 | 中国建筑第七工程局 | 钢结构管道拱桥浮拖施工方法 |
| CN102094389A (zh) * | 2009-12-14 | 2011-06-15 | 上海市基础工程有限公司 | 分离式大节段桁架梁液压提升装置 |
| CN101935987A (zh) * | 2010-08-27 | 2011-01-05 | 中交一公局桥隧工程有限公司 | 曲线桥大跨度钢管拱整体滑移施工方法 |
| CN102071644A (zh) * | 2010-12-31 | 2011-05-25 | 中铁港航工程局有限公司 | 一种桥梁拱肋整体提升安装方法 |
| CN202380403U (zh) * | 2011-12-13 | 2012-08-15 | 广东省公路勘察规划设计院股份有限公司 | 一种拱桥拱肋的整体提升系统 |
Non-Patent Citations (1)
| Title |
|---|
| 李跃等: "广州新光大桥主跨主拱中段大段整体提升架设", 《中外公路》, vol. 26, no. 2, 19 April 2006 (2006-04-19) * |
Cited By (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103061266B (zh) * | 2013-01-11 | 2015-01-14 | 武船重型工程股份有限公司 | 一种在强潮涌海域上的水路运输架设钢箱梁的方法 |
| CN103061266A (zh) * | 2013-01-11 | 2013-04-24 | 武船重型工程股份有限公司 | 一种在强潮涌海域上的水路运输架设钢箱梁的方法 |
| CN103696372A (zh) * | 2014-01-04 | 2014-04-02 | 中铁二十五局集团第二工程有限公司 | 一种钢管拱桥拱架的架设方法 |
| CN103696372B (zh) * | 2014-01-04 | 2016-09-07 | 中铁二十五局集团第二工程有限公司 | 一种钢管拱桥拱架的架设方法 |
| CN104018680A (zh) * | 2014-06-17 | 2014-09-03 | 中国建筑第二工程局有限公司 | 一种大跨度实腹式弧形梁的提升方法 |
| CN104846733A (zh) * | 2014-12-05 | 2015-08-19 | 广东省公路勘察规划设计院股份有限公司 | 一种汽车和轻轨同层的中承式系杆拱桥及其施工方法 |
| CN104562936A (zh) * | 2014-12-08 | 2015-04-29 | 中铁六局集团有限公司 | 一种连续系杆钢管拱桥施工方法 |
| CN105133505A (zh) * | 2015-08-04 | 2015-12-09 | 贵州桥梁建设集团有限责任公司 | 一种钢拱架整体平移装置及平移方法 |
| CN106193604A (zh) * | 2016-07-18 | 2016-12-07 | 广州建筑股份有限公司 | 用于大型钢网壳结构滑移中的稳定施工方法 |
| CN106012864A (zh) * | 2016-07-27 | 2016-10-12 | 中铁上海工程局集团有限公司 | 一种桥梁拱肋整体提升安装的方法 |
| CN106012864B (zh) * | 2016-07-27 | 2017-10-13 | 中铁上海工程局集团有限公司 | 一种桥梁拱肋整体提升安装的方法 |
| CN106988224A (zh) * | 2017-05-17 | 2017-07-28 | 广州市市政工程机械施工有限公司 | 桥梁的拱肋安装系统和安装方法 |
| CN108547223A (zh) * | 2018-03-12 | 2018-09-18 | 中交第二航务工程局有限公司 | 钢混叠合的混合梁桥施工方法 |
| CN108532465A (zh) * | 2018-04-20 | 2018-09-14 | 中交第三航务工程局有限公司 | 一种下承式钢箱拱桥的施工方法 |
| CN108487038A (zh) * | 2018-05-28 | 2018-09-04 | 中交二航局第四工程有限公司 | 用于系杆拱桥拱肋锁定的组合装置及拱桥拆除方法 |
| CN108487038B (zh) * | 2018-05-28 | 2024-01-16 | 中交二航局第四工程有限公司 | 用于系杆拱桥拱肋锁定的组合装置及拱桥拆除方法 |
| CN108842595A (zh) * | 2018-06-20 | 2018-11-20 | 广西交通科学研究院有限公司 | 预制拼装钢混组合三角刚架拱桥及其施工方法 |
| CN108842595B (zh) * | 2018-06-20 | 2023-07-04 | 广西交通科学研究院有限公司 | 预制拼装钢混组合三角刚架拱桥及其施工方法 |
| CN109457620A (zh) * | 2018-12-21 | 2019-03-12 | 中铁九桥工程有限公司 | 一种大跨度钢桁柔性拱桥拱肋整体液压提升施工系统 |
| CN109898421B (zh) * | 2019-02-19 | 2021-08-24 | 广东省交通规划设计研究院股份有限公司 | 用于钢箱拱桥拱肋整体提升的抗风结构及抗风方法 |
| CN109898421A (zh) * | 2019-02-19 | 2019-06-18 | 广东省交通规划设计研究院股份有限公司 | 用于钢箱拱桥拱肋整体提升的抗风结构及抗风方法 |
| WO2021128161A1 (zh) * | 2019-12-26 | 2021-07-01 | 广州建筑股份有限公司 | 一种拱形结构整体提升施工方法及装置 |
| CN112195799A (zh) * | 2020-09-05 | 2021-01-08 | 中交第四公路工程局有限公司 | 一种拱桥拱肋的提升合龙施工方法 |
| CN112081016A (zh) * | 2020-09-22 | 2020-12-15 | 东南大学 | 一种桥梁拱肋的提升合拢装置 |
| CN113356017A (zh) * | 2021-06-22 | 2021-09-07 | 上海市城市建设设计研究总院(集团)有限公司 | 提升斜拉索预应力效应的刚柔组合拉杆构造 |
| CN113356018A (zh) * | 2021-06-22 | 2021-09-07 | 上海市城市建设设计研究总院(集团)有限公司 | 提升斜拉索预应力效应的刚柔组合拉杆构造的施工方法 |
| CN113481818B (zh) * | 2021-08-23 | 2023-01-20 | 中铁二院工程集团有限责任公司 | 一种适用于超高速铁路的中承式拱桥 |
| CN113481818A (zh) * | 2021-08-23 | 2021-10-08 | 中铁二院工程集团有限责任公司 | 一种适用于超高速铁路的中承式拱桥 |
| CN115506243A (zh) * | 2022-08-30 | 2022-12-23 | 中铁七局集团有限公司 | 大跨度系杆拱桥的施工方法 |
| CN116122167A (zh) * | 2023-02-01 | 2023-05-16 | 浙江精工钢结构集团有限公司 | 一种用于跨航道拱形钢结构的安装方法 |
| CN117166341A (zh) * | 2023-10-17 | 2023-12-05 | 浙江中天恒筑钢构有限公司 | 用于安装跨水域下承式钢箱拱肋系杆拱桥的系统及方法 |
| CN117166341B (zh) * | 2023-10-17 | 2025-12-16 | 浙江中天恒筑钢构有限公司 | 用于安装跨水域下承式钢箱拱肋系杆拱桥的系统及方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102561191A (zh) | 一种拱桥拱肋的整体提升系统及施工方法 | |
| CN101418543B (zh) | 一种自锚式悬索桥斜拉施工法 | |
| CN102071644B (zh) | 一种桥梁拱肋整体提升安装方法 | |
| CN110042769B (zh) | 一种组合梁斜拉桥辅助跨全悬臂拼装施工方法 | |
| CN108532465B (zh) | 一种下承式钢箱拱桥的主桥的施工方法 | |
| CN101775809B (zh) | 海上自浮式钢底板单壁吊箱围堰施工方法及单壁吊箱围堰 | |
| CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
| CN103882812B (zh) | 斜拉索桥中跨主梁的施工方法 | |
| CN101225638A (zh) | 地锚式悬索桥预应力混凝土加劲箱梁安装方法 | |
| CN104674668B (zh) | 一种通过缆索吊装施工主梁节段的方法 | |
| CN103243658B (zh) | 斜拉桥牵索挂篮的组拼方法 | |
| CN103193163B (zh) | 船厂龙门式起重机的坞口安装方法 | |
| CN102146660A (zh) | 一种跨拱肋龙门吊及蝴蝶拱桥空间结构体系的安装方法 | |
| CN202380403U (zh) | 一种拱桥拱肋的整体提升系统 | |
| CN207919363U (zh) | 一种钢管混凝土拱桥拱肋低位拼装提升系统 | |
| CN105603881A (zh) | 一种大型跨海拱桥的整体架设系统及其施工方法 | |
| CN102367650A (zh) | 一种钢管拱桥的施工方法 | |
| CN103911956A (zh) | 一种大跨度斜拉桥钢桁梁安装方法 | |
| CN105839537A (zh) | 跨缆吊机带梁行走吊装悬索桥加劲梁的施工方法 | |
| CN106939553A (zh) | 一种钢桥面和钢箱拱肋安装方法 | |
| CN109252454A (zh) | 一种施工状态可调的大跨度组合体系拱桥顶推施工工法 | |
| CN106012841A (zh) | 缆索吊机及其安装方法 | |
| CN105484168B (zh) | 一种悬索桥加劲梁旋转吊装设备及加劲梁架设方法 | |
| CN205369055U (zh) | 悬索桥加劲梁旋转吊装设备 | |
| CN108625289B (zh) | 一种适用于悬索桥加劲梁的架设装置及架设方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent of invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Liang Linong Inventor after: Chen Wanli Inventor after: Wei Chaozhu Inventor after: He Hai Inventor after: Wang Qiang Inventor after: Jiang Qizhen Inventor before: Liang Linong Inventor before: Chen Wanli Inventor before: Wei Chaogui Inventor before: He Hai Inventor before: Wang Qiang Inventor before: Jiang Qizhen |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIANG LINONG CHEN WANLI WEI CHAOGUI HE HAI WANG QIANG JIANG QIZHEN TO: LIANG LINONG CHEN WANLI WEI CHAOZHU HE HAI WANG QIANG JIANG QIZHEN |
|
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120711 |