CN102979033A - 一种钢桁梁全焊桁片及其施工方法 - Google Patents

一种钢桁梁全焊桁片及其施工方法 Download PDF

Info

Publication number
CN102979033A
CN102979033A CN201210465882XA CN201210465882A CN102979033A CN 102979033 A CN102979033 A CN 102979033A CN 201210465882X A CN201210465882X A CN 201210465882XA CN 201210465882 A CN201210465882 A CN 201210465882A CN 102979033 A CN102979033 A CN 102979033A
Authority
CN
China
Prior art keywords
whole
steel truss
chord
truss girder
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210465882XA
Other languages
English (en)
Inventor
高宗余
万田保
刘汉顺
张强
杜萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201210465882XA priority Critical patent/CN102979033A/zh
Publication of CN102979033A publication Critical patent/CN102979033A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种钢桁梁全焊桁片及其施工方法。两个上弦整体节点两端及中间焊有上弦杆形成整体上弦杆,两个下弦整体节点两端及中间焊有下弦杆形成整体下弦杆,斜杆、竖杆上、下端分别与整体上弦杆件和整体下弦杆件的整体节点焊接。施工方法是将上弦两个节间作为一个整体上弦杆进行施工,下弦两个节间作为一个整体下弦杆进行施工,将两个节间内的竖杆、斜杆与整体上、下弦杆的整体节点板焊接。本发明可减少工地的拼接和焊接工作量,工作效率高、施工进度快,能保证质量;减少了一个节段的主桁拼接,省料;减少桥面板的一道横向工地焊缝,纵肋拼接工作,工作效率高;本发明可用于公路和铁路的简支钢桁梁、连续钢桁梁、钢桁梁斜拉桥等桥梁的钢桁梁。

Description

一种钢桁梁全焊桁片及其施工方法
技术领域
本发明涉及一种新型的钢桁梁全焊桁片及其施工方法。
背景技术
近几十年来,随着我国社会经济的高速发展,对桥梁的使用性能要求越来越高。公、铁两用钢桁梁桥具有跨度大、重量轻、承载能力高等优点,成为跨江、跨海大桥首要选择的结构形式。在该桥型的设计中经常遇到以下问题:传统的钢桁梁的架设均采用散拼的设计和安装方法,即使用吊机将单根杆件逐根吊装至桥面梁端,然后在梁上一个个用螺栓拧紧或一点点地焊接,此方法的优势是制造、安装设备及工艺简单,常规的制造设备及架梁吊机就能满足要求。缺点是工人须现场施拧满足结构连接强度要求的大量高强度螺栓,工地焊缝的数量较多。由于工人水上高空作业环境差、工作强度大,造成施工进度较慢。对应散拼的安装工艺,设计时钢桁结构单个节间的上弦杆、下弦杆、斜杆、竖杆均按单根散装杆件设计。
发明内容
本发明的目的是针对上述现状,旨在提供一种整体性好,能加快施工进度,提高工作效率的钢桁梁全焊桁片及其施工方法。
本发明目的的实现方式为,一种钢桁梁全焊桁片,两个上弦整体节点两端及中间焊有上弦杆形成整体上弦杆,两个下弦整体节点两端及中间焊有下弦杆形成整体下弦杆,斜杆、竖杆上、下端分别与整体上弦杆件和整体下弦杆件的整体节点焊接。
一种钢桁梁全焊桁片及施工方法,具体步骤如下:
1)将两个上弦整体节点外端与两上弦1对接熔透焊,内端与两个上弦杆对接熔透焊,中间的两个上弦杆对接熔透焊形成整体上弦杆,
2)将两个下弦整体节点外端与两下弦杆对接熔透焊,内端与两个下弦杆对接熔透焊,中间的两个下弦杆熔透形成整体下弦杆,
3)将斜杆、竖杆上、下端分别插入整体上弦杆件和整体下弦杆件的整体节点内,并进行熔透焊即成钢桁梁全焊桁片。
本发明将上弦两个节间作为一个整体上弦杆,下弦两个节间作为一个整体下弦杆,将两个节间内的竖杆、斜杆插入整体上、下弦杆的整体节点板内并进行焊接,最后形成每两个节间为一个设计单元的全焊桁片。
本发明有以下优点:
1、减少了一个节段的主桁拼接,可节省主桁拼接用料;同时也可减少桥面板的一道横向工地焊缝,减少了纵肋拼接工作,提高了工作效率。
2、可减少工地的拼接和焊接工作量,提高了工作效率,施工进度较快,容易保证钢梁质量。
3、由于吊重适中,对运输吊装设备要求不高。
本发明可用于公路和铁路的简支钢桁梁、连续钢桁梁、钢桁梁斜拉桥等桥梁结构的钢桁梁设计;可适用于N形桁架钢桁梁、三角形桁架钢桁梁。
附图说明
图1为上弦杆与上弦整体节点间组拼焊接位置图,
图2为整体上弦杆件结构示意图,
图3为下弦杆与下弦整体节点间组拼焊接位置图,
图4为整体下弦杆件结构示意图,
图5为竖杆、斜杆与整体上、下弦杆件的组拼焊接位置图,
图6为本发明立体结构示意图,
图7为本发明侧面结构示意图。
具体实施方式
本发明是一种钢桁梁全焊桁片,两个上弦整体节点2两端及中间焊有上弦杆1形成整体上弦杆3,两个下弦整体节点5两端及中间焊有下弦杆4形成整体下弦杆6,斜杆7、竖杆8上、下端分别与整体上弦杆件3和整体下弦杆件6的整体节点焊接。
所述上弦杆1和下弦杆4截面为箱型。所述斜杆7和竖杆8截面为箱型或工字型。
本发明的施工方法,具体步骤如下:
1)将两个上弦整体节点2外端与两上弦杆1对接熔透焊,内端与两个上弦杆1对接熔透焊,中间的两个上弦杆对接熔透焊形成整体上弦杆3(见图1、2),
2)将两个下弦整体节点5外端与两下弦杆4对接熔透焊,内端与两个下弦杆4对接熔透焊,中间的两个下弦杆熔透形成整体下弦杆6(见图3、4),
3)将斜杆7、竖杆8上、下端分别插入整体上弦杆件3和整体下弦杆件6的整体节点内,并进行熔透焊即成图6、7所示的,主桁每两个节间为一个设计单元的钢桁梁全焊桁片。

Claims (4)

1.一种钢桁梁全焊桁片,其特征在于两个上弦整体节点两端及中间焊有上弦杆形成整体上弦杆,两个下弦整体节点两端及中间焊有下弦杆形成整体下弦杆,斜杆、竖杆上、下端分别与整体上弦杆件和整体下弦杆件的整体节点焊接。
2.根据专利要求1所述的一种钢桁梁全焊桁片,其特征在于上弦杆(1)和下弦杆(4)截面为箱型。
3.根据专利要求1所述的一种钢桁梁全焊桁片,其特征在于斜杆(7)和竖杆(8)截面为箱型或工字型。
4.一种权利要求1所述的钢桁梁全焊桁片的施工方法,其特征在于具体步骤如下:
1)将两个上弦整体节点外端与两上弦1对接熔透焊,内端与两个上弦杆对接熔透焊,中间的两个上弦杆对接熔透焊形成整体上弦杆,
2)将两个下弦整体节点外端与两下弦杆对接熔透焊,内端与两个下弦杆对接熔透焊,中间的两个下弦杆熔透形成整体下弦杆,
3)将斜杆、竖杆上、下端分别插入整体上弦杆件和整体下弦杆件的整体节点内,并进行熔透焊即成主桁每两个节间为一个设计单元的钢桁梁全焊桁片。
CN201210465882XA 2012-11-16 2012-11-16 一种钢桁梁全焊桁片及其施工方法 Pending CN102979033A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210465882XA CN102979033A (zh) 2012-11-16 2012-11-16 一种钢桁梁全焊桁片及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210465882XA CN102979033A (zh) 2012-11-16 2012-11-16 一种钢桁梁全焊桁片及其施工方法

Publications (1)

Publication Number Publication Date
CN102979033A true CN102979033A (zh) 2013-03-20

Family

ID=47853358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210465882XA Pending CN102979033A (zh) 2012-11-16 2012-11-16 一种钢桁梁全焊桁片及其施工方法

Country Status (1)

Country Link
CN (1) CN102979033A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321154A (zh) * 2013-06-27 2013-09-25 中国中铁股份有限公司 一种大跨径钢桁梁整体吊装施工方法
CN103422438A (zh) * 2013-07-25 2013-12-04 中铁建钢结构有限公司 箱型钢桁架弦杆栓接构件扭曲值补偿修正划线方法
CN104929053A (zh) * 2015-07-03 2015-09-23 金少平 一种菱形建筑架用连接盒
CN105113382A (zh) * 2015-05-21 2015-12-02 中铁大桥勘测设计院集团有限公司 带副桁的钢桁架斜撑双腹板连接结构
CN105735129A (zh) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 一种全焊桁架节段模块化拼装方法
CN110512521A (zh) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 大节段钢桁梁的对接装置和对接方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167710A (ja) * 2000-11-30 2002-06-11 Nkk Corp 鋼管継手構造及びパイプトラス橋施工法
CN101446069A (zh) * 2008-12-30 2009-06-03 中铁大桥局集团第五工程有限公司 钢桁梁多节点整体安装方法
CN101603288A (zh) * 2009-07-03 2009-12-16 中铁大桥局股份有限公司 一种公铁两用斜拉桥的三桁式主梁结构及其安装方法
CN102031752A (zh) * 2010-12-30 2011-04-27 上海市城市建设设计研究院 全焊接整体节点
CN102352604A (zh) * 2011-08-05 2012-02-15 中铁大桥局股份有限公司 一种钢桁梁桁片单元和钢桁梁结构及其安装方法
CN202913338U (zh) * 2012-11-16 2013-05-01 中铁大桥勘测设计院集团有限公司 一种钢桁梁全焊桁片

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167710A (ja) * 2000-11-30 2002-06-11 Nkk Corp 鋼管継手構造及びパイプトラス橋施工法
CN101446069A (zh) * 2008-12-30 2009-06-03 中铁大桥局集团第五工程有限公司 钢桁梁多节点整体安装方法
CN101603288A (zh) * 2009-07-03 2009-12-16 中铁大桥局股份有限公司 一种公铁两用斜拉桥的三桁式主梁结构及其安装方法
CN102031752A (zh) * 2010-12-30 2011-04-27 上海市城市建设设计研究院 全焊接整体节点
CN102352604A (zh) * 2011-08-05 2012-02-15 中铁大桥局股份有限公司 一种钢桁梁桁片单元和钢桁梁结构及其安装方法
CN202913338U (zh) * 2012-11-16 2013-05-01 中铁大桥勘测设计院集团有限公司 一种钢桁梁全焊桁片

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龙东利: ""合福铁路铜陵长江大桥主桁片拼装工艺方案讨论"", 《科技视界》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321154A (zh) * 2013-06-27 2013-09-25 中国中铁股份有限公司 一种大跨径钢桁梁整体吊装施工方法
CN103321154B (zh) * 2013-06-27 2015-11-18 中国中铁股份有限公司 一种大跨径钢桁梁整体吊装施工方法
CN103422438A (zh) * 2013-07-25 2013-12-04 中铁建钢结构有限公司 箱型钢桁架弦杆栓接构件扭曲值补偿修正划线方法
CN103422438B (zh) * 2013-07-25 2015-05-20 中铁建钢结构有限公司 箱型钢桁架弦杆栓接构件扭曲值补偿修正划线方法
CN105113382A (zh) * 2015-05-21 2015-12-02 中铁大桥勘测设计院集团有限公司 带副桁的钢桁架斜撑双腹板连接结构
CN104929053A (zh) * 2015-07-03 2015-09-23 金少平 一种菱形建筑架用连接盒
CN105735129A (zh) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 一种全焊桁架节段模块化拼装方法
CN110512521A (zh) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 大节段钢桁梁的对接装置和对接方法

Similar Documents

Publication Publication Date Title
CN106758856B (zh) 分块预制的先张法预应力波形钢腹板组合箱梁的施工方法
CN100482892C (zh) 下弦开敞桁式波纹钢腹板组合梁
CN109024225A (zh) 超高性能混凝土桁架拱片单元、桁架拱片桥梁及施工方法
CN108193607B (zh) 一种加固用装配式预应力桁架及其施工方法
CN102979033A (zh) 一种钢桁梁全焊桁片及其施工方法
CN101613990B (zh) 铁路钢桁梁t型加劲肋正交异性板桥面的施工方法
CN101818478B (zh) 圆钢管混凝土墩柱与混凝土盖梁的连接结构
CN103924505A (zh) 采用波形钢腹板的预制钢-混凝土组合t梁及施工方法
CN102352604A (zh) 一种钢桁梁桁片单元和钢桁梁结构及其安装方法
CN108824162A (zh) 一种采用平钢板与波形钢板混合腹板的钢-混凝土组合连续梁及其施工方法
CN104328734A (zh) 一种多联多跨连续钢桁梁桥及其施工方法
CN103938549A (zh) 装配式波形钢斜腹板组合梁的施工方法
CN206570671U (zh) 基于混合预应力的装配式波形钢腹板组合箱梁
CN206538672U (zh) 新型装配式桁架钢栈桥
CN104060542A (zh) 组合梁斜拉桥横桥向预应力施加装置及其施加方法
CN202913338U (zh) 一种钢桁梁全焊桁片
CN102776829A (zh) 一种钢管混凝土组合桁架桥
CN202990196U (zh) 一种部分预应力预制薄板
CN207714129U (zh) 一种采用t头钢筋的桥面板湿接缝结构
CN106758857B (zh) 分块预制式二次预应力波形钢腹板组合梁的施工方法
CN211735002U (zh) 一种快速化安装的钢-混凝土组合梁桥
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN204940144U (zh) 一种波形钢腹板临时加固装置
CN104047223A (zh) 轻型组合结构桥梁及其施工方法
CN110373990A (zh) 双层结合钢桁梁整孔制造及架设施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130320