CN203034799U - 塔吊标准节支承高空支模钢平台结构 - Google Patents

塔吊标准节支承高空支模钢平台结构 Download PDF

Info

Publication number
CN203034799U
CN203034799U CN 201320060395 CN201320060395U CN203034799U CN 203034799 U CN203034799 U CN 203034799U CN 201320060395 CN201320060395 CN 201320060395 CN 201320060395 U CN201320060395 U CN 201320060395U CN 203034799 U CN203034799 U CN 203034799U
Authority
CN
China
Prior art keywords
standard knot
tower crane
crane standard
steel platform
platform structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320060395
Other languages
English (en)
Inventor
华学严
张灵传
崔朝赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI CONSTRUCTION ENGINEERING GROUP NO.4 CONSTRUCTION ENGINEERING CO., LTD.
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN 201320060395 priority Critical patent/CN203034799U/zh
Application granted granted Critical
Publication of CN203034799U publication Critical patent/CN203034799U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种塔吊标准节支承高空支模钢平台结构,包括塔吊标准节格构柱基础及安装于塔吊标准节格构柱基础上的格构柱结构的塔吊标准节,所述塔吊标准节四周环绕设置有周边支模架,所述塔吊标准节顶部设有口字型或者工字型顶支座,所述顶支座上安装钢平台,所述钢平台上安装钢管支撑架,所述钢管支撑架上设有浇筑混凝土用的木方及模板。本实用新型支模体系传力明确、受力合理、安全可靠,能满足结构截面尺寸大、搭设高度高的要求;施工便捷、实施可行、定型稳定、且可缩短施工工期。

Description

塔吊标准节支承高空支模钢平台结构
技术领域
本实用新型涉及悬空梁板结构支模领域,具体涉及塔吊标准节支承高空支模钢平台体系。
背景技术
在大型建筑中,因结构需要或建筑外形美观要求,大截面悬空梁板结构设计形式越来越多。如大型体育馆顶环梁、联系两相邻高楼间的高空连廊、展览中心的大截面悬挑屋盖梁等。大截面悬空梁板结构施工过程中,模板支撑是关键环节。在悬空结构的模板支撑体系中,一般采用满堂落地支模架,但当悬空结构截面特大,或支模架搭设高度超过30m时,满堂支模架不能满足施工要求时,因此需要一种安全可靠的高空支模体系。
实用新型内容
本实用新型所要解决的技术问题就是提供一种塔吊标准节支承高空支模钢平台结构,支模体系传力明确、受力合理、安全可靠,能满足结构截面尺寸大、搭设高度高的要求。
为解决上述技术问题,本实用新型采用如下技术方案:塔吊标准节支承高空支模钢平台结构,包括塔吊标准节格构柱基础及安装于塔吊标准节格构柱基础上的格构柱结构的塔吊标准节,其特征在于:所述塔吊标准节四周环绕设置有周边支模架,所述塔吊标准节顶部设有口字型或者工字型顶支座,所述顶支座上安装钢平台,所述钢平台上安装钢管支撑架,所述钢管支撑架上设有浇筑混凝土用的木方及模板。
优选的,所述塔吊标准节格构柱基础内设置有井字形的暗梁,所述塔吊标准节底部与预埋在暗梁内的螺栓紧固。
优选的,所述塔吊标准节的格构柱沿柱高设置抱箍与周边支模架相连接。
优选的,所述钢平台板包括两根竖向主龙骨及焊接固定于竖向主龙骨顶端之间的横向次龙骨,所述竖向主龙骨通过抱箍连接顶支座。
优选的,所述次龙骨上间隔焊接有短钢筋。
优选的,所述顶支座与次龙骨间设置竖向斜撑。
优选的,所述顶支座下部焊接方钢管,所述方钢管插入塔吊标准节的主肢内。
塔吊标准节支承高空支模钢平台施工方法,包括以下步骤:
步骤一:塔吊标准节格构柱基础加固,当塔吊标准节格构柱基础坐落于楼层结构时,需采取竖向支撑的加固方式将上部荷载往下传至地下室底板或者自然地坪,竖向支撑随楼层结构施工预设;
步骤二:塔吊标准节格构柱基础施工,施工前按规范进行基础受力计算,使基础配筋满足要求;
步骤三:塔吊标准节格构柱的吊装与安装,利用施工现场塔吊或汽车吊吊装塔吊标准节,上下标准节间采用螺栓连接固定;
步骤四:塔吊标准节安装完成后进行塔吊标准节顶支座处理,在塔吊标准节上设置口字型顶支座,或者采用工字型顶支座;
步骤五:钢平台施工;
步骤六:搭设上部钢管支撑架;
步骤七:按常规支模施工方法铺设木方、模板,绑扎钢筋,浇筑混凝土;
步骤八:待混凝土达到强度要求后拆除支模体系,从一端向另一端、自上而下逐步拆除。
优选的,所述塔吊标准节基础采用满堂扣件式钢管脚手架进行加固。
本实用新型采用上述技术方案提供的塔吊标准节支承高空支模钢平台体系施工方法,支模体系传力明确、受力合理、安全可靠,能满足结构截面尺寸大、搭设高度高的要求;施工便捷、实施可行、定型稳定、且可缩短施工工期;材料可回收,经济性好;塔吊标准节格构柱柱距较大,方便结构下方车辆及大型机械运输通行。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步描述:
图1为塔吊标准节格构柱基础结构示意图;
图2为钢管支撑架结构示意图;
图3为暗梁结构示意图;
图4为钢平台结构示意图;
图5为顶支座与塔吊标准节的主肢连接结构示意图。
具体实施方式
如图1至图5的塔吊标准节支承高空支模钢平台结构,其包括塔吊标准节格构柱基础1及安装于塔吊标准节格构柱基础上的格构柱结构的塔吊标准节2,所述塔吊标准节四周环绕设置有周边支模架12,所述塔吊标准节顶部设有口字型或者工字型顶支座3,所述顶支座上安装钢平台,所述钢平台上安装钢管支撑架4。所述塔吊标准节格构柱基础内设置有井字形的暗梁11,所述塔吊标准节底部与预埋在暗梁内的螺栓紧固。所述塔吊标准节的格构柱沿柱高设置抱箍与周边支模架12相连接。
所述钢平台板包括两根竖向主龙骨30及焊接固定于竖向主龙骨顶端之间的横向次龙骨31,所述竖向主龙骨通过抱箍连接顶支座3。所述次龙骨上间隔焊接有短钢筋34固定立杆。所述顶支座与次龙骨间设置竖向斜撑33。所述顶支座下部焊接方钢管35,所述方钢管插入塔吊标准节的主肢20内。
上述塔吊标准节支承高空支模钢平台施工方法,包括以下步骤:
步骤一:塔吊标准节格构柱基础加固,当塔吊标准节格构柱基础坐落于楼层结构时,需采取竖向支撑的加固方式将上部荷载往下传至地下室底板或者自然地坪,竖向支撑随楼层结构施工预设;
步骤二:塔吊标准节格构柱基础施工,施工前按规范进行基础受力计算,使基础配筋满足要求;
步骤三:塔吊标准节格构柱的吊装与安装,利用施工现场塔吊或汽车吊吊装塔吊标准节,上下标准节间采用螺栓连接固定;
步骤四:塔吊标准节安装完成后进行塔吊标准节顶支座处理,在塔吊标准节上设置口字型顶支座,或者采用工字型顶支座等;
步骤五:钢平台施工,主龙骨采用大截面型钢,次龙骨采用小截面型钢,主次龙骨之间采用焊接连接;
步骤六:以次龙骨为立杆基础,搭设上部钢管支撑架,立杆顶部采用可调顶托,顶托梁采用双钢管;
步骤七:按常规支模施工方法铺设木方、模板,绑扎钢筋,浇筑混凝土;
步骤八:待混凝土达到强度要求后拆除支模体系,从一端向另一端、自上而下逐步拆除。
其中所述塔吊标准节基础采用满堂扣件式钢管脚手架进行加固。

Claims (6)

1.塔吊标准节支承高空支模钢平台结构,包括塔吊标准节格构柱基础(1)及安装于塔吊标准节格构柱基础上的格构柱结构的塔吊标准节(2),其特征在于:所述塔吊标准节四周环绕设置有周边支模架(12),所述塔吊标准节顶部设有口字型或者工字型顶支座(3),所述顶支座上安装钢平台,所述钢平台上安装钢管支撑架(4),所述钢管支撑架(4)上设有浇筑混凝土用的木方及模板。
2.根据权利要求1所述的塔吊标准节支承高空支模钢平台结构,其特征在于:所述塔吊标准节格构柱基础(1)内设置有井字形的暗梁(11),所述塔吊标准节(2)底部与预埋在暗梁内的螺栓紧固。
3.根据权利要求1所述的塔吊标准节支承高空支模钢平台结构,其特征在于:所述塔吊标准节的格构柱沿柱高设置抱箍与周边支模架(12)相连接。
4.根据权利要求1所述的塔吊标准节支承高空支模钢平台结构,其特征在于:所述钢平台板包括两根竖向主龙骨(30)及焊接固定于竖向主龙骨顶端之间的横向次龙骨(31),所述竖向主龙骨通过抱箍连接顶支座。
5.根据权利要求4所述的塔吊标准节支承高空支模钢平台结构,其特征在于:所述次龙骨上间隔焊接有短钢筋(34)。
6.根据权利要求4所述的塔吊标准节支承高空支模钢平台结构,其特征在于:所述顶支座(3)与次龙骨间设置竖向斜撑(33)。
CN 201320060395 2013-02-04 2013-02-04 塔吊标准节支承高空支模钢平台结构 Expired - Fee Related CN203034799U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320060395 CN203034799U (zh) 2013-02-04 2013-02-04 塔吊标准节支承高空支模钢平台结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320060395 CN203034799U (zh) 2013-02-04 2013-02-04 塔吊标准节支承高空支模钢平台结构

Publications (1)

Publication Number Publication Date
CN203034799U true CN203034799U (zh) 2013-07-03

Family

ID=48686933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320060395 Expired - Fee Related CN203034799U (zh) 2013-02-04 2013-02-04 塔吊标准节支承高空支模钢平台结构

Country Status (1)

Country Link
CN (1) CN203034799U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122691A (zh) * 2013-02-04 2013-05-29 中天建设集团有限公司 塔吊标准节支承高空支模钢平台结构及施工方法
CN107989447A (zh) * 2017-12-26 2018-05-04 中建三局第二建设工程有限责任公司 一种大型覆土混凝土罐穹顶钢支撑结构及安装方法
CN109797964A (zh) * 2019-01-30 2019-05-24 中建四局第六建筑工程有限公司 一种集成塔吊的顶升平台系统
CN111877759A (zh) * 2020-06-15 2020-11-03 中国一冶集团有限公司 塔吊洞口封堵施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122691A (zh) * 2013-02-04 2013-05-29 中天建设集团有限公司 塔吊标准节支承高空支模钢平台结构及施工方法
CN107989447A (zh) * 2017-12-26 2018-05-04 中建三局第二建设工程有限责任公司 一种大型覆土混凝土罐穹顶钢支撑结构及安装方法
CN109797964A (zh) * 2019-01-30 2019-05-24 中建四局第六建筑工程有限公司 一种集成塔吊的顶升平台系统
CN111877759A (zh) * 2020-06-15 2020-11-03 中国一冶集团有限公司 塔吊洞口封堵施工方法
CN111877759B (zh) * 2020-06-15 2022-03-22 中国一冶集团有限公司 塔吊洞口封堵施工方法

Similar Documents

Publication Publication Date Title
CN101886468B (zh) 高位连体结构悬挂式模板支撑施工方法
CN105649360A (zh) 一种整体装配式建筑系统及安装方法
CN106337555A (zh) 建筑外墙悬挑结构三角钢支撑施工方法
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN102535845A (zh) 一种连廊结构承重架的施工方法
CN102733606A (zh) 高空大悬挑结构的施工方法
CN104480922B (zh) 空间桁架支模系统及其施工方法
CN100365237C (zh) 一种自升式可变形可拆卸整体提升钢平台系统及施工方法
CN103935911B (zh) 塔吊附墙支撑结构及其施工方法
CN104389419A (zh) 悬挑支模平台安装结构及施工方法
CN103046645A (zh) 一种大跨度预制整浇结构及施工方法
CN102071747A (zh) 方钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法
CN206352391U (zh) 承插型键槽式快拆支撑体系
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN202324606U (zh) 一种u型承力座
CN109457814B (zh) 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法
CN114134820A (zh) 一种工字组合梁现浇桥面板的模板支撑及施工方法
CN102505849A (zh) 膜壳密肋楼盖模板支撑体系施工方法
CN102454292A (zh) 高空大跨度悬挑结构模架的支撑钢架
CN204282803U (zh) 悬挑支模平台安装结构
CN206956979U (zh) 一种带顶柱的一字型剪力墙
CN212507296U (zh) 高支模体系
CN203230165U (zh) 超高悬挑结构模板支撑平台
CN202090577U (zh) 高层建筑电梯井道模板支撑施工平台
CN111705677A (zh) 一种用于高墩柱翻模施工的滑升架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NO.4 CONSTRUCTION ENGINEERING CO., LTD., GUANGXI C

Free format text: FORMER OWNER: ZHONGTIAN CONSTRUCTION GROUP CO., LTD.

Effective date: 20150710

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Hui

Inventor after: Li Yousheng

Inventor after: Feng Guifang

Inventor after: Liu Guiping

Inventor after: Yao Zili

Inventor before: Hua Xueyan

Inventor before: Zhang Lingchuan

Inventor before: Cui Chaobin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUA XUEYAN ZHANG LINGCHUAN CUI CHAOYUN TO: HUANG HUI LI YOUSHENG FENG GUIFANG LIU GUIPING YAO ZILI

TR01 Transfer of patent right

Effective date of registration: 20150710

Address after: 541000 the Guangxi Zhuang Autonomous Region city Guilin Wayao Road No. 46

Patentee after: GUANGXI CONSTRUCTION ENGINEERING GROUP NO.4 CONSTRUCTION ENGINEERING CO., LTD.

Address before: 322100 Dongyang, Zhejiang Province, Wu Ning Road, No. 65, No.

Patentee before: Zhongtian Construction Group Co., Ltd.

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Hui

Inventor after: Li Yousheng

Inventor after: Feng Guifang

Inventor after: Liu Guiping

Inventor after: Yao Zhili

Inventor before: Huang Hui

Inventor before: Li Yousheng

Inventor before: Feng Guifang

Inventor before: Liu Guiping

Inventor before: Yao Zili

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG HUI LI YOUSHENG FENG GUIFANG LIU GUIPING YAO ZILI TO: HUANG HUI LI YOUSHENG FENG GUIFANG LIU GUIPING YAO ZHILI

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20200204